B08 Exhibit 1 Sample Task Order 1 and 2.docx

DOCX document 36 KB Posted

Attached to
NR-ARD-17 - IMPROVE OPERATIONS RFP Federal contract opportunity
Solicitation number
140P2120R0017
Issued by
Department of the Interior National Park Service

About this file

This document outlines two sample task orders for operating and maintaining the IMPROVE Network air quality monitoring program. Task Order 1 involves network operations, including site maintenance, data management and quality assurance. It also requires filter analysis including mass, elemental and optical absorption measurements on approximately 20,000 filters annually. Task Order 2 includes establishing a new monitoring site, conducting a special study involving one-year of sampling, overseeing outreach recognition of site operators, and developing methods for a reduced-cost monitoring approach. The period of performance for both task orders is one year. Deliverables include quality assurance reports, database transfers, documentation of the monitoring network, standard operating procedures, and a quality assurance project plan.

View the file

Other files for this federal contract opportunity

Other files attached to NR-ARD-17 - IMPROVE OPERATIONS RFP, newest first.
File Type Posted
B09 Attachment 5 QnA_0001.docx DOCX document
B09 Exhibit 1 Sample Task Ord 2020_0001.docx DOCX document
Sol_140P2120R0017_Amd_0001.pdf PDF
B09 Attachment 1 IDIQ Pricing Schedule_28Oct2020_0001.xlsx XLSX spreadsheet
B08 Attachment 1 IDIQ Pricing Schedule.xlsx XLSX spreadsheet
B08 Attachment 4 SOP 126 Appendix-E_Open-Shelter-Specifications.pdf PDF
B08 Attachment 3 Government Furnished Property.xlsx XLSX spreadsheet
B08 Exhibit 2 Past Performance Questionnaire.doc DOC document
B08 Attachment 2 Site List.docx DOCX document
Sol_140P2120R0017.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCOPE OF WORK

IMPROVE Network Operations and Filter Analysis

SAMPLE TASK ORDER

BACKGROUND

The National Park Service (NPS) conducts air quality monitoring to better understand visibility in the national parks. The objective of this Sample Task Order is to operate and maintain the IMPROVE Network, the primary visibility monitoring program for NPS, and to carry out gravimetric, elemental and optical absorption analysis on the collected filters. Price proposals should be based on the current network, which includes 157 sites, with 158 monitors (Phoenix has two collocated monitors). The Period of Performance for the Sample Task Order is one year. Specific tasks are listed here.

TASKS

1) Network Operations (Task 3.3) The Contractor shall assist NPS in operating and maintaining the IMPROVE particle monitoring network. This task includes, but is not limited to: training agency personnel to support routine site operations; communicating with site personnel; coordinating shipments of all IMPROVE filters; providing routine preventative service of instruments; maintaining equipment; supplying Teflon and nylon filters; coordinating analysis of selected filters for ion and carbonaceous material with the appropriate contractors; conducting an internal quality assurance program; participating in laboratory and field audits; storing Teflon filters for the duration of the contract; reducing the IMPROVE data and submitting to the appropriate databases; maintaining current documentation for the network; participating in the IMPROVE Steering Committee Meeting; and archiving all IMPROVE data for the duration of the contract.

2) Filter Analysis (Task 3.4) The Contractor also shall analyze all fine (PM2.5) and total (PM10) Teflon filters for mass concentrations, analyze all fine Teflon filters for elemental concentrations of the species listed in the RFP, and conduct optical absorption on the Teflon filters. This task order is based on 20,000 filters analyzed annually, as specified in the RFP for each of these analyses.

DELIVERABLES

Quality assurance report: a summary report on quality control data shall be provided to the COR twice per year.

Database and transfers: data from the network should be maintained in an SQL Database. ASCII files of valid data should be transferred to the IMPROVE/FED and the EPA AQS databases, or other database as directed by the COR, on a quarterly basis.

System configuration: a description of the network, including all site locations, shall be submitted to the COR upon request.

Analysis software: code associated with data editing and reduction shall be submitted to the COR upon request.

Standard Operating Procedures (SOPs). Current SOPs for Network Operations and Analysis shall be maintained and updated on the IMPROVE website.

Quality Assurance Project Plan (QAPP). The QAPP shall be updated and provided upon request, as required by EPA.

Desired Delivery Schedule All of the Tasks listed (1-2), and the associated deliverables, shall be completed by the end of the Period of Performance. The Contractor is responsible for coordinating all tasks to ensure the work is completed in a timely and efficient manner.

SCOPE OF WORK

SAMPLE TASK ORDER 2. INDIVIDUAL TASKS

BACKGROUND

The National Park Service (NPS) conducts air quality monitoring to better understand visibility in the national parks. The objective of this Sample Task Order is to implement several Individual Tasks associated with the IMPROVE Network, the primary visibility monitoring program for NPS. Price proposals should be based on the tasks described below. The Period of Performance for the Sample Task Order is one year. Specific tasks are listed here.

TASKS

1) The contactor shall establish a new IMPROVE site (Individual Task 4.1. Establishment of New Monitoring Site). The contractor should assume that all parts needed for the IMPROVE sampler are provide by NPS, but that an open air sampling structure (http://vista.cira.colostate.edu/improve/wp-content/uploads/2018/01/IMPROVE-SOP-126_Appendix-E_Open-Shelter-Specifications_12.2017.pdf - sampler parts are listed on page 1 herein) will need to be built onsite by the contractor. For the price quote, do not include travel costs to and from the site. To establish the new site, the contractor shall:

· Purchase all necessary part and install the sampling structure for instrument installation.

· Install all components needed for an active IMPROVE site and conduct any initial tests required to ensure proper operation.

· Train agency personnel responsible for routine operation of instruments the NPS anticipates a requirement for one site operator and one back-up operator for this requirement.

2) The contractor shall participate in a Special Study at Colorado National Monument (Individual Task 4.7. Special Studies). The contractor shall deploy an IMPROVE sampler at the site for 1 year, which will operate on a one-in-three-day sampling schedule and shall coordinate analysis of the filters. As part of this task, the contractor shall conduct gravimetric, elemental and filter absorption measurements, consistent with the routine monitoring program. Ion and Carbon analysis will be conducted by separate contractors and those costs should not be included here. At the end of the study, the contactor shall provide all processed data (including from the Carbon and Ion Contractors) and decommission the site, returning all instruments to storage. For the price quote, assume that the IMPROVE sampler is provided by NPS, and that a sampling structure is already in place. For the price quote, do not include travel costs to and from the site.

3) The Contractor shall help oversee outreach activities related to the IMPROVE Program (4.8 IMPROVE Outreach), aimed at recognizing IMPROVE site operators. For this effort, the Contractor shall summarize site statistics (e.g. years of service, sample collection efficiency, changes in visibility over the lifetime of the site), provide some form of recognition (assume $20 cost per site), and distribute these summary materials to every site.

4) The contractor shall develop methods to enhance current IMPROVE measurements to allow for cost savings measures (Individual Task 4.10. Development of Measurement Methods). The proposer should outline a “Reduced Cost” IMPROVE site that would (1) include fewer measurements than a typical IMPROVE site (as described above); and (2) still collect sufficient data to allow for calculation of visibility conditions. Price quotes should only include the anticipated effort to develop the “Reduced Cost” site.