About this file

This is a Statement of Work (SOW) for furnishings and installation services for Building 5 at VA Boston Healthcare System's Brockton Campus in Brockton, Massachusetts (Project #523A5-19-305).

The contractor must furnish, deliver, and install dual solar window shades (Qty. 227 units, 54" high x 48" wide, Draper Flex or approved equal with specific fabric and performance specifications) and acoustic panel wall treatments (Qty. 66 units, Carnegie Fabrics Xorel Artform or equal with NRC rating of .70 or greater) to the first and second floors of Building 5, Units A, B, and C. Deliverables include comprehensive freight, installation, and project management fees presented as a single line-item amount. The timeframe for delivery receipt is no later than 14 weeks following contract award, with specific dates to be mutually agreed upon between VA Boston Healthcare System Engineering Department and the contractor. The contractor must field-verify the space before final ordering and provide detailed 2D and 3D drawings and cut sheets for any "or equal" product substitutions.

Contractor requirements include: manufacturer certification for installers with healthcare environment experience; in-house services including interior design, sales, installation, and warehousing capability; minimum five years of continuous manufacturing experience; and proof of completion of at least three similar projects with references. Work must be performed from 7:00 AM to 4:30 PM, Saturdays off-hours, with the contractor escorted by VA personnel at all times. Installation must comply with ABA, NFPA, OSHA, BIFMA, and CAL 117 accessibility and life safety standards. A post-installation walk-through by the manufacturer's Regional Installation Manager is required. Payment is due upon completion and acceptance of work. The contractor must obtain short-term identification badges for all personnel, comply with VA security and parking regulations, and submit detailed sustainability and environmental compliance reports quarterly. All uncrated materials and trash must be removed from VA property by the contractor, and any damaged products must be repaired or replaced at the discretion of the Contracting Officer.

View the file

Other files

File Type Posted
Questions and Answers.pdf PDF
Building 5 Shades.pdf PDF
Building 5 Acoustic Panels.pdf PDF
OPP 460168-Layout-2.pdf PDF
36C24126Q0383 0001 RFQ Amendment ext to 5.4.docx DOCX document
OPP_460168_Layout_3 002.pdf PDF
Br-05-01-Layout1 4-10-20.pdf PDF
Br-05-02-Layout1 01-27-23.pdf PDF
36C24126Q0383.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Building 5

Outpatient Mental Health

Renovation

Open Market Furnishings

Project #523A5-19-305

VA Boston Healthcare System

940 Belmont Street

Building 5

Brockton, Massachusetts 02301

VA Boston Healthcare System Interior Design Brockton Campus – Building 5 Outpatient Mental Health Open Market Furnishings

Page | 2

CONTENTS

I. Justification II. Scope of Work III. Bid Requirements IV. Furniture Requirements V. Other Considerations for Performance VI. Contractor Requirements VII. Place of Performance VIII. Period of Performance IX. Payment Schedule X. Non-personal Services Statement XI. Appendix (Drawings)

Page | 3

I. JUSTIFICATION:

The VA Boston Healthcare System’s Brockton Campus Outpatient Mental Health service needs furnishings that will allow for the activation of their newly renovated space in building 5. The items listed herein will provide privacy throughout the renovated spaces. This will help prevent sensitive information from being seen and/or overheard. The dual solar shades will allow for visual privacy, control of solar glare and aid in energy efficiency by blocking cold from entering in cold months and heat in summer months.

II.SCOPE OF WORK:

The selected contractor shall be required to furnish, deliver, and install new dual solar shades and decorative acoustic panels to the first and second floor of Building 5, on units A, B and C at VA Boston Healthcare Systems, Brockton campus. The timeframe for delivery receipt shall be no later than 14 weeks following award of contract, with coordination of specific dates mutually agreed upon by the VA Boston Healthcare System Engineering Department and the selected contractor. The vendor shall field verify the space before placing a final order. The vendor responding to the solicitation shall provide the required furnishings as noted on the attached drawing, described in the performance-based technical specification, and described here within. The attached technical based specification describes the minimal materials, construction, and technical requirements.

III.BID REQUIREMENTS:

All bids shall be formatted appropriately as shown below to ensure a consistent basis for comparison:

Line Item Description Quantity Cost Extended (Item 1) (Guest Chairs (5) ($100) ($500)

Pieces Parts Fabric @ $60/yd.

Etc.)

Cost of item (as defined below, i.e. ‘DIRTT Demountable Wall Partition Assembly”) shall be wholly inclusive of all required components. DO NOT break out costs for any parts, pieces, or COMs in either the cost or extended cost columns.

