A.4.b.DoD-CPARS-Guide Rating Definitions.pdf
PDF 48 KB Posted
- Attached to
- Great Lakes National Program Office Mission Support Services Federal contract opportunity
- Solicitation number
- SOL-R5-10-00005
- Issued by
- Environmental Protection Agency Region 5
About this file
Attachment 4b
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SOLR51000005 A2.pdf | ||
| Microsoft Word - SOLR5100005 Solicitation Q A at Amendment 02.pdf | ||
| Microsoft Word - SOLR5100005 Solicitation Q A.pdf | ||
| SOLR51000005 A1.PDF | ||
| A.6.MSEC COI Plan.pdf | ||
| A.4.a.Past Performance Questionnaire CPARS.doc | DOC document | |
| A.5.EO 13514 Plan Attachment.pdf | ||
| SOL-R5-10-00005 Clause Body 03142011.pdf | ||
| A.7.KEY PERSONNEL RESUME Attachment.docx | DOCX document | |
| Section B Pricing Spreadsheet.xlsx | XLSX spreadsheet | |
| SOLR51000005 SF 33.pdf | ||
| A.3.lm_2008.pdf | ||
| A.1.AsianCarpControlStrategyFrameworkMay2010.pdf | ||
| A.2.glri_actionplan.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 2
Evaluation Ratings Definitions
A2-1
Evaluation Ratings Definitions (Excluding Utilization of Small Business)
Rating Definition Note
Dark Blue/
Exceptional
Performance meets contractual requirements and exceeds many to the
Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.
To justify an Exceptional rating, identify multiple significant events and state how they were of benefit to the Government. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been
NO significant weaknesses identified.
Purple/Very
Good
Performance meets contractual requirements and exceeds some to the
Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor was effective.
To justify a Very Good rating, identify a significant event and state how it was a benefit to the
Government. There should have been no significant weaknesses identified.
Green/
Satisfactory
Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
To justify a Satisfactory rating, there should have been only minor problems, or major problems the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than
Satisfactory solely for not performing beyond the requirements of the contract.
Yellow/ Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
To justify Marginal performance, identify a significant event in each category that the contractor had trouble overcoming and state how it impacted the Government. A Marginal rating should be supported by referencing the management tool that notified the contractor of the contractual deficiency
(e.g., management, quality, safety, or environmental deficiency report or letter).
Red/
Unsatisfactory
Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
To justify an Unsatisfactory rating, identify multiple significant events in each category that the contractor had trouble overcoming and state how it impacted the Government. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating. An
Unsatisfactory rating should be supported by referencing the management tools used to notify the contractor of the contractual deficiencies (e.g., management, quality, safety, or environmental deficiency reports, or letters).
NOTE 1: Plus or minus signs may be used to indicate an improving (+) or worsening (-) trend insufficient to change the assessment status.
NOTE 2: N/A (not applicable) should be used if the ratings are not going to be applied to a particular area for evaluation.
A2-2
Evaluation Ratings Definitions (Utilization of Small Business)
Rating Definition Note
Dark Blue/
Exceptional
Exceeded all negotiated subcontracting goals or exceeded at least one goal and met all of the other negotiated subcontracting goals for the current period. Had exceptional success with initiatives to assist, promote, and utilize small business (SB), small disadvantaged business (SDB), women-owned small business (WOSB), HUBZone small business, veteran-owned small business
(VOSB) and service disabled veteran owned small business (SDVOSB).
Complied with FAR 52.219-8, Utilization of Small Business Concerns. Exceeded any other small business participation requirements incorporated in the contract, including the use of small businesses in mission critical aspects of the program.
Went above and beyond the required elements of the subcontracting plan and other small business requirements of the contract. Completed and submitted
Individual Subcontract Reports and/or
Summary Subcontract Reports in an accurate and timely manner.
To justify an Exceptional rating, identify multiple significant events and state how they were a benefit to small business utilization. A singular benefit, however, could be of such magnitude that it constitutes an Exceptional rating. Ensure that small businesses are given meaningful, innovative work directly related to the project, rather than peripheral work, such as cleaning offices, supplies, landscaping, etc. Also, there should have been no significant weaknesses identified.
Purple/Very
Good
Met all of the negotiated subcontracting goals in the traditional socio-economic categories (SB, SDB and WOSB) and met at least one of the other socio-economic goals (HUBZone, VOSB, SDVOSB) for the current period. Had significant success with initiatives to assist, promote and utilize SB, SDB, WOSB, HUBZone, VOSB, and SDVOSB. Complied with
FAR 52.219-8, Utilization of Small
Business Concerns. Met or exceeded any other small business participation requirements incorporated in the contract, including the use of small businesses in mission critical aspects of the program.
Endeavored to go above and beyond the required elements of the subcontracting plan. Completed and submitted
Individual Subcontract Reports and/or
Summary Subcontract Reports in an accurate and timely manner.
To justify a Very Good rating, identify a significant event and state how they were a benefit to small business utilization. Ensure that small businesses are given meaningful, innovative work directly related to the project, rather than peripheral work, such as cleaning offices, supplies, landscaping, etc. There should be no significant weaknesses identified.
Green/
Satisfactory
Demonstrated a good faith effort to meet all of the negotiated subcontracting goals in the various socio-economic categories for the current period. Complied with
FAR 52.219-8, Utilization of Small
Business Concerns. Met any other small business participation requirements
To justify a Satisfactory rating, there should have been only minor problems, or major problems the contractor has addressed or taken corrective action.
There should have been no significant weaknesses identified. Per DoD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for
A2-3 included in the contract. Fulfilled the requirements of the subcontracting plan included in the contract. Completed and submitted Individual Subcontract Reports and/or Summary Subcontract Reports in an accurate and timely manner.
not performing beyond the requirements of the contract.
Yellow/ Marginal Deficient in meeting key subcontracting plan elements. Deficient in complying with FAR 52.219-8, Utilization of Small
Business Concerns, and any other small business participation requirements in the contract. Did not submit Individual
Subcontract Reports and/or Summary
Subcontract Reports in an accurate or timely manner. Failed to satisfy one or more requirements of a corrective action plan currently in place; however, does show an interest in bringing performance to a satisfactory level and has demonstrated a commitment to apply the necessary resources to do so. Required a corrective action plan.
To justify Marginal performance, identify a significant event that the contractor had trouble overcoming and how it impacted small business utilization. A Marginal rating should be supported by referencing the actions taken by the government that notified the contractor of the contractual deficiency.
Red/
Unsatisfactory
Noncompliant with FAR 52.219-8 and
52.219-9, DFARS 252.219-7003
(deviation), and any other small business participation requirements in the contract.
Did not submit Individual Subcontract
Reports and/or Summary Subcontract
Reports in an accurate or timely manner.
Showed little interest in bringing performance to a satisfactory level or is generally uncooperative. Required a corrective action plan.
To justify an Unsatisfactory rating, identify multiple significant events that the contractor had trouble overcoming and state how it impacted small business utilization. A singular problem, however, could be of such serious magnitude that it alone constitutes an
Unsatisfactory rating. An Unsatisfactory rating should be supported by referencing the actions taken by the government to notify the contractor of the deficiencies. When an Unsatisfactory rating is justified, the contracting officer must consider whether the contractor made a good faith effort to comply with the requirements of the subcontracting plan required by FAR 52.219-9 and follow the procedures outlined in FAR 52.219-16, Liquidated
Damages-Subcontracting Plan.
NOTE 1: Plus or minus signs may be used to indicate an improving (+) or worsening (-) trend insufficient to change assessment status.
NOTE 2: For subcontracting plans under the DoD Comprehensive Small Business Subcontracting Plan (Test Program), DFARS 252.219-7004 (deviation), the ratings entered in CPARS shall mirror those assigned by the Defense Contract
Management Agency who is responsible for monitoring such plans.
NOTE 3: Generally, zero percent is not a goal unless the Contracting Officer determined when negotiating the subcontracting plan that no subcontracting opportunities exist in a particular socio-economic category. In such cases, the contractor shall be considered to have met the goal for any socio-economic category where the goal negotiated in the plan was zero.
File details come from the government source that posted it. Updated .