This federal solicitation is for the Rainforest Trailhead Comfort Station Replacement project. The project scope involves demolishing an existing toilet building, installing a new precast concrete flush toilet facility with utilities, sidewalks, and a fiberglass enclosure. The work is to take place at the Quinault Rainforest Trailhead in Grays Harbor County, Washington, and must be completed by March 6, 2023. A bid guarantee, performance bond, and payment bond are required. The project value is estimated between $250,000 to $500,000. The solicitation is set aside 100% for small businesses with a NAICS code of 236220 and size standard of $39.5 million. The point of contact is Roland Watson. Proposals are due by August 11, 2022.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| REVISED 8-9-2022_Solicitation_1240BJ22R0019 Rainforest Trailhead Comfort Station.pdf | ||
| Amendment 2 to Solicitation 1240BJ22R00019.pdf | ||
| Amendment 1 to Solicitation 1240BJ22R00019.pdf | ||
| REVISED_Solicitation_1240BJ22R0019 Rainforest Trailhead Comfort Station.pdf | ||
| Rainforest_Drawings.pdf | ||
| TECHNICAL EVALUATION QUESTIONNAIRE PAST PERFORMANCE.pdf | ||
| SOW_Final.pdf | ||
| Rainforest_Specs_final.pdf | ||
| Wage Determination WA20220027 6-24-2022.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
1067525
USDA-FS CSA NORTHWEST 7
1220 SW 3RD AVE
STE 310
PORTLAND OR 97204-2829
40BJ
All proposal documents must be emailed to
Joseph.Korst@usda.gov. An e-mail copy of Bid Bond is acceptable for proposals valued at $150,000.00 or greater.
JOSEPH KORST
GAOA
x
1240BJ22R0019
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
RAINFOREST TRAILHEAD COMFROT STATION REPLACEMENT
Olympic National Forest
Quinault WA
Site Visit will be conducted on site on July 19th at 11AM PDT
Disclosure of the Magnitude of Construction: Between $250,000 and $500,000
Proposal Due Date is Thursday August 11, 2022 by 4PM PDT.
11. The Contractor shall begin performance
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
10 0 calendar days and complete it within ________________ ________________ calendar days after receiving
Section F
08/11/2022
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 4-85)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
Technical POC: Roland Watson, Roland.Watson@usda.gov Contractual POC: Joey Korst, Joseph.Korst@usda.gov
7/12/2022
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
USDA-FS CSA NORTHWEST 7
1220 SW 3RD AVE
STE 310
PORTLAND OR 97204-2829
40BJ
BRYCE H. KAMERDULA
28. NEGOTIATED AGREEMENT 29. AWARD
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
STANDARD FORM 1442 (REV. 4-85) BACK
Continued...
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 57
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
1240BJ22R0019
Delivery: 03/06/2023 Delivery Location Code: 05G2
OLYMPIC NATIONAL FOREST
1835 BLACK LAKE BLVD SW
OLYMPIA WA 98512-5623 US
Period of Performance: 09/07/2022 to 03/06/2023
Rainforest Toilet Replacement
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Solicitation No: 1240BJ22R0019 Project Name: RAINFOREST TRAILHEAD COMFORT STATION Page: 4 of 57
Table of Contents
PART I—THE SCHEDULE
SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS
B.1 SCHEDULE OF ITEMS
B.2 SCHEDULE NOTES
SECTION C - DESCRIPTION/SPECIFICATION/STATEMENT OF WORK………….6
SECTION D--PACKAGING AND MARKING
D-1 PACKING AND MARKING
D-2 PROJECT LABELING FOR OFFICIAL CORRESPONDENCE
SECTION E--INSPECTION AND ACCEPTANCE
E.1 CLAUSES
SECTION F--DELIVERIES OR PERFORMANCE
F.1 CLAUSES
SECTION G--CONTRACT ADMINISTRATION DATA
G.1 CLAUSES
G.2 OTHER REQUIREMENTS
SECTION H--SPECIAL CONTRACT REQUIREMENTS
H.1 CLAUSES
H.2 OTHER REQUIREMENTS
PART II--CONTRACT CLAUSES
SECTION I--CONTRACT CLAUSES
I.1 CLAUSES
PART III--LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION J--LIST OF ATTACHMENTS
J.1 ATTACHMENTS
PART IV--REPRESENTATIONS AND INSTRUCTIONS
SECTION K--REPRESENTATIONS, CERTIFICATIONS, AND
OTHER STATEMENTS OF OFFERORS OR RESPONDENTS
K.1 PROVISIONS
SECTION L--INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR
RESPONDENTS
SECTION M--EVALUATION FACTORS FOR AWARD
Page: 5 of 57
M.1 PROVISIONS
M.2 PROPOSAL EVALUATION
M.3 TECHNICAL EVALUATION FACTORS
Page: 6 of 57
PART I—THE SCHEDULE
SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS
B.1 SCHEDULE OF ITEMS
ITEM
NO.
DESCRIPTION PAY
UNIT
METHOD
OF MEAS
EST.
