SO-1856 Pleasant View AC Upgrades Addendum 1.pdf
PDF 686 KB Posted
- Attached to
- SO-1856 Pleasant View School A/C Upgrades
- Solicitation number
- RFP LSD 260000001993 3
- Issued by
- Grand Traverse County, Lansing City, Michigan
About this file
This is an addendum document related to the Pleasant View School A/C Upgrades project (SO-1856) in Michigan. The addendum modifies the original solicitation for air conditioning system upgrades at the Pleasant View School facility. The document clarifies project specifications, technical requirements, and bid submission procedures for contractors interested in upgrading the school's HVAC systems. The addendum addresses amendments to the scope of work, including any changes to equipment specifications, installation requirements, or site conditions that bidders must account for in their proposals. Bidders are required to acknowledge receipt of this addendum as part of their bid submission to ensure compliance with the updated project parameters and contractual obligations.
The addendum establishes revised specifications and requirements that supersede or supplement portions of the original solicitation documents. Contractors must incorporate all addendum provisions into their cost proposals and project schedules. The document serves to clarify ambiguities, correct errors, or provide additional information discovered during the pre-bid phase that affects project delivery, material sourcing, labor requirements, or timeline. All prospective bidders must account for the modifications outlined in this addendum when preparing their bids, and failure to acknowledge the addendum may result in bid rejection or non-responsiveness determinations during the evaluation process.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SO-1856 Pleasant View AC Upgrades.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
4000 West Eleven Mile Road | Berkley, MI 48072 | 248.399.1900 | www.sesnet.com
Addendum # 01
PROJECT: Lansing Public Schools Pleasantview Air Conditioning
SES PROJECT NO: 26 0957 01
DATE: 05/21/2026
The following are changes, clarifications, and additions made to the Specifications and Construction Drawings prior to the receipt of bids and shall be noted by the Contractor responsible for the same. All of these items shall be considered part of the Contract Documents.
The general character of the work required by this Addendum shall be the same as originally specified, and all incidentals required in connection with the work hereinafter described shall be included even though not specifically mentioned.
The contractor shall be held responsible to include and adjust the work of all trades involved as required to complete the work described hereinafter. All bidders shall review the Addendum as it alters the work shown on the Construction Drawings and the Specifications.
Drawings issued:
Mechanical:
None
Electrical:
E101
Electrical Drawings:
Item No. 1. Refer to sheet E101 (re-issued):
A. Added construction note for clarification on conduit routing for the new work.
WP
GFI M
M
M
JS
S
S
S
J
WP
GFI
WP
GFI
CLASSROOM
1D
CLASSROOM
1C
CLASSROOM
1B
CLASSROOM
1A
CLASSROOM
3A
CLASSROOM
3D
CLASSROOM
3C
CLASSROOM
3B
CLASSROOM
4A
CLASSROOM
4B
CLASSROOM
4C
CLASSROOM
2A
CLASSROOM
2B
CLASSROOM
2C
STOR
A
10A
STOR
MAINTENANCE
MECHANICAL ROOM
BOOK ROOM
STORAGE
TEACHER'S
KITCHEN
TLT
TLT
MULTI-PURPOSE
ROOM
PUPIL SERVICES
CLASSROOM
39B
AUDIO-VISUAL
CLASSROOM
39A
REMEDIAL READING
STUDY
LIBRARY
CUSTODIAN
BOILER ROOM
GENERAL OFFICE
PRINCIPLE'S
OFFICE
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CONFERENCE
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
RECEPTION HALL
CLINIC
TLT
CLO
CORRIDOR
JAN CLO
CORRIDOR
TLT
TLT
TLT
TLT
TLT
TLT
TLT
TLT
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
STO
18A
TLT
TLT
STOR
18B
TLT
TLT
TLT
TLT
TLT
TLT
CORRIDOR
CORRIDOR
TLT
TLT
TLT
STOR
STOR
STOR
NO WORK SCOPE IN RECENT ADDITION SPACE.
AC1
AC2
(E)EMDP-01
(E)EBCP-01
(E)EXCP-01
(E) MAIN DISC.
AC2-6,8AC2-9,11
AC2-5,7
30S30S
30S
30S
AC2-10,12AC2-13,15
AC2-17,19AC2-14,16
30S30S
30S 30S
30S
30S
AC1-1,3
30S30S
30S 30S 30S
30S
30S
30S
30S
30S
30S
AC1-5,7
AC1-6,8
AC1-9,11
AC1-10,12
AC1-13,15
AC1-14,16
AC1-17,19
AC1-18,20 AC1-21,23 AC1-22,24
AC1-2,4
(E) SERVICE XFMR
150KVA
480V SECONDARY
(E) SERVICE XFMR
240V SECONDARY
R1
(TYP)
R1
(TYP)
(TYP)
R1
R1
(TYP)
AC2-1,3
AC2-2,4
R2
R3
R3
(ON ROOF)
(ON ROOF)
(ON ROOF)
(ON ROOF)
RTU-1
FCU-2
CU-1FCU-1
FCU-2
CU-2
CU-2
(ON ROOF)
RTU-2
EBU1
R4
EBU1
R4
R5
R5
R5
R6
R7
R7
R6
(E) MDP
TO (E) MDP
TO (E) MDP
M
(E) UTILITY METER
#22358327
(E) FACP
NATIONAL TIME 902
AC2-18
AC1-26,28
AC1-25,27
AC1-29,31
T-AC1
(E) FACP
AC1-33
AC1-33
A
B
PROJECT:
SES
Strategic Energy Solutions
4000 W. Eleven Mile Road Berkely, MI 48072 Phone 248.399.1900 Fax 248.399.1901 www.sesnet.com
© 2026 SES, INC.
DRAWN:
CHECKED:
x
P
LO
T T
E D
O N
CLIENT:
Seal
Keyplan
SHEET TITLE:
SHEET NUMBER:
ISSUED FOR:
/2
/2
:2
:0
A
M C
U se rs
\b ck
\D o cu m e n ts \2
LS
D
P le a sa n t
V ie w A
C
M E
P b ke ck a n
.r vt
E101
SET
LLJ
SES Project #26 0957 01
PLEASANT VIEW AC
UPGRADE
4501 PLEASANT GROVE RD,
LANSING MI. 48910
COMPOSITE FIRST
FLOOR
ELECTRICAL PLAN
LANSING SCHOOL
DISTRICT
519 W. KALAMAZOO ST,
LANSING, MI. 48933
SCALE: 1/16" = 1'-0"
COMPOSITE FIRST FLOOR ELECTRICAL PLAN
POWER GENERAL NOTES
1. ALL RECEPTACLES ON EXTERIOR, IN KITCHEN, IN CONCESSION, IN LABORATORY, AND
WITHIN 6'-0" OF SINK OR OTHER WATER SUPPLY SHALL BE READILY ACCESSIBLE GFCI TYPE
RECEPTACLE.
2. REFER TO ARCHITECTURAL FLOOR PLANS AND ELEVATIONS TO VERIFY LOCATION OF
DEVICES.
3. ALL CONDUITS SERVING 120 VOLTS OR GREATER SHALL INCLUDE A GROUND WIRE.
4. ALL CONDUITS SHALL BE ROUTED CONCEALED UNLESS NOTED OTHERWISE.
5. ALL 120 VOLT CIRCUITS SHALL UTILIZE A SEPARATE NEUTRAL.
ISSUED DATE
BIDS/PERMITS 05/01/2026
ADDENDUM 1 05/21/2026
POWER KEYNOTES
R1 ELECTRICAL CONTRACTOR TO PROVIDE A 208V, NEMA 6-30R RECEPTACLE. COORDINATE
EXACT LOCATION WITH OWNER. PROVIDE SURFACE MOUNTED RACEWAY TO
RECEPTACLE; ROUTING TO BE COORDINATED WITH EXISTING FIELD CONDITIONS.
R2 EXISTING WALL MOUNTED CONDUIT IN THIS AREA IS DAMAGED. REPLACE BROKEN
SERVICE ENTRANCE CONDUIT AS REQUIRED TO REMEDY BROKEN CONDUIT.
COORDINATE WITH UTILITY AS REQUIRED FOR FACILITATION OF WORK. CONDUIT IS
CRACKED AND CONDUCTORS ARE EXPOSED TO ELEMENTS.
R3 NEW PANEL: COORDINATE WITH OWNER FOR EXACT LOCATION IN ROOM. IF THE ROOM
HAS OCCUPANCY SENSOR OFF LIGHTING CONTROLS CREATE A NIGHT LIGHT USING
EXISTING LIGHTING FIXTURE CLOSEST TO NEW PANEL.
R4 EBU1 IS AN EMERGENCY LIGHT WITH INTEGRATED BATTERY UNIT: WALL MOUNT IN
EXISTING SPACE TO ILLUMINATE PANEL LOCATION EGRESS PATH IN EMERGENCY
CONDITION. CONNECT TO EXISTING CIRCUIT FEEDING ADJACENT EMERGENCY BATTERY
LIGHTING FIXTURES IN ADJACENT SPACE. BASIS OF DESIGN FIXTURE IS: LITHONIA ELM4L .
ENGINEER APPROVED EQUAL PRIOR TO BIDS.
R5 ELECTRICAL CONTRACTOR TO MAKE ALL CONNECTIONS 120/208V OR HIGHER. LOW
VOLTAGE CONTROLS WIRE BY MECHANICAL TRADES. INDOOR UNIT IS FED FROM
OUTDOOR UNIT. PROVIDE MAINTENANCE DISCONNECT AT INDOOR UNIT, PROVIDE NEMA
3R DISCONNECT FOR OUTDOOR UNIT. COORDINATE WITH MECHANICAL TRADES,
MECHANICAL SCHEDULES ON SHEET M600, AND FINAL EQUIPMENT SELECTION'S
SUBMITTAL INSTALLATION INSTRUCTIONS.
R6 EQUIPMENT DISCONNECT PROVIDED BY MANUFACTURER. EC TO PROVIDE POWER
CONNECTION FOR EQUIPMENT AS INDICATED. COORDINATE INSTALLATION WITH
MECHANICAL TRADES AND FINAL EQUIPMENT SUBMITTAL POWER REQUIREMENTS
R7 DUCT SMOKE DETECTOR SHALL BE FURNISHED AND INSTALLED BY THE ELECTRICAL
CONTRACTOR. COORDINATE MOUNTING LOCATION AND QUANTITY WITH THE
MECHANICAL DUCTWORK CONTRACTOR. ELECTRICAL CONTRACTOR SHALL WIRE DUCT
SMOKE DETECTOR TO RTU SUPPLY AND RETURN FAN MOTOR STARTER SO THAT UPON
DETECTION OF SMOKE, THE SUPPLY/RETURN FAN WILL SHUT DOWN VIA NATIONAL TIME
902 FIRE ALARM CONTROL PANEL, REFER TO DETAIL ON SHEET E600. PROVIDE
WEATHERPROOF ENCLOSURES AS REQUIRED
NEW CONDUIT MAY BE ROUTED EXPOSED. IN CORRIDORS WITH ACT
CEILINGS THE PREFERENCE IS TO ROUTE CONDUIT CONCEALED ABOVE THE
ACT CEILING WHERE FIELD CONDITIONS PERMIT. ELECTRICAL CONTRACTOR
SHALL COORDINATE ACT CEILING LOCATIONS AND CONDUIT ROUTING PRIOR
TO INSTALLATION.
| Pleasant View AC Addendum #1 Write-Up.pdf |
| 2026 05 21 - Pleasant View AC - Addendum 1.pdf |
| Sheets |
| E101 - COMPOSITE FIRST FLOOR ELECTRICAL PLAN |
scan_c.thelen_2026-05-18-06-08-23.pdf
File details come from the government source that posted it. Updated .