Septic Drawing C001(I)_QWO ARSR.pdf
PDF 163 KB Posted
- Attached to
- QWO HVAC and Roof Replacement
- Solicitation number
- 697DCK-22-R-00350
About this file
This document contains a solicitation for a federal contract opportunity and related project drawing. The solicitation is for HVAC and roof replacement services at a FAA facility located in London, OH. The scope of work involves removing the existing roof and HVAC units along with associated ductwork and heaters. New equipment to be provided and installed includes a roof, two 15-ton packaged HVAC units, ductwork, mini-split systems, HVAC controls and new kitchen sink wastewater piping connected to the septic system. Asbestos abatement and air monitoring are also required. The NAICS code is 238220 and the contract type will be firm fixed price. The estimated value is between $450,000 to $550,000 with a 120 calendar day period of performance. The solicitation response due date is July 26, 2022. The drawing depicts the proposed septic connection installation. The opportunity is set aside for small businesses and issued by the FAA Southwestern Region.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BUIL
DIN
G
EQUIP
MENT
FENCE
CHAIN-LINK
N
HTG
HTG
HTG
H T
G
H T
G
HIGH TRANSIENT GROUND PLATE
4/0 AWG HIGH TRANSIENT CONNECTION TO EES
BELOW GRADE
BARE COPPER 4/0 AWG INSTALLED AT LEAST 3 FT.
3/4" X 10' COPPER GROUND ROD
EXISTING COPPER GROUND ROD
EXISTING EARTH ELECTRODE SYSTEM
FACILITY
PIPING FROM
EXISTING WST
TANK
SEPTIC(ASPHALT)
AREA
PARKING
NEW CLEAN-OUT
NEW CLEAN-OUT
SLOPE (MIN)
INSTALLED AT 2%
NEW PVC PIPING
F
IL
E
S
D
A T
E
T
IM
E
N
A M
E
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
H
G
F
E
D
C
12345678
REVDRAWING NO
DATE JCN
APPROVED BY
ISSUED BY
CHECKED
DRAWN
DESIGNED
SUBMITTED BY
REVIEWED BY
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV
DATE
APPROVED
DESCRIPTION JCN
DATE
REDLINE
APVD
A
GENERAL NOTES:
APPROVED BY ONSITE FAA REPRESENTATIVE
RELOCATE INTERFERENCES AS-REQUIRED; ALL RELOCATIONS MUST BE2.
UNDERGROUND EXISTING UTILITIES, APPURTENANCES, AND STRUCTURES
CONTRACTOR IS RESPONSIBLE FOR TO LOCATE AND PROTECT ALL1.
C001(I)
SEPTIC CONNECTION INSTALLATION DRAWING
QWO ARSR: ROOF AND HVAC REPLACEMENT PROJECT
LEGEND
File details come from the government source that posted it. Updated .