QTY.
UNIT
PRICE
TOTAL
PRICE
011900 Mobilization Lump Sum LSQ ALL $________ $________ 010250 Construction Staking Lump Sum LSQ All $_______ $________
024116 Structure Demolition (Existing Comfort Station) Lump Sum LSQ ALL $________ $________
033540 Concrete Sidewalk SF CQ 610 $_________ $________
111226 Electronic Fee Station – Furnished and Installed Lump Sum LSQ ALL $________ $_______
129410 Trash Receptacle, Including Mounting Pad Lump Sum LSQ ALL $________ $________
133401 Flush Comfort Station – Furnished and Installed, Including Utilities
Lump Sum LSQ ALL $________ $________
221100-1 Pipeline, 2” Waterline, Galvanized Steel Pipe, Including Trench
Linear Foot CQ 45 $________ $________
221100-2 Daylight Drains AQ EACH 1 $_______ $________
221100-3 2-Inch Curb Valve and Valve Box
AQ EACH 2 $________ $________
221313 Pipeline, 4" Sewerline, PVC pipe Schedule 80, Including Trench and Cleanouts
AQ EACH 25 $________ $________
260500 Electrical Distribution System Lump Sum LSQ ALL $_________ $________
262716 Fiberglass Walk-In Enclosure - Furnished and Installed, Including Utilities and Mounting Pad
Lump Sum LSQ ALL $________ $_______
311000 Clearing and Grubbing Lump Sum LSQ ALL $________ $________
329206 Seeding Lump Sum LSQ ALL $________ $________
TOTAL $__________________
B.2 SCHEDULE NOTES
LS – Lump Sum
Page: 7 of 57
Additional Terms:
1) Quoters must submit prices for all Items in the Schedule of Items above.
2) Disclosure of the Magnitude of Construction Projects:
Between $250,000 and $500,000.
3) Mobilization does not include on-site construction activities including the movement of personnel, materials, or equipment within the project site.
4) Payment for bond premiums in accordance with (IAW) Federal Acquisition Regulation ((FAR)
48 CFR Chapter 1) Clause 52.232-5 Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under Mobilization.
5) Payment will be made IAW Section G.2. only for those Items listed on the Schedule of Items above.
SECTION C - DESCRIPTION/SPECIFICATION/STATEMENT OF WORK
C.1 Description of Work / Scope of the Contract
A. This project consists of what is shown on the plans and as stated in the specifications, and as summarized below:
1. Mobilization
2. Clearing and Grubbing
3. Constructing new Picnic Pad and Shelter with site furnishings
4. Constructing a guardrail extension at the viewing platform
5. Elevated boardwalk construction with handrail
6. Precast and install concrete steps
7. Installation of signs, including interpretive signs (interpretive signs are government furnished)
8. Gravel Trail construction
9. Building the sitting bench and installing
The Contractor shall assume all risk, loss, damage, or expense arising out of prosecution of the work, except as otherwise provided in the contract.
B. Utility Disconnects
1. Disconnecting utilities, including water, wastewater, communication cable and electric, and stubbing lines off for future reconnection.
C. Demolition work includes the following:
1. Demolition of the existing comfort station and sidewalks.
2. Proper removal and disposal of contents, including proper recycling of thermostats, ballasts and light bulbs.
Page: 8 of 57
3. Disposal of all building demolition debris and contents. Existing building does not contain hazardous materials.
4. Salvage materials indicated for re-use, as shown on the drawings.
D. Clearing and Grubbing
1. Clearing and grubbing vegetation adjacent to existing building, and shrubs between road and existing building, removal of three large trees (greater than 12” in diameter), and several other small trees (less than six inches in diameter). Stump grinding at removed trees, limbing any additional trees up to a height of 15 feet in the ‘installation area’, bucking and placing in an approved location on site.
E. Site preparation work includes:
1. Erosion Control as needed.
2. Grading the building pad and compacting the sub-base and base rock in accordance with toilet manufacturer requirements and in drawings.
3. Preparation for the crane landing (in coordination with toilet manufacturer requirements).
4. Utility connections to existing service lines and preparing all new utility stubs as specified by toilet manufacturer, after building demolition is complete.
5. Working with local utility authorities to ensure work is performed in accordance with their requirements.
6. Ensuring stub ups are installed in accordance with toilet manufacturer requirements and contract requirements.
F. After site prep work is done, new precast concrete buildings will be installed, and designated utilities will require reconnection to the new toilet facility. Upon completion of building installation, new construction work includes the following:
1. Construction of new concrete pads and walkways as specified.
2. Salvaged Pump Station Control Panels and circuitry inside new walk-in enclosure.
3. Placement of seed and weed-free straw for erosion control.
C.2 Project Location and Access
The project is located on the Olympic National Forest, Grays Harbor County, Washington. From Quinault, WA travel southwest on South Shore Road for 0.9 miles. Turn left into the Quinault Rainforest Trailhead. (Access for trailers and trucks will be from South Shore Road. The bathroom is 100’ from the South Shore Road). Latitude: 47°27'35.41"N, Longitude: 123°51'44.45"W
Page: 9 of 57
C.3 Reference Codes, Standards, and Specifications
A. All work shall be accomplished in a safe, workmanlike manner and in accordance with standard industry practices. Plumbing work shall comply with the latest edition of the International Plumbing Code. Electrical work shall comply with the latest edition of the National Electrical Code. Concrete work shall comply with American Concrete Institute.
