File Type Posted
Q_A_140P8322Q0079_0001.pdf PDF
Sol_140P8322Q0079_Amd_0001.pdf PDF
Site_Visit_Roster_0001.pdf PDF
paradise_bg.pdf PDF
Park_Brochure.pdf PDF
SOW_Paradise_lot_painting.pdf PDF
KEY_PERSONNEL.docx DOCX document
PAST_PERFORMANCE.docx DOCX document
Parking_lot.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

0040585541

NPS, PWR - OLYM MABO

600 E. Park Avenue

Port Angeles WA 98362-6757

PPY

hal_hovesten@nps.gov

Hal Hoversten 3605696542

108/01/2022

140P8322Q0079

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

This solicitation is being issued for a Request for Quottations (RFQ). Substitute the words "quote" and "Quoter" for "offer" and "Offeror" where they appear in this form. The acceptance of a quote by the National Park Service will not establish a binding contract.

RFQ 140P8321Q0079 is for the purpose of all materials and equipment required to complete painting of asphalt markings on two parking lots in accordance with this scope of work.

In accordance with FAR 36.204 the estimated magnitude of this contract is below

$22,000.

This RFQ and incorporated provisions and clauses are those in effect through Federal

Acquisition Circular (FAC) 2021-014 effective 12-15-2021. This RFQ is a total small business set-aside, NAICS 237310 (Highway, Street and Bridge Construction) with a size standard of $39.50 Million dollars receipts for the past three years. Wages under this contract will be subject to Construction Hour rates (formally known as

Davis Bacon Wages) for Pierce County, Washington as attached.

All work shall be performed under a single firm fixed-price construction contract

Continued ...

11. The Contractor shall begin performance

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

10 15 calendar days and complete it within ________________ ________________ calendar days after receiving

08/16/2022

NSN 7540-01-155-3212

x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________

STANDARD FORM 1442 (Rev. 4-85)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

DOI, NPS, PWR - OLYM MABO - MORA

55210 238th. Ave. E.

Ashford WA 98304-9751

PY2

Hal Hoversten

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

STANDARD FORM 1442 (REV. 4-85) BACK

Continued...

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

3 4

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

140P8322Q0079 subject to the Wage Rate requirements

(Construction) for Pierce County, Washington.

To complete this SF-1442, write your business name, address, UEI (SAM.gov registration) number, and point of contact information in block 14 and complete blocks 15-20c including acknowledging all amendments in Block 19 (if applicable).

Complete the Price Schedule information in

Section B and return it with the documents listed in Section L.

This action is for the Federal Government and is exempt from all taxes (Exemption #53-0197094).

Address any questions by e-mail by no later than

August 11th at 12:00 PM Pacific Daylight Time.

The Government reserves the right to cancel this solicitation.

Offerors are required to have active registrations with completed representations/certifications in the System for

Awards Management website on the close date and time of this RFQ in order to be considered responsive and eligible for award.

https://www.sam.gov

Delivery: 10/06/2022

Delivery Location Code: 0009816045

NPS Mount Rainier National Park

Paradise Area

Lower Parking Lot

Upper Parking Lot

Paradise WA 98398 US

Period of Performance: 09/06/2022 to 10/06/2022

00010 Paint lower and upper parking lots at Paradise in accordance with the attached scope of work.

Product/Service Code: Z2LZ

Product/Service Description: REPAIR OR ALTERATION

OF PARKING FACILITIES

Contractors are required to register and submit a

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

4 4

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

140P8322Q0079

PDF invoice along with their payment request through the US Department of Treasury's Internet

Payment Platform: https://www.ipp.gov

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

Parking Lot Painting Mount Rainier National Park

SCOPE OF WORK

Request for quote (RFQ 140P8321Q0079) This RFQ is being issued for the purpose of all materials and equipment required to complete painting of asphalt markings on two parking lots in accordance with this scope of work.

This RFQ and incorporated provisions and clauses are those in effect through Federal Acquisition Circular (FAC) 2021-014 effective 12-15-2021. This RFQ is a total small business set-aside, NAICS 237310 (Highway, Street and Bridge Construction) with a size standard of $39.50 Million dollars receipts for the past three years. Wages under this contract will be subject to Construction Hour rates (formally known as Davis Bacon Wages) for Pierce County, Washington as attached.

The Government intends to make a firm fixed-price, Simplified Acquisition Procedures (FAR Park 13), best value contract to the single responsible quoter whose quote conforms to the solicitation and is found to be most advantageous to the Government, price and past experience being considered.

LOCATIONS

Performance of the asphalt marking in this scope of work shall be performed at the Lower Parking Lot and Upper Parking Lot at Paradise within Mount Rainier National Park.

The contractor shall be responsible for the repainting of parking control pavement markings. The markings shall include approximately 300 parking spaces in the Upper Lot, and 10 Accessible Parking in the Upper Lot, approximately 100 parking spaces in the lower lot and seven Accessible spaces. The contractor shall match existing road painting for parking spaces, Accessible Parking spaces, and parking restricted areas. The coloring will match existing color.

The lots shall be defined within the boundaries highlighted on the attached drawing. The parking lot will be available for use by the public during the project. The contractor will be responsible for isolating or blocking off sections of the lot to be painted.

All work will be performed during periods of low visitation or as determined by the Contracting Officer’s Representative (COR). Weather conditions will be a determining factor in deciding where and when work will occur on any given workday. Painting hours shall be from 8:00 AM to 5:00 PM on Monday through Thursday. Work on holidays and weekends will not be performed unless previously approved by the Contracting Officer.

New asphalt painting shall follow the same pattern as the existing weathered paint.

PRODUCTS:

1. Water based paint per WSDOT Specifications Drying time: Dry to no pickup, ASTM D 711 10 minutes maximum.

Drying to no track, 0.7 kg/L Type 1 90 seconds maximum.

Wet Film Thickness at 54 degrees Fahrenheit.

Flexibility FSS TT-P-1952B No cracking or flaking.

2. Glass beads AASHTO M47-81, Type 1 Waterproofed glass beads, 0.38 + 0.03-milimeter

CONTRACTOR’S USE OF PREMISES:

Construction Camp: Establishment of a camp within the park shall not be permitted.

The contractor shall at all times conduct operations to ensure the safety of and minimize inconvenience to the public. No closures will be permitted unless requested through the COR and approved by the Contracting Officer. The contractor shall be responsible for all signage and traffic control that may be needed to complete this project.

The contractor shall load and unload all materials used in the performance of this contract with the proper equipment, to be provided by the contractor.

Preservation of Natural Features: The contractor shall confine all operations within the work area of the construction project. Extra special care shall be taken to maintain natural surroundings and ensure they are not damaged. The contractor shall notify the COR immediately before incurring further damage in case damage occurs. The contractor shall restore damages at no additional cost to the Government.

Spill prevention: The contractor shall address any spills on roadways, parking areas, sidewalks and staging areas in a safety plan. The COR shall be notified immediately of any spills or leaks and the contractor shall mitigate any damage to park resources and clean up any spills or leaks at no additional cost to the Government.

APPLICATION:

Traffic Paint shall be applied at a minimum wet film thickness of 15 mils before beads or at a rate of 107 square feet per gallon.

Traffic stripes and pavement markings shall be applied only on dry surfaces and only during periods of favorable weather. Painting shall not be performed when the atmospheric temperature is below 50 degree F when using waterborne paint; when freshly painted surfaces may become damaged by rain, fog, or condensation; nor when it can be anticipated that the atmospheric temperature will drop below 50 degree F temperatures during the drying period.

On existing surfacing, pavement markings and traffic stripes shall be applied in one coat.

Each coat of paint for any traffic stripe, including glass beads where required, shall be applied in one pass of the striping machine, regardless of the number, widths and patterns of individual stripes involved.

Paint shall be applied in one coat shall be applied at an approximate rate of one gallon per 107 square feet.

Equipment used shall be capable of applying stripes for a minimum of one mile before resupplying paint into a paint reservoir.

The exact rate of paint to be applied shall be determined by the Contractor. The volume of paint applied shall be measured by stabbing the paint tank with a calibrated rod. At the option of the Contractor, if the striping machine is provided with paint gages, the volume of paint shall be determined by using the gages.

Unless otherwise directed by the CO, glass beads shall be uniformly incorporated in all coats of paint concurrently with the application of the paint, except that glass beads shall not be applied to black paint. Beads shall be embedded in the coat of traffic paint being applied to a depth of one-half their diameters.

Glass beads shall be applied at an approximate rate of 5 pounds per gallon of paint. The exact rate will be determined by the Engineer. The amount of glass beads applied shall be measured by stabbing the glass bead tank with a calibrated rod.

APPLICATION EQUIPMENT

Mechanical means shall be used to paint traffic stripes and pavement markings and to apply the glass beads for traffic stripes.

Equipment used in the application of traffic stripes and pavement markings shall produce stripes and pavement markings of uniform quality that conform to the specified requirements.

Auxiliary equipment for unloading and loading of materials used for suitable surface preparation;

forklifts, brooms, rollers, traffic control equipment, hand tools and any other support and safety equipment shall be provided by the contractor as necessary to perform the work and provide traffic control services at no cost to the Government.

controlled simultaneously with the paint applicator nozzle; and (i) calibrated rods for measuring the volumes of paint and glass beads in the paint and glass bead tanks.

TRAFFIC CONTROL:

The contractor shall install and maintain temporary traffic control devices adjacent to and within the project as required by the MUTCD and as follows:

Furnish/install traffic control devices before the start of construction operations.

Install only those traffic control devices needed for each stage or phase.

Relocate temporary traffic control devices as necessary.

Remove devices that no longer apply to the existing conditions.

Immediately replace any device that is lost, stolen, destroyed, or inoperative.

Keep temporary traffic control devices clean.

CONTRACTOR FURNISHED ITEMS

All materials shall be Contractor furnished from outside of the Park.

HAULING MATERIALS ON PUBLIC ROADS

Load restrictions on Park roads are identical to the State load restrictions with such additional regulations as may be imposed by the Park Superintendent. Information regarding rules and regulations for vehicular traffic on Park roads may be obtained from the Office of the Park Superintendent. A special permit shall not relieve the Contractor of liability for damage, which may result from moving of equipment. The Contractor shall notify the COR of the intent to mobilize any oversize, over length or over width loads (includes vehicles, trailers, equipment or supplies and materials) at least forty-eight (48) hours in advance prior to arrival at the park boundary of such loads to arrange for the escort of such loads into the Park.

TRAVEL RESTRICTIONS IN THE PARK

Any Contractor vehicles exceeding these restrictions must have a pilot vehicle. The pilot vehicle shall have a sign on the front indicating “Oversized load Follows”. The Contractor must notify the COR of the intent to utilize a pilot vehicle 48 hours prior to entering the Park. All costs for pilot vehicles shall be borne by the Contractor.

A double-axle line striper shall be the maximum sized utilized. These roadways are narrow and turns cannot be safely negotiated by triple-axle vehicles. The restrictions are necessary to insure work can be accomplished to existing striping patterns and to reduce damage to Government and personal property.

MEASUREMENT

The contractor shall develop the distances and supplies as a result of a site visit.

Payment will be made on actual quantities delivered.

Painting traffic stripes will be measures by the linear foot along the line of the traffic stripes, without deductions for gaps in broken traffic stripes.

PAYMENT

Payment will be made on a lump sum basis for actual materials and labor costs.

Payments and invoices (to include a vendor’s copy of the invoice as a PDF attachment) shall be submitted through the Internet Payment Platform (IPP) at this address: https://www.ipp.gov https://www.ipp.gov/

File details come from the government source that posted it. Updated .