Signed - W912HY20B0030-Plans.pdf

PDF 12 MB Posted

Attached to
Jadwin HVAC Chiller Contract
Solicitation number
W912HY20B0030
Issued by

About this file

This solicitation package includes plans and specifications for a construction project to replace one HVAC chiller unit located on the roof of the Jadwin Building at Fort Point Reservation in Galveston, Texas. The solicitation is issued by the U.S. Army Corps of Engineers Engineering District Galveston for removal and replacement of the existing chiller including all interior building components and appurtenant items. The package provides reference drawings of existing HVAC as-built conditions, project location details, general construction notes, mechanical drawings, and project photos to inform prospective bidders of the scope of work. Responses to W912HY20B0030 are due in accordance with the specified solicitation timeline and terms.

View the file

Other files

File Type Posted
Jadwin Chiller_ABSTRACT_W912HY20B0030 Final Bid-KO Signed.pdf PDF
AMEND_0006.pdf PDF
AMEND_0005.pdf PDF
AMEND_0004.pdf PDF
Amendment 3.pdf PDF
Amendment 2.pdf PDF
AMEND_0001_W912HY20B0030.pdf PDF
Signed - W912HY20B0030-Specs.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F il e

M o d e l

N a m e

G -0

-C o v e r

S h e e t

B y

M

O D

X M

A N

:3

:4

P

M D a te

T im e

W

C A

D D p ro je c ts G

A L V -1

J a d w in H

V A

C R e p a ir s F

Y -2

P la n s -S

C G

A L V -3

-1

C O

N T

R A

C T -P

L A

N S T x S c .d g n

TOTAL

ARMY

QUALITY

Galveston, Texas

Corps of Engineers

U. S. Army Engineer District, Galveston

Office of the District Engineer

SWG FILE NO.:

e c n el le cxE fo ret n e C

Coastal Navigation and Environmental Restoration

W912HY20B0030

GALV 304-144

FORT POINT RESERVATION, TEXAS

JADWIN BUILDING

April 2020

SOLICITATION NO.:

JADWIN CHILLER REPLACEMENT

employment as required by ER 1110-1-8152.

individuals appear on these project documents within the scope of their of Engineers. The initials or signatures and registration designations of

This project was designed by the Galveston District of the U.S. Army Corps

DEPUTY CHIEF, ENGINEERING AND CONSTRUCTION DIVISION

JOSEPH L. KING, RA

of Engineers U.S. Army Corps

Galveston District

G A

L V

E S

T O

N T

E X

A S

C O

R P

S O

F E

N G

IN

E E

R S

U .S

A R

M Y E

N G

IN

E E

R D

IS

T R

IC

T

G A

L V

E S

T O

N

A S S

H O

W N

D a te

R e v

S u b m it te d b y

A p p ro v e d b y

A p p ro v a l R e c o m m e n d e d

S c a le

D ra w n b y

D e s ig n e d b y

C h e c k e d b y

D e s c ri p ti o n

D a te

R e v

B y

Drawing No.:

F il e

M o d e l

N a m e

G -0

L

O C

A T

IO

N B y

M

O D

X M

A N

:3

:4

P

M D a te

T im e

W

C A

D D p ro je c ts G

A L V -1

J a d w in H

V A

C R e p a ir s F

Y -2

P la n s -S

C G

A L V -3

-1

C O

N T

R A

C T -P

L A

N S T x S c .d g n

G-002

M D

GALV 304-144SWG FILE NO.

A

N

F J

M A

P R

IL

C O

L O

N E

L E

N

U .S

A R

M Y

C O

M M

A N

D

IN

G

T

IM

O T

H Y R

V A

IL

P R

E P

A R

E D U

N D

E R T

H E D

IR

E C

T

IO

N O

F

J O

S E

P H L

K

IN

G

R .A

D e p u ty C h ie f E n g in e e ri n g E n g in e e ri n g a n d C o n s tr u c ti o n D iv is io n

C h ie f, G e n e ra l E n g in e e ri n g

L O

R I

K T

H O

M A

S P .E

G e n e ra l E n g in e e ri n g

M

IK

E D

IA

Z P .E

J A

D W

IN

C

H

IL

L E

R R

E P

L A

C E

M E

N T

J A

D W

IN

B

U

IL

D

IN

G F

O R

T P

O

IN

T R

E S

E R

V A

T

IO

N T

E X

A S

W912HY20B0030

SOLICITATION NO.:

G E

N E

R A

L N

O T

E S

A N

P R

O J E

C T L

O C

A T

IO

GALVESTON

HOUSTON

FREEPORT

MATAGORDA

DALLAS

FT.

WORTH

AUSTIN

SAN ANTONIO

CORPUS

CHRISTI

BROWNSVILLE

ARK.

LA.

T E X A S

100 0 100 200

SCALE OF MILES

ARTHUR

PORT

PECOS

R

IV

E R

R I O

G R A N D E

N U

E C

E S

RI

VER

SAN ANTONIO

R.

RIVER

C O L O

R A

D O

B R

A Z O S R

IV

E R

TR

IN

ITY

R E D R I V E R

SABINE

N E

C H

E S

RIVER

R

IV

E R

R

IVER

NEW

MEXICO

OKLAHOMA

MEXICO

Mexico

Gulf of

VICINITY MAP

GALVESTON

BAY

TEXAS

CITY

LA MARQUE

BAYTOWN

TURTLE

BAY

LAKE

HOUSTON

C E

D

B

AY

O U

S

A N

J

A C I

N T

O

BUFFALO BAYO U

T R

IN

IT

Y

R I V E R

CLEAR

LAKE

C L E

A R

CREEK

VICINITY MAP

SCALE IN MILES

55 10

GALVESTON

H O U S T O N

H O

U S T

O N

S

H

IP

C H

A N

N E

L

G

IW

W

LOCATION

PROJECT

LOCATION

PROJECT

ESCORT YOU IN.

A GOVERMENT REPRESENTATIVE WILL MEET YOU AND 3.

FRONT DESK.

ONCE ON THE GROUNDS YOU NEED TO SIGN IN AT THE 2.

FOR ENTRY.

AT GUARD GATE, YOU WILL NEED TO PRESENT YOUR ID 1.

ARRIVING AT THE DISTRICT OFFICE

Galveston District

G A

L V

E S

T O

N T

E X

A S

C O

R P

S O

F E

N G

IN

E E

R S

U .S

A R

M Y E

N G

IN

E E

R D

IS

T R

IC

T

G A

L V

E S

T O

N

A S S

H O

W N

D a te

R e v

S u b m it te d b y

A p p ro v e d b y

A p p ro v a l R e c o m m e n d e d

S c a le

D ra w n b y

D e s ig n e d b y

C h e c k e d b y

D e s c ri p ti o n

D a te

R e v

B y

Drawing No.:

F il e

M o d e l

N a m e

R -0 .0

B y

M

O D

X M

A N

:3

:2

P

M D a te

T im e

W

C A

D D p ro je c ts G

A L V -1

J a d w in H

V A

C R e p a ir s F

Y -2

P la n s -S

C G

A L V -3

-1

C O

N T

R A

C T -P

L A

N S T x S c .d g n

R-002

A

N

F J

M A

P R

IL

C O

L O

N E

L E

N

U .S

A R

M Y

C O

M M

A N

D

IN

G

T

IM

O T

H Y R

V A

IL

P R

E P

A R

E D U

N D

E R T

H E D

IR

E C

T

IO

N O

F

J O

S E

P H L

K

IN

G

R .A

D e p u ty C h ie f E n g in e e ri n g E n g in e e ri n g a n d C o n s tr u c ti o n D iv is io n

C h ie f, G e n e ra l E n g in e e ri n g

L O

R I

K T

H O

M A

S P .E

G e n e ra l E n g in e e ri n g

M

IK

E D

IA

Z P

D W

IN

C

H

IL

L E

R R

E P

L A

C E

M E

N T

J A

D W

IN

B

U

IL

D

IN

G F

O R

T P

O

IN

T R

E S

E R

V A

T

IO

N T

E X

A S

W912HY20B0030

SOLICITATION NO.:

H V

A C A

S -B

U

IL

T D

R A

W

IN

G S

R E

F E

R E

N C

E D

R A

W

IN

G

CONDITIONING CONDENSATE TRAP PIPING

SEE DETAILS SHOWN ON THE DRAWINGS OR THE CONTRACT SPECIFICATIONS FOR DEPTH OF AIR

SHALL BE PIPED FULL SIZE OF THE UNIT DRAIN OUTLET, WITH “P” TRAP, AND PIPED TO NEAREST DRAIN.

ALL AIR CONDITIONING CONDENSATE DRAIN LINES FROM EACH AIR HANDLING UNIT AND ROOFTOP UNIT 21.

WITH A PRODUCT SIMILAR TO 3M OR APPROVED EQUAL.

ALL OPENINGS IN FIRE WALLS DUE TO DUCTWORK, PIPING, CONDUIT, ETC., SHALL BE FIRE STOPPED 20.

EXISTING OPENINGS AND DIMENSIONS BEFORE ORDERING ANY EQUIPMENT.

OTHER TRADES INVOLVED. IT IS REQUIRED THAT THE CONTRACTOR PHYSICALLY MEASURE ALL

LOCATIONS AND SIZES OF ALL FLOOR, WALL, AND ROOF OPENINGS SHALL BE COORDINATED WITH ALL 19.

MECHANICAL CONTRACTOR.

CONTRACTOR SHALL BE FURNISHED BY THE MECHANICAL CONTRACTOR AND INSTALLED BY THE

ALL ROOF MOUNTED EQUIPMENT CURBS FOR EQUIPMENT PROVIDED BY THE MECHANICAL 18.

MECHANICAL EQUIPMENT, DUCTWORK, AND PIPING SHALL NOT BE SUPPORTED FROM ROOF DECK.17.

WELDING TO STRUCTURAL MEMBERS SHALL NOT BE PERMITTED.

COORDINATED WITH GENERAL CONTRACTOR. PROVIDE BEAM CLAMPS MEETING MSS STANDARDS.

ALL DUCTWORK, PIPING AND EQUIPMENT SUPPORTED FROM STRUCTURAL STEEL SHALL BE 16.

REQUIRED TO PROVIDE A VIBRATION FREE INSTALLATION.

ALL EQUIPMENT, PIPING, DUCTWORK, ETC., SHALL BE SUPPORTED AS DETAILED, SPECIFIED, AND 15.

INSTALLED BY THE MECHANICAL CONTRACTOR.

FOR PIPING, DUCTWORK, AND EQUIPMENT (UNLESS OTHERWISE NOTED) SHALL BE FURNISHED AND

ALL MISCELLANEOUS STEEL REQUIRED TO ENSURE PROPER INSTALLATION AND AS SHOWN IN DETAILS 14.

NOT SCALE DRAWINGS.

SITE CONDITIONS AND SHALL HAVE THE APPROVAL OF THE ENGINEER BEFORE BEING INSTALLED. DO

NECESSARY TO SECURE THE BEST CONDITIONS AND RESULTS MUST BE DETERMINED BY THE PROJECT

THAT ARE NOT DEFINITELY FIXED BY DIMENSIONS ARE APPROXIMATE ONLY. THE EXACT LOCATIONS

THE LOCATIONS OF ALL ITEMS SHOWN ON THE DRAWINGS OR CALLED FOR IN THE SPECIFICATIONS 13.

23 OF THE SPECIFICATIONS.

ALL CONTROL WIRE AND CONDUIT SHALL COMPLY WITH THE NATIONAL ELECTRIC CODE AND DIVISION 12.

DIMENSIONS BEFORE FABRICATION.

CONNECTIONS TO FURNISHED EQUIPMENT. FIELD VERIFY AND COORDINATE ALL DUCT AND PIPING

COORDINATE AND PROVIDE ALL DUCT AND PIPING TRANSITIONS REQUIRED FOR FINAL EQUIPMENT

COORDINATE ALL EQUIPMENT CONNECTIONS WITH MANUFACTURERS’ CERTIFIED DRAWINGS. 11.

ONE MANUFACTURER SHALL BE USED.

WHERE TWO OR MORE ITEMS OF THE SAME TYPE OF EQUIPMENT ARE REQUIRED, THE PRODUCT OF 10.

AND BALANCING SHALL BE PERFORMED IN ACCORDANCE WITH THE AABC STANDARDS.

COUNCIL (AABC) OR THE NATIONAL ENVIRONMENTAL BALANCING BUREAU (NEBB). TESTING, ADJUSTING, TESTING, ADJUSTING, AND BALANCING AGENCY SHALL BE A MEMBER OF THE ASSOCIATED AIR BALANCE 9.

MANUFACTURER FOR GOOD ACCURACY.

WITH STRAIGHT SECTION OF PIPE OR DUCT UP- AND DOWNSTREAM AS RECOMMENDED BY THE

LOCATE ALL TEMPERATURE, PRESSURE, AND FLOW MEASURING DEVICES IN ACCESSIBLE LOCATIONS 8.

APPLIED.

ALL TESTS SHALL BE COMPLETED BEFORE ANY MECHANICAL EQUIPMENT OR PIPING INSULATION IS 7.

ELECTRICAL WORK, ETC., SHOWN ON OTHER CONTRACT DOCUMENT DRAWINGS.

COORDINATE CONSTRUCTION OF ALL MECHANICAL WORK WITH ARCHITECTURAL, STRUCTURAL, CIVIL, 6.

MECHANICAL EQUIPMENT ROOMS.

ISOLATED EQUIPMENT (EXCEPT AT BASE ELBOW SUPPORTS AND ANCHOR POINTS) THROUGHOUT

PROVIDE VIBRATION ISOLATORS FOR ALL PIPING SUPPORTS CONNECTED TO AND WITHIN 50 FEET OF 5.

VIBRATION TO BUILDING STRUCTURE.

PROVIDE VIBRATION ISOLATION FOR ALL MECHANICAL EQUIPMENT TO PREVENT TRANSMISSION OF 4.

RECOMMENDATIONS, CONTRACT DOCUMENTS, AND APPLICABLE CODES AND REGULATIONS.

INSTALL ALL MECHANICAL EQUIPMENT AND APPURTENANCES IN ACCORDANCE WITH MANUFACTURERS’ 3.

ARE DIAGRAMMATIC AND ARE INTENDED TO CONVEY SCOPE AND GENERAL ARRANGEMENT ONLY.

CONTRACT DOCUMENT DRAWINGS FOR MECHANICAL WORK (HVAC, PLUMBING, AND FIRE PROTECTION) 2.

REQUIRED BY APPLICABLE UFC CRITERIA AND CODES.

AND OPERABLE MECHANICAL SYSTEMS AS INDICATED ON THE DRAWINGS, AS SPECIFIED AND AS

PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO INSTALL COMPLETE 1.

GENERAL NOTES:

TEST. CABINETS SHALL BE COATED ON INTERIOR AND EXTERIOR OF CABINET,

PROVIDED WITH CORROSION RESISTANCE COATING MEETING ASTM B117 10,000 HOUR SALT SPRAY

ALL MECHANICAL EQUIPMENT INSTALLED AS PART OF THIS PROJECT ON BUILDING EXTERIOR SHALL BE 5.

PROVIDE DIELECTRIC BREAKS AT ANY DISSIMILAR METAL CONNECTIONS.4.

AS THE PRIMARY SEALANT.

3" W.C. PRESSURE RATING AND CLASS A DUCT SEAL. PRESSURE SENSITIVE TAPE SHALL NOT BE USED

ALL NEW DUCT SYSTEMS SHALL BE FABRICATED IN ACCORDANCE WITH SMACNA REQUIREMENTS FOR 3.

ACCORDINGLY.

REQUIREMENTS AND IN COORDINATION WITH ZONAL DUCT AIR FLOWS OPENED AND / OR RESTRICTED

PERFORM BALANCING FUNCTIONS WHILE PUMPS AND AHUS ARE SET TO MAXIMUM SUPPLY 2.

THROUGHOUT EXISTING CEILINGS AND OPENINGS IN HARD OR SUSPENDED CEILINGS.

PROVIDE AND INSTALL ANY TRANSITIONS AND FITTINGS NECESSARY TO ROUTE THE NEW DUCTWORK 1.

MECHANICAL CONSTRUCTION GENERAL NOTES

EQUIPMENT PRIOR TO REMOVAL, REPAIR, OR RE- INSTALL.

PRIOR TO THE REMOVAL OF ALL EQUIPMENT AND DEVICES WITH DE-ENERGIZING POWER TO

ALL CONTRACTORS ARE TO COORDINATE WITH THE CONTRACTING AUTHORIZED REPRESENTATIVE 2.

OWNER REPRESENTATIVE.

AND RETURNED TO OWNER OR PROPERLY DISPOSED OF AS DIRECTED IN FULL COORDINATION WITH

INCLUDING ALL VALVES, INSTRUMENTS, DISCONNECTS, AND ALL OTHER DEVICES, SHALL BE SALVAGED

ALL EQUIPMENT DESIGNATED TO BE REMOVED – MECHANICAL, ELECTRICAL, CONTROLS, IT, ETC. – 1.

MECHANICAL DEMOLITION GENERAL NOTES

AND IN A MANNER THAT ACHIEVES THE RATED R-VALUE WITHOUT COMPRESSING THE INSULATION.

MANUFACTURER INSTRUCTIONS, IN SUBSTANTIAL CONTACT WITH THE SURFACE BEING INSULATED, COMPONENT R-VALUES SHALL BE LABELED AS CERTIFIED. INSULATION SHALL BE INSTALLED PER 8.

SEE SPECIFICATIONS FOR DUCTWORK GAUGES, BRACING, HANGERS, AND OTHER REQUIREMENTS.7.

FANS, VALVES, AND MECHANICAL EQUIPMENT.

PROVIDE ACCESS DOORS IN DUCTWORK FOR OPERATION, ADJUSTMENT, AND MAINTENANCE OF ALL 6.

THE DUCTWORK WHICH REQUIRE SERVICE AND/OR INSPECTION.

DAMPERS, SMOKE DAMPERS, VOLUME DAMPERS, HUMIDIFIERS, COILS, AND OTHER ITEMS LOCATED IN

PROVIDE ACCESS DOORS IN DUCTWORK TO PROVIDE ACCESS FOR ALL SMOKE DETECTORS, FIRE 5.

COST TO THE OWNER.

DIVIDED DUCTS AND TRANSITIONS AROUND OBSTRUCTIONS, SHALL BE PROVIDED AT NO ADDITIONAL

ALL DUCTWORK SHALL BE COORDINATED WITH ALL TRADES INVOLVED. OFFSETS IN DUCTS, INCLUDING 4.

STRUCTURE, WITH SPACE FOR INSULATION IF REQUIRED.

UNLESS OTHERWISE NOTED, ALL DUCTWORK IS OVERHEAD, TIGHT TO THE UNDERSIDE OF THE 3.

EQUIPMENT UNLESS OTHERWISE INDICATED.

ISOLATION. FLEXIBLE CONNECTIONS SHALL BE PROVIDED AT THE POINT OF CONNECTION TO THE

CONNECTED TO AIR HANDLING UNITS, FANS, AND OTHER EQUIPMENT WHICH REQUIRE VIBRATION

PROVIDE FLEXIBLE CONNECTIONS IN ALL DUCTWORK SYSTEMS (SUPPLY, RETURN, AND EXHAUST) 2.

CODE.

AND OPERABLE HVAC SYSTEMS AS INDICATED ON THE DRAWINGS, AS SPECIFIED AND AS REQUIRED BY

PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO INSTALL COMPLETE 1.

HVAC/SHEET METAL

Galveston District

G A

L V

E S

T O

N T

E X

A S

C O

R P

S O

F E

N G

IN

E E

R S

U .S

A R

M Y E

N G

IN

E E

R D

IS

T R

IC

T

G A

L V

E S

T O

N

A S S

H O

W N

D a te

R e v

S u b m it te d b y

A p p ro v e d b y

A p p ro v a l R e c o m m e n d e d

S c a le

D ra w n b y

D e s ig n e d b y

C h e c k e d b y

D e s c ri p ti o n

D a te

R e v

B y

Drawing No.:

F il e

M o d e l

N a m e

M -9

P

H O

T O

S B y

M

O D

X M

A N

:4

:2

P

M D a te

T im e

W

C A

D D p ro je c ts G

A L V -1

J a d w in H

V A

C R e p a ir s F

Y -2

P la n s -S

C G

A L V -3

-1

C O

N T

R A

C T -P

L A

N S T x S c .d g n

M-901

A

N

F J

M A

P R

IL

C O

L O

N E

L E

N

U .S

A R

M Y

C O

M M

A N

D

IN

G

T

IM

O T

H Y R

V A

IL

P R

E P

A R

E D U

N D

E R T

H E D

IR

E C

T

IO

N O

F

J O

S E

P H L

K

IN

G

R .A

D e p u ty C h ie f E n g in e e ri n g E n g in e e ri n g a n d C o n s tr u c ti o n D iv is io n

C h ie f, G e n e ra l E n g in e e ri n g

L O

R I

K T

H O

M A

S P .E

G e n e ra l E n g in e e ri n g

M

IK

E D

IA

Z P

D W

IN

C

H

IL

L E

R R

E P

L A

C E

M E

N T

J A

D W

IN

B

U

IL

D

IN

G F

O R

T P

O

IN

T R

E S

E R

V A

T

IO

N T

E X

A S

W912HY20B0030

SOLICITATION NO.:

C O

N D

E N

S

IN

G U

N

IT

A

C C -1

R

E P

A

IR

S O

F L

IE

B E

R T T

W O F

E

P L

A C

E M

E N

T O

F A

C C -R

S

U P

P O

R T S

P R

O J E

C T P

H O

T O

S

CARRIER AIR COOLED CONDENSING UNIT (ACC-R1)

CARRIER AIR COOLED CONDENSING UNIT (ACC-R1)

Galveston District

G A

L V

E S

T O

N T

E X

A S

C O

R P

S O

F E

N G

IN

E E

R S

U .S

A R

M Y E

N G

IN

E E

R D

IS

T R

IC

T

G A

L V

E S

T O

N

A S S

H O

W N

D a te

R e v

S u b m it te d b y

A p p ro v e d b y

A p p ro v a l R e c o m m e n d e d

S c a le

D ra w n b y

D e s ig n e d b y

C h e c k e d b y

D e s c ri p ti o n

D a te

R e v

B y

Drawing No.:

F il e

M o d e l

N a m e

M -9

P

H O

T O

S B y

M

O D

X M

A N

:4

:3

P

M D a te

T im e

W

C A

D D p ro je c ts G

A L V -1

J a d w in H

V A

C R e p a ir s F

Y -2

P la n s -S

C G

A L V -3

-1

C O

N T

R A

C T -P

L A

N S T x S c .d g n

M-902

A

N

F J

M A

P R

IL

C O

L O

N E

L E

N

U .S

A R

M Y

C O

M M

A N

D

IN

G

T

IM

O T

H Y R

V A

IL

P R

E P

A R

E D U

N D

E R T

H E D

IR

E C

T

IO

N O

F

J O

S E

P H L

K

IN

G

R .A

D e p u ty C h ie f E n g in e e ri n g E n g in e e ri n g a n d C o n s tr u c ti o n D iv is io n

C h ie f, G e n e ra l E n g in e e ri n g

L O

R I

K T

H O

M A

S P .E

G e n e ra l E n g in e e ri n g

M

IK

E D

IA

Z P

D W

IN

C

H

IL

L E

R R

E P

L A

C E

M E

N T

J A

D W

IN

B

U

IL

D

IN

G F

O R

T P

O

IN

T R

E S

E R

V A

T

IO

N T

E X

A S

W912HY20B0030

SOLICITATION NO.:

OUTSIDE AIR HANDLING UNIT CHILL WATER VALVES

OUTSIDE AIR HANDLING UNIT CHILL WATER VALVES

U N

IT

S R

T U -1 R

T U -2

R E

P A

IR

S T

O O

U T S

ID

E A

IR

H

A N

D L

IN

G

O J E

C T P

H O

T

S

Galveston District

G A

L V

E S

T O

N T

E X

A S

C O

R P

S O

F E

N G

IN

E E

R S

U .S

A R

M Y E

N G

IN

E E

R D

IS

T R

IC

T

G A

L V

E S

T O

N

A S S

H O

W N

D a te

R e v

S u b m it te d b y

A p p ro v e d b y

A p p ro v a l R e c o m m e n d e d

S c a le

D ra w n b y

D e s ig n e d b y

C h e c k e d b y

D e s c ri p ti o n

D a te

R e v

B y

Drawing No.:

F il e

M o d e l

N a m e

M -9

P

H O

T O

S B y

M

O D

X M

A N

:4

:3

P

M D a te

T im e

W

C A

D D p ro je c ts G

A L V -1

J a d w in H

V A

C R e p a ir s F

Y -2

P la n s -S

C G

A L V -3

-1

C O

N T

R A

C T -P

L A

N S T x S c .d g n

M-903

A

N

F J

M A

P R

IL

C O

L O

N E

L E

N

U .S

A R

M Y

C O

M M

A N

D

IN

G

T

IM

O T

H Y R

V A

IL

P R

E P

A R

E D U

N D

E R T

H E D

IR

E C

T

IO

N O

F

J O

S E

P H L

K

IN

G

R .A

D e p u ty C h ie f E n g in e e ri n g E n g in e e ri n g a n d C o n s tr u c ti o n D iv is io n

C h ie f, G e n e ra l E n g in e e ri n g

L O

R I

K T

H O

M A

S P .E

G e n e ra l E n g in e e ri n g

M

IK

E D

IA

Z P

D W

IN

C

H

IL

L E

R R

E P

L A

C E

M E

N T

J A

D W

IN

B

U

IL

D

IN

G F

O R

T P

O

IN

T R

E S

E R

V A

T

IO

N T

E X

A S

W912HY20B0030

SOLICITATION NO.:

R E

P A

IR

S C

H

IL

L W

A T

E R P

U M

P R

O O

M

O J E

C T P

H O

T O

S

PUMP ROOM #401 CHILL WATER PIPING PUMP ROOM #401 CHILL WATER PIPING PUMP ROOM #401 CHILL WATER PIPING

CHILL WATER PIPING VALVES CHILL WATER PUMPS #1 AND #2 CHILL WATER PUMPS CLOSE-UP

Galveston District

G A

L V

E S

T O

N T

E X

A S

C O

R P

S O

F E

N G

IN

E E

R S

U .S

A R

M Y E

N G

IN

E E

R D

IS

T R

IC

T

G A

L V

E S

T O

N

A S S

H O

W N

D a te

R e v

S u b m it te d b y

A p p ro v e d b y

A p p ro v a l R e c o m m e n d e d

S c a le

D ra w n b y

D e s ig n e d b y

C h e c k e d b y

D e s c ri p ti o n

D a te

R e v

B y

Drawing No.:

F il e

M o d e l

N a m e

M -9

P

H O

T O

S B y

M

O D

X M

A N

:4

:3

P

M D a te

T im e

W

C A

D D p ro je c ts G

A L V -1

J a d w in H

V A

C R e p a ir s F

Y -2

P la n s -S

C G

A L V -3

-1

C O

N T

R A

C T -P

L A

N S T x S c .d g n

M-904

A

N

F J

M A

P R

IL

C O

L O

N E

L E

N

U .S

A R

M Y

C O

M M

A N

D

IN

G

T

IM

O T

H Y R

V A

IL

P R

E P

A R

E D U

N D

E R T

H E D

IR

E C

T

IO

N O

F

J O

S E

P H L

K

IN

G

R .A

D e p u ty C h ie f E n g in e e ri n g E n g in e e ri n g a n d C o n s tr u c ti o n D iv is io n

C h ie f, G e n e ra l E n g in e e ri n g

L O

R I

K T

H O

M A

S P .E

G e n e ra l E n g in e e ri n g

M

IK

E D

IA

Z P

D W

IN

C

H

IL

L E

R R

E P

L A

C E

M E

N T

J A

D W

IN

B

U

IL

D

IN

G F

O R

T P

O

IN

T R

E S

E R

V A

T

IO

N T

E X

A S

W912HY20B0030

SOLICITATION NO.:

CHILLER #1 (CH-1) AND DISCONNECT SWITCH CWS/CWR GAUGES & METERING DEVICES

CHILLER CONTROL VALVES

CHILL WATER COILS

A N

D C

H

IL

L E

R

C H -2

R E

P A

IR

S T

O C

H

IL

L E

R

C H -1

P R

O J E

C T P

H O

T

S

W912HY20B0030-PLANS
GENERAL
1 G-001 COVER SHEET
2 G-002 PROJECT LOCATION AND GENERAL NOTES
REFERENCE
3 R-001 REFERENCE DRAWING - HVAC AS-BUILT DRAWINGS
4 R-002 REFERENCE DRAWING - HVAC AS-BUILT DRAWINGS
5 R-101 REFERENCE DRAWING - HVAC AS-BUILT DRAWINGS
6 R-102 REFERENCE DRAWING - HVAC AS-BUILT DRAWINGS
7 R-103 REFERENCE DRAWING - HVAC AS-BUILT DRAWINGS
8 R-104 REFERENCE DRAWING - HVAC AS-BUILT DRAWINGS
9 R-105 REFERENCE DRAWING - HVAC AS-BUILT DRAWINGS
10 R-106 REFERENCE DRAWING - HVAC AS-BUILT DRAWINGS
11 R-107 REFERENCE DRAWING - HVAC AS-BUILT DRAWINGS
12 R-108 REFERENCE DRAWING - HVAC AS-BUILT DRAWINGS
13 R-109 REFERENCE DRAWING - HVAC AS-BUILT DRAWINGS
14 R-110 REFERENCE DRAWING - HVAC AS-BUILT DRAWINGS
15 R-111 REFERENCE DRAWING - HVAC AS-BUILT DRAWINGS
16 R-112 REFERENCE DRAWING - HVAC AS-BUILT DRAWINGS
17 R-113 REFERENCE DRAWING - HVAC AS-BUILT DRAWINGS
18 R-201 REFERENCE DRAWING - JADWIN AS-BUILT DRAWINGS
19 R-202 REFERENCE DRAWING - JADWIN AS-BUILT DRAWINGS
MECHANICAL
20 M-901 PROJECT PHOTOS REPLACEMENT OF ACC-R1 SUPPORTS & REPAIRS OF LIEBERT TWO FAN CONDENSING UNIT ACC-1
21 M-902 PROJECT PHOTOS REPAIRS TO OUTSIDE AIR HANDLING UNITS RTU-1 & RTU-2
22 M-903 PROJECT PHOTOS CHILL WATER PUMP ROOM #401 REPAIRS
23 M-904 PROJECT PHOTOS REPAIRS TO CHILLER #1 (CH-1) AND CHILLER #2 (CH-2)
2020-04-29T18:38:06-0500
KING.JOSEPH.LOUIS.1060357338

File details come from the government source that posted it. Updated .