These specification and drawings cover requirements for contractor to demolish and remove an existing building, furnish and install new toilet building and enclosure building, plumb sewer and water stub ups, install electrical stub ups, place sidewalks, and perform sediment and erosion control.
B. The Contractor shall remove from the job site any employee for reasons of misconduct or security.
C. Actions and recommendations submitted by the Contractor shall comply with applicable laws and regulations for the site. All work submitted by the Contractor may be subject to the review and approval of EPA and/or the appropriate State regulatory agency. Therefore, it is the responsibility of the Contractor to contact the appropriate regulatory agency(s) to determine the requirements for each project. The Contractor will be responsible for writing and submitting reports to regulatory agencies as directed by the COR. It is the Contractor's responsibility to find out from the regulatory agency(s) which guidance materials are current and applicable.
D. The Contractor shall obtain and/or prepare permits, licenses, or other documents necessary to accomplish the prescribed work (see Clause 52.236-7). Costs shall be considered incidental to work items shown in the Schedule.
1. For Electrical, contact Grays Harbor PUD: 1-800-562-7726 or 360-532-4220
2. For Building, contact Grays Harbor County Building Division: 360-249-4222
C.5 Information about the Site
A. The Contractor shall take all precautions to maintain the work site at all times, in a condition that will prevent damage or injury to person or property, both Government, or otherwise. The Contractor shall protect all personnel, whether government or civilian, from all safety hazards on job sites during progress of work on this contract. All worksites shall be kept free of litter or other debris, and upon completion of work each day, all residual materials shall be cleaned.
Page: 10 of 57
B. Grays Harbor PUD (GHPUD) shall pull the existing meter and deenergize service feeder line prior to construction. After installation of flush toilet, GHPUD shall install new electrical meter and reenergize service feeder line.
1. Contractor is solely responsible for coordination with GHPUD throughout the project, including submission of applicable permits and electrical load calculations.
2. Contractor is solely responsible for payment of all permits and fees to the local utility companies.
There will be a Pre-Bid Tour for the project. Pre-Bid Tour will be on site Tuesday July 19th 11am PDT Prospective quoters are encouraged to tour the site prior to quoting.
With their quote, the Contractor acknowledges that they have taken the necessary steps to ascertain the nature and location of work and have investigated and satisfied themselves as to the general and local conditions that can affect the work or its cost. Any failure of the contractor to take the actions described and acknowledged in this paragraph will not relieve the Contractor from the responsibility of estimating properly the difficulty and cost of successfully performing the work, or for proceeding to successfully perform the work without additional expenses to the Government.
For information about the project site, contact the following individual:
Name: Roland Watson Telephone: 360-956-2317 E-mail: Roland.Watson@usda.gov
C.6 Clauses
AGAR 452.211-72 Statement of Work/Specifications (FEB 1988)
The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.
AGAR 452.211-73 Attachments to Statement of Work/Specifications (FEB 1988)
The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract / task order.
The specifications shown in the specification listing contained in the attachments are applicable to this contract. All specifications not included in the specification listing but referenced by listed specifications, are applicable. The specifications shown on the specification list are physically attached mailto:Roland.Watson@usda.gov
Page: 11 of 57
C.7 BioBased Products
The Contractor must comply with Section 9002 of the Farm Security and Rural Investment Act of 2002 (FSRIA), Executive Order (EO) 13423, “Strengthening Federal Environmental, Energy, and Transportation Management,” and the Federal Acquisition Regulation to provide biobased products.
The Contractor shall utilize products and material made from biobased materials (e.g., insulating foam, composite panels, and concrete and asphalt release fluids) to the maximum extent possible without jeopardizing the intended end use or detracting from the overall quality delivered to the end user. All supplies and materials shall be of a type and quality that conform to applicable Federal specifications and standards. All supplies and materials to be used in the performance of work described herein are subject to the approval of the Contracting Officer.
The following is an example list of products that may be used in this contract for minor construction for which biobased products are available. The list is not all inclusive. It is desirable that vendors be able to supply the greatest number of biobased products listed meeting the health and environmental specifications.
Graffiti and grease removers Insulation foam Concrete and asphalt release fluids Fluid-filled transformers Wood and concrete sealers Composite panels Adhesive and mastic removers Carpets Roof coating Hydraulic fluid Diesel fuel additives Greases Dust suppressant 2-cycle engine oil Absorbents
Biobased products that are designated for preferred procurement under USDA’s BioPreferred program must meet the required minimum biobased content as stated in the USDA Final Rule available at www.biopreferred.gov. The Contractor should provide data for their biobased products such as biobased content and source of biobased material
In addition to the biobased products designated by the U.S. Department of Agriculture in the BioPreferred Program, the Contractor is encouraged to use other commercially available biobased products.