• Comprehensive freight, installation, and any associated project management fees to be indicated as a single final line-item amount.

• All ‘Or Equal’ product bids must include a comprehensive technical package for review. The technical package shall include 2D and 3D drawings of the line items, cut sheets or other documentation supporting the item meets or exceeds all the indicated required characteristics.

Page | 4

IV. FURNITURE REQUIREMENTS:

Reference Appendix A – Drawing ID1.0 & ID1.1 Furniture & Equipment Plan – Outpatient Mental Health ITEM 1: Qty. 66 - Acoustic Panel Wall Treatments– Brand name or equal

Carnegie Fabrics Xorel Artform (similar as shown below)

Locations – Offices, Reception, Open Offices

Instant Artform – Basket Weave (M) Panel Type: Quiet Core Edge Treatment – Bevel Edge Square Feet varies by Office Size Colors: Switch 21, Spire 11 Large, Spire 11 Small, Strie 808

Note: Install as per manufacturers recommended install instructions on concrete block walls

Or equal Salient Characteristics:

• Panel fabric must be able to withstand 10:1 bleach cleaning solution

• Panels must have an NRC rating of .70 or greater

• Panels must be offered in a variety of shapes, sizes and 350 color ways of fabrics

• Panels must be trackable and self-healing

• Verify site condition panels for proper mounting type

Includes: Pick-proof caulk for tamper resistance Dimensions: 10’-0” w x 4’-0”H

ITEM 2: Qty. 227 - Dual Solar Window Shades Dimensions: 54” high x 48” wide +/- ; NOTE widths and heights may vary Manufacturer: Draper Flex or approved equal

Page | 5

Type: Dual shade with fascia Operator: Clutch Mechanism with continuous metal chain loop Back Roller Shade Fabric: SB9000 Series, Room Darkening in oyster Front Sheer Roller Shade Fabric: ATF2900 Series, 5% Open Weave in oyster/beige Fascia: Ivory (provide end caps if shades require outside mount) Mount: Preferred Inside Include: Window cleat for loop chains and single fascia for windows that are mulled together (96” wide +/-)

BRAND NAME OR EQUAL SALIENT CHARACTERISTICS

• “Or equal” products must include manufacturer’s product brochure including specification information.

SHADE PERFORMANCE REQUIREMENTS

A. Fire: Provide shade fabrics tested in accordance with the following:

1. 1989 NFPA 701 small scale vertical burn test and rated “Pass”.

2. 1996 NFPA 701 small scale vertical burn (telephone booth test) and rated “Pass”.

B. Toxicity: Provide shade fabrics tested in accordance with University of Pittsburgh toxicity protocol including LC50 analysis and toxicity characteristics.

C. Anti-microbial:

1. ASTM G-21-80 results for ATCC6538 (staphylococcus aureus) and ATCC13388

(pseudomonas aeruginosa) indicating minimum 5mm (0.197 inches) No growth contact area’.

2. ‘No Growth’ ASTM G-21-85 results for fungi ATCC9642, ATCC9644, ATCC9348 and ATCC9645 indicating ‘No Growth’.

V. OTHER CONSIDERATIONS FOR PROPOSAL

1. Dealer shall have in-house services available including interior design, sales, installation, and warehousing capability.

2. Dealer/manufacturer shall have the ability to train and demonstrate to owner facilities and maintenance staff how to adjust, operate and maintain demountable partitions.

3. Dealer/Manufacturer shall have the following professional associations:

a. Efficient Data Centers 7x24 Exchange

b. AFCOM

c. BICSI

4. Lead-time is a critical factor. Bidders shall present their best lead-time to design, manufacture, ship, and install furniture.

5. If bidder is not the manufacturer of all major components, such as core, surfaces, modular walls, and lift solutions, then the bidder shall specify which manufacturer is being used and include their reference information and experience to determine qualified status.

VI. CONTRACTOR REQUIREMENTS

Page | 6

Brockton Campus – Building 5 Outpatient Mental Health Open Market Furnishings

The contractor shall perform all work under this contract in strict accordance with all safety codes to eliminate the possibility of damage or injury to patients, personnel and equipment or building structures.

Delivery, Assembly, Installation and Storage Deliver and install once items arrive and are scheduled, August 2026

2. The contractor shall not be alone in the designated installation space and shall be always escorted by a VA employee,

3. Point of Contact (POC) for delivery and installation is Karen Blake (857)364-6107 or Neel Patel (774)273-5388.

4. Track all orders to ensure timely delivery and communication issues to COR.

5. The contractor shall be contacted by the POC at least two weeks prior to date that services are to begin. Pick-up, delivery and installation services are expected to be performed per future information. The contractor shall coordinate delivery times with the POC to confirm that the building is ready for delivery of furnishings. Once confirmation is received; the contractor shall provide the POC with a minimum of 72 hours notification as to date and time that the trucks and crews will be arriving.

6. In the event there is a delay in installation, the contractor shall notify the Government POC immediately.

7. Furniture delivery not to interfere with the operation of the facility. The contractor shall coordinate the work of the project with the COR to ensure minimal disruption of the Medical Center operations.

8. Foreman shall be available to supervise all installation.

9. Furniture layout and shop drawings will be provided before award; the contractor shall place items in building as identified in the furniture layout. Final furniture layout shall be determined by COR. Furniture layout shall meet the requirements and design intent of ABA, NFPA, OSHA, BIFMA, CAL 117, VA, for all accessibility, life safety, occupational safety, VA, and federal requirements for a business

10. All products shall be installed by manufacturer certified installers with experience working in healthcare environments.

11. The contractor shall uncrate all items received and perform all required assembly in accordance with the manufacturers’ instructions. All uncrated materials shall be removed from VA property by the contractor.

12. If the contractor is unable to complete the assembly and placement of all unloaded items before the end of the workday, the contractor shall be responsible for moving these items to a secure location, until the next available workday. The contractor shall be responsible for moving the items from the overnight storage site to

Page | 7 its designated position in the building. The contractor shall coordinate with the POC as to where any excess items are to be stored. The contractor shall be responsible for delivery of excess items to storage area(s) designated by the POC.

13. Post-installation “walk-through” shall be required by manufacturer’s Regional Installation Manager and Senior Account Manager to ascertain full compliance with the floor plan, console design, and materials specified. Any Inconsistencies will be noted and shall be scheduled for completion prior to signing off the project.

14. Repair or replace damaged products at the discretion of COR.

Product Documentation

1. Vendor shall provide furniture cut sheets, warranty and delivery schedule. Vendor shall provide O&M manual including warranty, care, and manufacturer contact information to COR at completion of project.

Record Management Statement The following standard items relate to records generated in executing the contract and should be included in a typical procurement contract:

1. Citations to pertinent laws, codes and regulations such as 44 U.S.C chapters 21, 29, 31 and 33; Freedom of Information Act (5 U.S.C. 552); Privacy Act (5 U.S.C.

552a); 36 CFR Part 1222 and Part 1228.

2. Contractor shall treat all deliverables under the contract as the property of the U.S. Government for which the Government Agency shall have unlimited rights to use, dispose of, or disclose such data contained therein as it determines to be in the public interest.

3. Contractor shall not create or maintain any records that are not specifically tied to or authorized by the contract using Government IT equipment and/or Government records.

4. Contractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of 1974 or that which is generally protected by the Freedom of Information Act.

5. Contractor shall not create or maintain any records containing any Government Agency records that are not specifically tied to or authorized by the contract.

6. The Government Agency owns the rights to all data/records produced as part of this contract.

7. The Government Agency owns the rights to all electronic information (electronic data, electronic information systems, electronic databases, etc.)

and all supporting documentation created as part of this contract. Contractor must deliver sufficient technical documentation with all data deliverables to permit the agency to use the data.

Page | 8

8. Contractor agrees to comply with Federal and Agency records management policies, including those policies associated with the safeguarding of records covered by the Privacy Act of 1974. These policies include the preservation of all records created or received regardless of format [paper, electronic, etc.] or mode of transmission [e-mail, fax, etc.] or state of completion [draft, final, etc.].

9. No disposition of documents will be allowed without the prior written consent of the Contracting Officer. The Agency and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Willful and unlawful destruction, damage or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. 2701.

Records may not be removed from the legal custody of the Agency or destroyed without regard to the provisions of the agency records schedules.

10. Contractor is required to obtain the Contracting Officer's approval prior to engaging in any contractual relationship (sub-contractor) in support of this contract requiring the disclosure of information, documentary material and/or records generated under, or relating to, this contract. The Contractor (and any sub-contractor) is required to abide by Government and Agency guidance for protecting sensitive and proprietary information

Sustainability Statement

• Awarded vendor is required to provide a report of items purchased by requesting VA

Boston Healthcare System once purchase orders are acknowledged at the end of the quarter. This report should include any previous requests awarded to you for this same station location that may have been acknowledged. Report must answer the questions below and is requested within 30 days of the end of the VA’s fiscal quarter.

