Solicitation for the Quality Assurance for Technical Support contract.
Solicitation number
SOL-HQ-14-00018
Issued by

About this file

SOL-HQ-14-00018

View the file

Other files

File Type Posted
Attachment_6_-_Key_Personnel.docx DOCX document
Amendment_1 _SOL_Changes_-QATS_RFP.docx DOCX document
SOL-HQ-14-00018_-_v18_021916.docx DOCX document
QATS_RFP_-_Amendment_1.docx DOCX document
Attachment_9_-_Past_Performance_Questionnaire.docx DOCX document
Attachment_10_-_Client_Authorization_Letter.docx DOCX document
Attachment_5_-_QATS_QASP_v2_0.docx DOCX document
Attachment_9_-_Past_Performance_Questionnaire.docx DOCX document
Attachment_4_-_Invoice_Preparation_Instructions.docx DOCX document
Attachment_1_-_QATS_PWS.docx DOCX document
Attachment_6_-_Key_Personnel.docx DOCX document
Attachment_5_-_QATS_QASP_v2_0.docx DOCX document
Attachment_2_-_QATS_GFP_-_updated.xlsx XLSX spreadsheet
Sol_SOL-HQ-14-00018.pdf PDF
Attachment_3_-_QATS_Reports_of_Work.docx DOCX document
Attachment_10_-_Client_Authorization_Letter.docx DOCX document
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

SOL-HQ-14-00018

x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

Washington DC 20460 Mail Code: 3805R

SRRPOD

1200 Pennsylvania Avenue, N. W.

William Jefferson Clinton Building US Environmental Protection Agency

SRRPOD

02/09/2016000001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

02/09/2016

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

This amendment is to respond to industry questions as well as make the appropriate modifications to the solicitation as required.

The submission date for proposals has been amended to March 18, 2016.

LIST OF CHANGES:

Bids due date : 11-MAR-16 changed to 18-MAR-16

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Ross Miller

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

03/03/2016

SOL-HQ-14-00018

Amendment 1 – Solicitation Question and Answers

Technical Proposal

1. For the Oral Presentations described in Section L-2, Subsection 1.1.2, can the responses be outlined on the flip charts during the two hour response preparation time to facilitate the presentations?

A: The Presenter(s) can structure their responses and use the supplies furnished in whatever way they feel is best suited to responding to the scenarios.

2. For the Oral Presentations described in Section L-2, Subsection 1.1.2, will members of the orals presentation team other than the primary presenter be allowed to add or tag-team comments as necessary?

A: Per Subsection 1.1.2 paragraph (e) – Presentations shall be delivered by the proposed QATS Program Manager and up to 4 other members of the proposed Key Personnel staff.

Therefore, any of the 5 people proposed to present, may speak at any time during the presentation.

3. In Section M-2 Evaluation Factors for Award clarification is requested on the relative weighting of the evaluation Factors and Subfactors. It's understood that the Subfactors under Factor 1 (Technical Capability), including 1.1 (Technical Approach), 1.2 (Key Personnel), and 1.3 (Management and Staffing Plan) are in descending order of importance. Does it follow that the importance of Factor 2 (Past Performance) is less than that of Subfactor 3 (Management and Staffing Plan)?

A: Factor 1 (Technical Capability) is of more importance than Factor 2 (Past Performance).

The Subfactors under Factor 1 are components of the larger importance of Factor 1. We are not using relative weighting in the evaluation of the Factors and Subfactors for this solicitation. All Subfactors and Subsections in Factor 1 (Technical Capability), will be used for the evaluation of that Factor alone and will not be individually evaluated against Factor 2.

4. The Performance Standards and QASP process described in Attachment 5 refers to Award Term and Award Term Incentives. An Award Term was identified in the previous RFP, however, it is not in this solicitation. Is this Attachment relevant?

A: Attachment 5 has been amended to remove all references to Award Terms and Award Term Incentives. The contemplated contract will have two (2) Option Periods. No Award Terms are anticipated.

5. Q: The key personnel description for Group Leader-Administrative in Attachment 6 indicates a minimum of six (6) years of experience in PC and mainframe based computer systems is required. Organizations of the size needed to support this contract utilize server-based computer systems. Is the mainframe experience requirement still an intended need under this contract?

A: Attachment 6, Group Leader – Administrative has been amended so that it now reads:

At a minimum, the Group Leader – Administrative shall have a B.S. Degree in Computer Science or equivalent from an accredited university or college and a minimum of six (6) years of combined experience in all aspects of environmental measurement information, computerized systems (both PC and server based), and systems analysis. Of these six (6) years of experience, a minimum of two (2) years of systems design, develop, operation, maintenance and testing experience and two (2) years of experience in administrative support functions, including training and records/file maintenance are required.

6. The client authorization letter example in Attachment 10 references the ESAT rather than QATS contract.

A: Attachment 10 has been amended to remove references to ESAT.

7. For various sections of the Technical Proposal, page limits are specified. The spacing to be used for proposal preparation does not appear to be specified in the solicitation. Can we use single spacing for the Technical Proposal?

A: Section L-2, Technical Proposal Instructions, has been amended to incorporate the following sentence:

“The Technical Proposal shall be Single Spaced.”

8. For the Past Performance section, completed questionnaires are requested back from the clients to the EPA Contract Specialist by March 11, 2016 (the due date of the solicitation). Is the specified date of March 11, 2016 correct for receipt of completed questionnaires from clients?

A: The due date for both the submission of proposals and for receipt of completed questionnaires from clients has been amended to March 18, 2016.

Price Proposal

1. In Section B-1 the Contract Base Period (Years 1 and 2: 24 months) table includes the column headings “Personnel Classification” for the key personnel followed by "Skill Level" (TBD);

however, the tables for Option Periods I and II include only the column “Labor Classification”.

The price proposal model on page 64 of Section L-2 uses the term Labor Categories. Why do the tables in Section B-1 differ, and does “Skill Level” in the base period table have any relevance?

A: The Section B-1 tables have been amended so they are consistent throughout the solicitation.

2. In Section B-1 in the first two paragraphs on page 8, the terms "normally assigned category of labor" and "function he/she is performing" as related to how fixed labor rates are to be applied is unclear. Labor categories are not variable unless an individual is promoted. Assigned fixed labor rates are assumed to be consistent with the assigned labor category. Functions performed by any individual may be numerous. Please clarify.

A: Work billed to the contract will be based on the work performed, not the employee’s assigned labor category. For example, if the Senior Organic Analytical Chemist was covering or doing work that is usually performed by a non-key personnel chemist, the contractor would invoice the Government at the rate of the non-key personnel chemist, not at the Senior Organic Analytical Chemist’s normal rate.

3. Do the Other Direct Cost (ODC) amounts required to be proposed as indicated in sections B-3 and L-2, page 66, include full markup (i.e., G&A)?

A: Yes, G&A is included in the ODC amounts referenced in B-3 and L-2.

4. If contract labor is proposed at the task order level as an ODC, will it apply to the listed ODC maximums as shown in Section B-3?

We do not foresee identifying contract labor as an ODC.

5. In Section L-2, the annual LOE ceilings as shown in the Price proposal Subsection 4.2 (Direct Labor) of 58,480 hours/year represent a 34% decrease from the 88,200 hours/year in the previous QATS RFP; however, the scope of services described in the PWS is essentially unchanged.

There appears to be no provision through total hours proposed or through optional LOE quantities to accommodate growth should the demand increase for QA/QC support within the CLP or for buy-in projects from the Regions. Is that an error? If not, will there be accommodations to increase the contract LOE ceilings when increased demand occurs?

A: The labor hours in Section l-2, Subsection 4.2 have been corrected, due to a computational error in the initial estimate, to 64,500 hours/year.

6. The Price Proposal Model Schedule 1 on page 64 of Section L-2 L-14 has columns for rates, proposed hours, and total cost for direct labor but not for teaming subcontractor and contract labor/consultants. Two questions: 1) Are teaming subcontractor and contract labor/consultant hours to be applied to the annual LOE totals indicated in this Section, and 2) if so can the schedules be modified accordingly?

A: Subcontractor hours should be applied to the annual LOE totals. Please see Price Proposal Model Schedule 1, Section D. (Team Subcontractors).

7. Specific Other Direct Costs (ODCs) amounts by contract period are indicated in Sections B-2 and L-2. The first sentence in Section L-2, Subsection 4.7 states, “For evaluation purposes, the Offeror shall propose the following ODCs:

Period/Term Amount Base Period (Two Years) $1,973,000.00 Option Period I (Three Years) $3,058,100.00 Option Period II (Two Years) $2,109,000.00

Are these amounts for proposal purposes only, or are they intended to be Period/Term ceilings?

A: They are intended to be Period/Term ceilings. Per Clause B-3, amounts in excess of the following are not allowable as a charge to this contract without the prior written approval of the Contracting Officer.

8. Section 4.0 – Labor Rates and Total Contract Price. Page 62 of the Solicitation states: “This section shall be divided into three subsections (in the electronic .xls file version of this section, each of the following subsections shall be its own spreadsheet tab).” Are the three subsections:

4.1 – Summary Page

4.2 – Direct Labor

4.3 – Administrative Labor

In addition, where are the spreadsheet tabs for the eight schedules to be placed?

A: Each Subsection shall have its own tab in the Price Proposal spreadsheet. The reference to “three” was deleted in L-2, Price Proposal, Section 4.

The seven (7) schedules should be separate and have their own respective tabs.

9. Subsection 4.1 – Summary Page. Pages 62 and 63 of the Solicitation identify the components of the Summary Page. The information requested appears to be similar to that to be provided on Schedule 1. Please provide a specific format for the Summary Page so that we may provide the desired information.

A: The Summary Page and Schedule 1 are the same document; however please submit it as Tab 4.1. Use the format in Schedule 1 for the Summary Page (Tab 4.1).

Schedules 2-8 have been amended to Schedules 1-7, as to not duplicate the Summary Page.

10. Schedules 2 thru 8: Individual Contract Year. Page 65 of the Solicitation requires the development of schedules for each contract year. However, Section B of the Solicitation (pages 6 and 7) shows the use of fixed hourly rates for each of the contract periods. Thus, it appears that the information on Schedules 2 and 3 would be identical as would Schedules 4 through 6 and Schedules 7 and 8. Is our interpretation correct?

A: That is correct. As shown in the answer to Question 9, the individual contract years are now labeled Schedules 1-7. Therefore Schedules 1 and 2 would be identical, as would Schedules 3 through 5 and Schedules 6 and 7.

CHANGES TO SOLICITATION

The following changes have been made to B-1:

- The first column is now titled Labor Category

- The Skill Level column has been deleted throughout

B-1 FIXED RATES FOR SERVICES-INDEFINITE DELIVERY/INDEFINITE

QUANTITY CONTRACT (EPAAR 1552.216-73) (APR 1984) TAILORED

The following fixed rates shall apply for payment purposes for the duration of the contact.

Item #0001 Contract Base Period (Years 1 and 2: 24 months):

Labor Category Estimated Direct Labor

Hours

Fixed Hourly Rate

Total

QATS Program Manager TBD TBD TBD Group Leader - Analytical Group Leader - Auditing Group Leader – Administrative Senior Quality Assurance Officer Senior Organic Analytical Chemist Senior Inorganic Analytical Chemist Senior Organic Auditor Senior Inorganic Auditor Senior Systems Analyst

Item #0002 Contract Option Period I (Years 3, 4 and 5: 36 months):

Labor Category Estimated Direct Labor

Hours

Fixed Hourly Rate

Total

QATS Program Manager TBD TBD TBD Group Leader - Analytical Group Leader - Auditing Group Leader – Administrative

Senior Quality Assurance Officer Senior Organic Analytical Chemist Senior Inorganic Analytical Chemist Senior Organic Auditor Senior Inorganic Auditor Senior Systems Analyst

Item #0003 Contract Option Period II (Years 6 and 7: 24 months):

Labor Category Estimated Direct Labor

Hours

Fixed Hourly Rate

Total

QATS Program Manager TBD TBD TBD Group Leader - Analytical Group Leader - Auditing Group Leader – Administrative Senior Quality Assurance Officer Senior Organic Analytical Chemist Senior Inorganic Analytical Chemist Senior Organic Auditor Senior Inorganic Auditor Senior Systems Analyst

The rate, or rates, set forth above cover all expenses, including report preparation, salaries, overhead, general and administrative expenses, and profit.

L-2 PROPOSAL INSTRUCTIONS (EPA-L-36-101) TAILORED

TECHNICAL PROPOSAL INSTRUCTIONS

The Technical Proposal shall be formatted to print so as not to exceed 8.5" x 11" sized pages.

The Technical Proposal shall not have margins smaller than 0.75" and shall not contain text smaller than 12-point Times New Roman font. Each paragraph shall be separated by at least one 12-point line. The Technical Proposal shall be Single Spaced. Page numbers shall be included and may be within the margins. The Technical Proposal may include graphics and tables provided that graphics and tables do not contain text smaller than 10-point font. The Technical Proposal shall be provided in either .doc or searchable .pdf format.

PRICE PROPOSAL INSTRUCTIONS

SECTION 4 – LABOR RATES AND TOTAL CONTRACT PRICE

In this section, the Offeror shall propose labor rates, materials costs, and the total contract price. This section shall be divided into subsections (in the electronic .xls file version of this section, each of the following subsections shall be its own spreadsheet tab):

SUBSECTION 4.1 – SUMMARY PAGE

In this section, the Offeror shall provide a summary page of:

1) Total Direct Labor. The Offeror shall detail all labor categories and labor rates proposed for all contract years, multiplied by the labor hours proposed per labor category in Clause B-1, with the product (i.e. total direct labor costs) shown for each contract year and in total;

2) Total Other Direct Costs. The Offeror shall detail all proposed Other Direct Costs for each contract year and in total; and

3) Identification of Subcontractors. The Offeror shall detail all proposed Subcontractors for Contracting Officer consent in accordance with the Section I clause, Subcontracts (FAR 52.244-

2), including the Subcontractor name, the prime Contractor’s evaluated Subcontract cost as required by FAR 15.404-3(b)(2), and Subcontract type.

4) Total Price. The Offeror shall detail the sum of total direct labor and total materials showing the total proposed contract price.

SUBSECTION 4.2 – DIRECT LABOR

In this subsection, the Offeror shall provide a detailed spreadsheet of proposed labor rates for all contract labor categories for each year of the contract (each year shall be its own separate spreadsheet tab). Labor rates shall be hourly, fixed, and fully burdened.

PRICE PROPOSAL MODEL

NOTE: This price proposal model/schedule should be tailored to the Offeror’s standard accounting practices.

SUMMARY PAGE (Subsection 4.1): Contract Summary (One Two-Year Base Period; One Three-Year Option Period I, One Two-Year Option Period II, for a total of seven (7) Years). For price proposal purposes, assume 64,500 labor hours per contract year, with a total of 451,500 labor hours over the life of the contract.

A. Direct Labor Rate Proposed Hours Cost

Program Manager*

Group Leader-Analytical*

Group Leader-Auditing*

Group Leader-Administrative*

Senior Quality Assurance Officer*

Senior Organic Analytical Chemist*

Senior Inorganic Analytical Chemist*

Senior Organic Auditor*

Senior Inorganic Auditor*

Senior Systems Analyst*

Other Proposed Labor Categories

* = Indicates Key Personnel Category

1. Total Professional Labor

2. Total Clerical (if applicable)

B. Total Direct Labor Costs (Loaded)

C. Other Direct Costs (ODCs)

D. Team Subcontractors 1.

2.

3.

E. Total Subcontractors

F. Material Handling (if applicable) __% (identify base)

G. Total Contract Price

SCHEDULE 1 thru 7: INDIVIDUAL CONTRACT YEAR

For price proposal purposes, assume 64,500 labor hours during each contract year.

Schedules 1 thru 7 shall use the same format described in Summary Page.

Attachment 5

- Removed all references to Award Terms and Award Term Incentives

Attachment 6

- Group Leader – Administrative:

At a minimum, the Group Leader – Administrative shall have a B.S. Degree in Computer Science or equivalent from an accredited university or college and a minimum of six (6) years of combined experience in all aspects of environmental measurement information, computerized systems (both PC and server based), and systems analysis. Of these six

(6) years of experience, a minimum of two (2) years of systems design, develop, operation, maintenance and testing experience and two (2) years of experience in administrative support functions, including training and records/file maintenance are required.

Attachment 9

- Changed submission date to March 18, 2016.

Attachment 10

- Removed all references to ESAT

- Changed submission date to March 18, 2016.