The awarded Contractor on each anniversary date of the contract shall compile a complete list of biobased products, including the information above, purchased to carry out the contract requirements. The Contractor shall list volume to be used and total cost for each individual product. This information will be used for reporting purposes.
The Contractor shall comply with the provision at FAR 52.223-1, Biobased Product Certification.
Page: 12 of 57
The Contractor shall comply with the clause at FAR 52.223-2, Affirmative Procurement of Biobased Products Under Service and Construction Contracts.
C.8 Required Submittals
The following is a general summary of the required submittals. Other submittals may be required as specified elsewhere in this contract.
Submittal Title Referenced By Specification No.
Submittal Date
Schedule of Work / Progress Schedule Schedules for Construction Contracts (FAR 52.236-15)
With Quote.
Job Specific Safety Plan including how Contractor will apply to the requirements regarding COVID.
Accident Prevention, (FAR 42.236-13)
COVID information with Quote. Rest of Safety Plan Prior to Work Starting
Copy of Required Insurance Coverage Insurance work on Government Installation (FAR 52.228-5)
Prior to Work Starting
Designation of Representative
R6-FS-6300-6
Superintendence by Contract (FAR 52.236-6)
At the Post Award Conference
Notification of Subcontracting & SF1413 - Statement and Acknowledgement for each Subcontractor including Owner/Operators and other Sole Proprietorship Subcontractors [not required for material suppliers]
Subcontracts (Labor Standards)
(FAR 52.236-11)
Prior to Subcontractor Starting Work
Payroll Records WH347 Certified Payrolls submitted weekly
Basic Contract Payrolls and Basic Records (FAR 52.222-8)
Weekly
Drug Free Workplace Policy (If applicable)
Drug-Free Workplace
(FAR 52.223-6)
Prior to Work Starting
Release of Claims Form Section G Prior to Final Payment Biobased or BioPreferred Products FAR 52.223-2 With Quote and in accordance with Clause Other Submittals Section C As required in Specifications and Plans
C.9 TECHNICAL SPECIFICATIONS
The technical specifications will be attached as listed in Section J.1.
Page: 13 of 57
SECTION D--PACKAGING AND MARKING
D-1 PACKING AND MARKING
All shipments of materials, equipment and/or supplies shall be addressed to the Contractor and not to the Government.
D-2 PROJECT LABELING FOR OFFICIAL CORRESPONDENCE
The Government singularly identifies each project with a contract number at time of award. The contract number is a unique identifier to purposely and permanently represent an awarded project. The Government issued contract number is to be referenced on all official communication starting upon notice of award.
Page: 14 of 57
SECTION E--INSPECTION AND ACCEPTANCE
E.1 CLAUSES
52.246-12 Inspection of Construction (AUG 1996) 52.246-13 Inspection-Dismantling, Demolition, or Removal of Improvements (AUG 1996)
SECTION F--DELIVERIES OR PERFORMANCE
F.1 CLAUSES
52.211-13 Time Extensions (SEP 2000) 52.211-18 Variation in Estimated Quantity (APR 1984) 52.242-14 Suspension of Work (APR 1984)
52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984)
The Contractor shall be required to (a) commence work under this contract within __10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than March 6th, 2023. The time stated for completion shall include final cleanup of the premises.
Page: 15 of 57
SECTION G--CONTRACT ADMINISTRATION DATA
G.1 CLAUSES
G.2 OTHER REQUIREMENTS
Post Award Conference (NOV 1996)
A post award conference with the successful offeror is required. It will be scheduled and held within _15_days after the date of contract award. The conference will be held by __Teleconference__.
Page: 16 of 57
SECTION H--SPECIAL CONTRACT REQUIREMENTS
H.1 CLAUSES
FAR 52.236-4 Physical Data (APR 1984)
Data and information furnished or referred to below is for the Contractor’s information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.
A. The indications of physical conditions on the drawings and in the specifications are the result of site investigations by observations and measurements.
Utilities
This work will be performed at the trailhead. The restroom, water, and electricity will be available from the comfort station up until demo. After that stage, the nearest restroom on site is about a mile away.
H.2 OTHER REQUIREMENTS
Conformity with Drawings and Specifications
Unless working tolerances are specified, all work performed and materials furnished shall be in reasonably close conformity with lines, grades, cross sections, dimensions, and material requirements shown on the drawings, indicated in the specifications, or designated on the ground. “Reasonably close conformity” is compliance with reasonable and customary manufacturing and construction tolerance.
A. Definition. "Work" includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.
B. The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.
C. Government inspections and tests are for the sole benefit of the Government and do not--
1. Relieve the Contractor of responsibility for providing adequate quality control measures.
Page: 17 of 57
2. Relieve the Contractor of responsibility for damage to or loss of the material before acceptance.
3. Constitute or imply acceptance; or
4. Affect the continuing rights of the Government after acceptance of the completed work under paragraph (I) below.
D. The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer's written authorization.
E. The Contractor shall promptly furnish, without additional charge, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer. The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary.
The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.
F. The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.
G. If the Contractor does not promptly replace or correct rejected work, the Government may
(1) by contract or otherwise, replace or correct the work and charge the cost to the Contractor or
(2) terminate for default the Contractor's right to proceed.
H. If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction.
However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.
I. Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government's rights under any warranty or guarantee.
Page: 18 of 57
Warning Signs and Restrictions
Contractor shall be totally responsible for safety signing, barricades and other signing to maintain a safe site to the public and Government employees. The site may be open to the public during construction. Forest Service will issue a closure order to the public, as needed. The Contractor will be responsible for singing and limiting public access.
Job Specific Safety Plan
A. Worker Safety - The Contractor shall perform all operations in a prudent, conscientious, safe and professional manner. Provide a plan, that demonstrates the following:
1. The contractor shall comply with OSHA and take necessary precautions to protect the life and health of all persons employed on the project. The contractor shall be familiar with the latest accepted accident prevention methods and shall provide necessary safety devices and safeguards accordingly.
2. At a minimum, the Contractor’s personnel and equipment shall comply with applicable Federal, state, and local laws, safety and health regulations and procedures, as well as Forest Service regulations, rules and procedures.
3. Fire Protection and Prevention: Contractor shall provide as many stored pressure fire extinguishers as are necessary to ensure that no more than 75 feet exists between a fire extinguisher at any point within containments areas; and in no case shall there be less than two fire extinguishers on site.
B. Spill Prevention and Response
1. The Contractor is solely responsible for all spills or leaks and subsequent clean up that may be required during the performance of this contract, which occur or are contributed to by the actions of its agents, employees, or subcontractors. The Contractor agrees to clean up such spills or leaks to the satisfaction of the Forest Service and in a manner that complies with applicable Federal, state, and local laws and regulations. The clean-up shall be at no cost to the Forest Service. The contractor shall provide spill response materials including, but not limited to, containers, shovels, and personal protective equipment. Spill response materials shall be always available to onsite personnel, in which hazardous materials and hazardous wastes are being handled or transported.
Spill response materials shall be compatible with the type of material being handled or transported.
2. The contractor shall report all such spills or leaks, regardless of their quantity, to the Forest Service immediately upon discovery. A written follow-up report shall be submitted to the Forest Service no later than 24 hours after the initial telephonic report. The written report shall be in narrative form and as a minimum include the following:
a. Description of the item spilled (identity, quantity, manifest no., etc.).
b. Whether amount spilled is EPA/state reportable, and if so whether it was reported, and to whom.
c. Exact time and location of spill including a description of the area involved.
d. Containment procedures initiated.
e. Summary of any communications contractor has with press, Federal, State and local regulatory agencies and officials, or Forest Service officials.
Page: 19 of 57
f. Upon completion of the clean-up activities for contractor caused spills and releases, the contractor shall submit a final clean-up certification report to the Forest Service. The report shall include a description of clean-up procedures employed at the site, the final disposition and disposal location of spill residue.
Include also copies of all spill related cleanup and closure documentation and correspondence from the regulatory agencies.
C. Security and Pedestrian Safety
1. No work that endangers, interferes, or conflicts with traffic or access to work sites shall be performed until a plan for satisfactory warning and handling of traffic and public has been submitted by the contractor and approved by the COR. Plan must be in accordance with requirements of the MUTCD. Contractor shall not be paid directly for this item, rather it will be considered incidental to other items of work listed in the Schedule of Items.
2. Contractor shall submit a Plan for approval. The plan shall consist of, at a minimum, construction zone perimeter, locations of signs, barriers, and construction fencing, egress routes, parking areas that will be occupied during demolition, and stockpile areas. Provide plan for adequate protection against accidental trespassing, and plan for site security after work hours.
a. The Contractor shall restrict access to the immediate area where removals are taking place using barrier tape and/or construction barriers. Caution signs shall be posted as needed. Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain.
b. Security for the Contractor's equipment and supplies shall be the sole responsibility of the Contractor.
c. Camping will be not permitted within the construction area.
Safety Items
(a) Data and information furnished or referred to below is for the Contractor’s information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor. This list shall not be deemed to be all inclusive. The Contractor shall bear the sole responsibility for taking all appropriate actions necessary to prevent accidents and injuries to individuals at the work site.
(b) The following checked activities have been identified by the Government as potential safety hazards.
[] Confined Entry Space.
[] Temporary excavation/deep trenching/slope stability.
[] Tree Felling.
[] Fall hazard from work heights exceeding six feet.
[] Blasting.
[] Traffic control on high-volume and/or high-speed and/or limited visibility roads.
[x] Heavy equipment operation.
[] Tree climbing and/or tower climbing.
Page: 20 of 57
[] Fire hazards.
[] Hazard materials handling.
[] Electrical hazard.
[] Hydraulic and/or pneumatic and/or other high pressure hazards.
[x] Mechanical hazards such as pulleys, springs, etc.
[X] Power tool operation including eye protection.
[X] Overhead hazards.
[X] COVID - 19
Storage of Materials and Equipment
Materials shall be stored to assure the preservation of their quality and fitness for work.
Approved areas on the Forest Service administrative site may be used for storage purposes, except demolished materials may not be stored on Forest Service land. All storage sites approved by the Government shall be restored to a satisfactory condition at the Contractor's expense.
Product Substitution, Shop Drawings and Material Certification
A. Product Substitution. Any modification of other items, designs, materials, products or equipment (including Government-Furnished Property), made necessary because of a substitution, will be the responsibility of the Contractor without adjustment in contract price or time. The Contracting Officer’s approval of any substitute will not affect the Contractor’s responsibility for such modification. All substitutions shall be requested by the Contractor after award of the contract has been made. No approvals will be made prior to award.
Hazardous Materials
Contractor shall notify the Government of any hazardous materials and or waste (as defined in 29 CFR 1910.1200) to be used on the job and will have Material Safety Data Sheets (MSDSs) for those materials available on the job. All such materials shall be labeled in accordance with Federal and State regulations.
Emergency Control
(a) Immediately extinguish without expense to the Government all fires on or in the vicinity of the project which are caused by the Contractor's employees, whether set directly or indirectly as a result of construction operations, with or without direction by the Forest Service. The Contractor may be held liable for all damages and costs of additional labor, subsistence, equipment, supplies, and transportation deemed necessary by the Government resulting from fires set or caused by Contractor's employees or resulting from construction operations.
Page: 21 of 57
(b) Contractor's Responsibility for Controlling Other Emergencies - When requested by the Contracting Officer, allow the Forest Service to temporarily use employees and equipment for emergency control work.
Payment will be made at not less than the current area rate established by the Forest Service.
(c) Fire fighting equipment will be required during the fire season from May 10 to August 31, and during any other period of fire danger designated by the Contracting Officer.
Furnish rust-free fire tools to equip all workers employed in Contractor's operations at each separate work site. Maintain tools in serviceable condition and keep tools in one or more weather-tight fire tools boxes. Paint fire tools boxes red, mark "tools for Fire Only" with letters at least 3” high, and keep sealed. Post a list of the contents inside each fire tool box so as to be visible when opened.
Equip each internal combustion engine with a spark arrester qualified and rated USDA-Forest Service, Standard 5100-1, unless it is:
(a) Equipped with a turbine-driven exhaust supercharger such as the turbocharger. There shall be no exhaust bypass.
(b) A multi-position engine, such as on a chain saw, which is equipped with screen arrester, as described in the Forest Service Spark Arrester guide.
A spark arrester, which does not meet the requirements in this guide may be approved upon submission of acceptable proof that the arrester is at least 80 percent efficient in retention, attrition, or destruction of carbon particles. Such arrester may be required to meet higher standards as improvements in design and efficiency are discovered.
(c) A passenger-carrying vehicle or light truck intended primarily for use on roads, and equipped with a factory designed muffler and exhaust system.
(d) A heavy duty truck, such as a dump or log truck, or other vehicle used for commercial hauling, used only on roads and equipped with a factory designed muffler and with a vertical stack exhaust system extending above the cab.
Page: 22 of 57
Properly install and constantly maintain in serviceable condition all exhaust equipment described in this Subsection, including spark arresters and mufflers.
Equip each unit of mobile or stationary power equipment, including trucks, with one shovel, and at least one fire extinguisher meeting one of the following specifications:
1. 2-1/2 pound size or larger dry chemical type.
2. 4 pound size or larger carbon dioxide type.
Test or check each extinguisher for proper functioning prior to the beginning of fire precautionary period.
Provide each gasoline power saw with one chemical-pressurized fire extinguisher of not less than 8 ounce capacity by weight. Maintain the extinguisher in good working order at all times.
Do not burn camp refuse, brush, slash, or debris such as that resulting from clearing around camps or on rights-of-way, without the written approval of the Contracting Officer. Submit written requests for burning to the Contracting Officer at least 48 hours in advance of intended burning. The Contracting Officer will approve routine camp refuse disposal incineration in the camp development proposal.
Disposal of Material
Debris encountered in the construction (metals, etc.) and other waste materials generated in the construction (cartons, scrap, etc.) shall be removed and disposed of in a State or City approved site off of National Forest Service Land, unless other disposal means are authorized in the plans or specifications.
KEY PERSONNEL
(a) The Contractor shall assign to this contract the following key personnel:
(b) During the first ninety (90) days of performance, the Contractor shall make no substitutions of key personnel unless the substitution is necessitated by illness, death, or termination of employment. The Contractor shall notify the Contracting Officer within 15 calendar days after the occurrence of any of these events and provide the information required by paragraph (c) below. After the initial 90-day period, the Contractor shall submit the information required by paragraph (c) to the Contracting Officer at least 15 days prior to making any permanent substitutions.
Page: 23 of 57
(c) The Contractor shall provide a detailed explanation of the circumstances necessitating the proposed substitutions, complete resumes for the proposed substitutes, and any additional information requested by the Contracting Officer. Proposed substitutes should have comparable qualifications to those of the persons being replaced. The Contracting Officer will notify the Contractor within 15 calendar days after receipt of all required information of the decision on substitutions. The contract will be modified to reflect any approved changes of key personnel.
INSURANCE COVERAGE
Pursuant to FAR clause 52.228-5, Insurance-Work on a Government Installation, the Contractor will be required to present evidence to show, as a minimum, the amounts of insurance coverage indicated below:
(a) Workers Compensation and Employer's Liability. The Contractor is required to comply with applicable Federal and State workers' compensation and occupational disease statutes. If occupational diseases are not compensable under those statutes, they shall be covered under the employer's liability section of the insurance policy, except when contract operations are so commingled with a Contractor's commercial operations that it would not be practical to require this coverage. Employer's liability coverage of at least $100,000 shall be required, except in States with exclusive or monopolistic funds that do not permit worker's compensation to be written by private carriers.
(b) General Liability. (1) The Contractor shall have bodily injury liability coverage written on a comprehensive form of policy of at least $500,000 per occurrence. (2) The Contractor shall have property damage liability insurance shall be required in the amount of ____*___ per occurrence.
(c) Automobile Liability. The Contractor shall have automobile liability insurance written on a comprehensive form of policy. The policy shall provide for bodily injury and property damage liability covering the operation of all automobiles used in connection with performing the contract. Policies covering automobiles operated in the United States shall provide coverage of at least $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage or loss.
(d) Aircraft Public and Passenger Liability. When aircraft are used in connection with performing the contract, the Contractor shall have aircraft public and passenger liability insurance. Coverage shall be at least $200,000 per person and $500,000 per occurrence for bodily injury, other than passenger injury. Coverage for passenger injury shall be at least $200,000 multiplied by the number of seats or passengers, whichever is greater.
Page: 24 of 57
PART II--CONTRACT CLAUSES
SECTION I--CONTRACT CLAUSES
I.1 CLAUSES
52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
Federal Acquisition Regulation (FAR) Clauses:
https://www.acquisition.gov/browse/index/far (FAR clauses begin with 52) Department of Agriculture Acquisition Regulation (AGAR) Clauses:
https://www.acquisition.gov/agar (AGAR clauses begin with 452) Deviations to clauses may be viewed at:
https://www.dm.usda.gov/procurement/policy/FARClassDeviations.htm
52.202-1 Definitions (JUN 2020) 52.203-3 Gratuities (APR 1984) 52.203-5 Covenant against Contingent Fees (MAY 2014) 52.203-6 Restrictions on Subcontractor Sales to the Government (JUN 2020) 52.203-7 Anti-Kickback Procedures (JUN 2020) 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity
(MAY 2014)
52.203-10 Price or Fee Adjustment for Illegal or Improper Activity (MAY 2014) 52.203-12 Limitation on Payments to Influence Certain Federal Transactions (JUN 2020) 52.203-17 Contractor Employee Whistleblower Rights & Requirements to Inform
Employees of Whistleblower Rights (JUN 2020) 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or
Statements (JAN 2017) 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper (MAY
2011) 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (JUN
2020) 52.204-13 System for Award Management Maintenance (OCT 2018) 52.204-14 Service Contract Reporting Requirements (OCT 2016) 52.204-19 Incorporation by Reference of Representations and Certifications (DEC 2014) 52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or
Provided by Kaspersky Lab and Other Covered Entities (NOV 2021) 52.204-25 Prohibition on Contracting for Certain Telecommunications and Video
Surveillance Services or Equipment (NOV 2021) 52.209-6 Protecting the Government's Interest when Subcontracting with Contractors
Debarred, Suspended, or Proposed for Debarment (NOV 2021) https://www.acquisition.gov/browse/index/far https://www.acquisition.gov/agar https://www.dm.usda.gov/procurement/policy/FARClassDeviations.htm
Page: 25 of 57