• What VA Site is this for?

• Were the items partially or fully blanket wrapped or in environmentally friendly packaging? (Y/N) ______________

• Were 10% or more of the materials for the product sourced within 500 miles from the manufacturing facility? (Y/N) _________

• What was the dollar amount of the recycled content purchased? $_________________

• What was the dollar amount of biobased product purchased? $_________________

• Did the products purchased contain 100 parts per million (ppm) or less of the following chemicals?

• Urea formaldehyde (Y/N) ______________

• Heavy metals including mercury, cadmium, lead, antimony (Y/N) ______________

• Hexavalent chromim in plated finishes consistent with the Restriction of the Use of

(Y/N) ______________

• Certain Hazardous Substances of the European Union Directive (EU RoHS) (Y/N)

• Stain and non-stick treatments derived from Perfluorinated Compounds (PFCs), Page | 9

• including Perfluorooctanoic Acid (PFOA) (Y/N) ______________

• Added antimicrobial treatments (Y/N) ______________

• Polyvinyl Chloride (PVC) (Y/N) ______________

• What was the dollar amount of biodegradable or recyclable materials at end of life product purchased? $_________________

• What was the dollar amount of rapidly renewable materials in product purchased? $_________________

• What was the dollar amount of products that were Greenguard, SCS, or Level certified? $_________________

• Were any products returned to you to be recycled? (Y/N) ______________

• If yes, was a credit towards the purchase received? (Y/N)

Protection of Property

1. The contractor shall protect all items from damage. The contractor shall take precautions against damage to the buildings, grounds and furnishings. The contractor shall repair or replace any items related to buildings or ground damaged accidentally, or on purpose due to actions by the contractor, utilizing materials of the same quality, size, grade and color, to match existing work.

2. The contractor shall perform an inspection of the buildings and grounds with the POC prior to commencing work. To ensure the contractor shall be able to repair or replace any items, components, buildings or grounds damaged due to negligence and/or actions taken by the contractor. The source of all repairs beyond simple surface cleaning shall be the responsibility of the facility construction contractor (or appropriate subcontractor), so that building warranty is maintained. Concurrence of the POC is required before the contractor or anyone other than the facility construction contractor (or its subcontractors) may perform any significant repair work. In all cases, repairs shall utilize materials of the same quality, size, texture, grade and color to match adjacent existing work.

3. The contractor shall be responsible for security of the areas in which the work is being performed prior to completion and transfer to the Government. The contractor shall maintain accountability and control of any keys provided and shall return them to the POC upon completion of the work.

4. Material handling equipment shall have rubber wheels.

5. Ensure that adjoining work is not damaged by installation of this work.

6. Provide temporary protection as required and repair all damage to such work.

Clean-up

1. The contractor shall be responsible for the removal and disposal of all trash connected with uncrating and assembling furniture and other items installed under this contract. Final acceptance from the contractor shall not occur until all trash connected with furniture installation is removed from the site.

Page | 10

2. Recyclable cardboard products shall be disposed of in accordance with applicable statutes, in respective containers.

3. Packing materials shall not be stored in the buildings for any period exceeding 24 hours.

4. Personal trash (food wrappers, drink containers, etc.) shall be removed from the site daily by the contractor.

5. Immediately after installation and adjustment; clean all surfaces to remove all marks, soil, and foreign matter. Just prior to substantial completion, recheck all components and perform all required additional cleaning.

Installer Qualifications

1. Furnish proof of familiarity with equipment to be installed.

2. Provide list of at least three previous projects, giving names of projects, scope, and name and telephone number of individuals at facility to contact.

3. Furnish proof of financial and technical resources to assure prompt performance in delivery and installation and in-service training of hospital personnel.

4. Provide competent supervision and installation personnel.

Conformance Standards Contractors provide installation service and ensure that the equipment functions in accordance with the equipment manufacturer’s technical performance specifications. Contractors shall conform to all regulations to include but not be limited to federal, state and local governing any chemicals, equipment or work which may be used or performed in the work under this contract.

Certified Trained Technicians & Key Personnel The installation and testing shall be performed by vendor trained personnel in accordance with the agreement. In addition, each report must, at a minimum, document the following data legibly and in complete detail.

A. Name of contractor and contract number.

B. Name of FSE who performed services.

C. Contractor service ESR number/log number.

D. Date, time (starting and ending), equipment downtime and hours on-site for service call.

E. Identification of equipment to be serviced:

1) Inventory ID number,

2) Manufacturer's name,

3) Device name,

4) Model number,

5) Serial number,

6) Any other manufacturer's identification numbers.

F. Itemized Description of Service Performed (including, if applicable, costs associated with after normal working hour services) including:

Page | 11

1) Labor and Travel,

2) Parts (with part numbers),

3) Materials and Circuit Location of problem/corrective action.

G. Signatures:

1) FSE performing services described

2) Authorized VA Employee who witnessed service described.

NOTE: - Any additional charges claimed must be approved by the COR or designated representative before service is completed!

Reporting Requirements The Contractor shall be required to report to the Police Office to check in. This check- in is mandatory. When the service is completed, the FSE shall document services rendered on a legible ESR(s). The FSE shall be required to check out with Engineering and submit the ESR(s) to the COR or designated representative. ALL ESRs shall be submitted to the equipment user for an "acceptance signature" and to the COR or designated representative for an "authorization signature". If COR or designated representative is unavailable, a signed, authorized copy of the ESR will be left with the user.

Identification, Parking, Smoking & VA Regulations The Contractor's FSE's shall always wear visible identification while on the premises of the VAMC. The Contractor shall park in the appropriate designated parking areas. Information on parking is available from the VA Police Section. The VAMC will not invalidate or make reimbursement for parking violations of the Contractor under any conditions. Smoking is prohibited inside any building at the VAMC. Possession of weapons is prohibited. Enclosed containers, including tool kits, shall be subject to search. Violations of VA regulations may result in citation answerable in the United States (Federal) District Court, not a local district, state, or municipal court

Security Requirements All contractor personnel shall obtain a short-term identification badge issued by the COR or government designated representative. Such badges shall be worn by the individual and prominently always displayed while on VA Property. No employee of the contractor shall enter the project site without a valid identification badge issued by the VA. To obtain a short-term identification badge, contractor personnel shall present to the COR a valid (non-expired) photo identification issued by a US federal, state or local government agency.

Source Quality Control

1. Systems furniture manufacturer shall have minimum 5 years of continuous experience in manufacture of all systems components and accessories.

Page | 12

2. Manufacturer shall furnish proof of successful completion of at least three projects of similar scope within that time; furnish names of projects, scope, and name and telephone number of individuals at facility to contact.

3. Furnish proof of financial and technical resources to assure prompt performance in Production and delivery The identified Sole Source Vendor shall be subject to the Federal laws, regulations, standards, and VA Directives and Handbooks regarding information and information system security as delineated in standard acquisition guidelines. Per the VA handbook 6500.6, no VA sensitive information will be transferred, shared, or stored with said vendor. As such, no additional mechanisms will be needed to ensure the protection of information.

VII. PLACE OF PERFORMANCE

The contractor shall coordinate delivery and installation of furnishings at the VA Medical Center, Brockton Campus, Building 5. Work to be performed from 7:00am to 4:30 PM, Saturdays OFF HOURS. Loading dock can be made available with appropriate advance notice and coordination.

VIII. PERIOD OF PERFORMANCE

The vendor is on notice that time is of the essence in the performance of this contract. The timeframe for delivery receipt shall be no later than 14 weeks after the award of contract, with coordination of specific dates mutually agreed upon by VA Boston Healthcare System Brockton Campus and the selected contractor. Vendor supplied storage for up to 60 days may be required.

IX. PAYMENT SCHEDULE

The contractor shall bill on completion and acceptance of the work. Invoices will be paid upon the completion and acceptance of the procured equipment. Invoices shall include at a minimum, the following information: Contract Number, Purchase Order/Task Order Number, Contractor Name, and Item(s) installed.

Additional Charges There shall be no additional charge for time spent at the site (during, or after the normal hours of coverage) awaiting the arrival of additional FSE and/or delivery of parts.

X. NON-PERSONAL SERVICES STATEMENT

The contractor employees performing services under this order shall be controlled and always supervised by management personnel of the contractor. The contractor’s management shall ensure that employees properly comply with the performance standards outlined in the SOW. The contractor’s employees shall perform their duties independent of, and with occasional supervision of VA COR. The tasks, duties, and responsibilities set forth in the SOW may not be interpreted or implemented in any manner that results in any contractor creating or modifying

Page | 13

Federal policy, obligating the appropriate funds for the United States Government, overseeing the work of Federal employees, providing direct personal services to any Federal employee, or otherwise violating contracting regulations.