Solicitation (RFQ) No. SGE50017Q0059
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24 & 30
1. REQUISITION NUMBER
5. SOLICITATION NUMBER
SGE50017Q0059
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER 6. SOLICITATION ISSUE
DATE
07/21/2017
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
Sara E. Collins
b. TELEPHONE NUMBER (No collect calls) 202-478-9537
c. EMAIL collinsse@state.gov
8. OFFER DUE DATE / LOCAL
TIME
08/16/2017 14:00:00
CODE FRANK
AMERICAN CONSULATE GENERAL FRANKFURT
GIESSENER STRASSE 30
ATTN: RPSO
FRANKFURT, 60435
GERMANY
9. ISSUED BY UNRESTRICTED OR X SET ASIDE: 100.00 % FOR
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
X SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
8(A)
NAICS: 611430
SIZE STANDARD: $11,000,000
10. THE ACQUISITION IS
SEE
SCHEDULE
11. DELIVERY FOR FOB DESTINATION
UNLESS BLOCK IS MARKED
12. DISCOUNT TERMS
13a. THIS CONTRACT IS
RATED ORDER UNDER DPAS
13b. RATING
X RFQ IFB RFP
14. METHOD OF SOLICITATION
TUNISCODE15. DELIVER TO
AMERICAN EMBASSY TUNIS
1053 LES BERGES DU LAC
ATTN: INL
TUNISIA
CODE16. ADMINISTERED BY
FACILITY
CODE
CODE
Contact Duns Telephone No.
17a. CONTRACTOR/OFFEROR FRANKCODE18a. PAYMENT WILL BE MADE BY
AMERICAN CONSULATE GENERAL FRANKFURT
GIESSENER STRASSE 30
ATTN: RPSO
FRANKFURT, 60435
GERMANY
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN
OFFER SEE ADDENDUM
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS
CHECKED
19. ITEM NO. 20. SCHEDULE OF SUPPLIES/SERVICES
(Use Reverse and/or Attach Additional Sheets as Necessary)
21. QUANTITY 22. UNIT 23. UNIT PRICE 24. AMOUNT
See Line Items Section
25. ACCOUNTING AND APPROPRIATION DATA
See Line Item Detail
26. TOTAL AWARD AMOUNT (For Govt. Use Only)
X 27a. SOLICITATION INCORPORATES BY REFERENCES FAR 52.212-1, 52.212-4, FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA ARE X ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4, 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN ____ COPIES TO
ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SET FORTH
OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS SUBJECT TO THE
TERMS AND CONDITIONS SPECIFIED.
29. AWARD OF CONTRACT: REF. OFFER DATED . YOUR OFFER ON
SOLICITATION (BLOCK 5) INCLUDING ANY ADDITIONS OR CHANGES WHICH
ARE SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF THE CONTRACTING OFFICER (TYPE OR PRINT)
Sara E. Collins 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 02/2012)
Prescribed by GSA - FAR (48 CFR) 53.212
SGE50017Q0059
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: _________________________________
32b. SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
PARTIAL FINAL
33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED
CORRECT FOR
COMPLETE PARTIAL FINAL
36. PAYMENT 37. CHECK NUMBER
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT 42a. RECEIVED BY (Print)
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 02/2012) BACK
001 CURRICULUM DEVELOPMENT 1.00 LT
Doc Ref No:
Delivery Date FOB:
002 DEPLOYMENT ONE 1.00 LT
Doc Ref No:
Delivery Date FOB:
003 DEPLOYMENT TWO 1.00 LT
Doc Ref No:
Delivery Date FOB:
004 DEPLOYMENT THREE 1.00 LT
Doc Ref No:
Delivery Date FOB:
005 EQUIPMENT 1.00 LT
Doc Ref No:
Delivery Date FOB:
B-010 TYPE OF CONTRACT
This is a hybrid firm fixed price and cost reimbursable type contract for commercial services and supplies.
The following is firm fixed price: curriculum development; direct labor; and Defense Base Act (DBA) insur-ance.
The following is cost reimbursable: travel and travel-related expenses (i.e., hotel), and equipment (based on fixed unit prices).
(end of clause)
B-012 LIMITATION OF COST OR LIMITATION OF FUNDS
FAR 52.232-20 "LIMITATION OF COST" or FAR 52.232-22 "LIMITATION OF FUNDS," as appropriate, shall apply separately and independently to each separately identified estimated cost.
(end of clause)
B-015 TRAVEL COSTS (Cost-Reimbursement)
(a) Except as otherwise provided herein, the Contractor shall be reimbursed for its reasonable actual travel costs in accordance with its usual accounting practices consistent with FAR Subpart 31.2, specifically FAR31.205-46. Travel must be directly related to and re-quired for performance of this contract, and authorized in advance and in writing by the Contracting Officer's Representative (COR).
In no event shall costs associated with employee commuting be reimbursable as a direct cost under this contract.
(b) The Contractor shall include a breakout of all authorized travel expenses as an attachment to its invoices.
(c) Administrative support (coordination of travel arrangements, etc.) will be the responsibility of the Contractor.
(d) Should any Contractor personnel be requested to perform in any area which has been determined by the Department of State to be a hazardous duty area, hazardous duty premium pay may be payable at the same rate as would be given to Department of State direct-hire employees pursuant to Chapter 650 of the U.S. Department of State Standardized Regulations (Government Civilians, Foreign Areas). Each employee will be notified upon arrival at any hazardous duty area of the applicable rates, terms and conditions at the
SGE50017Q0059
Line Item Summary
Solicitation Number:
SGE50017Q0059
Contract Number: Title: Emergency Management Program: Tunisia
Date of Solicitation:
07/21/2017
Line Item No. Description Quantity Unit Unit Price Total Cost time of performance. Hazardous duty premium pay shall not be burdened with any indirect costs (e.g., overhead, G and A) or fee/ profit.
(e) When local travel between the Contractor employee's regular place of performance and other locations is specifically authorized by the COR, transportation expenses shall be allowable costs under this contract. For the purposes of this clause, local travel means travel within a 50 mile radius of the Contractor employee's regular place of performance and does not include daily commuting or as-sociated costs.
(f) For travel where use of a personal automobile has been specifically authorized by the COR, reimbursement shall be computed on the basis of actual miles traveled from stat starting point to destination. Other related miscellaneous expenses, such as tolls and park-ing fees, incurred in the performance of tasks authorized under this contract, will be reimbursed. Car rentals require advance approval by the COR and will be authorized only when consistent with good business practice. Allowable costs shall not exceed the actual cost of renting a compact automobile (a maximum of one for four Contractor personnel), unless extenuating circumstances (e.g., excess baggage) require other arrangements and subsequent COR approval is obtained.
(g) The Government will reimburse the Contractor for Contractor employee's travel time to or from other authorized work locations, except that for labor categories which are exempt from the Fair Labor Standards Act (FSLA),, a reimbursement will be allowed only for travel during the employee's regular working hours. The Contractor will not be reimbursed for time spent in stand down or tempor-ary layovers by FLSA exempt contractor employees for the convenience of the Contractor except as authorized by the Federal Travel Regulations.
(h) The Contractor shall be responsible for ensuring that all personnel who will be required to travel outside the United States have current and valid passports. The Contractor shall also be responsible for obtaining any visas required for travel to foreign countries un-der this contract. The Contractor shall make no direct labor charges for obtaining/maintaining passports and/or visas.
(end of clause)
1.2 Continuation to SF-1449: Schedule Of Supplies/Services, Block 20 Description/Specifications/Work Statement
I. INTRODUCTION
The U.S. Department of State (DOS) Bureau of International Narcotics and Law Enforcement Affairs’ (INL) mission is to minimize the impact of international crime and illegal drugs on the United States and its citizens through global cooperation. INL’s Office of Africa and the Middle East (INL/AME) develops and executes for-eign assistance programming to promote civilian security and criminal justice sector reform in support of U.S.
policy objectives. We support these reform efforts in partnership with the host governments, U.S. embassies, and implementers throughout the region. In addition, INL/AME has responsibility for coordinating develop-ment of programs with other United States Government (USG) departments and agencies involved in security sector reform and other international organizations to ensure efficient coordination of policy and program im-plementation.
The U.S. government efforts to support Tunisia’s transition focus on three key areas: enhancing economic growth and opportunity, ensuring a secure and peaceful Tunisia, and supporting successful electoral processes and transparent and accountable governance. INL is playing a crucial role in promoting U.S. priorities by sup-porting Tunisian efforts to reform security and justice institutions to ensure they protect the rights of the Tunisi-an people, rather than the interests of the powerful. INL’s strategy in Tunisia is to focus on broad reform of the police, justice sector, and prisons system to complement more immediate-term efforts to bolster basic capacities through training and equipment.
The Bureau of International Narcotics and Law Enforcement Affairs (INL) is partnering with the Tunisian pris-on administration, the Directorate General of Prisons and Rehabilitation (DGPR), to strengthen emergency management practices within its prisons. Currently, the state of emergency response practices within Tunisia’s facilities is basic. As a vital component of operational security, emergency management and response training has been identified as an immediate critical need. In addition to natural disaster emergencies, prison officials must be prepared to address security emergencies (i.e. riots, hostage situations, critical incidents, and external attacks).
II. SCOPE OF WORK
The intent of the Emergency Management Program (EMP) is to improve the DGPR’s capacity to prepare for and respond to emergencies by developing emergency management policies and procedures, and provide train-ing on operating an effective incident command system, and Emergency Response Teams and Tactics.
The intent of this contract is for the Contractor to meet all requirements necessary to provide appropriate tech-nical assistance and emergency management training as outlined in this SOW, including but not limited to de-velopment of standard operating procedures, development of appropriate curriculum, provision of qualified trainers and staff, provision of appropriate equipment approved by INL, and provision of all logistical and ad-ministrative support prior to, during, and after the training. The Contractor shall deploy mobile training teams or technical advising teams for approximately one to two months per deployment as specified in section IV of this SOW. Mobile training teams and technical advising teams should be comprised of an appropriate number of staff and agreed upon by INL. INL will provide the Contractor appropriate information on Tunisian laws, procedures and the DGPR and prison system to provide a basis of support for the Contractor’s curriculum and procedural development and staff orientation efforts.
Place of Performance
Technical assistance and training courses will be presented at locations to be determined in Tunisia, as identi-fied by the DGPR and INL section. Sites being considered are Tunis, Borj El Amri, Borj El Roumi, Manouba, and Borj Touil.
Period of Performance
The period of performance will be one year from date of award.
Work Plan
The Contractor will develop a work plan in consultation with and approved by the COR, in which the Contract-or will provide technical assistance to develop emergency management policies and procedures, and develop the curriculum and conduct training of Tunisian civilian correctional officers in the topics outlined in this SOW. Curriculum should be aligned with the reality of situations, laws, and experiences specific to Tunisia and incorporating internationally accepted standards. All curriculum, course schedules, work plans, course materi-als, and other materials related to the training must be submitted to INL for approval no later than 30 days prior to the scheduled deployment. Upon approval by INL the Contractor shall translate the curriculum, course ma-terials, or other materials specified by INL into Arabic no later than 10 days prior to commencement of the tech-nical assistance or training.
The Contractor shall complete three (3) deployments of mobile training teams or technical advising teams to Tunisia during the Period of Performance. The first deployment shall consist of a technical advising team that will work directly with DGPR leadership to establish a comprehensive set of policies and procedures that will provide a basis for the establishment of a comprehensive Emergency Management System. The policies and procedures resulting from the initial technical advising deployment should be incorporated into the design of the training curriculum providing a cohesive systematic approach for the establishment of an Emergency Manage-ment System at all levels. The total estimated duration of the first deployment is four (4) weeks.
The second deployment shall consist of a train-the-trainer workshop and four iterations of Incident Command Systems at DGPR Headquarters and the prison facilities in Borj Roumi, Borj Amri, and Manouba. The total es-timated duration of the second deployment is six (6) weeks in duration.
The third deployment shall consist of eight iterations of Emergency Response Team and Tactics at the DGPR training academy and the prison facilities in Borj Roumi, Borj Amri, and Manouba, and a table top exercise.
The table top exercise should bring together key stakeholders within the DGPR’s Emergency Management Sys-tem to work through a true-to-life scenario to identify strengths and weaknesses within the policies and proced-ures and provide general understanding of key changes to participants when responding to a critical or emer-gency incident. The total estimated duration of the third deployment is nine (9) weeks.
Technical Assistance and Course Content
The Contractor shall define its technical assistance plan AND training plan in the quote to meet the objectives of this statement of work
In the future, INL may elect to have the Contractor offer additional technical assistance or training in the areas related to emergency management. Requirements for any such courses will be defined through an amended Statement of Work prepared by INL.
The Contractor will provide qualified staff on-site in Tunisia for the duration of the technical assistance and training activities. The Contractor shall propose a Project Manager who will function as the lead for both the Technical Assistance and Training Activities. The Project Manager will coordinate with the Contracting Of-ficer’s Representative (COR), INL program office, and U.S. Embassy Tunis, Tunisia.
The Contractor will meet with INL and DGPR representatives following first iteration of each training course to ensure the curriculum meets the needs of the DGPR, modifying the curriculum if/as required.
All spoken/orally presented training will be in English and the Contractor is responsible for providing qualified interpreters for simultaneous interpretation into Arabic. The Contractor is responsible for translating all written material (short student guides, technical data, operations manuals, etc.) into Arabic prior to the commencement of classes. The Contractor will produce all printed materials.
Technical Assistance and Courses Required
1. TECHNICAL ASSISTANCE – (5-10 participants, 20 working days)
The Contractor’s project manager and technical advisors will be responsible for the achievement of the follow-ing outcomes listed below focusing on developing a high level of knowledge in emergency management theory and techniques for participating DGPR staff.
The contractor shall provide effective mentorship and guidance to the DGPR staff responsible for the review and drafting of policies and procedures concerning the establishment of an emergency management system to at a minimum include:
• Recommend and provide corrections and emergency management international standards when applicable
• Identify duplication or contradiction within policies and procedures
• Identify gaps within policy and procedures
• Provide specific examples or recommendations taking into consideration the Tunisian context
Deliverables:
• Perform a technical review of current policies procedures and select DGPR facilities.
• Assist in the drafting and editing of policies and procedures to include at a minimum; Emergency Plans for
DGPR, Departmental and Facility Emergency Plans for Riots, Disturbances, Utility Failures and Major Dis-asters, Use of Force Standards, Crisis Situations and Correctional Emergency Response Team (CERT)
• Propose a policy and procedure lifecycle plan
2. TRAIN-THE-TRAINER-WORKSHOP – (15 participants, 10 working days)
The contractor’s project manager and trainers will be responsible for the achievement of the following out-comes listed below focusing on instructional techniques and developing a high level of knowledge in emer-gency management theory and techniques for participating DGPR trainers. DGPR trainers will be selected by the MOJ in consultation with INL.
The contractor shall teach, demonstrate, and provide guidelines for effective delivery of training courses in es-tablishing an incident command systems and emergency response teams and tactics to at a minimum include:
• Understanding individual learning styles;
• Understanding the principles of adult learning;
• Being able to create a tailored training program;
• Knowing how to choose the right style for a particular group;
• Understanding the qualities of a successful trainer;
• Knowing how to assess an audience;
• Knowing the importance of training goals;
• Understanding the importance of a training needs analysis;
• Developing lesson plans;
• Developing training aids;
• Delivering transformational training;
• Understanding the importance of evaluating training;
• Performing training assessments;
• Giving and receiving constructive feedback; and
• Designing beneficial practical exercise.
Deliverables:
• Provide guidelines and assist in the development of standards for the creation of the training noted above.
• Develop and stage a Train-the-Trainer Workshop that provides the participants with the skill, knowledge and abilities needed to design and present a successful emergency management course.
• Video recording of each of the participants giving a ten (10) minute sample presentation. The only copy shall be presented to INL Tunis immediately following the last day of class.
• Development of a curriculum that can be provided to the Tunisians to deliver this training in the future.
3. INCIDENT COMMAND SYSTEMS – (10 participants, 5 working days)
After completion of this training the participants should have the knowledge to setup and operate an on-site in-cident commander center that coordinates with DGPR HQ and is part of the Emergency Management System to manage a variety of critical incidents on-site.
The Contractor’s Project Manager and Trainers will be responsible for the achievement of the following out-comes listed below focusing on the importance of determining and adhering to roles and responsibilities before, during, and after events. Participants will be Prison Commanders, Chief of Security, Incident Commanders and Squad Leaders.
Teaching, demonstrating, and providing guidelines for effectively managing, supervising, commanding, and co-ordinating an incident command system should include at a minimum:
• When to establish an incident command
• Command and Control to include strategic, operational and tactical command roles, responsibilities, proto-cols and procedures
• Incident Command responsibilities for gathering and assessing intelligence and managing information dur-ing an emergency or critical event.
• Providing medical assistance to citizens, inmates, and correctional staff during and emergency or critical event.
• Dealing with mass causality events
• Hostage Situations and Negotiations
• Establishing contact with inmates
• How to proactively engage with the media during an emergency or critical event
• Human rights standards and knowledge of basic human rights issues
Deliverables:
• Provide guidelines and assist in the development of standards for the creation of the training noted above.
• Provide guidelines and templates for establishing an Incident Command including strategic, operational and tactical command roles, responsibilities, protocols and procedures.
• Provide guidance and practical exercises which reinforce the internationally accepted provisions, in accord-ance with applicable laws, for the use of force and escalation of force during emergencies or critical events.
• Provide a template and reinforce during practical exercises on how to conduct media briefings related to and during an emergency or critical event
4. EMERGENCY RESPONSE TEAMS AND TACTICS – (25 participants, 5 working days)
After completion of the training participants should have the ability to respond proportionally to a variety of critical incidents as part of an Emergency Response Team and employ appropriate emergency response tactics.
This should be a physically demanding training and assist in the selection, deployment, and maintenance of in-dividual facilities emergency response teams.
The Contractor’s Project Manager and Trainers will be responsible for the achievement of the following out-comes listed below focusing on the importance of determining and adhering to roles and responsibilities before, during, and after events. Participants will be selected emergency response team members to include front line officers, team leaders, and squad leaders.
Teaching, demonstrating, and providing guidelines for effectively managing, supervising, commanding, and co-ordinating the establishment of an emergency response teams should include at a minimum:
• Overview of DGPR Emergency Management System
• Emergency Management System (Command Roles)
• Use of Force/ Report Writing
• Special Group Management/ Intelligence Units
• Public Information
• After Action Reports
• Cell Entry / Cell Extractions
• Yard Clearing
• CPR/ First Aid
• Pressure Point Control Tactics (Restraints, Baton)
• Silent Communications
• Fire Life Safety
• OC- Chemical Agent
• Less Lethal Equipment and Use
• Hostage Situations
• Riots / Disturbances
• Mass Movements
• Understanding of unit and individual tactics, including but not limited to: Use of barriers, non-lethal devices, protective equipment, defensive and offensive formations, peaceful management tactics, non-vi-olent/non-compliant tactics, and violent disorder tactics.
• Officer discipline and restraint
• When use of force, including deadly force, is acceptable in an emergency or critical incident.
• Dealing with mass causality events
• Providing medical assistance to citizens, inmates, and correctional staff during and emergency or critical event.
Deliverables:
• Provide guidelines and assist in the development of standards for the creation of the training noted above.
• Provide guidelines and reinforce during practical exercises various offensive and defensive tactics.
• Provide guidelines and reinforce during practical exercises de-escalation tactics.
5. TABLE TOP EXERCISE (20-30 participants, 1 working day)
The contractor’s Project Manager and Tabletop Exercise Advisors will be responsible for the achievement of the following outcomes listed below focusing on the importance of determining and adhering to roles and re-sponsibilities before, during, and after the event. Participants will be selected from previous attendees and will include DGPR staff, Prison leadership, and front line staff.
At a minimum the TTX should facilitate stakeholder discussion concerning:
• Emergency Management System Command Roles
• Flow of information
• Use of force and/or restraint
• Inter-agency cooperation
Deliverables
• Provide a participant exercise book to include at a minimum; objectives, scenario, evaluation forms, and any other necessary documentation.
• Immediately following the exercise conduct a hot wash and record participants thoughts and observations.
Required Reports/Deliverables
1. Technical Assistance
Within ten (10) business days of the completion of the technical assistance, the Contractor will provide to the COR a written report/evaluation of the technical assistance providing an overview of the following areas:
• Legal or existing DGPR policy that conflicts with best practices;
• Suggested equipment or additional specific training necessary to support the continued development of the units’ capabilities;
• List of current emergency management procedures that do not conform or comply with international human rights standards;
• Advisor’s assessment of willingness or opposition of DGPR to take into consideration suggestions and al-ternatives;
• Detailed information on the policies and procedures produced and lifecycle plan recommended.
The Project Manager, who serves as the Lead Technical Advisor, shall make all project-related decisions in consultation with Contractor headquarters and the COR. The deliverables required to accomplish the goals and objectives of the project are outlined above.
The Embassy will vet all course participants as required by applicable U.S. law. The Contractor must abide by and ensure the full enforcement of Leahy Amendment vetting and restrictions on course participants. No Tunisian government employee may participate in any Contractor-provided advising or portion of advising, which have not been fully vetted and otherwise cleared for participation, with absolutely no exceptions. The Contractor will be required to have each trainee sign a form certifying his or her lack of involvement in narcot-ics trafficking at the beginning of each course. The Contractor will be required to conduct a one-time photo-graphic verification/identification of advising participants to ensure all advisees are the same as those submitted for vetting.
Finally, the technical advisors shall complete a written report no later than twenty (10) business days after the conclusion of the first deployment. The report should include highlights, problems encountered, lessons learned, and detailed information on the policies and procedures drafted during the deployment. The report should include any recommendations for follow-on mentoring or technical assistance concerning the policies and procedures and their lifecycle.
2. Courses
Within ten (10) business days of the completion of each course, the Contractor will provide to the COR a writ-ten report/evaluation of the training providing an overview of the following areas using the template to be provided after contract award:
• Names of students enrolled in the course;
• Names of students completing the course;
• Names of students not completing the course and a reason for each student’s failure to complete the course (not meeting the 90% attendance rule, behavioral issues, etc.);
• Pre- and post – test scores;
• Block by block of instruction outline of course as planned and any deviations from planned course material;
• Logistical or coordination problems/issues and suggested solutions to issues noted;
• Legal or existing agency policy that conflicts with best practices;
• Instructor’s assessment of willingness or opposition to implement the material as presented;
• Conflicts between instructional material (as presented) and existing policies/practices used by the DGPR/ students;
• List of current emergency management equipment/practices/tactics that do not conform or comply with in-ternational human rights standards;
• Suggested modifications to existing practices or new policies that should be developed to support interna-tionally accepted best practices, internally accepted standards, or human right requirements;
• Suggested equipment or additional specific training necessary to support the continued development of the units’ capabilities;
• Summary of student critiques of the course, instructors and materials; and
• Attach the curriculum delivered.
The Project Manager, who serves as the Lead Trainer, shall make all project-related decisions in consultation with Contractor headquarters and the COR. The deliverables required to accomplish the goals and objectives of the project are outlined above.
The Embassy will vet all course participants as required by applicable U.S. law. The Contractor must abide by and ensure the full enforcement of Leahy Amendment vetting and restrictions on course participants. No Tunisian government employee may participate in any Contractor-provided course or portion of any course, which have not been fully vetted and otherwise cleared for participation, with absolutely no exceptions. The Contractor will be required to have each trainee sign a form certifying his or her lack of involvement in narcot-ics trafficking at the beginning of each course. The Contractor will be required to conduct periodic photograph-ic verification/identification of training participants to ensure all trainees are the same as those submitted for vetting, with the first verification occurring at the beginning of each course.
The Contractor should expect delays during the early weeks of project delivery as Embassy Tunis must estab-lish the trainee list and vet all training participants.
An after action report (AAR) for the table top exercise should be submitted to the COR within (10) business days after the conclusion of the tabletop exercise. At a minimum the AAR should include an Executive Sum-mary, Exercise Overview, Exercise Objectives and Evaluation, Lessons Learned and Best Practices, and Appen-dices.
A final report shall be submitted to the COR within twenty (20) business days of the conclusion of the final de-ployment. The report shall include highlights, problems encountered, lessons learned, and detailed information demonstrating the major impact of the program during the entire reporting period; such as success stories, digit-al photos, quotes, and facts from the conducted trainings. The major impact of the training should be determ-ined by observations and interviews and validated by U.S. Embassy personnel. The final report should also provide any recommended follow-up activities for U.S. Embassy personnel to consider.