52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015) 52.211-18 Variation in Estimated Quantity (APR 1984) 52.215-2 Audit and Records -- Negotiation (JUN 2020) 52.215-8 Order of Precedence—Uniform Contract Format (OCT 1997) 52.217-7 Option for Increased Quantity – Separately Price Line Item (MAR 1989) 52.219-6 Notice of Total Small Business Set-Aside (NOV 2020) 52.219-8 Utilization of Small Business Concerns (OCT 2018) 52.219-28 Post Award Small Business Program Representation (SEP 2021) 52.222-3 Convict Labor (JUN 2003) 52.222-4 Contract Work Hours and Safety Standards -- Overtime Compensation (MAY
2018) 52.222-6 Construction Wage Rate Requirement (AUG 2018) 52.222-7 Withholding of Funds (MAY 2014) 52.222-8 Payrolls and Basic Records (JUL 2021) 52.222-9 Apprentices and Trainees (JUL 2005) 52.222-10 Compliance with Copeland Act Requirements (FEB 1988) 52.222-11 Subcontracts (Labor Standards) (MAY 2014) 52.222-12 Contract Termination - Debarment (MAY 2014) 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations
(MAY 2014)
52.222-14 Disputes Concerning Labor Standards (FEB 1988) 52.222-15 Certification of Eligibility (MAY 2014) 52.222-21 Prohibition of Segregated Facilities (APR 2015) 52.222-26 Equal Opportunity (APR 2016) 52.222-27 Affirmative Action Compliance Requirements for Construction (APR 2015) 52.222-30 Construction Wage Rate Requirements-Price Adjustment (None or Separately
Specified Pricing Method) (AUG 2018) 52.222-35 Equal Opportunity for Veterans (JUN 2020) 52.222-36 Equal Opportunity for Workers with Disabilities (JUN 2020) 52.222-37 Employment Reports on Veterans (JUN 2020) 52.222-40 Notification of Employee Rights Under National Labor Relations Act (DEC
2010) 52.222-50 Combating Trafficking in Persons (NOV 2021) 52.222-54 Employment Eligibility Verification (NOV 2021) 52.222-55 Minimum Wages for Contractor Workers under Executive Order 14026 (JAN
2022) 52.222-62 Paid Sick Leave under Executive Order 13706 (JAN 2022) 52.223-2 Affirmative Procurement of Biobased Products under Service and Construction
Contracts (SEP 2013) 52.223-3 Hazardous Material Identification and Material Safety Data Alt 1 (FEB 2021) 52.223-5 Pollution Prevention and Right-to-Know Information (MAY 2011) 52.223-6 Drug-Free Workplace (MAY 2001) 52.223-15 Energy Efficiency in Energy Consuming Products (MAY 2020) 52.223-17 Affirmative Procurement of EPA-designated Items in Service and Construction
Contracts (AUG 2018)
Page: 26 of 57
52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving (JUN 2020)
52.223-20 Aerosols (JUN 2016) 52.223-21 Foams. (JUN 2016) 52.225-9 Buy American Act-Construction Materials (NOV 2021) 52.225-13 Restrictions on Certain Foreign Purchases (FEB 2021) 52.227-1 Authorization and Consent (JUN 2020) 52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement (JUN 2020) 52.227-4 Patent Indemnity -- Construction Contracts (DEC 2007) 52.228-2 Additional Bond Security (OCT 1997) 52.228-5 Insurance – Work on a Government Installation (JAN 1997) 52.228-12 Prospective Subcontractor Requests for Bonds (MAY 2014) 52.228-14 Irrevocable Letter of Credit (NOV 2014) 52.229-3 Federal, State, and Local Taxes (FEB 2013) 52.232-5 Payments under Fixed-Price Construction Contracts (MAY 2014) 52.232-17 Interest (MAY 2014) 52.232-23 Assignment of Claims (MAY 2014) 52.232-27 Prompt Payment for Construction Contracts (JAN 2017) 52.232-33 Payment by Electronic Funds Transfer – System for Award Management (OCT
2018) 52.232-39 Unenforceability of Unauthorized Obligations (JUN 2013) 52.233-1 Disputes (MAY 2014) Alt 1 (DEC 1991) 52.233-3 Protest after Award (AUG 1996) 52.233-4 Applicable Law for Breach of Contract Claim (OCT 2004) 52.236-2 Differing Site Conditions (APR 1984) 52.236-3 Site Investigation and Conditions Affecting the Work (APR 1984) 52.236-5 Material and Workmanship (APR 1984) 52.236-6 Superintendence by the Contractor (APR 1984) 52.236-7 Permits and Responsibilities (NOV 1991) 52.236-8 Other Contracts (APR 1984) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and
Improvements (APR 1984) 52.236-10 Operations and Storage Areas (APR 1984) 52.236-11 Use and Possession Prior to Completion (APR 1984) 52.236-12 Cleaning Up (APR 1984) 52.236-13 Accident Prevention (NOV 1991)
Alternate I (NOV 1991) 52.236-14 Availability and Use of Utility Services (APR 1984) 52.236-15 Schedules for Construction Contracts (APR 1984) 52.236-21 Specifications and Drawings for Construction (FEB 1997)
Alternate I (APR 1984) Alternate II (APR 1984)
52.242-5 Payments to Small Business Subcontractors (JAN 2017) 52.242-13 Bankruptcy (JUL 1995) 52.243-4 Changes (JUN 2007)
Page: 27 of 57
52.244-6 Subcontracts for Commercial Products and Commercial Services (JAN 2022)
(DEVIATION APR 2020)
52.245-1 Government Property (SEP 2021) - Alt 1 (APR 2012) 52.245-9 Use and Charges (APR 2012) 52.246-21 Warranty of Construction (MAR 1994)
Alternate I (MAR 1994) 52.248-3 Value Engineering – Construction (OCT 2020) 52.249-2 Termination for Convenience of the Government…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .