Signed - W912HY20B0030-Plans.pdf
PDF 12 MB Posted
- Attached to
- Jadwin HVAC Chiller Contract
- Solicitation number
- W912HY20B0030
About this file
This solicitation package includes plans and specifications for a construction project to replace one HVAC chiller unit located on the roof of the Jadwin Building at Fort Point Reservation in Galveston, Texas. The solicitation is issued by the U.S. Army Corps of Engineers Engineering District Galveston for removal and replacement of the existing chiller including all interior building components and appurtenant items. The package provides reference drawings of existing HVAC as-built conditions, project location details, general construction notes, mechanical drawings, and project photos to inform prospective bidders of the scope of work. Responses to W912HY20B0030 are due in accordance with the specified solicitation timeline and terms.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Jadwin Chiller_ABSTRACT_W912HY20B0030 Final Bid-KO Signed.pdf | ||
| AMEND_0006.pdf | ||
| AMEND_0005.pdf | ||
| AMEND_0004.pdf | ||
| Amendment 3.pdf | ||
| Amendment 2.pdf | ||
| AMEND_0001_W912HY20B0030.pdf | ||
| Signed - W912HY20B0030-Specs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F il e
M o d e l
N a m e
G -0
-C o v e r
S h e e t
B y
M
O D
X M
A N
:3
:4
P
M D a te
T im e
W
C A
D D p ro je c ts G
A L V -1
J a d w in H
V A
C R e p a ir s F
Y -2
P la n s -S
C G
A L V -3
-1
C O
N T
R A
C T -P
L A
N S T x S c .d g n
TOTAL
ARMY
QUALITY
Galveston, Texas
Corps of Engineers
U. S. Army Engineer District, Galveston
Office of the District Engineer
SWG FILE NO.:
e c n el le cxE fo ret n e C
Coastal Navigation and Environmental Restoration
W912HY20B0030
GALV 304-144
FORT POINT RESERVATION, TEXAS
JADWIN BUILDING
April 2020
SOLICITATION NO.:
JADWIN CHILLER REPLACEMENT
employment as required by ER 1110-1-8152.
individuals appear on these project documents within the scope of their of Engineers. The initials or signatures and registration designations of
This project was designed by the Galveston District of the U.S. Army Corps
DEPUTY CHIEF, ENGINEERING AND CONSTRUCTION DIVISION
JOSEPH L. KING, RA
of Engineers U.S. Army Corps
Galveston District
G A
L V
E S
T O
N T
E X
A S
C O
R P
S O
F E
N G
IN
E E
R S
U .S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
G A
L V
E S
T O
N
A S S
H O
W N
D a te
R e v
S u b m it te d b y
A p p ro v e d b y
A p p ro v a l R e c o m m e n d e d
S c a le
D ra w n b y
D e s ig n e d b y
C h e c k e d b y
D e s c ri p ti o n
D a te
R e v
B y
Drawing No.:
F il e
M o d e l
N a m e
G -0
L
O C
A T
IO
N B y
M
O D
X M
A N
:3
:4
P
M D a te
T im e
W
C A
D D p ro je c ts G
A L V -1
J a d w in H
V A
C R e p a ir s F
Y -2
P la n s -S
C G
A L V -3
-1
C O
N T
R A
C T -P
L A
N S T x S c .d g n
G-002
M D
GALV 304-144SWG FILE NO.
A
N
F J
M A
P R
IL
C O
L O
N E
L E
N
U .S
A R
M Y
C O
M M
A N
D
IN
G
T
IM
O T
H Y R
V A
IL
P R
E P
A R
E D U
N D
E R T
H E D
IR
E C
T
IO
N O
F
J O
S E
P H L
K
IN
G
R .A
D e p u ty C h ie f E n g in e e ri n g E n g in e e ri n g a n d C o n s tr u c ti o n D iv is io n
C h ie f, G e n e ra l E n g in e e ri n g
L O
R I
K T
H O
M A
S P .E
G e n e ra l E n g in e e ri n g
M
IK
E D
IA
Z P .E
J A
D W
IN
C
H
IL
L E
R R
E P
L A
C E
M E
N T
J A
D W
IN
B
U
IL
D
IN
G F
O R
T P
O
IN
T R
E S
E R
V A
T
IO
N T
E X
A S
W912HY20B0030
SOLICITATION NO.:
G E
N E
R A
L N
O T
E S
A N
P R
O J E
C T L
O C
A T
IO
GALVESTON
HOUSTON
FREEPORT
MATAGORDA
DALLAS
FT.
WORTH
AUSTIN
SAN ANTONIO
CORPUS
CHRISTI
BROWNSVILLE
ARK.
LA.
T E X A S
100 0 100 200
SCALE OF MILES
ARTHUR
PORT
PECOS
R
IV
E R
R I O
G R A N D E
N U
E C
E S
RI
VER
SAN ANTONIO
R.
RIVER
C O L O
R A
D O
B R
A Z O S R
IV
E R
TR
IN
ITY
R E D R I V E R
SABINE
N E
C H
E S
RIVER
R
IV
E R
R
IVER
NEW
MEXICO
OKLAHOMA
MEXICO
Mexico
Gulf of
VICINITY MAP
GALVESTON
BAY
TEXAS
CITY
LA MARQUE
BAYTOWN
TURTLE
BAY
LAKE
HOUSTON
C E
D
B
AY
O U
S
A N
J
A C I
N T
O
BUFFALO BAYO U
T R
IN
IT
Y
R I V E R
CLEAR
LAKE
C L E
A R
CREEK
VICINITY MAP
SCALE IN MILES
55 10
GALVESTON
H O U S T O N
H O
U S T
O N
S
H
IP
C H
A N
N E
L
G
IW
W
LOCATION
PROJECT
LOCATION
PROJECT
ESCORT YOU IN.
A GOVERMENT REPRESENTATIVE WILL MEET YOU AND 3.
FRONT DESK.
ONCE ON THE GROUNDS YOU NEED TO SIGN IN AT THE 2.
FOR ENTRY.
AT GUARD GATE, YOU WILL NEED TO PRESENT YOUR ID 1.
ARRIVING AT THE DISTRICT OFFICE
Galveston District
G A
L V
E S
T O
N T
E X
A S
C O
R P
S O
F E
N G
IN
E E
R S
U .S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
G A
L V
E S
T O
N
A S S
H O
W N
D a te
R e v
S u b m it te d b y
A p p ro v e d b y
A p p ro v a l R e c o m m e n d e d
S c a le
D ra w n b y
D e s ig n e d b y
C h e c k e d b y
D e s c ri p ti o n
D a te
R e v
B y
Drawing No.:
F il e
M o d e l
N a m e
R -0 .0
B y
M
O D
X M
A N
:3
:2
P
M D a te
T im e
W
C A
D D p ro je c ts G
A L V -1
J a d w in H
V A
C R e p a ir s F
Y -2
P la n s -S
C G
A L V -3
-1
C O
N T
R A
C T -P
L A
N S T x S c .d g n
R-002
A
N
F J
M A
P R
IL
C O
L O
N E
L E
N
U .S
A R
M Y
C O
M M
A N
D
IN
G
T
IM
O T
H Y R
V A
IL
P R
E P
A R
E D U
N D
E R T
H E D
IR
E C
T
IO
N O
F
J O
S E
P H L
K
IN
G
R .A
D e p u ty C h ie f E n g in e e ri n g E n g in e e ri n g a n d C o n s tr u c ti o n D iv is io n
C h ie f, G e n e ra l E n g in e e ri n g
L O
R I
K T
H O
M A
S P .E
G e n e ra l E n g in e e ri n g
M
IK
E D
IA
Z P
D W
IN
C
H
IL
L E
R R
E P
L A
C E
M E
N T
J A
D W
IN
B
U
IL
D
IN
G F
O R
T P
O
IN
T R
E S
E R
V A
T
IO
N T
E X
A S
W912HY20B0030
SOLICITATION NO.:
H V
A C A
S -B
U
IL
T D
R A
W
IN
G S
R E
F E
R E
N C
E D
R A
W
IN
G
CONDITIONING CONDENSATE TRAP PIPING
SEE DETAILS SHOWN ON THE DRAWINGS OR THE CONTRACT SPECIFICATIONS FOR DEPTH OF AIR
SHALL BE PIPED FULL SIZE OF THE UNIT DRAIN OUTLET, WITH “P” TRAP, AND PIPED TO NEAREST DRAIN.
ALL AIR CONDITIONING CONDENSATE DRAIN LINES FROM EACH AIR HANDLING UNIT AND ROOFTOP UNIT 21.
WITH A PRODUCT SIMILAR TO 3M OR APPROVED EQUAL.
ALL OPENINGS IN FIRE WALLS DUE TO DUCTWORK, PIPING, CONDUIT, ETC., SHALL BE FIRE STOPPED 20.
EXISTING OPENINGS AND DIMENSIONS BEFORE ORDERING ANY EQUIPMENT.
OTHER TRADES INVOLVED. IT IS REQUIRED THAT THE CONTRACTOR PHYSICALLY MEASURE ALL
LOCATIONS AND SIZES OF ALL FLOOR, WALL, AND ROOF OPENINGS SHALL BE COORDINATED WITH ALL 19.
MECHANICAL CONTRACTOR.
CONTRACTOR SHALL BE FURNISHED BY THE MECHANICAL CONTRACTOR AND INSTALLED BY THE
ALL ROOF MOUNTED EQUIPMENT CURBS FOR EQUIPMENT PROVIDED BY THE MECHANICAL 18.
MECHANICAL EQUIPMENT, DUCTWORK, AND PIPING SHALL NOT BE SUPPORTED FROM ROOF DECK.17.
WELDING TO STRUCTURAL MEMBERS SHALL NOT BE PERMITTED.
COORDINATED WITH GENERAL CONTRACTOR. PROVIDE BEAM CLAMPS MEETING MSS STANDARDS.
ALL DUCTWORK, PIPING AND EQUIPMENT SUPPORTED FROM STRUCTURAL STEEL SHALL BE 16.
REQUIRED TO PROVIDE A VIBRATION FREE INSTALLATION.
ALL EQUIPMENT, PIPING, DUCTWORK, ETC., SHALL BE SUPPORTED AS DETAILED, SPECIFIED, AND 15.
INSTALLED BY THE MECHANICAL CONTRACTOR.
FOR PIPING, DUCTWORK, AND EQUIPMENT (UNLESS OTHERWISE NOTED) SHALL BE FURNISHED AND
ALL MISCELLANEOUS STEEL REQUIRED TO ENSURE PROPER INSTALLATION AND AS SHOWN IN DETAILS 14.
NOT SCALE DRAWINGS.
SITE CONDITIONS AND SHALL HAVE THE APPROVAL OF THE ENGINEER BEFORE BEING INSTALLED. DO
NECESSARY TO SECURE THE BEST CONDITIONS AND RESULTS MUST BE DETERMINED BY THE PROJECT
THAT ARE NOT DEFINITELY FIXED BY DIMENSIONS ARE APPROXIMATE ONLY. THE EXACT LOCATIONS
THE LOCATIONS OF ALL ITEMS SHOWN ON THE DRAWINGS OR CALLED FOR IN THE SPECIFICATIONS 13.
23 OF THE SPECIFICATIONS.
ALL CONTROL WIRE AND CONDUIT SHALL COMPLY WITH THE NATIONAL ELECTRIC CODE AND DIVISION 12.
DIMENSIONS BEFORE FABRICATION.
CONNECTIONS TO FURNISHED EQUIPMENT. FIELD VERIFY AND COORDINATE ALL DUCT AND PIPING
COORDINATE AND PROVIDE ALL DUCT AND PIPING TRANSITIONS REQUIRED FOR FINAL EQUIPMENT
COORDINATE ALL EQUIPMENT CONNECTIONS WITH MANUFACTURERS’ CERTIFIED DRAWINGS. 11.
ONE MANUFACTURER SHALL BE USED.
WHERE TWO OR MORE ITEMS OF THE SAME TYPE OF EQUIPMENT ARE REQUIRED, THE PRODUCT OF 10.
AND BALANCING SHALL BE PERFORMED IN ACCORDANCE WITH THE AABC STANDARDS.
COUNCIL (AABC) OR THE NATIONAL ENVIRONMENTAL BALANCING BUREAU (NEBB). TESTING, ADJUSTING, TESTING, ADJUSTING, AND BALANCING AGENCY SHALL BE A MEMBER OF THE ASSOCIATED AIR BALANCE 9.
MANUFACTURER FOR GOOD ACCURACY.
WITH STRAIGHT SECTION OF PIPE OR DUCT UP- AND DOWNSTREAM AS RECOMMENDED BY THE
LOCATE ALL TEMPERATURE, PRESSURE, AND FLOW MEASURING DEVICES IN ACCESSIBLE LOCATIONS 8.
APPLIED.
ALL TESTS SHALL BE COMPLETED BEFORE ANY MECHANICAL EQUIPMENT OR PIPING INSULATION IS 7.
ELECTRICAL WORK, ETC., SHOWN ON OTHER CONTRACT DOCUMENT DRAWINGS.
COORDINATE CONSTRUCTION OF ALL MECHANICAL WORK WITH ARCHITECTURAL, STRUCTURAL, CIVIL, 6.
MECHANICAL EQUIPMENT ROOMS.
ISOLATED EQUIPMENT (EXCEPT AT BASE ELBOW SUPPORTS AND ANCHOR POINTS) THROUGHOUT
PROVIDE VIBRATION ISOLATORS FOR ALL PIPING SUPPORTS CONNECTED TO AND WITHIN 50 FEET OF 5.
VIBRATION TO BUILDING STRUCTURE.
PROVIDE VIBRATION ISOLATION FOR ALL MECHANICAL EQUIPMENT TO PREVENT TRANSMISSION OF 4.
RECOMMENDATIONS, CONTRACT DOCUMENTS, AND APPLICABLE CODES AND REGULATIONS.
INSTALL ALL MECHANICAL EQUIPMENT AND APPURTENANCES IN ACCORDANCE WITH MANUFACTURERS’ 3.
ARE DIAGRAMMATIC AND ARE INTENDED TO CONVEY SCOPE AND GENERAL ARRANGEMENT ONLY.
CONTRACT DOCUMENT DRAWINGS FOR MECHANICAL WORK (HVAC, PLUMBING, AND FIRE PROTECTION) 2.
REQUIRED BY APPLICABLE UFC CRITERIA AND CODES.
AND OPERABLE MECHANICAL SYSTEMS AS INDICATED ON THE DRAWINGS, AS SPECIFIED AND AS
PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO INSTALL COMPLETE 1.
GENERAL NOTES:
TEST. CABINETS SHALL BE COATED ON INTERIOR AND EXTERIOR OF CABINET,
PROVIDED WITH CORROSION RESISTANCE COATING MEETING ASTM B117 10,000 HOUR SALT SPRAY
ALL MECHANICAL EQUIPMENT INSTALLED AS PART OF THIS PROJECT ON BUILDING EXTERIOR SHALL BE 5.
PROVIDE DIELECTRIC BREAKS AT ANY DISSIMILAR METAL CONNECTIONS.4.
AS THE PRIMARY SEALANT.
3" W.C. PRESSURE RATING AND CLASS A DUCT SEAL. PRESSURE SENSITIVE TAPE SHALL NOT BE USED
ALL NEW DUCT SYSTEMS SHALL BE FABRICATED IN ACCORDANCE WITH SMACNA REQUIREMENTS FOR 3.
ACCORDINGLY.
REQUIREMENTS AND IN COORDINATION WITH ZONAL DUCT AIR FLOWS OPENED AND / OR RESTRICTED
PERFORM BALANCING FUNCTIONS WHILE PUMPS AND AHUS ARE SET TO MAXIMUM SUPPLY 2.
THROUGHOUT EXISTING CEILINGS AND OPENINGS IN HARD OR SUSPENDED CEILINGS.
PROVIDE AND INSTALL ANY TRANSITIONS AND FITTINGS NECESSARY TO ROUTE THE NEW DUCTWORK 1.
MECHANICAL CONSTRUCTION GENERAL NOTES
EQUIPMENT PRIOR TO REMOVAL, REPAIR, OR RE- INSTALL.
PRIOR TO THE REMOVAL OF ALL EQUIPMENT AND DEVICES WITH DE-ENERGIZING POWER TO
ALL CONTRACTORS ARE TO COORDINATE WITH THE CONTRACTING AUTHORIZED REPRESENTATIVE 2.
OWNER REPRESENTATIVE.
AND RETURNED TO OWNER OR PROPERLY DISPOSED OF AS DIRECTED IN FULL COORDINATION WITH
INCLUDING ALL VALVES, INSTRUMENTS, DISCONNECTS, AND ALL OTHER DEVICES, SHALL BE SALVAGED
ALL EQUIPMENT DESIGNATED TO BE REMOVED – MECHANICAL, ELECTRICAL, CONTROLS, IT, ETC. – 1.
MECHANICAL DEMOLITION GENERAL NOTES
AND IN A MANNER THAT ACHIEVES THE RATED R-VALUE WITHOUT COMPRESSING THE INSULATION.
MANUFACTURER INSTRUCTIONS, IN SUBSTANTIAL CONTACT WITH THE SURFACE BEING INSULATED, COMPONENT R-VALUES SHALL BE LABELED AS CERTIFIED. INSULATION SHALL BE INSTALLED PER 8.
SEE SPECIFICATIONS FOR DUCTWORK GAUGES, BRACING, HANGERS, AND OTHER REQUIREMENTS.7.
FANS, VALVES, AND MECHANICAL EQUIPMENT.
PROVIDE ACCESS DOORS IN DUCTWORK FOR OPERATION, ADJUSTMENT, AND MAINTENANCE OF ALL 6.
THE DUCTWORK WHICH REQUIRE SERVICE AND/OR INSPECTION.
DAMPERS, SMOKE DAMPERS, VOLUME DAMPERS, HUMIDIFIERS, COILS, AND OTHER ITEMS LOCATED IN
PROVIDE ACCESS DOORS IN DUCTWORK TO PROVIDE ACCESS FOR ALL SMOKE DETECTORS, FIRE 5.
COST TO THE OWNER.
DIVIDED DUCTS AND TRANSITIONS AROUND OBSTRUCTIONS, SHALL BE PROVIDED AT NO ADDITIONAL
ALL DUCTWORK SHALL BE COORDINATED WITH ALL TRADES INVOLVED. OFFSETS IN DUCTS, INCLUDING 4.
STRUCTURE, WITH SPACE FOR INSULATION IF REQUIRED.
UNLESS OTHERWISE NOTED, ALL DUCTWORK IS OVERHEAD, TIGHT TO THE UNDERSIDE OF THE 3.
EQUIPMENT UNLESS OTHERWISE INDICATED.
ISOLATION. FLEXIBLE CONNECTIONS SHALL BE PROVIDED AT THE POINT OF CONNECTION TO THE
CONNECTED TO AIR HANDLING UNITS, FANS, AND OTHER EQUIPMENT WHICH REQUIRE VIBRATION
PROVIDE FLEXIBLE CONNECTIONS IN ALL DUCTWORK SYSTEMS (SUPPLY, RETURN, AND EXHAUST) 2.
CODE.
AND OPERABLE HVAC SYSTEMS AS INDICATED ON THE DRAWINGS, AS SPECIFIED AND AS REQUIRED BY
PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO INSTALL COMPLETE 1.
HVAC/SHEET METAL
Galveston District
G A
L V
E S
T O
N T
E X
A S
C O
R P
S O
F E
N G
IN
E E
R S
U .S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
G A
L V
E S
T O
N
A S S
H O
W N
D a te
R e v
S u b m it te d b y
A p p ro v e d b y
A p p ro v a l R e c o m m e n d e d
S c a le
D ra w n b y
D e s ig n e d b y
C h e c k e d b y
D e s c ri p ti o n
D a te
R e v
B y
Drawing No.:
F il e
M o d e l
N a m e
M -9
P
H O
T O
S B y
M
O D
X M
A N
:4
:2
P
M D a te
T im e
W
C A
D D p ro je c ts G
A L V -1
J a d w in H
V A
C R e p a ir s F
Y -2
P la n s -S
C G
A L V -3
-1
C O
N T
R A
C T -P
L A
N S T x S c .d g n
M-901
A
N
F J
M A
P R
IL
C O
L O
N E
L E
N
U .S
A R
M Y
C O
M M
A N
D
IN
G
T
IM
O T
H Y R
V A
IL
P R
E P
A R
E D U
N D
E R T
H E D
IR
E C
T
IO
N O
F
J O
S E
P H L
K
IN
G
R .A
D e p u ty C h ie f E n g in e e ri n g E n g in e e ri n g a n d C o n s tr u c ti o n D iv is io n
C h ie f, G e n e ra l E n g in e e ri n g
L O
R I
K T
H O
M A
S P .E
G e n e ra l E n g in e e ri n g
M
IK
E D
IA
Z P
D W
IN
C
H
IL
L E
R R
E P
L A
C E
M E
N T
J A
D W
IN
B
U
IL
D
IN
G F
O R
T P
O
IN
T R
E S
E R
V A
T
IO
N T
E X
A S
W912HY20B0030
SOLICITATION NO.:
C O
N D
E N
S
IN
G U
N
IT
A
C C -1
R
E P
A
IR
S O
F L
IE
B E
R T T
W O F
E
P L
A C
E M
E N
T O
F A
C C -R
S
U P
P O
R T S
P R
O J E
C T P
H O
T O
S
CARRIER AIR COOLED CONDENSING UNIT (ACC-R1)
CARRIER AIR COOLED CONDENSING UNIT (ACC-R1)
Galveston District
G A
L V
E S
T O
N T
E X
A S
C O
R P
S O
F E
N G
IN
E E
R S
U .S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
G A
L V
E S
T O
N
A S S
H O
W N
D a te
R e v
S u b m it te d b y
A p p ro v e d b y
A p p ro v a l R e c o m m e n d e d
S c a le
D ra w n b y
D e s ig n e d b y
C h e c k e d b y
D e s c ri p ti o n
D a te
R e v
B y
Drawing No.:
F il e
M o d e l
N a m e
M -9
P
H O
T O
S B y
M
O D
X M
A N
:4
:3
P
M D a te
T im e
W
C A
D D p ro je c ts G
A L V -1
J a d w in H
V A
C R e p a ir s F
Y -2
P la n s -S
C G
A L V -3
-1
C O
N T
R A
C T -P
L A
N S T x S c .d g n
M-902
A
N
F J
M A
P R
IL
C O
L O
N E
L E
N
U .S
A R
M Y
C O
M M
A N
D
IN
G
T
IM
O T
H Y R
V A
IL
P R
E P
A R
E D U
N D
E R T
H E D
IR
E C
T
IO
N O
F
J O
S E
P H L
K
IN
G
R .A
D e p u ty C h ie f E n g in e e ri n g E n g in e e ri n g a n d C o n s tr u c ti o n D iv is io n
C h ie f, G e n e ra l E n g in e e ri n g
L O
R I
K T
H O
M A
S P .E
G e n e ra l E n g in e e ri n g
M
IK
E D
IA
Z P
D W
IN
C
H
IL
L E
R R
E P
L A
C E
M E
N T
J A
D W
IN
B
U
IL
D
IN
G F
O R
T P
O
IN
T R
E S
E R
V A
T
IO
N T
E X
A S
W912HY20B0030
SOLICITATION NO.:
OUTSIDE AIR HANDLING UNIT CHILL WATER VALVES
OUTSIDE AIR HANDLING UNIT CHILL WATER VALVES
U N
IT
S R
T U -1 R
T U -2
R E
P A
IR
S T
O O
U T S
ID
E A
IR
H
A N
D L
IN
G
O J E
C T P
H O
T
S
Galveston District
G A
L V
E S
T O
N T
E X
A S
C O
R P
S O
F E
N G
IN
E E
R S
U .S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
G A
L V
E S
T O
N
A S S
H O
W N
D a te
R e v
S u b m it te d b y
A p p ro v e d b y
A p p ro v a l R e c o m m e n d e d
S c a le
D ra w n b y
D e s ig n e d b y
C h e c k e d b y
D e s c ri p ti o n
D a te
R e v
B y
Drawing No.:
F il e
M o d e l
N a m e
M -9
P
H O
T O
S B y
M
O D
X M
A N
:4
:3
P
M D a te
T im e
W
C A
D D p ro je c ts G
A L V -1
J a d w in H
V A
C R e p a ir s F
Y -2
P la n s -S
C G
A L V -3
-1
C O
N T
R A
C T -P
L A
N S T x S c .d g n
M-903
A
N
F J
M A
P R
IL
C O
L O
N E
L E
N
U .S
A R
M Y
C O
M M
A N
D
IN
G
T
IM
O T
H Y R
V A
IL
P R
E P
A R
E D U
N D
E R T
H E D
IR
E C
T
IO
N O
F
J O
S E
P H L
K
IN
G
R .A
D e p u ty C h ie f E n g in e e ri n g E n g in e e ri n g a n d C o n s tr u c ti o n D iv is io n
C h ie f, G e n e ra l E n g in e e ri n g
L O
R I
K T
H O
M A
S P .E
G e n e ra l E n g in e e ri n g
M
IK
E D
IA
Z P
D W
IN
C
H
IL
L E
R R
E P
L A
C E
M E
N T
J A
D W
IN
B
U
IL
D
IN
G F
O R
T P
O
IN
T R
E S
E R
V A
T
IO
N T
E X
A S
W912HY20B0030
SOLICITATION NO.:
R E
P A
IR
S C
H
IL
L W
A T
E R P
U M
P R
O O
M
O J E
C T P
H O
T O
S
PUMP ROOM #401 CHILL WATER PIPING PUMP ROOM #401 CHILL WATER PIPING PUMP ROOM #401 CHILL WATER PIPING
CHILL WATER PIPING VALVES CHILL WATER PUMPS #1 AND #2 CHILL WATER PUMPS CLOSE-UP
Galveston District
G A
L V
E S
T O
N T
E X
A S
C O
R P
S O
F E
N G
IN
E E
R S
U .S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
G A
L V
E S
T O
N
A S S
H O
W N
D a te
R e v
S u b m it te d b y
A p p ro v e d b y
A p p ro v a l R e c o m m e n d e d
S c a le
D ra w n b y
D e s ig n e d b y
C h e c k e d b y
D e s c ri p ti o n
D a te
R e v
B y
Drawing No.:
F il e
M o d e l
N a m e
M -9
P
H O
T O
S B y
M
O D
X M
A N
:4
:3
P
M D a te
T im e
W
C A
D D p ro je c ts G
A L V -1
J a d w in H
V A
C R e p a ir s F
Y -2
P la n s -S
C G
A L V -3
-1
C O
N T
R A
C T -P
L A
N S T x S c .d g n
M-904
A
N
F J
M A
P R
IL
C O
L O
N E
L E
N
U .S
A R
M Y
C O
M M
A N
D
IN
G
T
IM
O T
H Y R
V A
IL
P R
E P
A R
E D U
N D
E R T
H E D
IR
E C
T
IO
N O
F
J O
S E
P H L
K
IN
G
R .A
D e p u ty C h ie f E n g in e e ri n g E n g in e e ri n g a n d C o n s tr u c ti o n D iv is io n
C h ie f, G e n e ra l E n g in e e ri n g
L O
R I
K T
H O
M A
S P .E
G e n e ra l E n g in e e ri n g
M
IK
E D
IA
Z P
D W
IN
C
H
IL
L E
R R
E P
L A
C E
M E
N T
J A
D W
IN
B
U
IL
D
IN
G F
O R
T P
O
IN
T R
E S
E R
V A
T
IO
N T
E X
A S
W912HY20B0030
SOLICITATION NO.:
CHILLER #1 (CH-1) AND DISCONNECT SWITCH CWS/CWR GAUGES & METERING DEVICES
CHILLER CONTROL VALVES
CHILL WATER COILS
A N
D C
H
IL
L E
R
C H -2
R E
P A
IR
S T
O C
H
IL
L E
R
C H -1
P R
O J E
C T P
H O
T
S
| W912HY20B0030-PLANS |
| GENERAL |
| 1 G-001 COVER SHEET |
| 2 G-002 PROJECT LOCATION AND GENERAL NOTES |
| REFERENCE |
| 3 R-001 REFERENCE DRAWING - HVAC AS-BUILT DRAWINGS |
| 4 R-002 REFERENCE DRAWING - HVAC AS-BUILT DRAWINGS |
| 5 R-101 REFERENCE DRAWING - HVAC AS-BUILT DRAWINGS |
| 6 R-102 REFERENCE DRAWING - HVAC AS-BUILT DRAWINGS |
| 7 R-103 REFERENCE DRAWING - HVAC AS-BUILT DRAWINGS |
| 8 R-104 REFERENCE DRAWING - HVAC AS-BUILT DRAWINGS |
| 9 R-105 REFERENCE DRAWING - HVAC AS-BUILT DRAWINGS |
| 10 R-106 REFERENCE DRAWING - HVAC AS-BUILT DRAWINGS |
| 11 R-107 REFERENCE DRAWING - HVAC AS-BUILT DRAWINGS |
| 12 R-108 REFERENCE DRAWING - HVAC AS-BUILT DRAWINGS |
| 13 R-109 REFERENCE DRAWING - HVAC AS-BUILT DRAWINGS |
| 14 R-110 REFERENCE DRAWING - HVAC AS-BUILT DRAWINGS |
| 15 R-111 REFERENCE DRAWING - HVAC AS-BUILT DRAWINGS |
| 16 R-112 REFERENCE DRAWING - HVAC AS-BUILT DRAWINGS |
| 17 R-113 REFERENCE DRAWING - HVAC AS-BUILT DRAWINGS |
| 18 R-201 REFERENCE DRAWING - JADWIN AS-BUILT DRAWINGS |
| 19 R-202 REFERENCE DRAWING - JADWIN AS-BUILT DRAWINGS |
| MECHANICAL |
| 20 M-901 PROJECT PHOTOS REPLACEMENT OF ACC-R1 SUPPORTS & REPAIRS OF LIEBERT TWO FAN CONDENSING UNIT ACC-1 |
| 21 M-902 PROJECT PHOTOS REPAIRS TO OUTSIDE AIR HANDLING UNITS RTU-1 & RTU-2 |
| 22 M-903 PROJECT PHOTOS CHILL WATER PUMP ROOM #401 REPAIRS |
| 23 M-904 PROJECT PHOTOS REPAIRS TO CHILLER #1 (CH-1) AND CHILLER #2 (CH-2) |
| 2020-04-29T18:38:06-0500 | |
| KING.JOSEPH.LOUIS.1060357338 |
File details come from the government source that posted it. Updated .