This is a Project Manual and bidding document for the Sherman Pines Subdivision Roadway and Drainage Improvements project prepared for the Town of Queensbury, New York, by LaBella Associates, DPC. The work encompasses roadway and drainage improvements within the Sherman Pines Subdivision, including asphalt pavement overlay and shim course placement to improve roadway crown and drainage; removal and replacement of existing deteriorated storm pipe connections between drywells with new HDPE storm drain pipe; refurbishment and adjustment of existing drywells with new grade adjustment rings and frame/grate replacement; pavement and driveway tie-ins; temporary traffic control; erosion and sediment control; and restoration of disturbed areas. The bid is due at 10:00 a.m. on August 11, 2026, at the Town of Queensbury's offices located at 742 Bay Road, Queensbury, New York 12804. Substantial completion is required by November 30, 2026, with final restoration and project readiness for final payment by December 31, 2026. No pre-bid conference will be held; however, bidders are required to examine the contract documents and visit the site to familiarize themselves with site conditions. Questions regarding bidding documents must be submitted in writing by August 4, 2026. The work will be awarded as a single prime contract on a unit price basis.
Bid security in the amount of five percent of the total bid price must accompany all bids. The successful bidder will be required to furnish performance bonds and payment bonds, each equal to 100% of the contract price, as well as a Non-Collusive Affidavit and Certification of Compliance with the Iran Divestment Act. Subcontracting of up to 50% of the total contract amount is permissible, and all contractors and subcontractors must comply with New York State prevailing wage requirements under Labor Law Article 8. The Town of Queensbury strongly encourages Minority and Women-owned Business Enterprises and Section 3 Firms to submit bids. All bidders must register with the New York State Department of Labor under Labor Law Section 220-i before submitting bids or performing work on this public project. The bid documents specify comprehensive insurance requirements including a $1,000,000 General Liability Policy with the Town as additional insured, an Owners & Contractors Protective Policy, Workers' Compensation coverage, $1,000,000 Automobile Liability coverage, and a $2,000,000 Excess Liability Policy. The Town reserves the right to accept or reject any and all bids and to readvertise if deemed in the best interest of the municipality.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 001116 Inv to Bid.pdf | ||
| addendum #2.pdf | ||
| Sherman Pines Subdivision_Plan Set.pdf | ||
| Sherman Pines Subdivision_Addendum 03.pdf | ||
| Addendum #1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LaBella Associates P.C. | 20 Elm Street, Suite 110 | Glens Falls, NY 12801 www.labellapc.com
PROJECT MANUAL
FOR
SHERMAN PINES SUBDIVISION
ROADWAY AND DRAINAGE
IMPROVEMENTS
GENERAL CONSTRUCTION
BIDDING DOCUMENTS AND TECHNICAL SPECIFICATIONS
PREPARED FOR:
Town of Queensbury 742 Bay Road
Queensbury, NY 12804
PREPARED BY:
LABELLA ASSOCIATES, DPC
LABELLA PROJECT NUMBER 2250839.11
1 TABLE OF CONTENTS
PROJECT MANUAL
TABLE OF CONTENTS
DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS
INTRODUCTORY INFORMATION
Section 000101 Title Page (Cover)
000110 Table of Contents
SOLICITATION
Section 001116 Invitation to Bid
INSTRUCTIONS FOR PROCUREMENT
Section 002113 Instructions to Bidders
PROCUREMENT FORMS AND SUPPLEMENTS
Section 004113 Bid Form – Contract 1 – General Construction
004114 Bid Bond Penal Sum Form (EJCDC C-430)
004336 Proposed Subcontractor’s List
004513 Bidder’s Qualification Statement
004519 Non-Collusive Affidavit
004520 Iran Divestment Act Certification
004900 Hold Harmless
CONTRACTING FORMS AND SUPPLEMENTS
Section 005100 Notice of Award (EJCDC C-510)
005200 Agreement – Contract 1 – General Construction
005500 Notice to Proceed (EJCDC C-550)
PROJECT FORMS
Section 006113.13 Performance Bond (EJCDC C-610)
006113.16 Payment Bond (EJCDC C-615)
006276 Application for Payment (EJCDC C-620)
006516 Certificate of Substantial Completion (EJCDC C-625)
CONDITIONS OF THE CONTRACT
Section 007200 Standard General Conditions
007300 Supplementary Conditions – Modifications to General
Conditions
007310 Supplementary Conditions – Additional Articles file://///chazencompanies.com/Unedited%20Vendor%20Specifications/EJCDC%20Documents/Construction%20Documents/C-510%20Notice%20of%20Award.doc file://///chazencompanies.com/Unedited%20Vendor%20Specifications/EJCDC%20Documents/Construction%20Documents/C-550%20Notice%20to%20Proceed.doc file://///chazencompanies.com/Unedited%20Vendor%20Specifications/EJCDC%20Documents/Construction%20Documents/C-620%20Contr%20appl%20for%20Payment.doc file://///chazencompanies.com/Unedited%20Vendor%20Specifications/EJCDC%20Documents/Construction%20Documents/C-625%20Cert%20of%20Substantial%20Completion.doc
2 TABLE OF CONTENTS
DIVISION 01 – GENERAL REQUIREMENTS
SUMMARY
Section 011100 Summary
011400 Work Restrictions
PRICE AND PAYMENT PROCEDURES
Section 012200 Unit Prices
012600 Contract Modification Procedures
012639 Field Order (EJCDC C-942)
012649 Work Change Directive (EJCDC C-940)
012663 Change Order (EJCDC C-941)
012900 Payment Procedures
ADMINISTRATIVE REQUIREMENTS
Section 013100 Project Management and Coordination
013200 Construction Progress Documentation
013300 Submittal Procedures
QUALITY REQUIREMENTS
Section 014000 Quality Requirements
014200 References
014529 Testing Laboratory Services
TEMPORARY FACILITIES AND CONTROLS
Section 015000 Temporary Facilities & Controls
015526 Traffic Control
PRODUCT REQUIREMENTS
Section 016000 Product Requirements
EXECUTION AND CLOSEOUT REQUIREMENTS
Section 017000 Execution Requirements
017123 Field Engineering
017329 Cutting and Patching
017700 Closeout Procedures
017839 Project Record Documentation file://///chazencompanies.com/Unedited%20Vendor%20Specifications/EJCDC%20Documents/Construction%20Documents/C-942%20Field%20Order.doc file://///chazencompanies.com/Unedited%20Vendor%20Specifications/EJCDC%20Documents/Construction%20Documents/C-940%20Work%20Change%20Directive.doc file://///chazencompanies.com/Unedited%20Vendor%20Specifications/EJCDC%20Documents/Construction%20Documents/C-941%20Change%20Order.doc
3 TABLE OF CONTENTS
DIVISION 02 – EXISTING CONDITIONS
Section 023313 Underground Utility Locator Service
024113 Selective Demolition
DIVISION 31 – EARTHWORK
Section 310000 Earthwork
310001 Earthwork Materials
312513 Erosion and Sediment Control
DIVISION 32 – EXTERIOR IMPROVEMENTS
Section 320117 Pavement repair and Resurfacing
321216 Asphalt Paving
329120 Topsoil
329219 Seeding
DIVISION 33 – UTILITIES
Section 334104 Storm Drain Pipe
334900 Adjustment of Drainage Structures and Appurtenances
APPENDIX A LaBella Survey
APPENDIX B Prevailing Rate Schedule
END OF TABLE OF CONTENTS
001116-1 INVITATION TO BID
SECTION 001116
INVITATION TO BID
A Sealed bid for the:
SHERMAN PINES SUBDIVISION ROADWAY AND DRAINAGE IMPROVEMENTS
will be received at the following address:
PURCHASING AGENT
TOWN OF QUEENSBURY
742 BAY ROAD
QUEENSBURY, NEW YORK 12804
until 10:00 a.m. local time on August 11, 2026, and then at said office publicly opened and read aloud.
If the Bid is actually received by mail or by hand after the appointed time on the date specified it shall be rejected, notwithstanding that such Bid may have been placed in a mail box or other mail receptacle regularly maintained by the United States Postal Service before such time, and ordinarily in sufficient time to have been delivered on time.
Questions about the bidding documents may be submitted in writing to LaBella via email (see contact information below). Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all registered plan holders. Questions received after
August 4, 2026 may not be answered.
The Project generally consists of the following work:
The Work generally consists of roadway and drainage improvements within the Sherman Pines
Subdivision in the Town of Queensbury, New York. The Work includes asphalt pavement overlay and shim course placement to improve roadway crown and drainage; removal of existing deteriorated storm pipe connections between drywells and replacement with new HDPE storm drain pipe matching the existing layout and diameter; refurbishment and adjustment of existing drywells, including new grade adjustment rings and resetting or replacement of frames and grates;
pavement and driveway tie-ins; temporary traffic control; erosion and sediment control; and restoration of disturbed areas.
Work shall be substantially completed by November 30, 2026. Final restoration shall be completed and the project ready for final payment by December 31, 2026.
001116-2 INVITATION TO BID
Electronic copies of the drawings and specifications can be obtained via email through the following contacts (Please send all correspondence to both):
Angelique Smith
LaBella Associates, DPC
Glens Falls, N.Y. 12801
Email: amsmith@labellapc.com
Tel: (518) 824-1923
Paul Guillet, PE
LaBella Associates, DPC
Glens Falls, N.Y. 12801
Email: pguillet@labellapc.com
Tel: (518) 824-1943
Note that only bidders who obtain bidding and contract documents from and are registered with LaBella
Associates will receive notification of Addenda.
This work will be awarded as one (1) single prime contract.
The Bid will be received on a Unit Price Basis.
The Bid should not include sales and compensating use taxes on materials incorporated into the work. Bid security in the amount of 5% of the Bid must accompany the Bid in accordance with the Instruction to
Bidders.
The successful Bidder will be required to furnish a performance bond and a payment bond, each in an amount equal to 100% of the contract price. Bidders will also be required to furnish a Non-Collusive
Affidavit and Certification of Compliance with the Iran Divestment Act.
The Town of Queensbury strongly encourages Minority and Women owned Business Enterprises and
Section 3 Firms to apply.
The Contractors and subcontractors shall comply with all applicable New York State prevailing wage requirements, including Labor Law Article 8, and any other applicable local wage requirements.
Attention of Bidders is particularly called to the requirements for ensuring that employees and applicants for employment are not discriminated against because of their race, color, religion, sex or national origin.
The Town of Queensbury, as Owner, reserves the right to accept or reject any and all bids, to waive any informality or technicality in any bid, and to readvertise for bids if deemed in the best interest of the
Town.
By Order of: Town of Queensbury
END OF SECTION - 001116
002113-1 INSTRUCTION TO BIDDERS
SECTION 002113
INSTRUCTIONS TO BIDDERS
TABLE OF CONTENTS
Page
Article 1— Defined Terms
Article 2— Bidding Documents
Article 3— Qualifications of Bidders
Article 4— NO Pre-Bid Conference
Article 5— Examination of Contract Documents and Site
Article 6— Availability of Lands for Work, etc
Article 7— Interpretations and Addenda
Article 8— Bid Security
Article 9— Contract Times
Article 10— Liquidated Damages
Article 11— Substitute and "Or-Equal" Items
Article 12— Subcontractors, Suppliers and Others
Article 13— Bid Form
Article 14— SUBMITTAL of Bids
Article 15— Modification and Withdrawal of Bids
Article 16— Opening of Bids
Article 17— Bids to Remain Subject to Acceptance
Article 18— Evaluation of Bids and Award of Contract
Article 19— bonds and insurance
Article 20— Disqualification
Article 21— Signing of Agreement
Article 22— Sales and Use Taxes
Article 23— Retainage
Article 24— Wicks Exempt
002113-2 INSTRUCTION TO BIDDERS
ARTICLE 1—DEFINED TERMS
1.01 Terms used in these Instructions to Bidders have the meanings indicated in the General Conditions and Supplementary Conditions. Additional terms used in these Instructions to Bidders have the meanings indicated below:
A. Bidder - one who submits a Bid directly to Owner as distinct from a sub-bidder, who submits a bid to a Bidder.
B. Issuing Office - the office from which the Bidding Documents are to be issued and where the bidding procedures are to be administered.
C. Successful Bidder - the lowest, responsible and responsive Bidder to whom Owner (on the basis of Owner's evaluation as hereinafter provided) makes an award.
ARTICLE 2—BIDDING DOCUMENTS
2.01 Bidder shall obtain a complete set of Bidding Requirements and proposed Contract Documents
(together, the Bidding Documents). See the Agreement for a list of the Contract Documents. It is
Bidder’s responsibility to determine that it is using a complete set of documents in the preparation of a Bid. Bidder assumes sole responsibility for errors or misinterpretations resulting from the use of incomplete documents, by Bidder itself or by its prospective Subcontractors and Suppliers.
2.02 Bidding Documents are made available for the sole purpose of obtaining Bids for completion of the Project and permission to download or distribution of the Bidding Documents does not confer a license or grant permission or authorization for any other use. Authorization to download documents, or other distribution, includes the right for plan holders to print documents solely for their use, and the use of their prospective Subcontractors and Suppliers, provided the plan holder pays all costs associated with printing or reproduction. Printed documents may not be re-sold under any circumstances.
2.03 Bidder may register as a plan holder and obtain complete sets of Bidding Documents, in the number and format stated in the Advertisement or invitation to bid, from the Issuing Office. Bidders may rely that sets of Bidding Documents obtained from the Issuing Office are complete, unless an omission is blatant. Registered plan holders will receive Addenda issued by Owner.
2.04 Electronic Documents
A. When the Bidding Requirements indicate that electronic (digital) copies of the Bidding
Documents are available, such documents will be made available to the Bidders as Electronic
Documents in the manner specified.
B. Bidding Documents will be provided in electronic format only as Adobe PDF (portable
Document Format) files. The Electronic Documents are intended to constitute the official
Bidding Documents for the Project and may be used and relied upon the Bidder, unless otherwise stated in the Bidding Documents. The Bidder assumes all risks associated with the transmission, receipt, downloading, viewing, printing, or reproduction of the Electronic
Documents, including any differences or errors resulting from such use.
002113-3 INSTRUCTION TO BIDDERS
2.05 Complete sets of Bidding Documents must be used in preparing Bids; neither Owner nor Engineer assume any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents.
2.06 Owner and Engineer in making copies of Bidding Documents available on the above terms do so only for the purpose of obtaining Bids for the Work and do not confer a license or grant for any other use.
ARTICLE 3—QUALIFICATIONS OF BIDDERS
3.01 To demonstrate qualifications to perform the Work, each Bidder must be prepared to submit within five (5) days after Bid Opening upon Owner’s request detailed written evidence such as financial data, previous experience, present commitments and other such data as may be called for below (or in the Supplementary Instructions). Some or all of this data may be requested as part of the Bid by inclusion of a Bidder’s Qualification Statement in the Bid Forms that must be completed by all
Bidders. Each bid must contain evidence of Bidder’s qualification to do business in the state where project is located or covenant to obtain such qualification prior to award of the contract.
3.02 Public Work Contractor and Subcontractor Registry
A. Starting December 30, 2024, all contractors and subcontractors submitting bids or performing construction work on public work projects or private projects covered by Article 8 of the Labor
Law are required to register with the New York State Department of labor (NYSDOL) under
Labor Law Section 220-i.
B. Private projects subject to Article 8 of the Labor Law include those covered by Labor Law
Sections 224-a (public subsidy funded projects), 224-d (renewable energy systems), 224-e
(broadband projects), 224-f (climate risk-related and energy transition projects, and roadway excavations.).
C. The law defines a “contractor” as any entity entering into a contract to perform construction, demolition, reconstruction, excavation, rehabilitation, repair, installation, renovation, alteration, or custom fabrication. The law defines “subcontractor” as any entity subcontracting with a contractor to perform construction, demolition, reconstruction, excavation, rehabilitation, repair, installation, renovation, alteration, or custom fabrication, which is subject to Article 8 of the Labor Law. Contractors are responsible for verifying that any subcontractors they work with are registered.
D. Contractors need to register before submitting any new bids or commencing new work on a covered project on or after December 30, 2024. Subcontractors need to register before commencing new work on a covered project on or after December 30, 2024. NYSDOL encourages all contractors and subcontractors to register as soon as possible to obtain a
Certificate of Registration to avoid negatively impacting a bidding period or project schedule.
002113-4 INSTRUCTION TO BIDDERS
ARTICLE 4—NO PRE-BID CONFERENCE
4.01 No pre-bid conference will be held for this Project.
4.02 Bidders remain responsible for examining the Bidding Documents, visiting the Site, becoming familiar with Site conditions, and satisfying themselves as to all conditions that may affect cost, progress, performance, or furnishing of the Work, as provided in Article 5.
4.03 Questions regarding the Bidding Documents must be submitted in writing in accordance with
Article 7 and the Invitation to Bid. Interpretations or clarifications, if any, will be issued only by
Addendum. Oral statements or other informal communications will not modify the Bidding
Documents and will not be binding.
ARTICLE 5—EXAMINATION OF CONTRACT DOCUMENTS AND SITE
5.01 It is the responsibility of each Bidder before submitting a Bid:
A. To examine thoroughly the Contract Documents and other related data identified in the
Bidding Documents;
B. To visit the site to become familiar with and satisfy Bidder as to the general, local and site conditions that may affect cost, progress, performance or furnishing of the Work;
C. To consider federal, state and local Laws and Regulations that may affect cost, progress, performance or furnishing of the Work;
D. To study and carefully correlate Bidder's knowledge and observations with the Contract
Documents and such other related data, and;
E. To promptly notify Engineer of all conflicts, errors, ambiguities or discrepancies which Bidder has discovered in or between the Contract Documents and such other related documents.
5.02 Reference is made to the Supplementary Conditions for identification of:
A. Those reports of explorations and tests of subsurface conditions at the site or contiguous to the site which have been utilized by Engineer in preparation of the Contract Documents. Bidder may rely upon the general accuracy of the “technical data” contained in such reports, but not upon other data, interpretations, opinions or information contained in such reports or otherwise relating to the subsurface conditions at the site, or upon the completeness thereof for the purposes of bidding or construction.
B. Those drawings of physical conditions in or relating to existing surface and subsurface structures (except Underground Facilities) which are at or contiguous to the site that have been utilized by Engineer in preparation of the Contract Documents. Bidder may rely upon the general accuracy of the "technical data" contained in such drawings, but not upon other data, interpretations, opinions or information shown or indicated in such drawings or otherwise relating to such structures, or upon the completeness thereof for the purposes of bidding or construction.
002113-5 INSTRUCTION TO BIDDERS
Copies of such reports and drawings will be made available by Owner to any Bidder on request. Those reports and drawings are not part of the Contract Documents, but “technical data” contained therein upon which Bidder is entitled to rely as provided in Paragraph 5.03 of the General Conditions has been identified and established in Paragraph SC-5.03 of the
Supplementary Conditions. Bidder is responsible for any interpretation or conclusion drawn from any “technical data” or any such data, interpretations, opinions or information.
5.03 Information and data shown or indicated in the Contract Documents with respect to existing
Underground Facilities at or contiguous to the site is based upon information and data furnished to
Owner and Engineer by owners of such Underground Facilities or others, and Owner and Engineer do not assume responsibility for the accuracy or completeness thereof unless it is expressly provided otherwise in the Supplementary Conditions.
5.04 Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to subsurface conditions, other physical conditions and Underground Facilities, and possible changes in the Contract Documents due to differing or unanticipated conditions appear in
Paragraphs 5.04 and 5.05 of the General Conditions.
5.05 Before submitting a Bid each Bidder will be responsible to obtain such additional or supplementary examinations, investigations, explorations, tests, studies and data concerning conditions (surface, subsurface and Underground Facilities) at or contiguous to the site or otherwise, which may affect cost, progress, performance or furnishing of the Work or which relate to any aspect of the means, methods, techniques, sequences or procedures of construction to be employed by Bidder and safety precautions and programs incident thereto or which Bidder deems necessary to determine its Bid for performing and furnishing the Work in accordance with the time, price and other terms and conditions of the Contract Documents.
5.06 If required by the Contract Documents, the Owner will provide each Bidder with access to the site to conduct such examinations, investigations, explorations, tests and studies necessary for submission of a Bid. Bidder must fill all holes and clean up and restore the site to its former conditions upon completion of such explorations, investigations, tests and studies.
5.07 Each bidder must inform themselves of the conditions relating to the construction of the project and the employment of labor thereon. Failure to do so will not relieve a successful bidder of their obligation to furnish all material and labor necessary to carry out the provisions of their contract.
Insofar as possible the contractor, in carrying out the Work, must employ such methods or means as will not cause any interruption of or interference with the Work of any other contractor.
5.08 At the time of the opening of Bids each Bidder will be presumed to have inspected the site and to have read and to be thoroughly familiar with the plans and Contract Documents (including all
Addenda). The failure or omission of any Bidder to examine any form, instrument or document shall in no way relieve any Bidder from any obligation in respect of his/her bid.
5.09 The Contractor agrees that before making a Contractor’s proposal the Contractor carefully examines the Contract Documents, together with the site of the proposed Work, as well as its surrounding territory, and is fully informed regarding all the conditions affecting the Work to be done and labor and materials to be furnished for the completion of this contract, including the existence of wire, pipes, and other facilities and structures of municipal and other public service corporations on, over and under the site, and that this information was secured by personal investigation and research and not from estimates or records of the Owner, and that he will make
002113-6 INSTRUCTION TO BIDDERS
no claim against the Owner by reason of estimates, tests, or representations of any officer or agent of the Owner.
5.10 The submission of a Bid will constitute an incontrovertible representation by Bidder that Bidder has complied with every requirement of this Article, that without exception the Bid is premised upon performing and furnishing the Work required by the Contract Documents and applying the specific means, methods, techniques, sequences or procedures of construction (if any) that may be shown or indicated or expressly required by the Contract Documents, that Bidder has given
Engineer written notice of all conflicts, errors, ambiguities and discrepancies that Bidder has discovered in the Contract Documents and the written resolutions thereof by Engineer is acceptable to Bidder, and that the Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the Work.
ARTICLE 6—AVAILABILITY OF LANDS FOR WORK, ETC
6.01 The lands upon which the Work is to be performed, rights-of-way and easements for access thereto and other lands designated for use by Contractor in performing the Work are identified in the
Contract Documents. All additional lands and access thereto required for temporary construction facilities, construction equipment or storage of materials and equipment to be incorporated in the
Work are to be obtained and paid for by Contractor. Easements for permanent structures or changes in existing structures are to be obtained and paid for by Owner unless otherwise provided in the
Contract Documents.
ARTICLE 7—INTERPRETATIONS AND ADDENDA
7.01 Owner on its own initiative may issue Addenda to clarify, correct, supplement, or change the
Bidding Documents.
7.02 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows:
A. LaBella Associates DPC: Angelique Smith email: amsmith@labellapc.com
B. LaBella Associates DPC: Paul Guillet email: pguillet@labellapc.com
7.03 Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all registered plan holders. Questions received after the deadline may not be answered.
7.04 Only responses set forth in an Addendum will be binding. Oral and other interpretations or clarifications will be without legal effect. Responses to questions are not part of the Contract
Documents unless set forth in an Addendum that expressly modifies or supplements the Contract
Documents.
ARTICLE 8—BID SECURITY
8.01 A Bid must be accompanied by Bid security made payable to Owner in an amount of five percent
(5%) percent of Bidder’s maximum Bid price (determined by adding the base bid and all alternates) mailto:amsmith@labellapc.com mailto:pguillet@labellapc.com
002113-7 INSTRUCTION TO BIDDERS
and in the form of a Bid bond issued by a surety meeting the requirements of Paragraph 6.01 of the
General Conditions. Such Bid bond will be issued in the form included in the Bidding Documents.
8.02 The Bid security of the apparent Successful Bidder will be retained until Owner awards the contract to such Bidder, and such Bidder has executed the Contract, furnished the required Contract security, and met the other conditions of the Notice of Award, whereupon the Bid security will be released.
If the Successful Bidder fails to execute and deliver the Contract and furnish the required Contract security within 15 days after the Notice of Award, Owner may consider Bidder to be in default, annul the Notice of Award, and the Bid security of that Bidder will be forfeited, in whole in the case of a penal sum bid bond, and to the extent of Owner’s damages in the case of a damages-form bond. Such forfeiture will be Owner’s exclusive remedy if Bidder defaults.
8.03 The Bid security of other Bidders that Owner believes to have a reasonable chance of receiving the award may be retained by Owner until the earlier of 7 days after the Effective Date of the Contract or 61 days after the Bid opening, whereupon Bid security furnished by such Bidders will be released.
8.04 Bid security of other Bidders that Owner believes do not have a reasonable chance of receiving the award will be released within 7 days after the Bid opening.
ARTICLE 9—CONTRACT TIMES
9.01 The number of days within which, or the dates by which, the Work is to be (a) substantially completed and (b) ready for final payment, and (c) Milestones (if any) are to be achieved, are set forth in the Agreement.
ARTICLE 10—LIQUIDATED DAMAGES
10.01 Provisions for liquidated damages, if any, for failure to timely attain a Milestone, Substantial
Completion, or completion of the Work in readiness for final payment, are set forth in the
Agreement.
ARTICLE 11—SUBSTITUTE AND "OR-EQUAL" ITEMS
11.01 The Contract for the Work, as awarded, will be on the basis of materials and equipment specified or described in the Bidding Documents without consideration during the bidding and Contract award process of possible substitute or “or-equal” items. In cases in which the Contract allows the
Contractor to request that Engineer authorize the use of a substitute or “or-equal” item of material or equipment, application for such acceptance may not be made to and will not be considered by
Engineer until after the Effective Date of the Contract.
11.02 During the bid period:
Substitution requests and “or-equal” requests will not be considered during the Bid period. Bids must be based solely on the materials, equipment, products, and methods specified or described in the Bidding Documents, as modified only by Addenda issued before the Bid opening. Bidders may submit written questions regarding apparent conflicts, ambiguities, or omissions in the Bidding
Documents in accordance with Article 7. Responses, if any, will be issued only by Addendum.
002113-8 INSTRUCTION TO BIDDERS
Such questions will not be treated as requests for approval of substitutions or “or-equal” items. Any substitution or “or-equal” request permitted by the Contract Documents may be submitted only after award of the Contract and will be reviewed in accordance with the applicable requirements of the Contract Documents..
11.03 After Contract award:
The Contract, if awarded, will be on the basis of materials and equipment described in the Drawings or specified in the Specifications without consideration of possible substitute or "or-equal" items.
Whenever it is indicated in the Drawings or specified in the Specifications that a substitute or "or-equal" item of material or equipment may be furnished or used by Contractor if acceptable to
Engineer, application for such acceptance will not be considered by Engineer until after the
Effective Date of the Agreement. The procedure for submission of any such application by
Contractor and consideration by Engineer is set forth in Paragraphs 7.04 of the General Conditions and may be supplemented in the General Requirements.
11.04 All prices that Bidder sets forth in its Bid will be based on the presumption that the Contractor will furnish the materials and equipment specified or described in the Bidding Documents, as supplemented by Addenda. Any assumptions regarding the possibility of post-Bid approvals of “or-equal” or substitution requests are made at Bidder’s sole risk.
ARTICLE 12—SUBCONTRACTORS, SUPPLIERS AND OTHERS
12.01 Subcontracting of work to a maximum of fifty percent (50%) of the total contract amount is permissible under this contract.
12.02 If the work to be subcontracted requires licensing, evidence of proper licensing must be submitted with the request for approval. All subcontractors must submit proof of insurance. (Contractor's bodily injury, Contractor's property damage liability insurance, including blasting insurance and
Workmen's Compensation Insurance) in the same amounts required under the Contractor's
Agreement with the Owner.
12.03 If the Supplementary Conditions require the identity of certain Subcontractors, Suppliers and other persons and organizations to be submitted to Owner in advance of the Notice of Award, the apparent Successful Bidder, and any other Bidder so requested, shall within seven (7) days after the Bid opening submit to Owner a list of all Subcontractors, Suppliers and other persons and organizations (including those who are to furnish the principal items of material and equipment) proposed for those portions of the Work for which such identification is so required. Such list shall be accompanied by an experience statement with pertinent information regarding similar projects and other evidence of qualification for each such Subcontractor, Supplier, person or organization if requested by Owner. If Owner or Engineer/Architect after due investigation has reasonable objection to any proposed Subcontractor, Supplier, other person or organization, either may before the Notice of Award is given request the apparent Successful Bidder to submit an acceptable substitute without an increase in Bid price.
12.04 If apparent Successful Bidder declines to make any such substitution, Owner may award the contract to the next lowest Bidder that proposes to use acceptable Subcontractor, Supplier, and other persons and organizations. The declining to make requested substitutions will not constitute grounds for sacrificing the Bid security of any Bidder. Any Subcontractor, Supplier, other person or organization listed and to whom Owner or Engineer does not make written objection prior to
002113-9 INSTRUCTION TO BIDDERS
giving of the Notice of Award will be deemed acceptable to Owner and Engineer subject to revocation of such acceptance after the Effective Date of the Agreement as provided in Paragraph
7.06, of the General Conditions.
12.05 In contracts where the Contract Price is on the basis of Unit Price, the apparent Successful Bidder, prior to the Notice of Award, shall identify in writing to Owner those portions of the Work that such Bidder proposes to subcontract and after the Notice of Award may only subcontract portions of the Work with Owner’s written consent.
12.06 Some or all of such identification of subcontractors and material and equipment suppliers may be requested as part of the Bid by inclusion of an appropriate form(s) in the Bid Forms that must be completed by all Bidders.
12.07 No Contractor shall be required to employ any Subcontractor, Supplier, other person or organization against whom the Contractor has reasonable objection.
ARTICLE 13—BID FORM
13.01 The Bid Form is included with the Bidding Documents; additional copies may be obtained from
Engineer (or the Issuing Office).
13.02 All blanks on the Bid Form must be completed by printing in black ink or by typewriter. Where space has been provided, the Bid price(s) on the form must be stated in words and numerals; in case of a conflict, words will take precedence. Any quantities shown for unit price items are only an estimate and are in no way guaranteed as final quantities.
13.03 Bids by corporations must be executed in the corporate name by the president or a secretary and the corporate seal must be affixed and attested by the secretary or an assistant secretary. The corporate address and state of incorporation must be shown below the signature.
13.04 Bids by partnerships must be executed in the partnership name and signed by a partner, whose title must appear under the signature, and the official business address of the partnership must be shown below the signature.
13.05 Bids by LLCs are to be signed by managing member/operating manager. All names must be typed or printed in black ink below the signature.
13.06 The Bid shall contain an acknowledgment of receipt of all Addenda (the numbers of which must be filled in on the Bid Form).
13.07 The business address and telephone number for communications regarding the Bid must be shown.
13.08 Evidence of authority to conduct business as an out-of-state corporation in the state where the Work is to be performed shall be provided. State contractor license number, if any, must also be shown.
ARTICLE 14—SUBMITTAL OF BIDS
14.01 A Bid must be received no later than the date and time prescribed and at the place indicated in the
Advertisement or invitation to bid and must be enclosed in a plainly marked package with the
Project title, and, if applicable, the designated portion of the Project for which the Bid is submitted, 002113-10 INSTRUCTION TO BIDDERS the name and address of Bidder, and must be accompanied by the Bid security and other required documents. If a Bid is sent by mail or other delivery system, the sealed envelope containing the Bid must be enclosed in a separate package plainly marked on the outside with the notation “BID
ENCLOSED.” A mailed Bid must be addressed to the location designated in the Advertisement.
14.02 Bids received after the date and time prescribed for the opening of bids, or not submitted at the correct location or in the designated manner, will not be accepted and will be returned to the Bidder unopened.
ARTICLE 15—MODIFICATION AND WITHDRAWAL OF BIDS
15.01 An unopened Bid may be withdrawn by an appropriate document duly executed in the same manner that a Bid must be executed and delivered to the place where Bids are to be submitted prior to the date and time for the opening of Bids. Upon receipt of such notice, the unopened Bid will be returned to the Bidder.
15.02 If a Bidder wishes to modify its Bid prior to Bid opening, Bidder must withdraw its initial Bid in the manner specified in Paragraph 15.01 and submit a new Bid prior to the date and time for the opening of Bids.
15.03 If within seventy-two (72) hours after Bids are opened any Bidder files a duly signed written notice with Owner and promptly thereafter demonstrates to the reasonable satisfaction of Owner that there was a material and substantial mistake in the preparation of its Bid, the Bidder may withdraw its
Bid, and the Bid security will be returned. Thereafter, if the Work is rebid, the Bidder will be disqualified from further bidding on the Work.
ARTICLE 16—OPENING OF BIDS
16.01 Bids will be opened at the time and place indicated in the advertisement or invitation to bid and, unless obviously non-responsive, read aloud publicly. An abstract of the amounts of the base Bids and major alternates, if any, will be made available to Bidders after the opening of Bids.
ARTICLE 17—BIDS TO REMAIN SUBJECT TO ACCEPTANCE.
17.01 All Bids will remain subject to acceptance for forty-five (45) days after the day of the Bid opening, but Owner may, in its sole discretion, release any Bid and return the Bid security prior to that date.
ARTICLE 18—EVALUATION OF BIDS AND AWARD OF CONTRACT
18.01 Owner reserves the right to reject any or all Bids, including without limitation the rights to reject any or all nonconforming, non-responsive, unbalanced or conditional Bids and to reject the Bid of any Bidder if Owner believes that it would not be in the best interest of the Project to make an award to that Bidder, whether because the Bid is not responsive or the Bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by
Owner. Owner also reserves the right to waive all informalities not involving price, time, or changes in the Work and to negotiate contract terms with the Successful Bidder. Discrepancies between the multiplication of units of Work and unit prices will be resolved in favor of the unit
002113-11 INSTRUCTION TO BIDDERS
prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum. Discrepancies between words and figures will be resolved in favor of the words.
18.02 In evaluating Bids, Owner will consider the qualifications of Bidders, whether or not the Bids comply with the prescribed requirements, and such alternatives, unit prices, and other data, as may be requested in the Bid Form or prior to the Notice of Award. It is the Owners intent to accept alternates (if any are accepted) in the order in which they are listed in the Bid Form, but Owner may accept them in any order or combination. If unit- priced alternatives are accepted by Owner the Contract will be awarded on the basis of the Bid with substitutions of affected payment items, estimated quantities, unit prices, and total prices included on the Bid Form.
18.03 Owner may consider the qualifications and experience of Subcontractors, Suppliers, and other persons and organizations proposed for those portions of the Work as to which the identity of
Subcontractors, Suppliers and other persons and organizations must be submitted as provided in the Supplementary Conditions. Owner also may consider the operating costs, maintenance requirements, performance data and guarantees of major items of materials and equipment proposed for incorporation in the Work when such data is required to be submitted prior to the
Notice of Award.
18.04 Owner may conduct such investigations as Owner deems necessary to assist in the evaluation of any Bid and to establish the responsibility, qualifications, and financial ability of Bidders, proposed
Subcontractors, Suppliers and other persons and organizations to perform and furnish the Work in accordance with the Contract Documents to Owner's satisfaction within the prescribed time. Owner reserves the right to reject the Bid of any Bidder who does not pass any such evaluation to Owner’s satisfaction.
18.05 If the contract is to be awarded, it will be awarded to lowest Bidder whose evaluation by the Owner indicates to Owner that the award will be in the best interests of the Project.
18.06 If the contract is to be awarded, Owner will give Successful Bidder a Notice of Award within forty-five (45) days after the day of the Bid opening.
ARTICLE 19—BONDS AND INSURANCE
19.01 Article 6 of the General Conditions, as may be modified by the Supplementary Conditions, sets forth Owner’s requirements as to performance and payment bonds, other required bonds (if any), and insurance. When the Successful Bidder delivers the executed Agreement to Owner, it must be accompanied by required bonds and insurance documentation.
19.02 All bonds are required to be obtained from companies holding certificates of authority as acceptable sureties pursuant to 31 CFR part 223, “Surety Companies Doing Business with the United States.”
Performance Bonds shall be provided on EJCDC form C-610, no other forms are acceptable.
Payment Bonds shall be provided on EJCDC form C-615, no other forms are acceptable.
19.03 Article 8, Bid Security, of these Instructions, addresses any requirements for providing bid bonds as part of the bidding process.
002113-12 INSTRUCTION TO BIDDERS
ARTICLE 20—DISQUALIFICATION
20.01 The Owner reserves the right to refuse to issue a Bid Form to a prospective Bidder should such
Bidder be in default for any of the following reasons:
A. Failure to comply with any pre-qualification regulations of the Owner, if such regulations are cited or otherwise included, in the Contract Documents as a requirement for Bidding.
B. Failure to pay, or satisfactorily settle, all bills due for labor and materials on former contracts in force (with the Owner) at the time the Owner issues the Contract Documents to a prospective Bidder.
C. Contractor defaulted under previous contracts with the Owner.
D. Contractor has performed unsatisfactory work on previous contracts with the Owner.
20.02 Bids received from Bidders who have previously failed to complete contracts within the time required, or who have previously performed similar work in an unsatisfactory manner, may be rejected. A Bid may be rejected if the Bidder cannot show that he has the necessary ability, plant and equipment to commence the work at the time prescribed and thereafter to complete the work at the rate or within the time specified. A Bid may be rejected if the Bidder is already obligated for the performance of other work that would delay the commencement or completion of the work.
20.03 The Owner reserves the right to reject any Bid if the evidence submitted by, or investigation of, such Bidder fails to satisfy the Owner that such Bidder is properly qualified to carry out the obligations contained in the Contract Documents and to complete the work described therein.
20.04 Bids shall be considered irregular and rejected for the following reasons:
A. If the Bid is on a Form other than that furnished by the Owner, or, if the Owner's Bid Form is altered, or, if any part of the Bid Form is detached.
B. If there are unauthorized additions, conditional or alternate pay items, or irregularities of any kind which make the Bid incomplete, indefinite, or otherwise ambiguous.
C. If the Bid does not contain a unit price for each pay item listed in the Bid Summary, except in the case of authorized alternate pay items, for which the Bidder is not required to furnish a unit price.
D. If the Bid contains unit prices that are obviously unbalanced.
E. If the Bid is not accompanied by the Bid Security specified by the Owner.
ARTICLE 21—SIGNING OF AGREEMENT
21.01 When Owner issues a Notice of Award to the Successful Bidder, it will be accompanied by the unexecuted counterparts of the Agreement along with the other Contract Documents as identified in the Agreement. Within fifteen (15) days thereafter, Successful Bidder must execute and deliver the required number of counterparts of the Agreement and any bonds and insurance documentation
002113-13 INSTRUCTION TO BIDDERS
required to be delivered by the Contract Documents to Owner. Within ten (10) days thereafter, Owner will deliver one fully executed counterpart of the Agreement to Successful Bidder, together with printed and electronic copies of the Contract Documents as stated in Paragraph 2.02 of the
General Conditions.
ARTICLE 22—SALES AND USE TAXES
22.01 Owner is exempt from New York State Sales and Use Taxes on materials and equipment to be incorporated in the Work. Said taxes shall not be included in the Contract Price. Refer to
Supplementary Conditions SC-7.10 for additional information.
ARTICLE 23—RETAINAGE
23.01 Provisions concerning retainage and Contractors’ rights to deposit securities in lieu of retainage are set forth in the Agreement.
ARTICLE 24—WICKS EXEMPT
24.01 Each bidder on a public work contract, where the preparation of separate specifications is not required, shall submit with its bid a separate sealed list that names each subcontractor that the bidder will use to perform work on the contract, and the agreed-upon amount to be paid to each, for: (a) plumbing and gas fitting, (b) steam heating, hot water heating, ventilating and air conditioning apparatus and (c) electric wiring and standard illuminating fixtures. After the low bid is announced, the sealed list of subcontractors submitted with such low bid shall be opened and the names of such subcontractors shall then be announced.
A. All bidders must complete Section 004336 Proposed Subcontractor Form. The form should be legible, and it must be included, in a separate sealed envelope, with the other bid documents in the Bid Envelope. Bidders who plan to self-perform work must indicate this on the
Proposed Subcontractor Form, as required.
B. Sign the Proposed Subcontractor Form in the space provided. An officer or a principal of a corporation or a partnership signing for the firm shall print or type the title of the person on the line provided. The same procedure shall apply to the bid of joint venture by two or more firms, except that the signature and title of an officer or a principal of each member firm of the joint venture shall be required. All signatures must be original. Mechanically reproduced signatures or copies are not acceptable.
C. No contract will be awarded without a completed and signed Proposed Subcontractor Form.
Failure to submit, sign or provide Subcontractor’s Agreed-Upon Amount on the Proposed
Subcontractor Form will result in disqualification of the bid.
D. The sealed lists of subcontractors submitted by all other bidders shall be returned to them unopened after the contract is awarded.
24.02 After bids are received, any changes by the low bidder to subcontractors or agreed-upon amounts to be paid to each subcontractor shall require the approval of the Owner pursuant to Section 135 of the State Finance Law and Section 101 of New York State General Municipal Law. Submit any
002113-14 INSTRUCTION TO BIDDERS
proposed changes to the Proposed Subcontractor Form Contractor’s Proposal in writing to the
Owner’s Representative. For changes proposed before award of the contract, send revisions to the
Proposed Subcontractor Form in writing to the Owner’s Representative.
END OF SECTION - 002113
EJCDC® C-410, Bid Form for Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
SECTION 004113
BID FORM
CONTRACT 1 – GENERAL CONSTRUCTION
The terms used in this Bid with initial capital letters have the meanings stated in the Instructions to Bidders, the General Conditions, and the Supplementary Conditions.
ARTICLE 1—OWNER AND BIDDER
1.01 This Bid is submitted for: Sherman Pines Subdivision Roadway and Drainage Improvements
1.02 This Bid is submitted to: Town of Queensbury
1.03 The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with Owner in the form included in the Bidding Documents to perform all Work as specified or indicated in the Bidding Documents for the prices and within the times indicated in this Bid and in accordance with the other terms and conditions of the Bidding Documents.
1.04 The Work will be awarded as one (1) contract.
ARTICLE 2—ATTACHMENTS TO THIS BID
2.01 The following documents are submitted with and made a condition of this Bid:
A. Required Bid Security in the form of a Bid Bond in accordance with the instructions to Bid-ders.
B. List of Proposed Subcontractors;
C. Non-Collusive Affidavit;
D. Certification of Compliance with the Iran Divestment Act;
E. Owner’s Hold Harmless Agreement;
F. Required Bidder Qualification Statement with supporting data;
ARTICLE 3—BASIS OF BID – UNIT PRICES
3.01 Unit Price Bids
A. Bidder will complete the Work in accordance with the Contract Documents for the following price(s):
1. Completed Bid Schedule below.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
2. Refer to Section 012200 – “UNIT PRICES” for scope of payment items. Estimated quan-tities are not guaranteed and are solely for the purpose of comparison of Bids and deter-mination of initial Contract Price. Final payment will be based on actual in place quanti-ties, as determined by the Owner or Owners representative.
3. If the required quantities of the items listed in the completed Bid Schedule are increased or decreased by Change Order, the adjustment prices set forth below shall apply to such increased or decreased quantities:
CONTRACT 1 – GENERAL CONSTRUCTION
BASE BID
Base Bid – General Construction (Unit Price Bid)
The Work generally consists of roadway and drainage improvements within the Sherman Pines
Subdivision in the Town of Queensbury, New York. The Work includes asphalt pavement overlay and shim course placement to improve roadway crown and drainage; removal of existing deterio-rated storm pipe connections between drywells and replacement with new HDPE storm drain pipe matching the existing layout and diameter; refurbishment and adjustment of existing drywells, in-cluding new grade adjustment rings and resetting or replacement of frames and grates; pavement and driveway tie-ins; temporary traffic control; erosion and sediment control; and restoration of disturbed areas.
BID SUMMARY
TOTAL OF BASE BID UNIT PRICES:
(use words) (figures)
Note: In case of a discrepancy between unit prices written in words and figures, the unit prices written in words shall govern. In case of a discrepancy between unit prices bid and extended totals, the unit prices shall govern.
Unit prices have been computed in accordance with Article 13.03, Paragraph C of the General
Conditions. BIDDER acknowledges that quantities are not guaranteed and final payment will be based on actual quantities determined as provided in the Contract Documents.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, BID SCHEDULE
CONTRACT NO. 1 – GENERAL CONSTRUCTION BASE BID
Item
No.
Description Est. Qty. Unit Unit Price (Words) Unit Price (Figures)
Extended Total
(Figures)
1 Mobilization & General Provisions 1 LS ____________________ dollars
____________________ cents
2 Maintenance & Traffic Protection 1 LS ____________________…