Equipment for Training and Participants
The Contractor shall procure and distribute non-lethal emergency response equipment for training (to include at a minimum; Red Man suit and Red Weapons; baton, knife, pistol) for each course to include the Train-the-Trainer Workshop. At the end of each training course, participants will return said equipment to the Con-tractor for use in subsequent courses. The Contractor will be responsible for the in-country secure storage of training equipment before, during and after training courses, and for maintaining inventories.
At the end of the Period of Performance, the equipment used for training will become the property of INL.
The quote shall provide cost and specifications for equipment to be procured for training purposes under this contract.
Additionally, the Contractor shall recommend to INL a list of non-lethal emergency response equipment to out-fit a standard emergency response team member (to include but not limited to; normal assigned duty gear used for responding to riots to include; impact weapons, helmet with drop shield, protective body equipment, gas mask, etc.). Upon approval from the COR, the Contractor will procure and distribute the equipment to each graduate and/or squad of the emergency response teams and tactics training.
The quote shall provide cost and specifications for equipment to be procured for disbursement.
Shipping, licensing, customs clearance, and any other cost incurred in procuring equipment under this contract, transporting it to the training locations, and storing it prior to final delivery to INL (for training equipment at the end of the Period of Performance) or prior to distribution to graduates (for equipment delivered up completion of training courses) will be the sole responsibility of the Contractor.
Monitoring and Evaluation and Impact Assessment
Training instructors will test students at the end of each course to determine retention of material and will grade and turn over the completed tests to the INL Director. At the end of each course, instructors shall provide stu-dents with an opportunity to give a written anonymous evaluation of the course and course instructions which will also be provide to the INL Director prior to departure. Training instructors within one week will provide the INL Director via email with an evaluation of the participants and any recommendations for future training given under this contract.
The contractor shall maintain open, timely, and effective communications with the COR, INL program office, and Embassy Tunis, resulting in a relationship that proactively addresses potential problems with flexible, workable solutions.
All training events shall be documented with a digital camera (still photos and video) by the contractor. Photos and videos shall be provided to the COR in the final report.
Training Materials, Manuals, and Works Under this Contract
All documents produced under this contract are the property of the U.S. Government. The U.S. Government re-serves the right to reproduce, distribute, perform, or display the training documents under this contract.
III. STAFFING
In addition to deploying training and technical advisors, the Contractor will assign one person as the Project Manager. This person is designated as key personnel. The Contractor shall provide the selected individual’s re-sume, three (3) written professional correctional references, and a two-page writing sample on the state of the Tunisia corrections system as part of the quote. The Contractor can have no permanent project staff based in Tunis and will minimize the number of project staff in country at any time. If the Contractor must remove Key Personnel, it must be in accordance with the Key Personnel Clause.
Security
All work will be unclassified and security clearances are not required.
Relationships
The Contractor shall be responsible for project assessment, curriculum development, implementation, and eval-uation. The Project Manager, technical advisors, and trainers assigned to the project shall receive clarifications and contract guidance through the COR who will be delegated upon contract award.
The COR will work closely with the contractor to assess, develop, design, implement, and evaluate the project.
The Project Manager, technical advisors, and trainers shall receive programmatic guidance from INL/AME’s program office, the INL Director in Tunis, and the INL Senior Corrections Advisor in Tunis.
Staffing
The Contractor shall recruit and submit for approval the trainers and technical advisors as set forth below. In addition, if the contractor replaces any trainer or technical advisor or staff during any period of this contract, the contractor must recruit and submit to the COR for final approval, replacement candidates who meet all the same qualifications as outlined in this SOW.
Recruitment of Technical Advisors and Trainers
The Contractor shall be responsible for recruitment of qualified candidates that meet or exceed the minimum qualifications set out below in the “Responsibilities/Qualifications” section. The quote of the Contractor shall include its recruitment and selection process for all staff under this contract, as well as the number of trainers and technical advisors it deems necessary to implement the project. INL reserves the right to review recruit-ment materials and outreach efforts.
Selection of Technical Advisors and Trainers
After notification of award by the Contracting Officer (CO), the Contractor shall immediately confirm receipt and indicate that it is beginning the selection process for appropriate candidates based on the position descrip-tion provided in this SOW.
The Contractor shall submit to the COR the appropriate candidate résumés and references no later than fourteen
(30) calendar days prior to the date of proposed deployment.
The review process for trainers will occur within five (5) working days of receipt of the résumé(s). .
The Contractor must submit at least two resumes of qualified candidates for each position to fill under this con-tract.
If deemed necessary by the COR, the Contractor shall submit supporting documentation sufficient to allow INL to conclude that the candidate possesses the qualifications, experience, suitability and training required by this Statement of Work for the position for which he/she is a candidate. The Contractor shall inform COR at the time of submission of the résumés and references whether a candidate was previously dismissed for cause on a prior INL contract, or terminated his/her position prior to the completion of any INL contract. Following INL approval of qualified candidates(s), the Contractor may begin pre-screening activities.
If the Contractor feels that the COR has unjustly disqualified a technically compliant candidate, they may sub-mit the resume for final review and approval to the Contracting Officer.
Pre-screening and Contractor Administrative Duties
The Contractor shall be responsible for pre-screening qualified personnel. Candidates with prior experience overseas are desirable. Candidates must be recruited for specific positions and must have the skill sets required of the position as outlined below. Candidates should possess the ability to live, work, and communicate with host country nationals for extended periods of time under austere conditions. Prior to submitting a candidate, the Contractor is responsible for conducting a pre-screening of the candidate, which shall include, but not be limited to the following:
1. Requisite Experience and skill sets;
2. Adverse Personal Behavior and/or Disciplinary Matters.
The Contractor shall institute a code of behavior and clearly state its expectations to all contract personnel. The
Contractor shall follow up promptly on any adverse personal behavior or disciplinary matters and will commu-nicate regularly and promptly with State Department program officers and the Contracting Officer regarding discipline and other incidents, including health-related matters that affect the performance of the contract.
The Contractor shall be responsible for securing the necessary visas, passports, and immunizations (as per CDC recommendations) for its personnel. The Contractor shall determine and conduct all required administrative activities for the trainers.
Key Personnel (Project Manager)
The responsibilities of the Project Manager involve coordinating the administration of the technical assistance and training activities, ensuring that each trainer can train the local corrections staff in the subject area of emer-gency management.
The Project Manager will ensure compliance with all contract requirements, working in close coordination with INL and Embassy Tunis, especially in interactions involving planning and other managerial issues.
In addition, the Project Manager will determine the feasibility and effectiveness of proposed course in the Tunisian context and identify the resources required to implement these courses. The Project Manager should understand how to operate in foreign environments with legal systems different from that of the United States, and be able to provide advice on the implementation of new policies and procedures. The Project Manager should coordinate with U.S. Embassy Tunis on clarification on legal issues that are specific to Tunisia.
Minimum Requirements
• A minimum of 5 years of experience in project management in similar international training missions of similar size and scope preferably in North Africa or the Middle East;
• Graduate of a certified state, federal, local, or equivalent corrections and/or probation and parole academy;
• Demonstrated experience coordinating and conducting successful training using simultaneous interpreta-tion;
• A minimum of 10 years as a senior training officer of a correctional institution or equivalent with an em-phasis on Emergency Management Training.
Preferred Qualifications
• Fluent in French and/or Arabic
Non-Key Personnel
1. Technical Advisors
The technical advisors are responsible for working directly with senior level Tunisian corrections officials to es-tablish policies and procedures for a domestic emergency management system which should be aligned with the reality of situations, laws, and experiences specific to Tunisia and incorporating internationally accepted stand-ards.
Minimum Requirements
• Minimum of 10 years’ experience as an officer in a correctional institution or equivalent with experience drafting new and revised policies and procedures.
• A minimum of 5 years as member of an Emergency Response Team.
• A minimum of 3 years’ experience in similar international missions of similar size and scope.
Preferred Qualifications
• Fluent in French and/or Arabic
2. Trainer
The trainers are responsible for instructing correctional officers with varied levels of rank, expertise, and experi-ence in emergency management philosophies and principles; and, instructing in a classroom and practical set-ting on the knowledge, techniques, skills, and procedures necessary to execute the duties of correctional officer responding to an emergency or critical incident.
Minimum Requirements
• Graduate of a certified state, federal, local, or equivalent corrections and/or probation and parole academy.
• A minimum of 5 years as an officer of a correctional institution and member of an Emergency Response Team.
• A minimum of 3 years’ experience as a trainer in similar international training missions of similar size and scope.
Preferred Qualifications
• Fluent in French and/or Arabic
3. Table Top Exercise Advisor
The tabletop exercise advisor is responsible for designing and executing a Tunisian specific real-to-life tabletop exercise that enhances general awareness, validates policy and procedures, and rehearse concepts and proced-ures concerning the DGPR’s ability to respond to an emergency or critical incident.
Minimum Requirements:
• A minimum of 3 years’ experience developing, delivering, and evaluating tabletop exercises.
• Demonstrated experience delivering training or tabletop exercises to international audiences.
Preferred Qualification:
• Fluent in French and/or Arabic
TIMETABLE / FREQUENCY
The Contractor’s quote shall establish a tentative course schedule that is both realistic and timely, and meets the operational requirements of the DGPR. The actual schedule will be determined in consultation with the COR, Embassy Tunis, and the DGPR.
The Contractor cannot schedule training during local holidays.
The technical assistance and course requested under this contract will occur in the following order and subject to change by the COR/CO.
1. Deployment One
• Technical Assistance - review (5 working day)
• Technical Assistance – Assist in development of SOPs (15 working days)
2. Deployment Two
• Train-the-Trainer Workshop (10 working days)
• Establishment of Incident Command Systems (5 working days)
• Establishment of Incident Command Systems (5 working days)
• Establishment of Incident Command Systems (5 working days)
• Establishment of Incident Command Systems (5 working days)
3. Deployment Three
• Establishment of Emergency Response Teams and Tactics (5 working days)
• Establishment of Emergency Response Teams and Tactics (5 working days)
• Establishment of Emergency Response Teams and Tactics (5 working days)
• Establishment of Emergency Response Teams and Tactics (5 working days)
• Establishment of Emergency Response Teams and Tactics (5 working days)
• Establishment of Emergency Response Teams and Tactics (5 working days)
• Establishment of Emergency Response Teams and Tactics (5 working days)
• Establishment of Emergency Response Teams and Tactics (5 working days)
• Table Top Exercise (1 working day)
V. RESPONSIBILITY OF U.S. EMBASSY TUNIS AND THE GOVERNMENT OF TUNISIA
(GOT)
The GOT will provide participants and coordinate with Embassy Tunis to make arrangements for the necessary training facilities; The Contractor will not be responsible for this. The training location will be coordinated by an agreement between the GOT, COR, and Embassy Tunis.
INL will work with the GOT to facilitate the adoption of the curriculum used for this training by the training academy in Tunisia to ensure that future officers are learning the same skills developed during this training ef-fort.
Life and Mission Support (LMS)
The Contractor will provide ground transportation to/from the airport and to/from the hotel to the worksite, provide simultaneous interpreters as needed, translation equipment as needed, computers and presentation equipment as needed, such as laptop computer; LCD data display (projector); speakers for laptop; white board;
white board markers; flip chart; flip chart paper; permanent magic markers; and student note taking materials.
The Contractor shall be responsible for providing per diem (e.g. lodging, meals, and incidental expenses) to the trainers while in country. These expenses are cost reimbursable. INL will only reimburse lodging at the actual cost incurred, which must be at or below U.S. government approved rates.
D-002 MARKING OF REPORTS
All reports delivered by the Contractor to the Government under this contract shall prominently show on the cover of the report:
(a) Name and business address of the Contractor;
(b) Contract number and delivery order number, if applicable;
(c) Date of report; and
(d) Program office(s).
(e) All reports become the property of the Department. Reports shall not contain any markings or legends which restrict the Department's use of such reports in any way.
(end of clause)
Clause Title
52.246-4 Inspection of Services - Fixed-Price (Aug 1996)
52.246-5 Inspection of Services Cost-Reimbursement (Apr 1984)
(a) Definition. "Services," as used in this clause, includes services performed, workmanship, and material fur-nished or used in performing services.
(b) The Contractor shall provide and maintain an inspection system acceptable to the Government covering the services under this contract. Complete records of all inspection work performed by the Contractor shall be maintained and made available to the Government during contract performance and for as long afterwards as the contract requires.
(c) The Government has the right to inspect and test all services called for by the contract, to the extent practic-able at all places and times during the term of the contract. The Government shall perform inspections and tests in a manner that will not unduly delay the work.
(d) If any of the services performed do not conform with contract requirements, the Government may require the Contractor to perform the services again in conformity with contract requirements, for no additional fee.
When the defects in services cannot be corrected by reperformance, the Government may-
(1) Require the Contractor to take necessary action to ensure that future performance conforms to contract re-quirements; and
(2) Reduce any fee payable under the contract to reflect the reduced value of the services performed.
(e) If the Contractor fails to promptly perform the services again or take the action necessary to ensure future performance in conformity with contract requirements, the Government may-
(1) By contract or otherwise, perform the services and reduce any fee payable by an amount that is equitable un-der the circumstances; or
(2) Terminate the contract for default.
(End of clause)
E-004 INSPECTION AND ACCEPTANCE (Services)
Inspection and acceptance of the services to be provided hereunder shall be made by the Contracting Officer's Representative.
(end of clause)
E-002 INSPECTION AND ACCEPTANCE (F.O.B. Destination)
Inspection and acceptance shall be made at destination by an authorized representative of the Government.
(end of clause)
Clause Title
Clause Title
52.242-15 Stop-Work Order (Aug 1989)
52.242-17 Government Delay of Work (Apr 1984)
F-006 PERIOD OF PERFORMANCE
This contract shall be effective on the date of the Contracting Officer's signature, and shall remain in effect for one (1) year.
(end of clause)
RFR-004 INVOICE INSTRUCTIONS FOR OVERSEAS LOCAL VENDORS
Invoice Payment: Payment will be made via Electronic Fund Transfer (EFT) in accordance with Federal Ac-quisition Regulation FAR 32.9 “Prompt Payment”. The original invoice must be issued to and mailed to the address as provided in block # 21 on the first page of the order; and a copy is to be emailed in .pdf format to RPSO at: FrankfurtSSB@state.gov.
To avoid possible delay in payment, please ensure the invoice:
a) is correctly addressed;
b) references the correct order number (see block # 3 of the order);
c) provides complete bank details.
NOTE TO RECEIVING OFFICE:
To avoid unnecessary correspondence and inquiries, please ensure ARIBA Status Tracking is updated as soon as the supplies / services have been received.
OTHER…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .