Sol_SOL-DC-14-00002.pdf

PDF 1012 KB Posted

Attached to
Statistical and Technical Support for the Assessment of Toxic Substances
Solicitation number
SOL-DC-14-00002
Issued by

About this file

SOL-DC-14-00002

View the file

Other files

File Type Posted
Amendment_2_Solicitation_Changes.docx DOCX document
Sol_SOL-DC-14-00002_Amd_000002.pdf PDF
14-00002-TechproposalInst.docx DOCX document
Amendment_1_Solicitation_Changes.docx DOCX document
Sol_SOL-DC-14-00002_Amd_000001.pdf PDF
Responses_to_Questions.docx DOCX document
FAR_52_246-11_FULL_TEXT_FILL-IN.docx DOCX document
14-00002_Evaluation_Factors.docx DOCX document
Cost_Proposal_Instructions.docx DOCX document
14-00002-TechproposalInst.docx DOCX document
SOW_for_SOL-DC-14-00002.docx DOCX document
Attachment_9_-_Reports_of_Work.docx DOCX document
pastperformancequestionnaire.docx DOCX document
14-00002-CLIENT_AUTHORIZATION_LETTER.docx DOCX document
INVOICE_PREPARATION_INSTRUCTIONS.docx DOCX document
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOL-DC-14-00002

SOLICITATION, OFFER AND AWARD

4. TYPE OF SOLICITATION2. CONTRACT NUMBER 3. SOLICITATION NUMBER

7. ISSUED BY CODE 8. ADDRESS OFFER TO (If other than Item 7)

ORDER UNDER DPAS (15 CFR 700)

6. REQUISITION/PURCHASE NUMBER

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

NEGOTIATED (RFP)

SEALED BID (IFB)

5. DATE ISSUED

1. THIS CONTRACT IS A RATED RATING PAGE OF PAGES

1 2

C. E-MAIL ADDRESS

EXT.NUMBERAREA CODE

B. TELEPHONE (NO COLLECT CALLS)A. NAME

10. FOR

INFORMATION

CALL:

CAUTION: LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

(Date)(Hour) local timeuntildepository located in copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if hand carried, in the

SOLICITATION

9. Sealed offers in original and

PART IV - REPRESENTATIONS AND INSTRUCTIONS

OTHER STATEMENTS OF OFFERORS

EVALUATION FACTORS FOR AWARD

INSTRS., CONDS., AND NOTICES TO OFFERORS

REPRESENTATIONS, CERTIFICATIONS AND

LIST OF ATTACHMENTS

CONTRACT CLAUSES

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACH.

I

J

K

L

M SPECIAL CONTRACT REQUIREMENTS

CONTRACT ADMINISTRATION DATA

DELIVERIES OR PERFORMANCE

INSPECTION AND ACCEPTANCE

PACKAGING AND MARKING

DESCRIPTION/SPECS./WORK STATEMENT

SUPPLIES OR SERVICES AND PRICES/COSTS

SOLICITATION/CONTRACT FORM

PART II - CONTRACT CLAUSESPART I - THE SCHEDULE

H

G

F

E

D

C

B

A

SEC. DESCRIPTION PAGE(S) (X) DESCRIPTION SEC. (X)

11. TABLE OF CONTENTS

18. OFFER DATE17. SIGNATURE

SUCH ADDRESS IN SCHEDULE.

IS DIFFERENT FROM ABOVE - ENTER

15C. CHECK IF REMITTANCE ADDRESS

EXT.NUMBERAREA CODE

15B. TELEPHONE NUMBER

(Type or print)AND

ADDRESS

OF

OFFEROR

CODE FACILITY

16. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER15A. NAME

DATEAMENDMENT NO.DATEAMENDMENT NO.

and related documents numbered and dated):

amendments to the SOLICITATION for offerors

(The offeror acknowledges receipt of

14. ACKNOWLEDGEMENT OF AMENDMENTS

CALENDAR DAYS (%)30 CALENDAR DAYS (%)20 CALENDAR DAYS (%)10 CALENDAR DAYS (%)

(See Section I, Clause No. 52.232.8)

13. DISCOUNT FOR PROMPT PAYMENT

designated point(s), within the time specified in the schedule.

by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the

12. In compliance with the above, the undersigned agrees, if this offer is accepted within ______________ calendar days (60 calendar days unless a different period is inserted

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

OFFER (Must be fully completed by offeror)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

28. AWARD DATE

(Signature of Contracting Officer)

27. UNITED STATES OF AMERICA

25. PAYMENT WILL BE MADE BY

26. NAME OF CONTRACTING OFFICER (Type or print)

CODE 24. ADMINISTERED BY (If other than Item 7)

ITEM

(4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN

41 U.S.C. 253 (c) ( 10 U.S.C. 2304 (c) (

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

21. ACCOUNTING AND APPROPRIATION20. AMOUNT19. ACCEPTED AS TO ITEMS NUMBERED

AWARD (To be completed by government)

CODE

06/09/2015 X

HPOD

HPOD

US Environmental Protection Agency Ariel Rios Building 1200 Pennsylvania Avenue, N. W.

Mail Code: 3803R Washington DC 20460

SEE SECTION L 1630 ES 07/09/2015

Sharon Hargrove-Whitehair 202 whitehair.sharon@epa.gov

564-4764

PAGE(S)

Christine Edwards

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is unusable

STANDARD FORM 33 (Rev. 9-97)

Prescribed by GSA - FAR (48 CFR) 53.214(c)

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 2

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

SOL-DC-14-00002

(A) (B) (C) (D) (E) (F)

Statistical and Technical Support for the Assessment of Toxic Substances

OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

NSN 7540-01-152-8067

SECTION A - Solicitation/Contract Form

SECTION B - Supplies or Services/Prices

B-1 LOCAL CLAUSES 1552.211-73 LEVEL OF EFFORT - COST REIMBURSEMENT TERM

CONTRACT (AUG 1995)(DEVIATION)

B-2 LOCAL CLAUSES 1552.211-74 WORK ASSIGNMENTS (EPAAR 1552.211-74) (APR 1984)

B-3 LOCAL CLAUSES EPA-B-16-102 ESTIMATED COST AND FIXED FEE

B-4 LOCAL CLAUSES EPA-B-31-101 OTHER DIRECT COSTS

B-5 LOCAL CLAUSES EPA-B-32-101 LIMITATION OF FUNDS NOTICE

SECTION C - Description/Specifications

C-1 EPAAR 1552.211-79 COMPLIANCE WITH EPA POLICIES FOR INFORMATION

RESOURCES MANAGEMENT. (JAN 2012)

C-2 LOCAL CLAUSES EPA-C-10-101 STATEMENT OF WORK/PERFORMANCE WORK

STATEMENT/SPECIFICATIONS

SECTION D - Packaging and Marking

SECTION E - Inspection and Acceptance

E-1 FAR 52.246-5 INSPECTION OF SERVICES - COST-REIMBURSEMENT. (APR 1984)

E-2 FAR 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT. (FEB 1999)

SECTION F - Deliveries or Performance

F-1 FAR 52.242-15 STOP-WORK ORDER. (AUG 1989) - ALTERNATE I (APR 1984)

F-2 EPAAR 1552.211-70 REPORTS OF WORK. (OCT 2000)

F-3 EPAAR 1552.211-72 MONTHLY PROGRESS REPORT. (SEP 2013)

F-4 EPAAR 1552.211-75 WORKING FILES. (APR 1984)

F-5 EPAAR 1552.211-78 MANAGEMENT CONSULTING SERVICES. (APR 1985)

F-6 LOCAL CLAUSES EPA-F-12-101 PERIOD OF PERFORMANCE

SECTION G - Contract Administration Data

G-1 EPAAR 1552.216-74 PAYMENT OF FEE. (MAY 1991)

G-2 EPAAR 1552.232-70 SUBMISSION OF INVOICES. (JUN 1996)

G-3 EPAAR 1552.242-70 INDIRECT COSTS. (APR 1984)

G-4 EPAAR 1552.245-70 GOVERNMENT PROPERTY. (SEP 2009)

G-5 EPAAR 1552.245-71 GOVERNMENT-FURNISHED DATA. (SEP 2009)

G-6 LOCAL CLAUSES EPA-G-42-101 CONTRACT ADMINISTRATION REPRESENTATIVES21

SECTION H - Special Contract Requirements

H-1 EPAAR 1552.203-71 DISPLAY OF EPA OFFICE OF INSPECTOR GENERAL HOTLINE

POSTER. (AUG 2000)

H-2 EPAAR 1552.208-70 PRINTING. (SEP 2012)

H-3 EPAAR 1552.209-71 ORGANIZATIONAL CONFLICTS OF INTEREST. (MAY 1994) --

ALTERNATE I (MAY 1994)

H-4 EPAAR 1552.209-73 NOTIFICATION OF CONFLICTS OF INTEREST REGARDING

PERSONNEL. (MAY 1994)

H-5 EPAAR 1552.217-71 OPTION TO EXTEND THE TERM OF THE CONTRACT-COST-TYPE

CONTRACT. (APR 1984)

H-6 EPAAR 1552.217-73 OPTION FOR INCREASED QUANTITY-COST-TYPE CONTRACT.

(JUN 1997)

H-7 EPAAR 1552.227-76 PROJECT EMPLOYEE CONFIDENTIALITY AGREEMENT. (MAY

1994)

H-8 EPAAR 1552.228-70 INSURANCE LIABILITY TO THIRD PERSONS. (OCT 2000)

H-9 EPAAR 1552.235-70 SCREENING BUSINESS INFORMATION FOR CLAIMS OF

CONFIDENTIALITY. (APR 1984)

H-10 EPAAR 1552.235-71 TREATMENT OF CONFIDENTIAL BUSINESS INFORMATION.

(APR 1984)

H-11 EPAAR 1552.235-75 ACCESS TO TOXIC SUBSTANCES CONTROL ACT CONFIDENTIAL

BUSINESS INFORMATION (APR 1996). (APR 1996)

H-12 EPAAR 1552.235-76 TREATMENT OF CONFIDENTIAL BUSINESS INFORMATION.

(APR 1996)

H-13 EPAAR 1552.235-78 DATA SECURITY FOR TOXIC SUBSTANCES CONTROL ACT

CONFIDENTIAL BUSINESS INFORMATION. (DEC 1997)

H-14 EPAAR 1552.235-79 RELEASE OF CONTRACTOR CONFIDENTIAL BUSINESS

INFORMATION. (APR 1996)

H-15 EPAAR 1552.235-80 ACCESS TO CONFIDENTIAL BUSINESS INFORMATION. (OCT

2000)

H-16 EPAAR 1552.237-71 TECHNICAL DIRECTION. (AUG 2009)

H-17 EPAAR 1552.237-72 KEY PERSONNEL. (APR 1984)

H-18 EPAAR 1552.237-75 PAPERWORK REDUCTION ACT. (APR 1984)

H-19 EPAAR 1552.237-76 GOVERNMENT-CONTRACTOR RELATIONS. (JUN 1999)

H-20 LOCAL CLAUSES EPA-H-07-103 NOTICE REGARDING PROHIBITED CONTRACTOR

ACTIVITIES ON ENVIRONMENTAL PROTECTION AGENCY (EPA CONTRACTS)

H-21 LOCAL CLAUSES EPA-H-09-107 UNPAID FEDERAL TAX LIABILITY & FELONY

CRIMINAL VIOLATION CERTIFICATION (APR 2012)

SECTION I - Contract Clauses

I-1 FAR 52.202-1 DEFINITIONS. (NOV 2013)

I-2 FAR 52.203-3 GRATUITIES. (APR 1984)

I-3 FAR 52.203-5 COVENANT AGAINST CONTINGENT FEES. (APR 1984)

I-4 FAR 52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT.

(SEP 2006)

I-5 FAR 52.203-7 ANTI-KICKBACK PROCEDURES. (OCT 2010)

I-6 FAR 52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR

ILLEGAL OR IMPROPER ACTIVITY. (JAN 1997)

I-7 FAR 52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY.

(JAN 1997)

I-8 FAR 52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL

TRANSACTIONS. (OCT 2010)

I-9 FAR 52.203-13 CONTRACTOR CODE OF BUSINESS ETHICS AND CONDUCT. (APR 2010)

I-10 FAR 52.203-14 DISPLAY OF HOTLINE POSTER(S). (DEC 2007)

I-11 FAR 52.203-17 CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS AND

REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS. (APR 2014)

I-12 FAR 52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON POSTCONSUMER FIBER

CONTENT PAPER. (MAY 2011)

I-13 FAR 52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER

SUBCONTRACT AWARDS. (JUL 2013)

I-14 FAR 52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE. (JUL 2013)

I-15 FAR 52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN

SUBCONTRACTING WITH CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR

DEBARMENT. (AUG 2013)

I-16 FAR 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING

RESPONSIBILITY MATTERS. (JUL 2013)

I-17 FAR 52.210-1 MARKET RESEARCH. (APR 2011)

I-18 FAR 52.215-2 AUDIT AND RECORDS - NEGOTIATION. (OCT 2010)

I-19 FAR 52.215-8 ORDER OF PRECEDENCE - UNIFORM CONTRACT FORMAT. (OCT 1997)

I-20 FAR 52.215-23 LIMITATIONS ON PASS-THROUGH CHARGES. (OCT 2009)

I-21 FAR 52.216-7 ALLOWABLE COST AND PAYMENT. (JUN 2013)

I-22 FAR 52.216-25 CONTRACT DEFINITIZATION. (OCT 2010)

I-23 FAR 52.217-8 OPTION TO EXTEND SERVICES. (NOV 1999)

I-24 FAR 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT. (MAR 2000)

I-25 FAR 52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS. (JUL 2013)

I-26 FAR 52.219-9 SMALL BUSINESS SUBCONTRACTING PLAN. (JUL 2013)

I-27 FAR 52.219-16 LIQUIDATED DAMAGES - SUBCONTRACTING PLAN. (JAN 1999)

I-28 FAR 52.219-25 SMALL DISADVANTAGED BUSINESS PARTICIPATION PROGRAM-

DISADVANTAGED STATUS AND REPORTING. (JUL 2013)

I-29 FAR 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION.

(JUL 2013)

I-30 FAR 52.222-3 CONVICT LABOR. (JUN 2003)

I-31 FAR 52.222-21 PROHIBITION OF SEGREGATED FACILITIES. (FEB 1999)

I-32 FAR 52.222-26 EQUAL OPPORTUNITY. (MAR 2007)

I-33 FAR 52.222-35 EQUAL OPPORTUNITY FOR VETERANS. (SEP 2010)

I-34 FAR 52.222-36 AFFIRMATIVE ACTION FOR WORKERS WITH DISABILITIES. (OCT

2010)

I-35 FAR 52.222-37 EMPLOYMENT REPORTS ON VETERANS. (SEP 2010)

I-36 FAR 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL

LABOR RELATIONS ACT. (DEC 2010)

I-37 FAR 52.222-50 COMBATING TRAFFICKING IN PERSONS. (FEB 2009)

I-38 FAR 52.222-54 EMPLOYMENT ELIGIBILITY VERIFICATION. (AUG 2013)

I-39 FAR 52.223-6 DRUG-FREE WORKPLACE. (MAY 2001)

I-40 FAR 52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING

WHILE DRIVING. (AUG 2011)

I-41 FAR 52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES. (JUN 2008)

I-42 FAR 52.225-25 PROHIBITION ON CONTRACTING WITH ENTITIES ENGAGING IN

CERTAIN ACTIVITIES OR TRANSACTIONS RELATING TO IRAN-REPRESENTATION AND

CERTIFICATIONS. (DEC 2012)

I-43 FAR 52.227-14 RIGHTS IN DATA-GENERAL. (DEC 2007) - ALTERNATE V (DEC 2007)

I-44 FAR 52.227-17 RIGHTS IN DATA--SPECIAL WORKS. (DEC 2007)

I-45 FAR 52.228-7 INSURANCE - LIABILITY TO THIRD PERSONS. (MAR 1996)

I-46 FAR 52.230-2 COST ACCOUNTING STANDARDS. (MAY 2012)

I-47 FAR 52.230-3 DISCLOSURE AND CONSISTENCY OF COST ACCOUNTING PRACTICES.

(MAY 2012)

I-48 FAR 52.230-6 ADMINISTRATION OF COST ACCOUNTING STANDARDS. (JUN 2010)

I-49 FAR 52.232-17 INTEREST. (OCT 2010)

I-50 FAR 52.232-22 LIMITATION OF FUNDS. (APR 1984)

I-51 FAR 52.232-23 ASSIGNMENT OF CLAIMS. (JAN 1986)

I-52 FAR 52.232-25 PROMPT PAYMENT. (JUL 2013) - ALTERNATE I (FEB 2002)

I-53 FAR 52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER - SYSTEM FOR AWARD

MANAGEMENT. (JUL 2013)

I-54 FAR 52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS. (JUN 2013)46

I-55 FAR 52.233-1 DISPUTES. (JUL 2002)

I-56 FAR 52.233-3 PROTEST AFTER AWARD. (AUG 1996) - ALTERNATE I (JUN 1985)

I-57 FAR 52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM. (OCT 2004)

I-58 FAR 52.237-3 CONTINUITY OF SERVICES. (JAN 1991)

I-59 FAR 52.242-1 NOTICE OF INTENT TO DISALLOW COSTS. (APR 1984)

I-60 FAR 52.242-3 PENALTIES FOR UNALLOWABLE COSTS. (MAY 2001)

I-61 FAR 52.242-4 CERTIFICATION OF FINAL INDIRECT COSTS. (JAN 1997)

I-62 FAR 52.242-13 BANKRUPTCY. (JUL 1995)

I-63 FAR 52.243-2 CHANGES - COST-REIMBURSEMENT. (AUG 1987)

I-64 FAR 52.244-2 SUBCONTRACTS. (OCT 2010) - ALTERNATE I (JUN 2007)

I-65 FAR 52.244-5 COMPETITION IN SUBCONTRACTING. (DEC 1996)

I-66 FAR 52.244-6 SUBCONTRACTS FOR COMMERCIAL ITEMS. (DEC 2013)

I-67 FAR 52.245-1 GOVERNMENT PROPERTY. (APR 2012)

I-68 FAR 52.245-9 USE AND CHARGES (APR 2012)

I-69 FAR 52.246-25 LIMITATION OF LIABILITY - SERVICES. (FEB 1997)

I-70 FAR 52.249-6 TERMINATION (COST-REIMBURSEMENT). (MAY 2004)

I-71 FAR 52.249-14 EXCUSABLE DELAYS. (APR 1984)

I-72 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE. (FEB 1998)

I-73 FAR 52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES. (APR 1984)

I-74 FAR 52.253-1 COMPUTER GENERATED FORMS. (JAN 1991)

SECTION J - List of Documents, Exhibits and Other Attachments

SECTION K - Representations, Certifications, and Other Statements of Bidders

K-1 FAR 52.203-11 CERTIFICATION AND DISCLOSURE REGARDING PAYMENTS TO

INFLUENCE CERTAIN FEDERAL TRANSACTIONS. (SEP 2007)

K-2 FAR 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS. (JAN 2014)

K-3 FAR 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS. (JUL 2013) ...55

K-4 FAR 52.225-25 PROHIBITION ON CONTRACTING WITH ENTITIES ENGAGING IN

CERTAIN ACTIVITIES OR TRANSACTIONS RELATING TO IRAN-REPRESENTATION AND

CERTIFICATIONS. (DEC 2012)

K-5 FAR 52.230-1 COST ACCOUNTING STANDARDS NOTICES AND CERTIFICATION. (MAY

2012)

K-6 FAR 52.230-7 PROPOSAL DISCLOSURE--COST ACCOUNTING PRACTICE CHANGES.

(APR 2005)

K-7 EPAAR 1552.209-72 ORGANIZATIONAL CONFLICT OF INTEREST CERTIFICATION.

(APR 1984)

K-8 EPAAR 1552.224-70 SOCIAL SECURITY NUMBERS OF CONSULTANTS AND CERTAIN

SOLE PROPRIETORS AND PRIVACY ACT STATEMENT. (APR 1984)

SECTION L - Instructions,Conditions, and Notices to Bidders

L-1 FAR 52.204-7 SYSTEM FOR AWARD MANAGEMENT. (JUL 2013)

L-2 FAR 52.215-1 INSTRUCTIONS TO OFFERORS - COMPETITIVE ACQUISITION. (JAN

2004)

L-3 FAR 52.215-16 FACILITIES CAPITAL COST OF MONEY. (JUN 2003)

L-4 FAR 52.215-20 REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA OR DATA

OTHER THAN COST OR PRICING DATA. (OCT 2010) - ALTERNATE IV (OCT 2010)

L-5 FAR 52.215-22 LIMITATIONS ON PASS-THROUGH CHARGES--IDENTIFICATION OF

SUBCONTRACT EFFORT. (OCT 2009)

L-6 FAR 52.216-1 TYPE OF CONTRACT. (APR 1984)

L-7 FAR 52.222-46 EVALUATION OF COMPENSATION FOR PROFESSIONAL EMPLOYEES.

(FEB 1993)

L-8 FAR 52.233-2 SERVICE OF PROTEST. (SEP 2006)

L-9 FAR 52.237-10 IDENTIFICATION OF UNCOMPENSATED OVERTIME. (OCT 1997)

L-10 FAR 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE. (FEB

1998)

L-11 FAR 52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS. (APR 1984)

L-12 EPAAR 1552.209-70 ORGANIZATIONAL CONFLICT OF INTEREST NOTIFICATION.

(APR 1984)

L-13 EPAAR 1552.215-75 PAST PERFORMANCE INFORMATION. (OCT 2000)

L-14 EPAAR 1552.219-71 PROCEDURES FOR PARTICIPATION IN THE EPA MENTOR-

PROTEGE PROGRAM. (OCT 2000)

L-15 EPAAR 1552.233-70 NOTICE OF FILING REQUIREMENTS FOR AGENCY PROTESTS.

(JUL 1999)

L-16 LOCAL CLAUSES EPA-L-12-101 PROPOSED CONTRACTOR START DATE

L-17 LOCAL CLAUSES EPA-L-15-102 TECHNICAL QUESTIONS

L-18 LOCAL CLAUSES EPA-15-L-104 ELECTRONIC SUBMISSION OF PROPOSALS/BIDS/

OFFERS/QUOTES (MAR 2014)

L-19 LOCAL CLAUSES EPA-L-19-102 EPA'S GOALS FOR SUBCONTRACTING WITH SMALL

BUSINESSES

L-20 LOCAL CLAUSES EPA-L-46-101 INSTRUCTIONS FOR THE PREPARATION OF A

QUALITY MANAGEMENT PLAN

SECTION M - Evaluation Factors for Award

M-1 EPAAR 1552.215-70 EPA SOURCE EVALUATION AND SELECTION PROCEDURES-

NEGOTIATED PROCUREMENTS. (AUG 1999)

M-2 EPAAR 1552.215-71 EVALUATION FACTORS FOR AWARD. (AUG 1999)

M-3 EPAAR 1552.217-70 EVALUATION OF CONTRACT OPTIONS. (APR 1984)

SECTION A - Solicitation/Contract Form

SECTION B - Supplies or Services/Prices

B-1 LOCAL CLAUSES 1552.211-73 LEVEL OF EFFORT - COST REIMBURSEMENT TERM

CONTRACT (AUG 1995)(DEVIATION)

(a) The Contractor shall perform all work and provide all required reports within the level of effort specified below. The Government will order 24,000 direct labor hours for the base period which represents the Government's best estimate of the level of effort required to fulfill these requirements.

(b) Direct labor includes personnel such as engineers, scientists, draftsmen, technicians, statisticians, and programmers and not support personnel such as company management, typists, and key punch operators even though such support personnel are normally treated as direct labor by the Contractor. The level of effort specified in paragraph (a) includes Contractor, subcontractor, and consultant labor hours.

(c) Under any circumstances, if the Government orders or the Contractor provides less than 90 percent of the level of effort specified for the base period or any optional period exercised, an equitable downward adjustment of the fixed fee, if any, for that period will be made. The Government may require the Contractor to provide additional effort up to 110 percent of the level of effort for any period until the estimated cost for that period has been reached. However, this additional effort shall not result in any increase in the fixed fee, if any. If this is a cost-plus-incentive-fee (CPIF) contract, the term "fee" in this paragraph means "base fee and incentive fee." If this is a cost-plus-award-fee (CPAF) contract, the term "fee" in this paragraph means "base fee and award fee."

(d) If the level of effort specified to be ordered during a given base or option period is not ordered during that period, that level of effort may not be accumulated and ordered during a subsequent period.

(e) These terms and conditions do not supersede the requirements of either the "Limitation of Cost" or "Limitation of Funds" clauses.

(End of clause)

B-2 LOCAL CLAUSES 1552.211-74 WORK ASSIGNMENTS (EPAAR 1552.211-74) (APR 1984)

(a) The Contractor shall perform work under this contract as specified in written work assignments issued by the Contracting Officer.

(b) Each work assignment will include (1) a numerical designation, (2) the estimate of required labor hours, (3) the period of performance and schedule of deliverables, and (4) the description of the work.

(c) The Contractor shall acknowledge receipt of each work assignment by returning to the Contracting Officer a signed copy of the work assignment within seven (7) calendar days after its receipt. The Contractor shall begin work immediately upon receipt of a work assignment.

Within fifteen (15) calendar days after receipt of a work assignment, the Contractor shall submit two (2) copy(ies) of a work plan to the Contracting Officer's Representative and one (1) copy(ies) to the Contracting Officer. The work plan shall include a detailed technical and staffing plan and a detailed cost estimate.

Within thirty (30) calendar days after receipt of the work plan, the Contracting Officer will provide written approval or disapproval of it to the Contractor.

If the Contractor has not received approval on a work plan within forty-five (45) calendar days after its submission, the Contractor shall stop work on that work assignment. Also, if the Contracting Officer disapproves a work plan, the Contractor shall stop work until the problem causing the disapproval is resolved. In either case, the Contractor shall resume work only when the Contracting Officer finally approves the work plan.

(d) This clause does not change the requirements of the "Level of Effort" clause, nor the notification requirements of either the "Limitation of Cost" or "Limitation of Funds" clauses.

(e) Work assignments shall not allow for any change to the terms or conditions of the contract. Where any language in the work assignment may suggest a change to the terms or conditions, the Contractor shall immediately notify the Contracting Officer.

B-3 LOCAL CLAUSES EPA-B-16-102 ESTIMATED COST AND FIXED FEE

(a) The estimated cost of this contract is To Be Determined (TBD).

(b) The fixed fee is TBD.

(c) The total estimated cost and fixed fee is TBD.

B-4 LOCAL CLAUSES EPA-B-31-101 OTHER DIRECT COSTS

For the categories listed, Other Direct Costs in excess of the following are not allowable as a charge to this contract without the prior written approval of the Contracting Officer:

Base Period - $340,000.00 Option Period I - $360,200.00 Option Period II - $360,706.00 Option Period III - $371,527.00 Option Period IV - $382,673.00

B-5 LOCAL CLAUSES EPA-B-32-101 LIMITATION OF FUNDS NOTICE

(a) Pursuant to the Limitation of Funds clause, incremental funding in the amount of $TBD is allotted to cover estimated cost. Funding in the amount of $TBD is provided to cover the corresponding increment of fixed fee. The amount allotted for costs is estimated to cover the contractor's performance through TBD.

(b) When the contract is fully funded as specified in the Estimated Cost and Fixed Fee Clause (EP 52.216- 190), the Limitation of Cost clause shall become applicable.

(c) Recapitulation of Funds

Funding Action Estimated Cost Fixed Fee Total Cost Plus Fixed Fee (CPFF) TBD TBD Previous Amount TBD TBD This Modification TBD TBD Total Funded TBD TBD Total Per Contract TBD TBD Balance Unfunded TBD TBD

SECTION C - Description/Specifications

C-1 EPAAR 1552.211-79 COMPLIANCE WITH EPA POLICIES FOR INFORMATION

RESOURCES MANAGEMENT. (JAN 2012)

C-2 LOCAL CLAUSES EPA-C-10-101 STATEMENT OF WORK/PERFORMANCE WORK

STATEMENT/SPECIFICATIONS

The Contractor shall furnish the necessary personnel, material, equipment, services, and facilities (except as otherwise specified), to perform the Statement of Work included in Attachment #1.

SECTION D - Packaging and Marking

SECTION E - Inspection and Acceptance

E-1 FAR 52.246-5 INSPECTION OF SERVICES - COST-REIMBURSEMENT. (APR 1984)

(a) Definition. “Services,” as used in this clause, includes services performed, workmanship, and material furnished or used in performing services.

(b) The Contractor shall provide and maintain an inspection system acceptable to the Government covering the services under this contract. Complete records of all inspection work performed by the Contractor shall be maintained and made available to the Government during contract performance and for as long afterwards as the contract requires.

(c) The Government has the right to inspect and test all services called for by the contract, to the extent practicable at all places and times during the term of the contract. The Government shall perform inspections and tests in a manner that will not unduly delay the work.

(d) If any of the services performed do not conform with contract requirements, the Government may require the Contractor to perform the services again in conformity with contract requirements, for no additional fee. When the defects in services cannot be corrected by performance, the Government may—

(1) Require the Contractor to take necessary action to ensure that future performance conforms to contract requirements; and

(2) Reduce any fee payable under the contract to reflect the reduced value of the services performed.

(e) If the Contractor fails to promptly perform the services again or take the action necessary to ensure future performance in conformity with contract requirements, the Government may—

(1) By contract or otherwise, perform the services and reduce any fee payable by an amount that is equitable under the circumstances; or

(2) Terminate the contract for default.

(End of clause)

E-2 FAR 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT. (FEB 1999)

See Attachment #4 for full text.

SECTION F - Deliveries or Performance

F-1 FAR 52.242-15 STOP-WORK ORDER. (AUG 1989) - ALTERNATE I (APR 1984)

F-2 EPAAR 1552.211-70 REPORTS OF WORK. (OCT 2000)

The Contractor shall prepare and deliver reports, including plans, evaluations, studies, analyses and manuals in accordance with Attachment #9. Each report shall cite the contract number, identify the U.S.

Environmental Protection Agency as the sponsoring agency, and identify the name of the Contractor preparing the report.

The OMB clearance number for progress reports delivered under this contract is 2030-0005.

(End of clause)

F-3 EPAAR 1552.211-72 MONTHLY PROGRESS REPORT. (SEP 2013)

(a) The Contractor shall furnish via email two (2) electronically submitted copies of the combined monthly technical and financial progress report stating the progress made, including the percentage of the project completed, and a description of the work accomplished to support the cost. If the work is ordered using work assignments or delivery orders, include the estimated percentage of task completed during the reporting period for each work assignment or delivery order.

(b) Specific discussions shall include difficulties encountered and remedial action taken during the reporting period, and anticipated activity with a schedule of deliverables for the subsequent reporting period.

(c) The Contractor shall provide a list of outstanding actions awaiting Contracting Officer authorization, noted with the corresponding work assignment, such as subcontractor/consultant consents, overtime approvals, and work plan approvals.

(d) The report shall specify financial status at the contract level as follows:

(1) For the current reporting period, display the amount claimed.

(2) For the cumulative period and the cumulative contract life display: the amount obligated, amount originally invoiced, amount paid, amount suspended, amount disallowed, and remaining approved amount. The remaining approved amount is defined as the total obligated amount, less the total amount originally invoiced, plus total amount disallowed.

(3) Labor hours.

(i) A list of employees, their labor categories, and the numbers of hours worked for the reporting period.

(ii) For the current reporting period, display the expended direct labor hours and costs broken out by EPA contract labor hour category for the prime contractor and each subcontractor and consultant.

(iii) For the cumulative contract period and the cumulative contract life display:

the negotiated, expended and remaining direct labor hours and costs broken out by EPA contract labor hour category for the prime contractor, and each subcontractor and consultant.

(iv) Display the estimated direct labor hours and costs to be expended during the next reporting period.

(4) Display the current dollar ceilings in the contract, net amount invoiced, and remaining amounts for the following categories: Direct labor hours, total estimated cost, award fee pool (if applicable), subcontracts by individual subcontractor, travel, program management, and Other Direct Costs (ODCs).

(5) Unbilled allowable costs. Display the total costs incurred but unbilled for the current reporting period and cumulative for the contract.

(6) Average cost of direct labor. Compare the actual average cost per hour to date with the average cost per hour of the approved work plans for the current contract period.

(e) The report shall specify financial status at the work assignment or delivery order level as follows:

(1) For the current period, display the amount claimed.

(2) For the cumulative period display: amount shown on workplan, or latest work assignment/delivery order amendment amount (whichever is later); amount currently claimed; amount paid; amount suspended; amount disallowed; and remaining approved amount. The remaining approved amount is defined as: the workplan amount or latest work assignment or delivery order amount (whichever is later), less total amounts originally invoiced, plus total amount disallowed.

(3) Labor hours.

(i) A list of employees, their labor categories, and the number of hours worked for the reporting period.

(ii) For the current reporting period, display the expended direct labor hours and costs broken out by EPA contract labor hour category for the prime contractor and each subcontractor and consultant.

(iii) For the current reporting period, cumulative contract period, and the cumulative contract life display: the negotiated, expended and remaining direct labor hours and costs broken out by EPA contract labor hour category for the prime contractor and each subcontractor and consultant.

(iv) Display the estimated direct labor hours and costs to be expended during the next reporting period.

(v) Display the estimates of remaining direct labor hours and costs required to complete the work assignment or delivery order.

(4) Unbilled allowable costs. Display the total costs incurred but unbilled for the current reporting period and cumulative for the work assignment.

(5) Average cost of direct labor. Display the actual average cost per hour with the cost per hour estimated in the workplan.

(6) A list of deliverables for each work assignment or delivery order during the reporting period.

(f) This submission does not change the notification requirements of the "Limitation of Cost" or "Limitation of Funds" clauses requiring separate written notice to the Contracting Officer.

(g) The reports shall be submitted to the following addresses on or before the 15th of each month following the first complete reporting period of the contract. See EPAAR 1552.232-70, Submission of Invoices, paragraph (e), for details on the timing of submittals. Distribute reports as follows:

No. of copies Addressee Address (email and/or shipping) 2 Cynthia Bowie, Contracting Officer's Representative 1200 Pennsylvania Ave., N.W.

WJC East - Room 4303-P Washington, DC 20460

1 Christine Edwards, Contracting Officer 1200 Pennsylvania Ave., N.W.

Mail Code 3803R Washington, DC 20460

(End of clause)

F-4 EPAAR 1552.211-75 WORKING FILES. (APR 1984)

F-5 EPAAR 1552.211-78 MANAGEMENT CONSULTING SERVICES. (APR 1985)

F-6 LOCAL CLAUSES EPA-F-12-101 PERIOD OF PERFORMANCE

The period of performance of this contract shall be from date of contract award through 12 months plus four (4) one-year option periods inclusive of all required reports.

SECTION G - Contract Administration Data

G-1 EPAAR 1552.216-74 PAYMENT OF FEE. (MAY 1991)

(a) The term fee in this clause refers to either the fixed fee under a cost-plus-fixed-fee type contract, or the base fee under a cost-plus-award-fee type contract.

(b) The Government will make provisional fee payments on the basis of percentage of work completed. Percentage of work completed is the ratio of direct labor hours performed to the direct labor hours set forth in clause 1552.211-73, Level of Effort-Cost-Reimbursement Term Contract.

(End of clause)

G-2 EPAAR 1552.232-70 SUBMISSION OF INVOICES. (JUN 1996)

(a) Unless otherwise specified in the contract, an invoice or request for contract financing payment shall be submitted as an original and five copies. The Contractor shall submit the invoice or request for contract financing payment to the following offices/individuals designated in the contract: the original and two copies to the Accounting Operations Office shown in Block 12 on the cover of the contract; two copies to the Contracting Officer's Representative (the Contracting Officer's Representative may direct one of these copies to a separate address); and one copy to the Contracting Officer.

(b) The Contractor shall prepare its invoice or request for contract financing payment on the prescribed Government forms. Standard Forms Number 1034, Public Voucher for Purchases and Services other than Personal, shall be used by contractors to show the amount claimed for reimbursement. Standard Form 1035, Public Voucher for Purchases and Services other than Personal-Continuation Sheet, shall be used to furnish the necessary supporting detail or additional information required by the Contracting Officer. The Contractor may submit self-designed forms which contain the required information.

(c)(1) The Contractor shall prepare a contract level invoice or request for contract financing payment in accordance with the invoice preparation instructions identified as a separate attachment in Section J of the contract. If contract work is authorized by individual work assignments, the invoice or request for contract financing payment shall also include a summary of the current and cumulative amounts claimed by cost element for each work assignment and for the contract total, as well as any supporting data for each work assignment as identified in the instructions.

(2) The invoice or request for contract financing payment shall include current and cumulative charges by major cost element such as direct labor, overhead, travel, equipment, and other direct costs. For current costs, each major cost element shall include the appropriate supporting schedule identified in the invoice preparation instructions.

Cumulative charges represent the net sum of current charges by cost element for the contract period.

(3) The charges for subcontracts shall be further detailed in a supporting schedule showing the major cost elements for each subcontract. The degree of detail for any subcontract exceeding $5,000 is to be the same as that set forth under (c)(2).

(4) The charges for consultants shall be further detailed in the supporting schedule showing the major cost elements of each consultant. For current costs, each major cost element of the consulting agreement shall also include the supporting schedule identified in the invoice preparation instructions.

(d) Invoices or requests for contract financing payment must clearly indicate the period of performance for which payment is requested. Separate invoices or requests for contract financing payment are required for charges applicable to the basic contract and each option period.

(e)(1) Notwithstanding the provisions of the clause of this contract at FAR 52.216-7, Allowable Cost and Payment, invoices or requests for contract financing payment shall be submitted once per month unless there has been a demonstrated need and Contracting Officer approval for more frequent billings. When submitted on a monthly basis, the period covered by invoices or requests for contractor financing payments shall be the same as the period for monthly progress reports required under this contract.

(2) If the Contracting Officer allows submissions more frequently than monthly, one submittal each month shall have the same ending period of performance as the monthly progress report.

(3) Where cumulative amounts on the monthly progress report differ from the aggregate amounts claimed in the invoice(s) or request(s) for contract financing payments covering the same period, the contractor shall provide a reconciliation of the difference as part of the payment request.

(End of Clause)

G-3 EPAAR 1552.242-70 INDIRECT COSTS. (APR 1984)

(a) In accordance with paragraph (d) of the "Allowable Cost and Payment" clause, the final indirect cost rates applicable to this contract shall be established between the Contractor and the appropriate Government representative (EPA, other Government agency, or auditor), as provided by FAR 42.703-1(a). EPA's procedures require a Contracting Officer determination of indirect cost rates for its contracts. In those cases where EPA is the cognizant agency (see FAR 42.705-1), the final rate proposal shall be submitted to the cognizant audit activity and to the following designated Contracting Officer: Environmental Protection Agency, Chief, Cost Policy and Rate Negotiation Branch (3804F), Cost Advisory and Financial Analysis Division, Washington, DC 20460.

Where EPA is not the cognizant agency, the final rate proposal shall be submitted to the above-cited address, to the cognizant audit agency, and to the designated Contracting Officer of the cognizant agency. Upon establishment of the final indirect cost rates, the Contractor shall submit an executed Certificate of Current Cost or Pricing Data (see FAR 15.406-2) applicable to the data furnished in connection with the final rates to the cognizant audit agency. The final rates shall be contained in a written understanding between the Contractor and the appropriate Government representative. Pursuant to the "Allowable Cost and Payment" clause, the allowable indirect costs under this contract shall be obtained by applying the final agreed upon rate(s) to the appropriate bases.

(b) Until final annual indirect cost rates are established for any period, the Government shall reimburse the contractor at billing rates established by the appropriate Government representative in accordance with FAR 42.704, subject to adjustment when the final rates are established. The established billing rates are currently as follows:

Cost center TBD Period TBD Rate TBD Base TBD

These billing rates may be prospectively or retroactively revised by mutual agreement, at the request of either the Government or the Contractor, to prevent substantial overpayment or underpayment.

(c) Notwithstanding the provisions of paragraphs (a) and (b) of this clause, ceilings are hereby established on indirect costs reimbursable under this contract. The Government shall not be obligated to pay the Contractor any additional amount on account of indirect costs in excess of the ceiling rates listed below:

Cost center TBD Period TBD Rate TBD Base TBD

(End of clause)

G-4 EPAAR 1552.245-70 GOVERNMENT PROPERTY. (SEP 2009)

(a) The contractor shall not fabricate or acquire, on behalf of the Government, either directly or indirectly through a subcontract, any item of property without prior written approval from the Contracting Officer. If the Contracting Officer authorizes the contractor to acquire and/or fabricate equipment for use in the performance of this contract, the equipment shall be subject to the provisions of the "Government Property" clause and listed on the contract via contract modification.

(b) If the Government provides item(s) of Government property to the contractor for use in the performance of this contract, this property shall be used and maintained by the contractor in accordance with the provisions of the "Government Property" clause.

The "EPA Contract Property Administration Requirements" provided below apply to this contract.

U.S. Environmental Protection Agency

Contract Property Administration Requirements

1. Purpose. This document sets forth the requirements for the U.S. Environmental Protection Agency (EPA) contractors performing Government property management responsibilities under EPA contracts. These requirements supplement those contained in the Government Property clause(s) and Part 45 Government Property of the Federal Acquisition Regulation (FAR).

2. Contract Property Administration (CPAR)

a. EPA Delegation. EPA delegates all contract property administration to the EPA Contract Property Coordinator (CPC). The delegations apply to all EPA contracts issued with or that have the potential to receive, purchase or acquire Government Property or include the Government Property clauses. In addition to administering all contract property, the CPC provides technical expertise and assistance to the Contracting Officer (CO) and Contracting Officer Technical Representative (COTR) relative to Government Property.

b. DCMA Re-delegation. The CPC may request support for contract property management oversight, including property administration and plant clearance, from the Defense Contract Management Agency (DCMA). If DCMA agrees to provide support, DCMA will notify the contractor of the assigned property administrator (PA) and plant clearance officer (PLCO). The DCMA PA is available to the contractor for assistance in all matters of property administration.

Notwithstanding the delegation, as necessary, the contractor may contact the EPA CO. In the event of a disagreement between the contractor and the DCMA PA, the contractor should seek resolution from the CO. Unless, otherwise directed in the contract, or this document, all originals of written information or reports, except direct correspondence between the contractor and the DCMA PA, relative to Government property, should be forwarded to the administrative CO assigned to this contract and the CPC.

c. Disagreements. Notwithstanding the delegation(s), as necessary, the contractor may contact the CO. In the event of a disagreement between the contractor and the PA or the CPC the contractor should seek resolution from the CO.

3. Requests for Government Property.

In accordance with FAR 45.102, the contractor shall furnish all property required for performing Government contracts. If a contractor believes that Government property is required for performance of the contract, the contractor shall submit a written request to the CO. At a minimum, the request shall contain the following elements:

a. Contract number for which the property is required.

b. An item(s) description, quantity and estimated cost.

c. Certification that no like contractor property exists which could be utilized.

d. A detailed description of the task-related purpose of the property.

e. Explanation of negative impact if property is not provided by the Government.

f. Lease versus purchase analysis shall be furnished with the request to acquire property on behalf of the Government, with the exception of requests for material purchases. The contractor may not proceed with acquisition of property on behalf of the Government until receipt of written authorization from the Contracting Officer.

4. Transfer of Government Property. The Contracting Officer initiates the transfer of the government property via a contract modification. The transferor (EPA or another contractor) shall provide to the transferee, the receiving contractor, the information needed to establish and maintain the property records required of FAR 52.245-1, as well as all of the applicable data elements required by Attachment 1 of this clause. The transferee, the receiving contractor, should perform a complete inventory of the property before signing the acceptance document for the property. Accountability will transfer to the receiving contractor upon receipt and acceptance of the property, in accordance with FAR 45.106.

5. Records of Government Property.

a. In accordance with FAR 52.245-1, the contractor shall create and maintain records of all Government property, regardless of value, including property provided to and in the possession of a subcontractor. Material provided by the Government or acquired by the contractor and billed as a direct charge to the contract is Government property and records must be established as such.

b. The Contractor shall identify all Superfund property and designate it as such both on the item and on the Government property record. If it is not practicable to tag the item, the contractor shall write the ID number on a tag, card or other entity that may be kept with the item or in a file.

c. Support documentation used for posting entries to the property record shall provide complete, current and auditable data. Entries shall be posted to the record in a timely manner following an action.

d. For Government vehicles, in addition to the data elements required by EPA, the contractor shall also comply with the General Services Administration (GSA) and Department of Energy (DOE) record and report requirements supplied with all EPA provided motor vehicles. If the above requirements were not provided with the vehicle, the contractor shall notify the designated CPC and the Fleet Manager.

e. When Government property is disclosed to be in the management and/or control of the contractor but not provided under any contract, the contractor shall record and report the property in accordance with FAR 52.245-1.

6. Inventories of Government Property. The contractor shall conduct a complete physical inventory of EPA property at least once per year. The contractor shall report the results of the inventory, including any discrepancies, to the CO. Reconciliation of discrepancies shall be completed in accordance with the schedule negotiated with the CO. See section 10 herein, Contract Closeout, for information on final inventories.

7. Reports of Government Property. EPA requires an annual summary report, for each contract, by contract number, of Government property in the contractor's possession. The annual summary is due as of September 30th of each year, and upon contract termination or expiration.

a. For each classification listed on the EPA Property Report form, with the exception of material, the contractor shall provide the total acquisition cost and total quantity. If there are zero items in a classification, or if there is an ending balance of zero, the classification must be listed with zeros in the quantity and acquisition cost columns.

b. For material, the contractor shall provide the total acquisition cost only.

c. Property classified as Plant Equipment, Superfund and Special Test Equipment must be reported on two separate lines. The first line shall include the total acquisition cost and quantity of all items or systems with a unit acquisition cost of $25,000 or more. The second line shall include the total acquisition cost and quantity of all items with a unit acquisition cost of less than $25,000.

d. For items comprising a system, which is defined as "a group of interacting items functioning as a complex whole," the contractor may maintain the record as a system noting all components of the system under the main component or maintain individual records for each item. However, for the annual report of Government property the components must be reported as a system with one total dollar amount for the system, if that system total is $25,000 or more.

e. The reports are to be received at EPA by the CPC by October 5th of each year.

f. Distribution shall be as follows:

Original to: CPC One copy: CO

g. Contractors are required to comply with GSA and DOE special reporting requirements for motor vehicles. A statement of these requirements will be provided by the EPA Facility Management and Services Division (FMSD) concurrent with receipt of each vehicle.

h. The contractor shall provide detailed reports on an as-needed basis, as may be requested by the CO or the CPC.

8. Disposition of Government Property. The disposition process is composed of three distinct phases: identification, reporting, and final disposition.

a. Identification. The disposition process begins with the contractor identifying Government property that is no longer required for contract performance. Effective contract property management systems provide for identification of excess as it occurs. Once Government property has been determined to be excess to the accountable contract, it must be screened against the contractor's other EPA contracts for further use. If the property may be reutilized, the contractor shall notify the CO in writing. Government property will be transferred via contract modifications to other contracts only when the COs on both the current contract and the receiving contract authorize the transfer.

b. Reporting.

(i) EPA. Government property shall be reported in accordance with FAR 52.245-1. The Standard Form, SF 1428, Inventory Disposal Schedule, provides the format for reporting excess Government property. Instructions for completing and when to use the form may be found at FAR 52.245-1(j). Forward the completed SF 1428 to the CPC. The SF 1428 is available at http://www.arnet.gov/far/current/html/FormsStandard54.html. Superfund property must contain a Superfund notification and the following language must be displayed on the form: "Note to CO:

Reimbursement to the EPA Superfund is required."

(ii) DCMA. If the EPA contract has been re-delegated to DCMA, the excess items will be entered into the Plant Clearance Automated Reutilization Screening System (PCARSS). Access and information pertaining to this system may be addressed to the DCMA Plant Clearance Officer

(PLCO).

c. Disposition Instructions.

(i) Retention. When Government property is identified as excess, the CO may direct the contractor in writing to retain all or part of the excess Government Property under the current contract for possible future requirements.

(ii) Return to EPA. When Government property is identified as excess, the CO may direct the contractor in writing to return those items to EPA inventory. The contractor shall ship/deliver the property in accordance with the instructions provided by the CO.

(iii) Transfer. When Government property is identified as excess, the CO may direct the contractor in writing to transfer the property to another EPA contractor. The contractor shall transfer the property by shipping it in accordance with the instructions provided by the CO. To effect transfer of accountability, the contractor shall provide the recipient of the property with the applicable data elements set forth in Attachment 1 of this clause.

(iv) Sale. If GSA or the DCMA PLCO conducts a sale of the excess Government property, the contractor shall allow prospective bidders access to property offered for sale.

(v) Abandonment. Abandoned property must be disposed of in a manner that does not endanger the health and safety of the public. If the contract is delegated to DCMA and the contractor has input EPA property into the PCARSS system, the EPA Property Utilization Officer (PUO) shall notify the CO. The CO shall notify the contractor in writing of those items EPA would like to retain, have returned or transferred to another EPA contractor. The contractor shall notify the DCMA PLCO and request withdrawal of those items from the inventory schedule. The contractor shall update the Government property record to indicate the disposition of the item and to close the record. The contractor shall also obtain either a signed receipt or proof of shipment from the recipient. The contractor shall notify the CO when all actions pertaining to disposition have been completed. The contractor shall complete an EPA Property report with changes, to include supporting documentation of completed disposition actions and submit it to the CPC.

9. Decontamination. In addition to the requirements of the "Government Property" clause and prior to performing disposition of any EPA Government Property, the contractor shall certify in writing that the property is free from contamination by any hazardous or toxic substances.

10. Contract Closeout. The contractor shall complete a physical inventory of all Government property at contract completion and the results, including any discrepancies, shall be reported to the CO.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .