Sol_140P2120R0017.pdf
PDF 598 KB Posted
- Attached to
- NR-ARD-17 - IMPROVE OPERATIONS RFP Federal contract opportunity
- Solicitation number
- 140P2120R0017
About this file
This solicitation document requests proposals for the operation of the Interagency Monitoring of Protected Visual Environments (IMPROVE) network and associated filter analysis. The National Park Service will award an Indefinite Delivery Indefinite Quantity contract with a minimum value of $300,000 and maximum value of $28.1 million to a single offeror.
The successful offeror will operate 157 IMPROVE and IMPROVE protocol sites to monitor visibility and particulate matter in mandatory Class I federal areas on behalf of the National Park Service, U.S. Forest Service, U.S. Fish and Wildlife Service, and other agencies. Key responsibilities include site tasks such as equipment installation, operation, maintenance, and data validation for 158 samplers. The offeror must also conduct filter analysis to characterize particulate composition. The period of performance is January 2, 2021 through January 1, 2026. Proposals are due by November 15, 2020 and the government will make award by June 30, 2025.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B09 Attachment 1 IDIQ Pricing Schedule_28Oct2020_0001.xlsx | XLSX spreadsheet | |
| Sol_140P2120R0017_Amd_0001.pdf | ||
| B09 Attachment 5 QnA_0001.docx | DOCX document | |
| B09 Exhibit 1 Sample Task Ord 2020_0001.docx | DOCX document | |
| B08 Exhibit 2 Past Performance Questionnaire.doc | DOC document | |
| B08 Attachment 2 Site List.docx | DOCX document | |
| B08 Exhibit 1 Sample Task Order 1 and 2.docx | DOCX document | |
| B08 Attachment 4 SOP 126 Appendix-E_Open-Shelter-Specifications.pdf | ||
| B08 Attachment 3 Government Furnished Property.xlsx | XLSX spreadsheet | |
| B08 Attachment 1 IDIQ Pricing Schedule.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUMIS CHECKED
CODE 18a. PAYMENT WILL BE MADE BY
CODE
FACILITYCODE
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER
OFFEROR
PWA
Lakewood CO 80235 P.O.Box 25287 MS WCP 7333 W. Jefferson Ave DOI, NPS, WASO - WCP Contracting
0009831684 CODE 16. ADMINISTERED BYCODE
X
X
541380
SIZE STANDARD:
% FOR:SET ASIDE:UNRESTRICTED ORPWA
RFPIFB
10. THIS ACQUISITION ISCODE
RFQ
14. METHOD OF SOLICITATION
13b. RATING
NAICS:
SMALL BUSINESS
11/15/2020 1400 ET
10/15/2020
303-987-6779Casey Winters (No collect calls)
INFORMATION CALL:
FOR SOLICITATION 8. OFFER DUE DATE/LOCAL TIMEb. TELEPHONE NUMBER a. NAME
4. ORDER NUMBER3. AWARD/ 6. SOLICITATION
140P2120R0017
5. SOLICITATION NUMBER
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS 1. REQUISITION NUMBER PAGE OF
1 69 0040473521OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
TELEPHONE NO.
17a. CONTRACTOR/
Lakewood CO 80228 12795 W. Alameda Parkway NPS, NRSS, Air Resources Div.
15. DELIVER TO
Denver CO 80225 P.O.Box 25287 MS WCP
9. ISSUED BY
7.
2. CONTRACT NO.
EFFECTIVE DATE
$16.50
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW
ISSUE DATE
DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
11.
SEE SCHEDULEX
12. DISCOUNT TERMS
THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
13a.
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
8(A)
NPS, WASO - WCP Contracting
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
24.
AMOUNT
23.
UNIT PRICE
22.
UNIT
21.
QUANTITY
20.
SCHEDULE OF SUPPLIES/SERVICES
19.
ITEM NO.
IDIQ to Operate IMPROVE Monitoring Network and conduct related filter analysis Legacy Doc #: NPS Delivery: 06/30/2025 Period of Performance: 01/02/2021 to 01/01/2026
00010 IMPROVE Operations & Filter Analysis Product/Service Code: B502 Product/Service Description: SPECIAL Continued ...
(Use Reverse and/or Attach Additional Sheets as Necessary)
HEREIN, IS ACCEPTED AS TO ITEMS:
X
XX
DATED
PAULA Johnson
. YOUR OFFER ON SOLICITATION (BLOCK 5),
INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER
ARE
ARE
31c. DATE SIGNED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print)
ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL
SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
26. TOTAL AWARD AMOUNT (For Govt. Use Only)
OFFER
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA - FAR (48 CFR) 53.212
ARE NOT ATTACHED.
ARE NOT ATTACHED.
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
30b. NAME AND TITLE OF SIGNER (Type or print)
30a. SIGNATURE OF OFFEROR/CONTRACTOR
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
25. ACCOUNTING AND APPROPRIATION DATA
29. AWARD OF CONTRACT:
REF.
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32c. DATE 32b. SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
40. PAID BY39. S/R VOUCHER NUMBER38. S/R ACCOUNT NUMBER
37. CHECK NUMBER
FINALPARTIAL
36. PAYMENT
FINALPARTIAL
35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER33. SHIP NUMBER
COMPLETE
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
42d. TOTAL CONTAINERS42c. DATE REC'D (YY/MM/DD)
42b. RECEIVED AT (Location)
42a. RECEIVED BY (Print)
41c. DATE41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
STANDARD FORM 1449 (REV. 2/2012) BACK
24.
AMOUNT
23.
UNIT PRICE
22.
UNIT
21.
QUANTITY
20.
SCHEDULE OF SUPPLIES/SERVICES
19.
ITEM NO.
STUDIES/ANALYSIS- AIR QUALITY
Period of Performance: 09/01/2020 to 08/31/2025
32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE
69 2 of
Solicitation Document No.
140P2120R0017
Document Title IMPROVE Network Operations and Filter Analysis Indefinite Delivery Indefinite Quantity (IDIQ) Contract
Table of Contents (FAR 12.303 Contract Format)
PART B – CONTINUATION OF SF 1449
Supplemental Information:
IDIQ Contract Scope of Services
1. Introduction and Background
2. Objective/Purpose
3. Scope
4. Site Tasks
5. Incorporation of the Technical Proposal and Proposal Length
6. Contingency of Operations
7. Government Owned Property
8. Transition Phase
9. REFERENCES
PART C – COMMERCIAL CONTRACT CLAUSES
As indicated in Block 27a of the SF1449, FAR Clause 52.212-4 Contract Terms and Conditions – Commercial Items (OCT 2018) applies to this solicitation and is incorporated by reference Addenda to 52.212-4 CONTRACT TERMS AND CONDITIONS – COMMERCIAL ITEMS (OCT 2018)
Addendum 1.0: Schedule of Supplies and Services Addendum 2.0: Ordering Procedures Additional Clauses Incorporated by Reference Additional Clauses Incorporated by Full Text
52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUES OR
EXECUTIVE ORDERS – COMMERCIAL ITEMS (OCT 2020)
Department of the Interior Local Clauses List of Contract Attachments
PART E – SOLICITATION PROVISIONS
As indicated in Block 27a of the SF1449, FAR Clause 52.212-1 INSTRUCTIONS TO OFFERORS – COMMERCIAL ITEMS (MAR 2020) applies to this solicitation and is incorporated by reference Addendum to 52.212-1 INSTRUCTIONS TO OFFERORS – COMMERCIAL ITEMS (JUN 2020)
Addenda 1.0: Submission Instructions Specific to this Solicitation Addendum 2.0: Additional Provisions Incorporated by Reference Addendum 3.0: Additional Provisions Incorporated in Full Text
52.212-2 EVALUATION – COMMERCIAL ITEMS (OCT 2014)
52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS – COMMERCIAL ITEMS (JUN 2020)
PART B – CONTINUATION OF SF 1449
Supplemental Information:
1. This procurement is set aside as unrestricted under NAICS code 541380 “Testing Laboratories” with a size standard of $15M.
2. The price schedule (Blocks 19-24) applicable to this IDIQ is available in the Pricing Schedule (Attachment 1).
3. The Government will award one (1) Indefinite Delivery Indefinite Quantity (IDIQ) contract as a result of this solicitation.
Document Title IMPROVE Network Operations and Filter Analysis Indefinite Delivery Indefinite Quantity (IDIQ) Contract
4. The minimum contract value for all orders issued against this contract shall not be less than the minimum contract value stated in the following table. The maximum contract value for all orders issued against this contract shall not exceed the maximum quantity and contract value stated in the following table.
Minimum Contract Value
Maximum Contract Value
Task Order Minimum/Maximum
$300,000.00 $28,100,000.00 $10,000.00 / $10,000,000.00
5. Submitted offers shall be valid for 180 calendar days from the date specified for receipt of offers.
IDIQ Contract Scope of Services
1. Introduction and Background
1.1 Introduction
The National Park Service (NPS) is responsible for the protection and enhancement of air quality related resources in the areas it manages by ensuring compliance with directives, regulations, and applicable requirements of the NPS Organic Act of 1916 and the Clean Air Act. The Organic Act mandates the National Park Service to:
"...conserve the scenery and the natural and historic objects and the wildlife therein and to provide for the enjoyment of the same in such manner and by such means as will leave them unimpaired for the enjoyment of future generations."
The Clean Air Act affords special air quality protections to certain national parks and wilderness areas, designating them as mandatory Class I federal areas, and assigns to the Federal Land Managers (FLMs) of those areas "the affirmative responsibility to protect the air quality related values (including visibility)" of Class I lands. It also established "as a national goal the prevention of any future, and the remedying of any existing, impairment of visibility in mandatory Class I federal areas which impairment results from manmade air pollution." The Clean Air Act established a detailed program that provides guidance to the NPS in meeting these mandates.
On behalf of the NPS, the Air Resources Division (ARD) has an air quality program to carry out these responsibilities; this involves a wide range of activities, including air quality monitoring and modeling, technical review of Prevention of Significant Deterioration (PSD) permit applications, coordination with states and other federal agencies, analyses of air quality related values inventories and effects, and special studies focused on source apportionment, ecological impacts and visibility perception.
The National Park Service administers 48 parks and wilderness areas that are designated Class I, the U.S. Fish and Wildlife Service (FWS) administers 21 Class I wilderness areas, the U.S. Forest Service (USFS) administers 88 Class I wilderness areas and there is one international park that is Class I. Of these 158 mandatory Class I federal areas, visibility is considered an important attribute in all but two USFS wilderness areas. Visibility-protected Class I areas are to be protected from air pollution impacts on visibility.
Document Title IMPROVE Network Operations and Filter Analysis Indefinite Delivery Indefinite Quantity (IDIQ) Contract
The Regional Haze Rule (RHR) establishes the regulatory framework by which the national visibility goal is to be met [United States Environmental Protection Agency, 1999] and requires monitoring representative of the 156 visibility-protected Class I areas. The monitoring guidance, used to support the RHR, specifies particle sampling and analysis of the major aerosol components using methods patterned after those utilized since 1987 by the Interagency Monitoring of Protected Visual Environments (IMPROVE) program [Joseph et al., 1987; Malm et al., 1994]. The IMPROVE program is a cooperative measurement effort managed by a Steering Committee that consists of representatives from the U.S. Environmental Protection Agency (EPA), the NPS, the USFS, the FWS, the Bureau of Land Management (BLM), the National Oceanic and Atmospheric Administration (NOAA), four organizations representing state air quality organizations (the National Association of Clean Air Agencies, the Western States Air Resources Council, the Northeast States for Coordinated Air Use Management, and the Mid-Atlantic Regional Air Management Association), and three Associate Members: the State of Arizona Department of Environmental Quality, Environment Canada, and the South Korea Ministry of Environment. The IMPROVE program is designed to establish current visibility and aerosol conditions in mandatory Class I areas; to identify chemical species and emission sources responsible for existing man-made visibility impairment; to document long-term trends for assessing progress toward the national visibility goal; and with the enactment of the RHR, to provide regional haze monitoring representing all visibility-protected federal Class I areas where practical. The IMPROVE program oversees the RHR monitoring efforts.
The National Park Service manages the IMPROVE monitoring efforts on behalf of the Steering Committee. This solicitation is sponsored by the NPS but covers the monitoring efforts for all mandatory Class I federal areas, as well as other monitoring using the IMPROVE monitoring protocols (described further below). The successful offeror of this solicitation will work through the NPS on all contractual related matters; other agencies sponsoring IMPROVE monitors will work through the NPS to access the resources available through this contract.
1.2 Background
IMPROVE was established as a national visibility monitoring program in 1985. The IMPROVE network initially was funded by the NPS and consisted of 30 monitoring sites primarily located in national parks, 20 of which began operation in 1987. IMPROVE network operations were fully implemented in March 1988. Beginning in 1998 the EPA provided supplemental support to IMPROVE to expand the network in order to provide representative particle speciation monitoring for all 156 visibility-protected Class I areas, as required under the RHR. In a site selection process which included input from all interested state air quality agencies, the IMPROVE Steering Committee identified locations for 110 monitoring sites that were deemed representative of the regional haze conditions for 155 of the mandatory 156 Class I areas (the Bering Sea Wilderness is the exception). Additional information about the site selection process is available elsewhere [Malm et al., 2000; http://vista.cira.colostate.edu/improve/].
In addition to the 110 IMPROVE network sites that are used to represent Class I areas, a number of IMPROVE protocol sites are currently in operation, mostly in rural locations, that provide expanded spatial coverage in regions outside of Class I areas. Protocol sites are separately sponsored by state, regional, tribal, and federal organizations and use the same instrumentation, monitoring, and analysis protocols as IMPROVE. The use of identical samplers and analysis protocols by the same Contractor ensures that data generated by IMPROVE and IMPROVE http://vista.cira.colostate.edu/improve/
Document Title IMPROVE Network Operations and Filter Analysis Indefinite Delivery Indefinite Quantity (IDIQ) Contract protocol sites can be treated as directly comparable. In total, there are 159 IMPROVE and IMPROVE protocol sites. Two of these sites (Lake Tahoe Community College and Baengnyeong Island, South Korea) are not funded as part of this contract and so should not be included in proposals; rather, technical and cost proposals should be prepared for 157 sites (110 IMPROVE and 47 IMPROVE Protocol sites) (See Attachment 2). Of the 157 sites, one of the sites is for Carbon analysis only (Detroit), and one site (Phoenix) has two samplers, such that there are a total of 158 samplers. Most sites are located in rural areas; however, for the purpose of comparing differences in aerosol composition between rural and urban areas, there are several urban sites (see Attachment 2). Likewise, to better facilitate inter-comparison and integration of IMPROVE data with EPA’s Chemical Speciation Network (CSN), six sites are collocated with CSN sites. Data from all IMPROVE sites are available on the Federal Land Manager Environmental Database (FED; http://views.cira.colostate.edu/fed/).
Map of 157 IMPROVE and IMPROVE Protocol Sites as of December 2019.
The RHR specifies that IMPROVE aerosol data be used to calculate the metric for tracking progress toward the goal of eliminating man-made visibility impairment for the visibility-protected Class I areas, with the ultimate goal of reaching endpoint (formerly natural background) conditions by 2064. As a result it is especially important to ensure that the IMPROVE aerosol monitoring and data processing procedures produce comparable data over a period of many decades so that credible haze trends can be determined.
To collect samples for the speciated particle measurements, the NPS currently employs a 4-channel (labeled A, B, C, and D) IMPROVE particle sampling system. A description of the current IMPROVE sampler and standard operating procedures can be found on the IMPROVE website http://views.cira.colostate.edu/fed/
Document Title IMPROVE Network Operations and Filter Analysis Indefinite Delivery Indefinite Quantity (IDIQ) Contract
(http://vista.cira.colostate.edu/improve/). The PM2.5 (particles <2.5 micrograms in diameter) samplers operate with a nominal flow rate of 22.8 liters/minute (LPM), while the PM10 sampler (particles <10 micrograms in diameter) runs at 16.9 LPM. Both collect samples for a 24-hour time interval, midnight to midnight local time, every third day. Channel A (PM2.5), operated with Teflon filters, is used for determining fine mass, elemental composition, and optical absorption. Elements to be determined from the analysis are given in Table 1, along with measurement detection limits and precision. Channel B (PM2.5) is operated with a nitric acid denuder and a nylon filter collection substrate. The nylon filter is analyzed for the anions nitrate, nitrite, sulfate and chloride. Channel C (PM2.5), operated using pre-fired quartz filters, is used to determine elemental and organic carbon using the thermal/optical reflectance technique. A complete description of this technique, including recent upgrades, is available in Chow et al. (1993; 2007; 2015). Channel D is operated with a Teflon substrate and PM10 inlet. The PM10 filters are analyzed for total mass. Laboratory blanks are also utilized for each of the channels, and field blanks are employed to better assess detection limits and potential contaminants in the samples. For further details on all measurements and analysis, see the IMPROVE website, and the pages describing standard operating procedures contained therein (http://vista.cira.colostate.edu/Improve/sops/).
2. Objective/Purpose The purpose of this contract is to (1) assist NPS in operating, maintaining and reconfiguring (where required) the IMPROVE particle monitoring network, which consists of 110 IMPROVE sites and 47 IMPROVE protocol sites; (2) analyze all exposed fine (PM2.5) and total (PM10) Teflon filters for mass concentrations; and (3) analyze PM2.5 Teflon filters for elemental concentrations of select elements (Table 1) and optical absorption; (4) coordinate analysis of nylon and quartz filters for ion and carbonaceous material, respectively1; (5) establish and conduct an internal quality assurance program; (6) participate in laboratory and field audits; and (7) provide a final, integrated dataset (including ion and carbon data, as well as associated metadata).
The Contractor is expected to employ established protocols in operating the IMPROVE network.
See the standard operating procedures (SOPs) for the monitoring program at the IMPROVE website (http://vista.cira.colostate.edu/Improve/particulate-monitoring-network/). As new methods are developed and enhanced quality control measures are defined, through activities funded separately from this contract, the Contractor shall incorporate these new methods into the IMPROVE routine operations through the modification of SOPs. Task Orders may require that the Contractor also ensure that all pertinent information (e.g., data, metadata, laboratory and field logs, etc.) developed by the Contractor for routine operations are available to other organizations as needed for their activities.
3. Scope
3.1 Operations and Maintenance Tasks
3.1.1 Network Operations (Task 3.3) and Filter Analysis (Task 3.4).
This Contract is broken up Five Ordering Periods of one year each.
The Contractor shall assist NPS in operating and maintaining the IMPROVE particle monitoring network, as described in detail in Section 3.3 below. This task includes, but is not limited to:
1 The two Contractors for ion and carbonaceous materials are currently Research Triangle Institute (Research Triangle Park, NC) and Desert Research Institute (Reno, Nevada), respectively.
http://vista.cira.colostate.edu/improve/ http://vista.cira.colostate.edu/Improve/sops/ http://vista.cira.colostate.edu/Improve/particulate-monitoring-network/
Document Title IMPROVE Network Operations and Filter Analysis Indefinite Delivery Indefinite Quantity (IDIQ) Contract training agency personnel to support routine site operations; communicating with site personnel;
coordinating shipments of all IMPROVE filters; providing routine preventative service of instruments; maintaining equipment; purchasing Teflon and nylon filters; coordinating analysis of selected filters for ion and carbonaceous material with the appropriate Contractors; conducting a rigorous quality assurance program; participating in laboratory and field audits; storing Teflon filters for the duration of the contract; reducing the IMPROVE data and submitting to the appropriate databases; maintaining current documentation for the network; participating in the IMPROVE Steering Committee Meeting; and archiving all IMPROVE data for the duration of the contract.
As described in detail in Section 3.4, the Contractor also shall analyze all fine (PM2.5) and total (PM10) Teflon filters for mass concentrations, analyze all fine Teflon filters for elemental concentrations of the species listed in Table 1, and conduct optical absorption on the Teflon filters.
For the one in three-day sampling of the IMPROVE Network, and accounting for QA modules and additional QA filters, this amounts to 20,000 filters analyzed annually for each of these analyses.
3.2 DELIVERABLES
Quality assurance report: a summary report on quality control data shall be provided to the COR twice per year.
Database and transfers: data from the network should be maintained in an SQL Database. ASCII files of valid data should be transferred to the IMPROVE/FED and the EPA AQS databases, or other database, on a quarterly basis.
System configuration: a description of the network, including all site locations, shall be submitted to the COR upon request.
Analysis software: code associated with data editing and reduction shall be submitted to the COR upon request.
Standard Operating Procedures (SOPs). Current SOPs for Network Operations and Analysis shall be maintained and updated on the IMPROVE website.
3.3 Network Operations Task
The current network of 157 sites (158 samplers; 1 site is carbon only) is the default configuration.
In addition to the standard samplers, several sites have collocated quality assurance (QA) modules (see Attachment 2) which are used to better assess data quality. These QA modules, which replicate the measurements of the IMPROVE samplers, are to be run in a manner identical to that of the IMPROVE samplers.
3.3.1 Coordinate operations of all IMPROVE and IMPROVE Protocol particle samplers and QA modules The Contractor shall oversee and carry out all activities needed to ensure the effective collection of samples using the IMPROVE particle samplers and QA modules. Each site’s host agency is generally responsible for the following tasks, however many of these tasks may be required of the vendor on an individual basis, as proscribed within individual task orders under Site Tasks (See Section 4) of this IDIQ:
Document Title IMPROVE Network Operations and Filter Analysis Indefinite Delivery Indefinite Quantity (IDIQ) Contract
Providing a shelter or stand for the IMPROVE sampler, which includes providing necessary power (two 20-Amp circuits) for the IMPROVE samplers;
Maintaining the IMPROVE shelter in working condition, as outlined in the IMPROVE Standard Operating Procedures 126 (See Attachment 4;
http://vista.cira.colostate.edu/Improve/particulate-monitoring-network/);
Providing a site operator to conduct routine operation of the IMPROVE sampler, which consists of changing IMPROVE filters once per week (typically Tuesdays) and shipping the exposed filters to the IMPROVE Operations Contractor (at the expense of the IMPROVE Operations Contractor);
Providing a site operator who will serve as a point of contact for the IMPROVE Operations Contractor and network auditors; and
Basic troubleshooting of the samplers, as needed, with support from the IMPROVE Operations Contractor.
The Contractor's responsibilities shall include:
Train agency personnel to support routine site operations;
Provide internet connections at all sites to allow for communication with IMPROVE controllers;
Communicate with site personnel, send clean filter media for all IMPROVE sampler channels, and receive exposed filter media for PM10 and fine mass, elemental, ion, and carbon concentrations, air flow information and other relevant observations;
Provide routine preventative service of instruments on a schedule of once every two years at all monitoring sites. This includes field site visits to conduct internal quality assurance audits.
Air flow checks shall be performed by at least two independent techniques. Maintenance procedures are listed in the aforementioned SOPs;
Provide technical support to site operators;
Maintain procedures (e.g., timely repair of equipment, NPS notification of site operator problems, etc.) to help ensure that the Regional Haze Rule data completeness criteria are met for all monitoring sites (see page 2-8 of Tracking Progress Under the Regional Haze Rule:
Guidance Document, http://vista.cira.colostate.edu/Improve/wp-content/uploads/2016/04/RHRTrackingProgress.pdf); and
Provide a Safety Plan for Contractor personnel visiting the sites for calibration and maintenance. The Contractor shall also provide guidance on safety for agency personnel responsible for routine operation of the instruments during training.
3.3.2 Supply of Filters
The Contractor is responsible for supplying the Teflon and nylon filters. The Contractor is also responsible for acceptance testing of Teflon filters and coordination with the Ion Analysis Contractor for acceptance testing of nylon filters. The pre-fired quartz filters are received from the carbonaceous aerosol Contractor. The Contractor will supply a sufficient number of filters for filter acceptance testing, network-wide sample collection, laboratory blanks, field blanks, and all other quality assurance methods. For the current network configuration, for one year of network operation, including filters to be used for QA, this equates to approximately 20,000 filters each for Channels A, B, and D.
3.3.3 Coordination of Filters for Ion and Carbon Analysis
The Contractor will be responsible for procuring the Teflon filters (see 3.3.2) for Channels A and D, loading them into the filter cassettes for shipment to the field, receiving the sampled filters from http://vista.cira.colostate.edu/Improve/particulate-monitoring-network/ http://vista.cira.colostate.edu/Improve/wp-content/uploads/2016/04/RHRTrackingProgress.pdf http://vista.cira.colostate.edu/Improve/wp-content/uploads/2016/04/RHRTrackingProgress.pdf
Document Title IMPROVE Network Operations and Filter Analysis Indefinite Delivery Indefinite Quantity (IDIQ) Contract the field, and carrying out the associated analysis (see 3.4). Determination of ion and carbon mass are carried out under separate contracts. The Contractor shall also supply the nylon filters (see 3.3.2), load them into the filter cassettes for shipment to the field, receive the sampled filters from the field, and ship the sampled filters to the Ion Contractor for analysis on at least a monthly basis. The Contractor also will receive the blank, pre-fired quartz filters from the Carbon Contractor, prepare filter cassettes with quartz filters for shipment to the field, ship filter cassettes to the field, receive the sampled filters from the field, and ship the sampled filters to the Carbon Contractor for analysis on at least a monthly basis. In addition to the filters used for sampling, field blanks shall be shipped to and from the field for analysis for all channels (module A: ~40 per month; module B: ~40 per month; module C: ~30 per month; module D: ~20 per month). Shipping costs for all steps, except shipment of the new quartz filters from the Carbon Contractor, are included in Task Order pricing. For the quartz filters, the Contractor shall store exposed filters under refrigeration and ship the exposed filters using temperature controlled (cooled) shipping containers to the Carbon Contractor for analysis after receipt from the field on at least a monthly basis.
3.3.4 Filter Storage
All samples from Teflon filters are to be stored for the length of the contract. All samples shall be stored and archived in a way that will not allow contamination of filter media at detectable levels.
Detectable levels are defined to be consistent with the sensitivity of the proposed analytical technique. The Task Orders may require the vendor to conduct additional analysis, or to make the stored filters available to another laboratory to conduct additional analysis. At the end of the contract the Contractor will work with the COR to transfer the filters to an alternate archive. No filters are to be discarded without written approval from the COR.
3.3.5 Quality Assurance
The Contractor shall follow, and develop where appropriate, strict quality assurance protocols, which are consistent with the Quality Assurance Project Plan for IMPROVE (http://vista.cira.colostate.edu/improve/wp-content/uploads/2017/01/IMPROVE-QAPP- Signed_3_2016.pdf). At a minimum, the Contractor shall:
Follow the established objective criteria, and where not available develop objective criteria, to be applied to all quality control measures and routine data;
Systematically catalog and track all samples;
Note any abnormalities observed by the operator and correct problems if any are present;
Carry out acceptance testing for filter characteristics and analytic suitability (3.3.2; especially trace contamination, mass loss/gain);
Validate the results of gravimetric, elemental and optical absorption analysis via formal third party protocols and routine reanalysis of previous samples;
Carry out precision and bias analyses on collected samples;
Document all routine procedures and changes to the procedures; and Provide a summary report on quality control data twice per year to the COR and QA Manager at EPA, which will be made publicly available on the IMPROVE website. An example of a QA report can be found at: http://vista.cira.colostate.edu/improve/wp-content/uploads/2019/11/IMPROVE_QAReport_11.15.2019.pdf
Laboratory and Field Audits http://vista.cira.colostate.edu/improve/wp-content/uploads/2017/01/IMPROVE-QAPP-Signed_3_2016.pdf http://vista.cira.colostate.edu/improve/wp-content/uploads/2017/01/IMPROVE-QAPP-Signed_3_2016.pdf http://vista.cira.colostate.edu/improve/wp-content/uploads/2019/11/IMPROVE_QAReport_11.15.2019.pdf http://vista.cira.colostate.edu/improve/wp-content/uploads/2019/11/IMPROVE_QAReport_11.15.2019.pdf
Document Title IMPROVE Network Operations and Filter Analysis Indefinite Delivery Indefinite Quantity (IDIQ) Contract
The Contractor shall participate in laboratory and field audits on sample collection and all analytical techniques (gravimetric, elemental, and optical absorption), such as the annual audits conducted by the EPA’s quality assurance laboratory in Montgomery, AL.
In addition, an independent IMPROVE auditor (funded separately from this contract) will provide results from technical systems audits for approximately 20 sites per year. The IMPROVE Operations Contractor should work with the IMPROVE auditor, the COR, the site operators and the appropriate federal land manager to address problems identified during the audits.
3.3.6 Data Reduction and Database Management
The Contractor shall be responsible for data reduction and analysis, which includes:
Reduce all available gravimetric, elemental, ion and carbonaceous mass data to ng/m3 corrected for sample volume, artifacts, and other pertinent factors;
Submit the data to the NPS FED (http://views.cira.colostate.edu/fed/) and EPA AQS databases on a quarterly basis; data should be submitted within 6 months of filter collection;
Archive all IMPROVE data for the duration of the contract;
Provide metadata associated with all field, laboratory and data processing procedures; all metadata necessary to properly interpret the delivered routine data must accompany the measurement data, including those by the Ion and Carbon Analysis Contractors;
Maintain the total temporal record for all species at all monitoring sites past and present and relevant metadata, including chain of custody for filters, analysis spectra and flow rate data;
and
Provide data flags for all measurements, with descriptions of potential problems where appropriate.
3.3.7 Network Documentation
The Contractor shall maintain up-to-date documentation of:
System configuration of the monitoring network;
Analysis software and code utilized in data editing and reduction;
Database software for archiving data;
Detailed inventory of all government owned property associated with the IMPROVE program that includes the locations, serial numbers and conditions of all samplers and other government owned property;
Standard Operating Procedures (SOPs) for all IMPROVE field, laboratory and data processing tasks; and
Quality Assurance Project Plan (QAPP) as required by the U.S. EPA for all EPA monitoring programs (to be updated periodically, as required by EPA).
All documentation must be made available upon request from the CO and/or COR. The Contractor shall obtain written approval from the CO and COR before any changes to the system configuration occurs.
3.3.8 Steering Committee Meetings
The Contractor shall attend and provide technical and scientific progress reports at IMPROVE Steering Committee Meetings, held annually.
3.4 Filter Analysis Task
http://views.cira.colostate.edu/fed/
Document Title IMPROVE Network Operations and Filter Analysis Indefinite Delivery Indefinite Quantity (IDIQ) Contract
3.4.1 Gravimetric Analysis
The Contractor shall perform gravimetric analysis on the Teflon filters for the PM2.5 and PM10 samples. The desired minimum detectable limit for sample mass deposited on the filter is 10 micrograms or less. The anticipated upper limit for aerosol mass on the filter is 10,000 micrograms; this equates to ambient concentrations of ~400 micrograms m-3, sampled for 24 hours from the total (PM10) aerosol module. All gravimetric measurements shall be made in a temperature and relative humidity (RH) controlled environment. A mean temperature between 20 and 23 degrees Celsius and a mean RH between 30% and 40% should be maintained;
temperature and RH should be monitored to ensure a stable measurement environment. The Contractor's responsibilities shall include:
Pre-weigh Teflon filters prior to sending to sites; including field blanks;
Post-weigh Teflon filters upon receipt, including field blanks, and determine gravimetric mass from PM2.5 and PM10 Teflon filters to a precision of ± 3µg;
Perform routine measurements of laboratory blanks to assess short-term (<1 day) and long-term stability and performance of the instruments;
Perform routine measurements using one or more certified calibration standards;
Perform sufficient replicate weight analysis to determine measurement precision;
Report metadata related to the laboratory procedures and equipment.
3.4.2 Elemental Analysis
The Contractor shall perform non-destructive elemental analysis of filters by any of several equivalent techniques. Elemental mass shall be reported for fine mode Teflon filter samples for all of the elements listed in Table 1. Special consideration will be given to sensitivity levels of the following elements: Na, Mg, Al, Si, Cl, K, Ca, V, Fe, Ni, Cu, Zn, As, Se, Br, Pb. In addition to reporting elemental mass for each species, the Contractor shall:
Characterize the sensitivity, accuracy, and precision of the analytical techniques;
Perform replicate analyses on the network filters at a rate sufficient to establish measurement precision;
Routinely analyze laboratory and field blanks;
Document any changes to the analytical techniques or equipment;
Apply and document matrix corrections for all particle size and loading effects; and Archive and make available all metadata associated with the laboratory, field and data processing procedures needed to properly interpret and understand the quality of the delivered analytical data.
The method currently used to determine elemental composition is X-Ray Fluorescence (XRF).
Other, equivalent techniques may also be proposed. Technical proposals should address the suitability of the proposed analytical approach to determine masses for all elements listed in Table
1. Sensitivities also shall be indicated for each of the elements in Table 1. Quantitative and operational definitions shall be provided for the following quantities: accuracy, precision, and minimum detectable limit.
Because a primary goal of the IMPROVE network is to generate data that are suitable for long-term trends assessment, a proposal utilizing techniques other than XRF must address the issue of equivalence of data that would be generated by the proposed analytical systems to the data from the current analytical systems. NPS may require a demonstration of equivalence (i.e., results
Document Title IMPROVE Network Operations and Filter Analysis Indefinite Delivery Indefinite Quantity (IDIQ) Contract agreeing within specified uncertainties) on up to 50 actual IMPROVE network filter samples (reimbursed by NPS at posted commercial rates). The current analytical system’s precision and minimum detection limits (MDL) are given in Table 1. In the table, the analytical MDL is based on three times the standard deviation of 100 analyses of a single field blank filter. The analytical precision estimates are based on the root mean square sum of the standard deviations from 10 analyses of 18 different samples. Of the 18 samples used for the precision estimates, 16 were PM2.5 samples from the IMPROVE network and 2 were multi-element calibration reference filters.
For each sample, an element was only included in the precision estimate if the mean loading on the sample was greater than three times the detection limit, except for Zr, where the criterion was lowered to greater than the detection limit due to very low sampled masses.
Table 1. Detection limits and precision for elements to be analyzed based on the current IMPROVE analytical method of XRF. Precision is based on sample loadings >3 × MDL, except for Zr, which is only >MDL.
Element (Symbol)
Atomic Number
Minimum Detection Limit
(μg/cm2)
Re-analysis Precision
Sodium (Na) 11 0.04 5% Magnesium
(Mg) 12 0.05 16%
Aluminum (Al)
13 0.02 3%
Silicon (Si) 14 0.008 2% Phosphorous
(P) 15 0.002 21%
Sulfur (S) 16 0.0006 2% Chlorine (Cl) 17 0.002 14% Potassium
(K) 19 0.001 1%
Calcium (Ca) 20 0.003 3% Titanium (Ti) 22 0.002 6% Vanadium (V) 23 0.001 13%
Chromium (Cr)
24 0.002 12%
Manganese (Mn)
25 0.004 8%
Iron (Fe) 26 0.001 2% Nickel (Ni) 28 0.001 12%
Copper (Cu) 29 0.002 10% Zinc (Zn) 30 0.002 5%
Arsenic (As) 33 0.002 3% Selenium
(Se) 34 0.003 8%
Bromine (Br) 35 0.002 15% Rubidium
(Rb) 37 0.004 8%
Strontium 38 0.003 15%
Document Title IMPROVE Network Operations and Filter Analysis Indefinite Delivery Indefinite Quantity (IDIQ) Contract
(Sr) Zirconium
(Zr) 40 0.02 12%
Lead (Pb) 82 0.008 24%
3.4.3 Optical Absorption Measurements
The Contractor shall perform optical absorption measurements on the PM2.5 Teflon filters. The current method to determine optical absorption is the Hybrid Integrating Plate/Sphere (HIPS;
White et al., 2016). Other, equivalent techniques may also be proposed. If an alternate technique is proposed, the proposal must address the issue of equivalence of data that would be generated by the proposed analytical systems to the data from HIPS.
The Contractor's responsibilities shall include calculation of absorption coefficients of the collected samples. For the current system, the minimum detectable limit is 0.34 x 10-6 m-1 and the precision of the measurement is 0.15 x 10-6 m-1. MDL and precision estimates should be included for all proposed systems.
4. Site Tasks Task Orders will be evaluated annually and negotiated with the intent to keep pace with and respond to emerging air pollution issues, as well as logistical and financial challenges associated with the monitoring program. For example, the total number of IMPROVE sites has changed over time, with sites being added, removed and/or relocated. Although such changes typically occur each year, the number and type of changes to the network varies. As such, tasks related to reconfiguration of the network are included here as Site tasks. Similarly, the NPS often carries out Special Studies, which may include a short term IMPROVE sampler and associated analysis;
such analysis is considered separate from the routine monitoring network, and as such is included as an Site task. The following tasks may be needed at any time during the period of performance of the IDIQ and will be issued as individual exercise of pre-priced tasks. Stand Alone Task Orders for Site tasks may include any combination of the tasks below at various levels of effort. Pricing for each of the Site tasks will be dependent on the level of effort required, and as such a summary of labor rates for relevant personnel will determine overall site task pricing.
4.1 Establishment of New Monitoring Site
The Contractor may be required to install a new or existing IMPROVE sampler at a new site. The Contractor must consider siting criteria and SOPs for IMPROVE, as described on the IMPROVE webpage (http://vista.cira.colostate.edu/Improve/sops/), and will be responsible for the following tasks for each additional site identified on Individual Task Orders:
Assist in selection of appropriate monitoring sites;
Supply and install necessary sampling structure for instrument installation;
Supply and install monitoring instruments and maintain them in operable condition; and Train agency personnel responsible for routine operation of instruments.
Spare IMPROVE samplers are available to the vendor on an as-needed basis which may be maintained at the Contractor site. These samplers can be used for new sites so long as a sufficient number are available to quickly respond to replacement and repair needs. The Contractor will inform the COR when the number of spare samplers is below the number deemed sufficient to maintain the network so that additional samplers may be procured.
Document Title IMPROVE Network Operations and Filter Analysis Indefinite Delivery Indefinite Quantity (IDIQ) Contract
4.2 Repair or Replacement of Site Due to Malfunction, Safety Concerns or Loss.
The Contractor may be required to repair or replace an IMPROVE sampler which has been damaged or destroyed. The Contractor must consider SOPs for IMPROVE, as described on the IMPROVE webpage (http://vista.cira.colostate.edu/Improve/sops/), and would be responsible for the following tasks for each site identified on the Task Order:
When practical, repair components of damaged IMPROVE samplers and/or sampling structures;
Supply and install necessary sampling structure for instrument installation; and Supply and install monitoring instruments and maintain them in operable condition.
4.3 Decommissioning Current Monitoring Stations
The Contractor may be required to decommission one or more sites. The Contractor would be responsible for the following tasks at any site that is designated by the Task Order to be decommissioned:
Arrange for a final calibration and document the condition of the site and equipment;
Arrange for the removal of the IMPROVE sampling equipment, to be maintained as spare equipment or parts for possible use elsewhere;
Arrange for the removal of site documentation (field logs); and As necessary, arrange for the removal of the site sampling structure.
4.4 Supply samplers, associated equipment, spare parts.
The Contractor may be required to supply or develop samplers or associated equipment/parts.
Efficient operation of the network requires that an adequate supply of backup modules and all associated equipment be kept on hand. The Contractor shall inform the CO and COR about the need for any supply of equipment that falls outside of the base Network Operations and Filter Analysis IDIQ contract.
4.5 Site operators.
Most sites are operated and maintained by state and federal agency personnel. Some sites may not have that provision. In such situations the Task Order may require the Contractor to obtain the services of an on-site operator.
4.6 Additional Analyses
Methods not included in this solicitation may be requested to measure additional species, including species measured in the past as part of the IMPROVE Network, or measurements of new species. Such efforts may include, but are not limited to, FTIR analysis of aerosol samples to determine functional groups and estimate total particulate carbon, or measurements of total carbon using alternate methods. Alternatively, the Contractor may be required to extend optical absorption measurements from filter substrates (currently HIPS) to include measurements at multiple-wavelengths, encompassing the near-infrared to ultraviolet. Analytical methods such as these, as well as others not explicitly noted here, may be implemented in future monitoring.
Please provide information regarding measurement capabilities for additional aerosol and gas phase phases species and properties relevant to the IMPROVE Program.
4.7 Special Studies
Document Title IMPROVE Network Operations and Filter Analysis Indefinite Delivery Indefinite Quantity (IDIQ) Contract
The Contractor may be required to participate in Special Studies, providing support for the deployment of samplers, coordination of filters with other NPS Contractors, and additional filter analysis. The Contractor may also be required to deploy additional measurement techniques relevant to the IMPROVE Program, including, particle and/or particle mass sensors, meteorological measurements, and light scattering and absorption measurements. As part of these efforts, the Contractor may be required to conduct daily analysis as outlined in specific, applicable Task Orders.
4.8 IMPROVE Outreach
The Contractor may be required to oversee outreach activities related to the IMPROVE Program.
These activities may include communication and recognition of site operators and program partners, as well as outreach activities intended for the general public. The Contractor may be required to develop and distribute materials, as outlined by the Task Order.
4.9 Change in Site Maintenance Schedule
The Contractor may be required to increase the frequency of site visits for routine maintenance and calibration as specified at the task order level.
4.10 Development of Measurement Methods
The Contractor may be required to develop methods to enhance current IMPROVE measurements or to allow for cost savings measures. Specifications for new methods will be provided by the Task Order requirement documents, and the Contractor is encouraged to recommend new methods and cost savings measures at any time during the life of the IDIQ contract.
4.11 Operation of Alternate Configuration Sites
The Contractor may be required to operate sites that differ from those described above through separate Task Orders under this IDIQ Contract. These may include expanded monitoring or reduced cost sites.
5. Incorporation of the Technical Proposal and Proposal Length
(a) The Contractor’s technical proposal will be incorporated herein by reference. In the event of conflict between the provisions of the technical proposal and any other clause of this contract (including, the statement of work), the conflict will be resolved in accordance with 52.212-4(s), Order of Precedence. For this contract, the Contractor’s technical proposal will be deemed to be the last in order of precedence. The detailed technical content of the Contractor’s proposal is an important factor in the selection of the Contractor for award of this contract. It is agreed, therefore, that in performance of this contract, the Contractor shall not change or otherwise deviate from the content of the technical proposal without prior written approval of the Contracting Officer. If it is necessary for the Contractor to change the performance, design, configuration, or other items specified in the technical proposal, in order to comply with the requirements of the Statement of Work, contract clauses, or special contract requirements, the contract shall be modified at the discretion of the Government to reflect the changes at no increase in contract cost/price or extension of the delivery schedule or shall be negotiated if warranted.
(a) The Government, upon award of this contract, shall have full rights of ownership in the technical proposal and the data contained therein.
Document Title IMPROVE Network Operations and Filter Analysis Indefinite Delivery Indefinite Quantity (IDIQ) Contract
6. Contingency of Operations The offeror shall follow the negotiated contingency of operations plan in the event of catastrophic failures of computer and data storage systems. This shall include replacement of key personnel, recovery of data, alternate locations, and methods of contingency data validation and processing.
7. Government Owned Property All particle samplers are government-owned property. In total, there are 218 IMPROVE samplers.
This total includes all samplers that are in the field, samplers that are used for testing, and spare samplers used for replacements when repairs are needed.
8. Transition Phase An incumbent Contractor is currently providing the services described in this Statement of Work under an IDIQ contract. Upon contract completion or termination, the incumbent Contractor shall work to ensure a smooth and coordinated transition to the successful offeror by making staff and resources available to ensure timely transfer of existing inventories to the new Contractor. The incumbent Contractor shall also make available to the new Contractor any data collected through the previous contract which may assist the successful offeror during the transition phase.
9. REFERENCES
Chow, J. C., J. G. Watson, L. C. Pritchett, W. R. Pierson, C. A. Frazier, and R. G. Purcell, 1993.
The DRI thermal/optical reflectance carbon analysis system: description, evaluation, and applications in U.S. air quality studies, Atmospheric Environment, 27(N8): 1185-1201, June 1993.
Chow, J.C., Watson, J.G., Chen, L.W.A., Chang, M.C.O., Robinson, N.F., Trimble, D., Kohl, S., 2007. The IMPROVE-A temperature protocol for thermal/optical carbon analysis: maintaining consistency with a long-term database. Journal of the Air & Waste Management Association 57, 1014-1023.
Chow, J.C., Wang, X.L., Sumlin, B.J., Gronstal, S.B., Chen, L.W.A., Trimble, D.L., Kohl, S.D., Mayorga, S.R., Riggio, G., Hurbain, P.R., Johnson, M., Zimmermann, R., Watson, J.G., 2015.
Optical Calibration and Equivalence of a Multiwavelength Thermal/Optical Carbon Analyzer.
Aerosol and Air Quality Research 15, 1145-1159.
United States Environmental…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .