Amendment_1_Solicitation_Changes.docx

DOCX document 16 KB Posted

Attached to
Statistical and Technical Support for the Assessment of Toxic Substances
Solicitation number
SOL-DC-14-00002
Issued by

About this file

Solicitation Changes

View the file

Other files

File Type Posted
Amendment_2_Solicitation_Changes.docx DOCX document
Sol_SOL-DC-14-00002_Amd_000002.pdf PDF
14-00002-TechproposalInst.docx DOCX document
Sol_SOL-DC-14-00002_Amd_000001.pdf PDF
Responses_to_Questions.docx DOCX document
FAR_52_246-11_FULL_TEXT_FILL-IN.docx DOCX document
14-00002_Evaluation_Factors.docx DOCX document
Cost_Proposal_Instructions.docx DOCX document
14-00002-TechproposalInst.docx DOCX document
Sol_SOL-DC-14-00002.pdf PDF
SOW_for_SOL-DC-14-00002.docx DOCX document
Attachment_9_-_Reports_of_Work.docx DOCX document
pastperformancequestionnaire.docx DOCX document
14-00002-CLIENT_AUTHORIZATION_LETTER.docx DOCX document
INVOICE_PREPARATION_INSTRUCTIONS.docx DOCX document
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

B-1 LOCAL CLAUSES 1552.211-73 LEVEL OF EFFORT - COST REIMBURSEMENT TERM CONTRACT (AUG 1995)(DEVIATION)

(a) The Contractor shall perform all work and provide all required reports within the level of effort specified below. The Government will order 16,000 direct labor hours for the base period which represents the Government's best estimate of the level of effort required to fulfill these requirements.

(b) Direct labor includes personnel such as engineers, scientists, draftsmen, technicians, statisticians, and programmers and not support personnel such as company management, typists, and key punch operators even though such support personnel are normally treated as direct labor by the Contractor. The level of effort specified in paragraph (a) includes Contractor, subcontractor, and consultant labor hours.

(c) Under any circumstances, if the Government orders or the Contractor provides less than 90 percent of the level of effort specified for the base period or any optional period exercised, an equitable downward adjustment of the fixed fee, if any, for that period will be made. The Government may require the Contractor to provide additional effort up to 110 percent of the level of effort for any period until the estimated cost for that period has been reached. However, this additional effort shall not result in any increase in the fixed fee, if any. If this is a cost-plus-incentive-fee (CPIF) contract, the term "fee" in this paragraph means "base fee and incentive fee." If this is a cost-plus-award-fee (CPAF) contract, the term "fee" in this paragraph means "base fee and award fee."

(d) If the level of effort specified to be ordered during a given base or option period is not ordered during that period, that level of effort may not be accumulated and ordered during a subsequent period.

(e) These terms and conditions do not supersede the requirements of either the "Limitation of Cost" or "Limitation of Funds" clauses.

H-5 EPAAR 1552.217-71 OPTION TO EXTEND THE TERM OF THE CONTRACT-COST-TYPE CONTRACT. (APR 1984)

The Government has the option to extend the term of this contract for four (4) additional period(s). If more than 60 days remain in the contract period of performance, the Government, without prior written notification, may exercise this option by issuing a contract modification. To exercise this option within the last 60 days of the period of performance, the Government must provide to the Contractor written notification prior to that last 60-day period. This preliminary notification does not commit the Government to exercising the option. Use of an option will result in the following contract modifications:

(a) The "Period of Performance" clause will be amended to cover the period of performance for each option period.

Period Start Date End Date

Option Period ITBDTBD
Option Period IITBDTBD
Option Period IIITBDTBD
Option Period IVTBDTBD

(b) Paragraph (a) of the "Level of Effort" clause will be amended to reflect a new and separate level of effort:

Period Level of Effort (Direct Labor Hours)

Option Period I16,000
Option Period II16,000
Option Period III16,000
Option Period IV16,000

(c) The "Estimated Cost and Fixed Fee" clause will be amended to reflect increased estimated costs and fixed fee for each option period as follows:

Option 1 Option 2 Option 3 Option 4 Estimated cost Fixed fee Total

(d) If the contract contains "not to exceed amounts" for elements of other direct costs (ODC), those amounts will be increased as follows:

Period Amount

Option Period I$360,200.00
Option Period II$360,706.00
Option Period III$371,527.00
Option Period IV$382,673.00

H-6 EPAAR 1552.217-73 OPTION FOR INCREASED QUANTITY-COST-TYPE CONTRACT. (JUN 1997)

(a) By issuing a contract modification, the Government may increase the estimated level of effort by:

Period Level of Effort (Direct Labor Hours)

Base Period8,000
Option Period I8,000
Option Period II8,000
Option Period III8,000
Option Period IV8,000

The Government may issue a maximum of four orders to increase the level of effort in blocks of 2,000 hours during any given period.

The estimated cost and fixed fee of each increment of hours is as follows:

Estimated
PeriodCostFixed FeeTotal
Base Period$$$
Option Period I$$$
Option Period II$$$
Option Period III$$$
Option Period IV$$$

(b) When these options are exercised, paragraph (a) of the "Level of Effort" clause and the "Estimated Cost" clause will be modified accordingly.

(c) If the contract contains "not to exceed amounts" for elements of other direct costs (ODC), those amounts will be increased for each multiple of 2,000 hours as follows:

Period Ceiling

Option Period I $45,025.00 Option Period II $45,088.00 Option Period III $46,441.00 Option Period IV $47,834.00

File details come from the government source that posted it. Updated .