Rainforest_Specs_final.pdf
PDF 2 MB Posted
- Attached to
- Rainforest Trailhead Comfort Station Replacement Federal contract opportunity
- Solicitation number
- 1240BJ22R0019
About this file
This federal contract solicitation seeks bids for a Rainforest Trailhead Comfort Station Replacement project. The project scope involves demolishing an existing toilet building, installing a new precast concrete flush toilet facility with chase, installing new fiberglass walk-in enclosure, constructing concrete sidewalks and new underground utilities. The work location is the Quinault Rainforest Trailhead in Grays Harbor County, Washington. The pre-bid site visit deadline is August 5, 2022, bids are due by August 12, 2022 and the estimated project value is between $250,000 to $500,000. The NAICS code is 236220 with a $39.5 million size standard. This project is set aside 100% for small businesses. The contract also requires performance and payment bonds.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| REVISED 8-9-2022_Solicitation_1240BJ22R0019 Rainforest Trailhead Comfort Station.pdf | ||
| Amendment 2 to Solicitation 1240BJ22R00019.pdf | ||
| Amendment 1 to Solicitation 1240BJ22R00019.pdf | ||
| REVISED_Solicitation_1240BJ22R0019 Rainforest Trailhead Comfort Station.pdf | ||
| Rainforest_Drawings.pdf | ||
| Solicitation_1240BJ22R0019 Rainforest Trailhead Comfort Station.pdf | ||
| TECHNICAL EVALUATION QUESTIONNAIRE PAST PERFORMANCE.pdf | ||
| SOW_Final.pdf | ||
| Wage Determination WA20220027 6-24-2022.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUINALT RECREATION AREA
RAINFOREST TRAILHEAD COMFORT STATION REPLACEMENT
USDA Forest Service Region 06 Olympic National Forest
Prepared by:
United States Forest Service WO Enterprise Team
Prepared for:
United States Forest Service Olympic National Forest
LIST OF TECHNICAL SPECIFICATIONS
DIVISION 01 – GENERAL REQUIREMENTS
010250
011900
013300
014100
CONSTRUCTION STAKING
MOBILIZATION
SUBMITTAL PROCEDURES
QUALITY CONTROL
DIVISION 02 – EXISTING CONDITIONS
023701 SEDIMENT AND EROSION CONTROL
024100 WASTE MATERIAL DISPOSAL
024116 STRUCTURE DEMOLITION
DIVISION 03 - CONCRETE
033000 CAST IN PLACE CONCRETE
033540 CONCRETE SIDEWALK
DIVISION 11 - EQUIPMENT
111226 PARKING FEE COLLECTION EQUIPMENT
DIVISION 12 - FURNISHINGS
129410 TRASH RECEPTACLE
DIVISION 13 – SPECIAL CONSTRUCTION
133401 PRECAST CONCRETE RESTROOM BUILDING
DIVISION 22 - PLUMBING
221100 WATER DISTRIBUTION SYSTEMS
221313 FACILITY SANITARY SEWERS
DIVISION 26 - ELECTRICAL
260010 GENERAL TECHNICAL PROVISIONS
260050 BASIC METHODS AND MATERIALS
260400 UNDERGROUND CONTROL CABLE AND POWER DISTRIBUTION
262716 WALK-IN ENCLOSURE
264313 SURGE PROTECTIVE DEVICE
DIVISION 31 - EARTHWORK
311000 CLEARING AND GRUBBING
312000 EARTHWORK
DIVISION 32 – EXTERIOR IMPROVEMENTS
321204 CRUSHED AGGREGATE BASE AND SURFACE COURSE
329206 SEEDING
CONSTRUCTION STAKING 010250-1
USDA FOREST SERVICE, R-6
RAINFOREST TRAILHEAD COMFORT STATION REPLACEMENT
SECTION 010250 - CONSTRUCTION STAKING
PART 1 - GENERAL
1.1 SUMMARY
A. This work shall consist of the construction staking of roads, parking lots, parking spurs, family units, tent pads, paths, stairways, culverts, retaining walls, buildings, and utilities in accordance with the Drawings and Specifications. The work includes the furnishing of all labor, equipment, instruments, materials, transportation, and other incidentals necessary to complete the construction staking in accordance with these specifications and acceptable engineering practice.
1.2 QUALITY CONTROL
A. Construction staking shall be accomplished under the direction of a Civil Engineer, Engineering Technician, or Land Surveyor closely associated and familiar with construction staking;
periodic visits to the project site are required.
1.3 SUBMITTALS
A. Survey Notes
1.4 MEASUREMENT AND PAYMENT
A. Measurement shall be lump sum for surveying and staking the project through all phases of construction.
PART 2 - PRODUCTS
A. Not Used
PART 3 - EXECUTION
3.1 GENERAL
A. The Contractor shall be required to provide all necessary staking and control for all phases of construction. The contractor shall use the data and information shown on the project drawings and coordinate staking efforts with the Contracting Officer’s Representative. The Contracting Officer’s Representative shall approve final location of site features, and the Contractor shall provide the final staking based on the lines, grades and dimensions of the site features shown on the drawings. The Contractor may choose any method of establishing horizontal and vertical controls provided the following minimum precision and accuracy requirements are met.
B. Accuracy requirements:
1. As needed to meet the requirements of toilet manufacturer’s stub locations, and all other project requirements.
3.2 ESTABLISING AND REFERENCING IMPROVEMENT LOCATIONS
CONSTRUCTION STAKING 010250-2
A. Paths and Sidewalks
1. Slope stakes (cut and fill catch points), clearing limits, and slope stake references shall be established on both sides of the centerline at each station established. Slope stakes and slope stake references shall be located on a line at right angles to tangents and on radial lines or curves. Slope stake catch points shall be located by using the grading plans and/or profiles as shown on the drawings.
2. Slope stakes shall be set at 10-foot intervals, at significant breaks in the ground profile, culvert locations, and widening transition points.
B. Waterline, Sewerline, & other Utilities
1. Waterline, Sewerline, & other Utilities shall be staked at the locations shown on the drawings with the specified minimum burial depth. Waterline and sewerline elevations shall be sloped to drain, as agreed with the Contracting Officer’s Representative.
2. Slope stakes shall be set at 100-foot intervals, tees and intersections, change in line size and type, appurtenances, drains, and valves.
C. Buildings
1. Slope stakes and slope stake references shall be established at each corner and as necessary to provide adequate construction control. Coordinate with Contracting Officer’s Representative for determining final location of the buildings.
3.3 MARKING STAKES
A. All stakes shall be legibly marked, in the format agreed upon with the Contracting Officer’s Representative, with a stake pencil that leaves an imprinted or with waterproof ink. Marking shall conform to the nomenclature below:
PI Point of Intersection of tangents PC Point of curvature POC Point on curve Pt Point of tangency POT Point on tangent RP Reference point P P-line (preliminary location line) L L-line (final location line) BM Benchmark TBM Temporary benchmark BT Begin taper (any) ET End taper (any) C Cut F Fill L Centerline D Ditch W Width
3.4 SURVEY NOTES
A. All survey data shall be neatly recorded in survey books. All survey notes shall become the property of the Forest Service. Errors shall be deleted by lining out. Date, crew names and positions, instrumentation, and weather shall be recorded in the notes at the beginning of each
CONSTRUCTION STAKING 010250-3
day’s work. The party chief shall sign or initial each page of the notes immediately after the last entry for each day’s work.
B. Electronically recorded survey notes shall be consecutively numbered and headed to identify the contents. The notes shall be supported and accompanied by a bound book that records the project name and for each day identifies date, crew names and positions, instrumentation, weather, type of survey, stationing of sections between which survey was performed, and survey data or sketched that cannot be electronically recorded. The party chief shall sign or initial the electronically recorded notes and Day Book immediately after the last entry for each day’s work.
END OF SECTION 010250
AUGUST 2021
MOBILIZATION SECTION 011900-1
RAINFOREST TRAILHEAD COMFORT STATION REPLACEMENT
SECTION 011900 - MOBILIZATION
PART 1 - GENERAL
1.1 SUMMARY
A. This item is intended to compensate the Contractor for operations including, but not limited to, those necessary for the movement of personnel, equipment, supplies, and incidentals to the project site; for payment of premiums for bonds and insurance for the project; and for any other work and operations which must be performed or costs that must be incurred incident to the initiation of meaningful work at the site and for which payment is not otherwise provided for under the contract.
1.2 MEASUREMENT AND PAYMENT
A. The measurement shall be lump sum for mobilization. Payment shall be as follows:
1. Bond premiums will be reimbursed after receipt of the evidence of payment.
2. 50% of the lump sum, not to exceed 5% of the original contract amount, will be paid following completion of 5% of the original contract amount not including mobilization and bond premiums.
3. Payment of the remaining portion of the lump sum, up to 10% of the original contract amount, will be paid following completion of 10% of the original contract amount not including mobilization and bond premiums.
4. Any portion of the lump sum in excess of 10% of the original contract amount will be paid after final acceptance.
5. Progress payments for mobilization and preparatory work shall be subject to retainage.
PART 2 - PRODUCTS (NOT USED)
PART 3 - EXECUTION (NOT USED)
END OF SECTION 011900
SUBMITTAL PROCEDURES 013300-1
RAINFOREST TRAILHEAD COMFORT STATION REPLACEMENT
SECTION 013300 - SUBMITTAL PROCEDURES
PART 1 - GENERAL
1.1 SUMMARY
A. This Section includes administrative and procedural requirements for submitting Shop Drawings, Product Data, Samples, and other miscellaneous submittals. See Table 013300-1 for a summary of required submittals.
B. See other specification section within this package for additional requirements on submittal.
1.2 SUBMITTAL PROCEDURES
A. Coordination: Coordinate preparation and processing of submittals with performance of construction activities.
1. Coordinate transmittal of different types of submittals for related parts of the Work so processing will not be delayed because of need to review submittals concurrently for coordination.
a. The Contracting Officer (CO) reserves the right to withhold action on a submittal requiring coordination with other submittals until related submittals are received.
B. Processing Time: Allow enough time for submittal review, including time for re-submittals, as follows. Time for review shall commence on CO's receipt of submittal.
1. Initial Review: Allow 14 days for initial review of each submittal. Allow additional time if processing must be delayed to permit coordination with subsequent submittals. CO will advise Contractor when a submittal being processed must be delayed for coordination.
2. If intermediate submittal is necessary, process it in same manner as initial submittal.
3. Allow 14 days for processing each re-submittal.
4. No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing.
C. Identification: Place a permanent label or title block on each submittal for identification.
1. Indicate name of firm or entity that prepared each submittal on label or title block.
2. Provide a space on label or beside title block to record Contractor's review and approval markings and action taken by CO.
3. Include the following information on label for processing and recording action taken:
a. Project name.
b. Date.
c. Name and address of Contractor.
d. Name of manufacturer.
e. Unique identifier, including revision number.
f. Number and title of appropriate Specification Section.
g. Drawing number and detail references, as appropriate.
SUBMITTAL PROCEDURES 013300-2
h. If more than one item is shown on submittal sheet, identify item.
D. Deviations: Highlight, encircle, or otherwise identify deviations from the Contract Documents on submittals.
E. Additional Copies: Unless additional copies are required for final submittal, and unless CO observes noncompliance with provisions of the Contract Documents, initial submittal may serve as final submittal.
F. Use for Construction: Use only final submittals with mark indicating action taken by CO in connection with construction.
1.3 MEASUREMENT AND PAYMENT
A. No separate measurement and/or payment will be made for this section. Payment shall be included with work shown in the schedule of items.
PART 2 - PRODUCTS
2.1 ACTION SUBMITTALS – (Submittals requiring CO approval)
A. General: Prepare and submit Submittals required by individual Specification Sections.
B. Electrical Submittals: Refer to the “Division 26 – Electrical” specifications for special instructions on handling and submission.
C. Product Data: Collect information into a single submittal for each element of construction and type of product or equipment.
1. If information must be specially prepared for submittal because standard printed data are not suitable for use, submit as Shop Drawings, not as Product Data.
2. Mark each copy of each submittal to show which products and options are applicable.
3. Include the following information, as applicable:
a. Manufacturer's written recommendations.
b. Manufacturer's product specifications.
c. Manufacturer's installation instructions.
d. Manufacturer's catalog cuts.
e. Wiring diagrams showing factory-installed wiring.
f. Compliance with recognized trade association standards.
g. Compliance with recognized testing agency standards.
D. Shop Drawings: Prepare Project-specific information, drawn accurately to scale. Do not base Shop Drawings on reproductions of the Contract Documents or standard printed data.
1. Preparation: Include the following information, as applicable:
a. Dimensions.
b. Identification of products.
c. Fabrication and installation drawings.
d. Roughing-in and setting diagrams.
e. Wiring diagrams showing field-installed wiring, including power, signal, and control wiring.
f. Notation of dimensions established by field measurement.
SUBMITTAL PROCEDURES 013300-3
2. Wiring Diagrams: Differentiate between manufacturer-installed and field-installed wiring.
E. Contractor's Construction Schedule: The contractor shall submit a Construction Schedule, for approval by CO, in accordance with the contract provisions within 5 day of commencement of work.
F. Samples: Prepare physical units of materials or products, including the following:
1. Samples for Initial Selection: Submit manufacturer's color charts consisting of units or sections of units showing the full range of colors, textures, and patterns available.
2.2 INFORMATIONAL SUBMITTALS – (Submittals NOT requiring CO approval)
A. General: Prepare and submit an Informational Submittal as required by other Specification Sections.
1. Certificates and Certifications: Certificates and certifications shall be signed by an officer or other individual authorized to sign documents on behalf of that entity.
2. Test and Inspection Reports: Comply with requirements in Section 014100 "Quality Control."
B. Material Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting test results of material for compliance with requirements.
C. Field Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting results of field tests performed either during installation of product or after product is installed in its final location, for compliance with requirements.
D. Maintenance Data: Prepare written and graphic instructions and procedures for operation and normal maintenance of products and equipment.
E. Manufacturer's Instructions: Prepare written or published information that documents manufacturer's recommendations, guidelines, and procedures for installing or operating a product or equipment. Include name of product and name, address, and telephone number of manufacturer.
PART 3 - EXECUTION
3.1 GENERAL
A. Review each submittal and check for compliance with the Contract Documents. Note corrections and field dimensions. Mark with approval stamp before submitting to CO.
B. Approval Stamp: Stamp each submittal with a uniform, approval stamp. Include Project name and location, submittal number, Specification Section title and number, name of reviewer, date of Contractor's approval, and statement certifying that submittal has been reviewed, checked, and approved for compliance with the Contract Documents.
C. CO will not review submittals that do not bear Contractor's approval stamp and will return them without action.
D. Submittals not required by the Contract Documents will not be reviewed and may be discarded.
SUBMITTAL PROCEDURES 013300-4
E. Substitutions – Whenever materials, products, and equipment are listed by name or brand in the specifications and/or on the drawings, it is used as a measure of quality, utility, or standard. If the Contractor prefers to use any other brand or manufacturer of same quality, appearance and utility to that specified, he shall request substitution as provided below, not less than 30 days before the planned installation of the item. The Contracting Officer will approve or disapprove the request for substitution.
F. Requests for substitutions will only be considered if contractor submits the following:
1. Complete technical data including drawings, complete performance specifications, test data, samples and performance tests of the article proposed for substitution. Submit additional information if required by Contracting Officer. All items in the above information shall be circled, tagged, or marked in some way to indicate all deviations or differences which the proposed item differs from the originally specified item.
2. Similar data as above for item originally specified. All items shall be marked to identify where/how the proposed substitution will differ.
3. A statement by the Contractor that the proposed substitution is in full compliance with the contract documents, applicable codes, and laws.
4. The Contractor shall be responsible for any effect upon related work in the project for any substitution and shall pay any additional costs generated by any substitutions.
3.2 SUBMITTAL SCHEDULE – Submittals shall be made as required by and called for in the drawings and specifications. The following table is a summary of the required submittals for the project - the table is to assist the Contractor and may not be all inclusive – additional submittals may be required by specific specifications:
TABLE 013000-1
Spec.
Section Section Title Sub-section Required Submittal
010000 Project Information and General Scope of Work 1.4 Health and Safety Plan
010000 Project Information and General Scope of Work 1.5 Key personnel and subcontractor in-formation 010250 Construction Staking 3.4A Survey Notes 014100 Quality Control 1.3A Contractor Quality Control Plan 014100 Quality Control 1.3B Permits, Licenses and Certificates 014100 Quality Control 1.3C Test and Inspection Reports 014100 Quality Control 3.5A As-Built Drawings 023701 Sediment & Erosion Control Measures 1.2A Sediment & Erosion Control Plan 024100 Waste Material Disposal 1.3A Certificates of Recycling 024100 Waste Material Disposal 1.3B Waste Disposal Tickets
024116 Removal and Disposal of Existing Struc-tures 1.4A Local Permits and Applications to
Public Utilities 033000 Cast-in-Place Concrete 1.3A Product Data 033000 Cast-in-Place Concrete 1.3B Design Mix 033000 Cast-in-Place Concrete 1.3C Quality Control Test Reports 111226 Parking Fee Collection Equipment 1.3A Product Data 111226 Parking Fee Collection Equipment 1.3B Shop Drawings
111226 Parking Fee Collection Equipment 1.3C Software and Firmware Operational Documentation
133401 Precast Concrete Restroom Building 1.2A Manufacturer’s Literature
SUBMITTAL PROCEDURES 013300-5
Spec.
Section Section Title Sub-section Required Submittal
133401 Precast Concrete Restroom Building 1.2B Shop Drawings 133401 Precast Concrete Restroom Building 1.2C Design Calculations 133401 Precast Concrete Restroom Building 1.2D Concrete Delivery Certificates 221100 Water Distribution Systems 1.3A Product Data 221100 Water Distribution Systems 1.3B Pressure Test Results if required 221100 Water Distribution Systems 1.3C Disinfection Results if required 221313 Facility Sanitary Sewers 1.1A Product Data 221313 Facility Sanitary Sewers 1.1A Coordination Drawings 221313 Facility Sanitary Sewers 1.1A Product Certificates
260050 Basic Methods and Materials 1.03A Shop Drawings and Equipment Cata-log Data
260050 Basic Methods and Materials 1.03B Manufacturer’s Installation Operat-ing and Maintenance Instructions
260400 Underground Control Cable and Power Distribution
1.03B /
1.03 C
Shop Drawings and Equipment Cata-log Data
260400 Underground Control Cable and Power Distribution 1.03A Manufacturer’s Installation Operat-ing and Maintenance Instructions 262716 Walk-In Enclosure 1.3A Shop Drawings
262716 Walk-In Enclosure 1.3B Manufacturer’s Installation Instruc-tions
262716 Walk-In Enclosure 1.3C Manufacturer’s Operation and Maintenance Instructions
264313 Surge Protective Device 1.5A Product Data 264313 Surge Protective Device 1.5B Operation and Maintenance Manuals 264313 Surge Protective Device 1.5C Warranty Documentation
312000 Earthwork 1.3A Source and gradations for backfill materials
312000 Earthwork 1.3B Density Test Results
321204 Crushed Aggregate Base or Surface Course 1.2A Aggregate Base – Source, Gradation, Material Properties
321204 Crushed Aggregate Base or Surface Course 1.2B Compaction Test Results and Proctor
321204 Crushed Aggregate Base or Surface Course 1.2C Material Properties
END OF SECTION 013300
QUALITY CONTROL 014100-1
RAINFOREST TRAILHEAD COMFORT STATION REPLACEMENT
SECTION 014100 – QUALITY CONTROL
PART 1 - GENERAL
1.1 This work shall consist of providing quality control in conformance with the inspection, testing, and product certification requirements of this contract to ensure compliance with the drawings and specifications. The Contractor shall provide all personnel, equipment, tests, and reports necessary to meet the requirements of the contract.
1.2 QUALITY CONTROL
A. The Contractor shall provide and maintain a quality control system that will ensure all services, supplies, and construction work required under this contract conforms to the contract requirements. The Contractor shall perform, or cause to be performed, the sampling, inspection, and testing required to substantiate that all services, supplies, and construction conform to the contract requirements.
B. Special Tests and Inspections: Contractor will engage a testing agency to conduct required special tests and inspections. The Contractor shall authorize the testing agency to perform the required testing and inspections on the work completed. The authority shall include:
1. Testing agency will interpret tests and inspections and state in each report whether tested and inspected work complies with or deviates from the Contract Documents.
2. Testing agency will re-test and re-inspect corrected work.
C. Retesting/Reinspecting: Contractor shall provide quality-control services for retesting and reinspection for replaced construction work or for work that failed to comply with the requirements under the contract.
1.3 SUBMITTALS
A. Contractor Quality Control Plan
B. Permits, Licenses, and Certificates
C. Test and Inspection Reports
1.4 MEASUREMENT AND PAYMENT
A. No separate payment will be made for the work included under this section; rather payment shall be considered to be included in the items of work listed in the Schedule of Items.
PART 2 - PRODUCTS (Not Applicable)
PART 3 - EXECUTION
3.1 QUALITY CONTROL SYSTEM
QUALITY CONTROL 014100-2
A. General: Perform required testing, inspections, sampling, and similar services per direction specified in the contract drawings and specifications and in accordance with established industry standards.
3.2 CONTRACTOR QUALITY CONTROL PLAN
A. At the time of the preconstruction conference, the Contractor shall submit for approval a written Contractor Quality Control Plan.
1. If the plan requires any revisions or corrections, the Contractor shall resubmit the plan within 10 days.
2. The Government reserves the right to require changes in the plan during the contract period as necessary.
3. No change in the approved plan may be made without written concurrence by the Contracting Officer.
4. At a minimum, the plan shall include the following:
a. A list of personnel responsible for quality control and assigned duties. Include each person's qualifications.
b. A copy of a letter of direction to the Contractor's Quality Control Supervisor outlining assigned duties.
c. Names, qualifications, and descriptions of laboratories to perform sampling and testing, and samples of proposed report forms.
d. Methods of performing, documenting, and enforcing quality control of all work.
e. Methods of monitoring and controlling environmental pollution and contamination as required by all applicable regulations and laws.
3.3 TEST AND INSPECTION REPORTS
A. Submit copies of complete test results no later than three calendar days after the test was performed.
B. Submit failing test results and proposed remedial actions within four hours of noted deficiency.
C. Testing and Inspection Reports shall include the following:
1. Date of issue.
2. Project title and number.
3. Name, address, and telephone number of testing agency.
4. Dates and locations of samples, tests, or inspections.
5. Names of individuals performing tests and inspections.
6. Reference Specification Section(s).
7. Complete test or inspection data.
8. Test and inspection results and an interpretation of test results.
9. Ambient conditions at time sample was taken, tested, or inspected.
10. Comments or professional opinion on whether tested or inspected work complies with the
Contract Document requirements.
11. Name and signature of laboratory inspector.
12. Recommendations on retesting and reinspecting.
3.4 PERMITS, LICENSES, AND CERTIFICATES
QUALITY CONTROL 014100-3
A. For Contracting Officer’s records, submit copies of permits, licenses, certifications, inspection reports, releases, jurisdictional settlements, notices, receipts for fee payments, judgments, correspondence, records, and similar documents, established for compliance with standards and regulations relevant to the on performance of the work.
3.5 AS-BUILT DRAWINGS
A. The Contractor shall maintain a set of the contract drawings depicting as-built conditions.
These drawings shall be maintained in a current condition and shall be available for review. All variations from the original contract drawings shall be indicated in red on the drawings. Upon completion of the contract work, as-built drawings shall be submitted to the Contracting Officer.
3.6 SAMPLING, TESTING, AND CERTIFICATION REQUIREMENTS
A. Sampling, testing, and Certification requirements and frequency for specific items shall be as specified in the drawings and specification. The following table is a summary of the required sampling, testing, and certification for the project - the table is to assist the Contractor, but may not be all inclusive – additional submittals may be required by specific specification section:
TABLE 014100-1
Item
Subsection Certification or Test Required
Frequency
033000 2.12 Mixing and Delivery Each Truck 033000 3.12 Concrete – slump and temperature 1 per truck load 033000 3.12 Concrete – Composite (three cylinders and air) 1 composite per every two truck loads deliv-ered 111226 3.3D Software Test Until Operational and
Functional 221100 3.7 Hydrostatic Testing of Water System See Spec.
221100 3.8 Bacteriological Examination After disinfection, be-fore use 260010 3.25 Preliminary Tests - Underground Con-trol Cable Conductor Testing As needed to properly identify all functions
260010 3.27 Preliminary Tests – Sewage Pump Sta-tion Control Panel (All functions)
As needed to properly identify all functions
260010 3.28 Final Tests – Sewage Pump Station Control Panel (All functions)
Until Electrical Sys-tem Passes
260010 3.29 Tests – Preliminary Tests As needed to properly identify all functions
260010 3.29 Tests – Ground System, Insulation, Insulation Resistance, Insulation Re-sistance 600V rated wire, Continuity
Until Electrical Sys-tem Passes
260010 3.30 Final Tests – Comfort Station wiring and wiring to Pump Station
Until Electrical Sys-tem Passes
264313 3.04 Field Quality Control – SPDs Until Electrical Sys-tem Passes
312000 3.20C Moisture-Density Relationship One test for each soil type encountered
QUALITY CONTROL 014100-4
TABLE 014100-1
Item
Subsection Certification or Test Required
Frequency 312000 3.20C Utility Lines One test per 600 feet of trench (pipe zone and above-pipe zone)
312000 3.20C Foundation Pad (Subgrade Prepara-tion)
Greatest frequency of 2 tests per building or
1 test every 600 square feet of building
312000 3.20C Compaction Test – Exterior Concrete Slabs (Subgrade Preparation)
2 per 100 square feet
321204 3.4B Foundation Pad (Base)
Greatest frequency of 2 tests per building or
1 test every 600 square feet of building
321204 3.4B Exterior Concrete Slabs (Base) 2 tests per 100 square feet
END OF SECTION 014100
October 2020
SEDIMENT AND EROSION CONTROL MEASURES 023701-1
RAINFOREST TRAILHEAD COMFORT STATION REPLACEMENT
SECTION 023701 - SEDIMENT AND EROSION CONTROL MEASURES
PART 1 - GENERAL
1.1 The work under this section consists of furnishing all necessary labor, equipment, materials, and performing all operations in connection with construction sediment and control measures.
Contractor shall be prepared to keep soil on site for the duration of the project, and controls and maintenance will depend on contract award date. Contractor will provide all materials and labor necessary to protect streams and lakes, wet or dry, during construction activities. The Contractor will be required to submit a stream and lake protection plan and receive approval from the COR, in writing, prior to the beginning of construction. All disturbed topsoil shall be covered with straw to prevent erosion for the duration of the project.
A. General
1. All erosion and sediment control measures are to be placed prior to any disturbance caused by grading and or excavation and shall conform to the requirements of the appropriate regulatory agency for the State.
2. The Contractor shall be solely responsible for ensuring that erosion and sediment control measures are implemented and maintained at the site.
3. Soil disturbing activities include but are not limited to: Clearing and grubbing, excavation for utilities and foundations, roadway and parking lot construction, construction or modification of site drainage, grading, and preparation for final seeding.
1.2 SUBMITTALS
A. The Contractor shall be required to submit a sediment and erosion control plan in accordance with this specification for approval by the Contracting Officer 2 weeks prior to start of work.
The plan must include how the Contractor proposes to ensure sediment will not reach streams and lakes.
1.3 MEASUREMENT AND PAYMENT
A. Measurement and payment shall be incidental to work items in the Schedule.
PART 2 - PRODUCTS
2.1 MATERIALS
A. Synthetic Filter Fabric for silt fences.
1. Pervious sheet of polypropylene, nylon, or polyethylene fabric conforming to the following physical and hydraulic characteristics:
• Physical Properties (Min.) Requirement Test Method
• Grab Tensile, lbs. W120/F100 ASTM-D-4632
• Grab Elongation, % 15 ASTM-D-4632
• Mullen Burst, psi 275 ASTM-D-3786
SEDIMENT AND EROSION CONTROL MEASURES 023701-2
• Puncture, lbs. 65 ASTM-D-4833
• Trapezoidal Tear, lbs. 50 ASTM-D-4533
• UV Resistance, % 80 ASTM-D-4355
• AOS, US Sieve # 30/40 ASTM-D-4751
• Permittivity gal/min-sq. ft. 90 ASTM-D-4491
2. Filter fabric should contain ultraviolet ray inhibitors and stabilizers to provide a minimum of 6 months of expected usable construction life at a temperature range of 0 to 120 F.
3. Support Posts: 4 foot - 2 x 2 wood.
B. Weed Free Straw Bales:
1. Oat or wheat straw, free from weeds, viable weed seeds, foreign matter detrimental to plant life, and dry.
a. Certified Weed Free by Washington Weed Free Hay and Mulch Program.
b. In order to prevent deterioration of the bindings, all bales shall be either wire-bound or string-tied so that bindings are oriented around the sides rather than along the tops and bottoms of the bales.
C. Straw Wattles or Rolls:
1. Furnish straw wattles or rolls that are manufactured from weed free straw and wrapped in a tubular photodegradable plastic netting made from 85% high density polyethylene, 14% ethyl vinyl acetate and 1% color for UV inhibition. Conform to the following:
a. Diameter 9 inches min.
b. Netting strand thickness 0.030 inches
c. Netting knot thickness 0.055 inches
d. Mass of netting 0.315 to 0.385 ounces per foot
PART 3 - EXECUTION
3.1 CONSTRUCTION
A. Install straw bales at local drainage ways to prevent silt intrusion upon adjacent drainage courses. Remove straw bales following establishment of vegetation cover and utilize as mulch at swales or on steep slopes.
B. Prior to construction, install silt fence along the downhill construction limits to prevent silt intrusion upon adjacent land.
C. Install sediment and erosion control measures on the down slope toe of all top soil stock piles.
D. Maintain and remove all erosion controls as specified.
E. Temporary seeding shall be placed on exposed surfaces that will not be brought to final grading or permanent cover treatment within 30 days of the exposure to reduce erosion and sedimentation by stabilizing exposed soils. Seeded areas shall be checked regularly for bare spots, washouts, and healthy growth to assure that a good stand of grass is being maintained.
Reseed areas that fail to establish vegetation cover as soon as such areas are identified.
3.2 DUST CONTROL
SEDIMENT AND EROSION CONTROL MEASURES 023701-3
A. In areas subject to surface and air movement of dust, where on-site or off-site damage is likely to occur, one or more of the following preventive measures shall be taken for dust control:
1. Minimize the period of soil exposure using temporary ground cover and other temporary stabilization practices.
2. Sprinkle the site with water until surface is wet. Repeat as needed.
3.3 SILT FENCE
A. Silt fences are appropriate for the following general locations:
1. Immediately upstream of the point(s) of runoff discharge from a site before flow becomes concentrated. Below disturbed areas where runoff may occur in the form of overland flow.
2. Along the down slope toe of all topsoil stockpiles.
B. Materials.
1. Utilize standard strength synthetic filter fabric for sediment barriers. The filter fabric shall be purchased in a continuous roll cut to the length of the barrier to avoid the use of joints. When joints are necessary, filter cloth shall be spliced together only at a support post, with a minimum 6-inch overlap, and securely sealed.
2. The standard strength filter fabric shall be stapled or wired to the fence and 6 inches of the fabric shall be extended into the ground. Filter fabric shall not be stapled to existing trees.
3. Support posts shall be spaced at a maximum 6 feet and driven securely into the ground a minimum of 24 inches.
4. Filter fabric shall be buried a minimum of 12 inches.
5. The height of a silt fence shall not exceed 36 inches. Higher fences may impound volumes of water sufficient to cause failure of the structure.
C. Maintenance.
1. Silt fences and filter barriers shall be inspected immediately after each rainfall and at least daily during prolonged rainfall.
2. Silt fences shall be inspected for depth of sediment, tears, and to see if the fabric is securely attached to the fence posts, and to see that the fence posts are firmly in the ground. Any deficiencies shall be repaired immediately.
3. Should the fabric on a silt fence of filter barrier decompose or become ineffective prior to the end of the expected usable life and the barrier still be necessary, the fabric shall be replaced promptly.
4. Sediment deposits should be removed after each storm event and/or when deposits reach approximately 1/3 the height of the barrier or when the sediments limit or prevent the flow of water through the fabric hydraulic.
5. Any sediment deposits remaining in place after the silt fence or filter barrier is no longer required shall be dressed to conform with the existing grade, prepared, and seeded.
3.4 STRAW BALE EROSION CONTROL FENCE
A. Straw bale erosion control fences are appropriate for the following general locations:
1. Sheet flow applications: Straw bales shall be placed in a single row, lengthwise on the contour with ends of adjacent bales tightly abutting one another.
SEDIMENT AND EROSION CONTROL MEASURES 023701-4
2. Channel flow applications: Straw bales shall be placed in a single row, lengthwise and oriented perpendicular to the direction of flow with ends of adjacent bales tightly abutting one another. The barrier shall be extended to such a length that the bottoms of the end bales are higher in elevation than the top of the lowest middle bale to assure that sediment laden runoff will flow either through or over the barrier but not around it.
B. The barrier shall be entrenched and backfilled. A trench shall be excavated the width of a bale and the length of the proposed barrier to a minimum depth of 4 inches. After the bales are staked and chinked, the excavated soil shall be backfilled against the barrier. Backfill shall conform to the ground level of the downhill side and shall be built up to 4 inches against the uphill side of the barrier.
C. Each bale shall be securely anchored by at least 2 stakes or rebar driven through the bale. The first stake in each bale shall be driven toward the previously laid bale to force the bales together.
Stakes or rebar shall be driven a minimum of 12 inches into the ground or deep enough into the ground to securely anchor the bales, whichever is greater.
D. The gaps between bales shall be chinked (filled by wedging with straw to prevent water from escaping between the bales). Loose straw scattered over the area immediately uphill from a straw bale barrier tends to increase barrier efficiency.
3.5 STRAW WATTLE OR ROLL
A. Straw wattles shall be installed in accordance to manufacturer’s installation guidelines.
B. At a minimum:
1. The wattle shall be entrenched and backfilled. A trench shall be excavated the width of the straw waddle and the length of the proposed barrier to a depth of 2-3 inches.
2. Each wattle shall be securely anchored by at least one 18-24 inch stake every 3-4 feet and with a stake on each end. Stakes shall be driven perpendicular to slope face through the middle of the wattle until 2-3 inches remains exposed above the waddle.
3. After the wattles are staked, compact excavated soil against the uphill side of the barrier.
4. Adjacent wattles should tightly abut.
3.6 MAINTENANCE
A. Inspection shall be conducted daily, and repair or replacement shall be made promptly as needed. Straw bale carriers shall be removed when they have served their usefulness, but not before the upslope areas have been permanently stabilized.
END OF SECTION 023701
WASTE MATERIAL DISPOSAL 024100-1
RAINFOREST TRAILHEAD COMFORT STATION REPLACEMENT
SECTION 024100 - WASTE MATERIAL DISPOSAL
PART 1 - GENERAL
1.1 SUMMARY
A. This Section includes the following: recycling, repurposing, loading, handling, hauling, and placing of hazardous materials, excess excavation material, unsuitable excavation material, clearing and grubbing debris, and construction and demolition debris.
1.2 MEASUREMENT AND PAYMENT
A. There will be no separate measurement or payment for work in this Section. Waste material disposal is considered incidental to other items of work shown in the Schedule of Items.
1.3 SUBMITTALS
A. Certificates of recycling for ballasts, bulbs, and thermostats.
B. Waste disposal tickets from landfill.
PART 2 - PRODUCTS – NOT APPLICABLE
PART 3 - EXECUTION
3.1 WASTE MATERIAL TO BE HAULED TO A LANDFILL
A. All demolition materials, garbage, and other refuse generated shall be removed from the project site and legally disposed of off Government property in an approved landfill.
B. The Contractor shall dispose of removed materials, waste, trash, and debris in a safe, acceptable manner, in accordance with applicable laws and ordinances and as prescribed by authorities having jurisdiction.
C. Burying of trash and debris on the site will not be permitted. Burning of trash and debris at the site will not be permitted.
D. The contractor is responsible for all costs and permits associated with landfill disposal.
E. The Government is not responsible for waste material upon its departure from the project site.
3.2 ON-SITE STORAGE AND ACCUMULATION
A. Demolition debris shall be disposed of as needed, to avoid accumulation at the demolition site.
Materials that cannot be removed daily shall be stored in areas approved by the COR.
B. Ensure temporary storage of all waste is in accordance with regulations and is stored in a manner so that pedestrian safety is protected.
WASTE MATERIAL DISPOSAL 024100-2
3.3 RECYCLING
A. Thermostats, bulbs, and ballasts shall be recycled by a certified recycling company.
3.4 WASTE MATERIAL TO BE HAULED TO A DISPOSAL AREA
A. All excavated material not used in the construction of embankments or backfilling of trenches, or other excess material resulting from the excavation and embankment operation shall be hauled to a commercial disposal site or incorporated into existing embankments upon the approval of the Contracting Officer’s Representative.
B. All unsuitable excavated material and oversize boulders shall be hauled offsite or spread onsite at a location approved by the Contracting Officer’s Representative.
C. All stumps, slash and other clearing and grubbing debris shall be hauled offsite, or chipped onsite upon the approval of the Contracting Officer’s Representative.
END OF SECTION 024100
STRUCTURE DEMOLITION 024116-1
USDA FOREST SERVICE, R6
RAINFOREST TRAILHEAD COMFORT STATION REPLACEMENT
SECTION 024116 – STRUCTURE DEMOLITION
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Demolition and removal of buildings and site improvements.
2. Removing below-grade construction.
3. Disconnecting, capping or sealing, and removing site utilities.
4. Sidewalks and Pavement
5. Salvaging items for reuse by Owner.
1.2 MATERIALS OWNERSHIP
A. Unless otherwise indicated, demolition waste becomes property of Contractor.
B. Historic items, relics, antiques, and similar objects including, but not limited to, cornerstones and their contents, commemorative plaques and tablets, and other items of interest or value to Owner that may be uncovered during demolition remain the property of Owner.
1. Carefully salvage in a manner to prevent damage and promptly return to Owner.
1.3 PRE-DEMOLITION MEETINGS
A. Pre-demolition Conference: Conduct conference at Project site.
1.4 SUBMITTALS
A. Local Permits and Applications to Public Utilities (if applicable)
1.5 FIELD CONDITIONS
A. Buildings to be demolished will be vacated and their use discontinued before start of the Work.
B. Conditions existing at time of inspection for bidding purpose will be maintained by Owner as far as practical.
1. Before building demolition, Owner will remove the following items:
a. Miscellaneous hand tools, cleaning items, and building supplies will be salvaged by the Forest Service.
b. No water, wastewater, or electrical components will be salvaged by the Forest Service.
STRUCTURE DEMOLITION 024116-2
C. Hazardous Materials: It is not expected that hazardous materials will be encountered in the Work.
1. If materials suspected of containing hazardous materials are encountered, do not disturb;
immediately notify the Contracting Officer.
D. Composting Materials:
1. Dispose compost and composters at a suitable waste disposal site, in accordance with state, local and federal environmental requirements.
E. On-site storage or sale of removed items or materials is not permitted.
F. Arrange demolition schedule so as not to interfere with Owner's on-site operations.
1.6 MEASUREMENT AND PAYMENT
A. Measurement shall be Lump Sum (LS) for structure demolition, including attached sidewalks and pavements, underground utilities where encountered, the removal and proper disposal of all materials off the project site, and salvaging and storing site improvements as shown on the drawings.
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. Regulatory Requirements: Comply with governing EPA notification regulations before beginning demolition. Comply with hauling and disposal regulations of authorities having jurisdiction.
B. Standards: Comply with ANSI/ASSE A10.6 and NFPA 241.
2.2 SOIL MATERIALS
A. Satisfactory Soils: Comply with requirements in Section 312000 "Eartwork."
PART 3 - EXECUTION
3.1 EXAMINATION
A. Verify that utilities have been disconnected and capped before starting demolition operations.
B. In accordance with OSHA regulations, perform an engineering survey of condition of building to determine whether removing any element might result in structural deficiency or unplanned collapse of any portion of structure or adjacent structures during building demolition operations.
C. Inventory and record the condition of items to be removed and salvaged.
STRUCTURE DEMOLITION 024116-3
3.2 PREPARATION
A. Salvaged Items: Where shown on the drawings, salvage designated items and comply with the following:
1. Clean salvaged items of dirt and demolition debris.
2. Pack or crate items after cleaning. Identify contents of containers.
3. Store items in a secure area until delivery to Owner.
4. Transport items to storage area designated by Owner or as indicated on Drawings.
5. Protect items from damage during transport and storage.
3.3 UTILITY SERVICES AND MECHANICAL/ELECTRICAL SYSTEMS
A. Existing Utilities to be disconnected: Water, Sewer and Electrical serve this building. The Contractor shall coordinate with the appropriate utilities to shut off power and water to the building.
3.4 PROTECTION
A. Existing Facilities & Site Improvements: Protect adjacent site improvements and other building facilities during demolition operations.
B. Existing Utilities to Remain: Maintain utility services to remain and protect from damage during demolition operations (refer to drawings for locations of said utilities). Do not interrupt existing utilities serving adjacent occupied or operating facilities unless authorized in writing by Owner and authorities having jurisdiction.
C. Temporary Protection: Erect temporary protection, such as walks, fences, railings, canopies, and covered passageways, where required by authorities having jurisdiction and as indicated.
D. Remove temporary barriers and protections where hazards no longer exist. Where open excavations or other hazardous conditions remain, leave temporary barriers and protections in place.
3.5 DEMOLITION
A. General: Demolish indicated buildings and site improvements completely. Use methods required to complete the Work within limitations of governing regulations and as follows:
1. Do not use cutting torches until work area is cleared of flammable materials. Maintain portable fire-suppression devices during flame-cutting operations.
2. Maintain fire watch during and for at least 4 hours after flame-cutting operations.
3. Maintain adequate ventilation when using cutting torches.
4. Locate building demolition equipment and remove debris and materials so as not to impose excessive loads on supporting walls, floors, or framing.
B. Site Access and Temporary Controls: Conduct building demolition and debris-removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.
STRUCTURE DEMOLITION 024116-4
1. Do not close or obstruct streets, walks, walkways, or other adjacent occupied or used facilities without permission from Owner and authorities having jurisdiction. Provide alternate routes around closed or obstructed traffic-ways if required by authorities having jurisdiction.
2. Use water mist and other suitable methods to limit spread of dust and dirt. Comply with governing environmental-protection regulations.
C. Explosives: Use of explosives is not permitted.
D. Proceed with demolition of structural framing members systematically, from higher to lower level. Complete building demolition operations above each floor or tier before disturbing supporting members on the next lower level.
E. Remove debris from elevated portions of the building by chute, hoist, or other device that will convey debris to grade level in a controlled descent.
F. Salvage: Items designated for removal and salvage are considered Government-furnished property and shall be protected from damage. Salvaged items that are damaged shall be replaced in-kind at the expense of the Contractor. Items to be removed, salvaged, and protected from damage are indicated below:
1. Pump Station Control Panels and Components (As shown on the Drawings).
a. If these items are damaged and require replacement, additional engineering (included stamped drawings) shall be required for submission to the Contracting Officer for approval.
b. Refer to the “Division 26 – Electrical” specifications for additional removal, handling and storing instructions.
2. Trash Receptacle
G. Demolish foundation walls and other below-grade construction that are within footprint of new construction and extending 5 feet outside footprint indicated for new construction.
1. Remove below-grade construction, including basements, foundation walls, and footings, completely.
H. Existing Utilities: Demolish existing utilities and below-grade utility structures to the limit shown on the drawings. Provide stub locations for existing utilities designated for reconnection to new building.
I. Below-Grade Areas: Completely fill below-grade areas and voids resulting from building demolition operations with satisfactory soil materials according to backfill requirements in Section 312000 "Earthwork."
J. Site Grading: Uniformly rough grade area of demolished construction to a smooth surface, free from irregular surface changes. Provide a smooth transition between adjacent existing grades and new grades.
K. Promptly repair damage to adjacent buildings and site improvements caused by demolition operations.
STRUCTURE DEMOLITION 024116-5
3.6 CLEANING
A. Remove demolition waste materials from Project site and dispose of them at an EPA-approved construction and demolition waste landfill acceptable to authorities having jurisdiction, and recycle or dispose of them in accordance to State, Local, and Federal regulations."
B. Do not burn demolished materials.
C. Clean adjacent structures and site improvements of dust, dirt, and debris caused by building demolition operations. Return adjacent areas to condition existing before building demolition operations began.
END SECTION 024116
CAST-IN-PLACE CONCRETE 033000-1
RAINFOREST TRAILHEAD COMFORT STATION REPLACEMENT
SECTION 033000 - CAST-IN-PLACE CONCRETE
PART 1 - GENERAL
1.1 SUMMARY
A. This Section specifies cast-in place concrete, including formwork, reinforcement, concrete materials, mixture design, placement procedures, and finishes.
1.2 DEFINITIONS
A. Cementitious Materials: Portland cement alone or in combination with one or more of the following: blended hydraulic cement, fly ash and other pozzolans, ground granulated blast-furnace slag, and silica fume; subject to compliance with requirements.
1.3 SUBMITTALS
A. Product Data: For each type of product indicated.
B. Design Mixtures: For each concrete mixture. Indicate amounts of mixing water to be withheld for later addition at Project site.
C. Field quality-control test reports.
1.4 MEASUREMENT AND PAYMENT
A. Measurement of concrete will by one or more of the following methods as indicated in the Schedule of Items.
1. There will be no separate measurement or payment for this section. Concrete will be measured and paid in section 133450 “Flush Comfort Station Installation” and…