This solicitation is seeking proposals to replace the roof and HVAC systems at a Federal Aviation Administration facility. The scope of work includes removing the existing roof and two HVAC units along with associated ductwork, heaters supporting the office, and kitchen sink wastewater piping. Installation of a new roof, two 15-ton packaged HVAC units with ductwork, one mini-split system, HVAC controls, kitchen sink wastewater piping connected to the septic system, and all associated components is required. Equipment and materials must be approved by an FAA representative prior to installation. The project also involves asbestos abatement and air monitoring. Proposals are due by July 26, 2022. The estimated cost is between $450,000 to $550,000 and the period of performance is approximately 120 calendar days. The NAICS code is 238220 and the contracting vehicle is a firm fixed price contract set aside for small businesses.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ROOM

EQUIPMENT

N

OFFICE

M A

T C

H L

IN

E

N O

M E

C H

A N

IC

A

L W

O R

K B

E Y

O N

D T

H

IS

L

IN

E

EQUIPMENT ROOM LAYOUT PLAN

SCALE: NOT TO SCALE

48"x20"

RETURN

48"x16"

SUPPLY

OFF PAD (TYP)

ROUTE CONDENSATE

CONNECTION (TYP)

FLEXIBLE

SEE NOTE 2

AS REQUIRED;

MODIFY HANDRAIL

VANES (TYP)

TURNING

SCREEN

CEILING WITH

TO DROP

RETURN DUCT

750 CFM

16x16

700 CFM

30x16 18x16

(TYP)

550 CFM

�14

700 CFM

OAS CONTROLLER

PAD

NEW CONCRETE

OUTDOOR UNIT

NEW MINI-SPLIT

NEW DISCONNECT

CONDENSATE LINE

LINE

VENTILATION AIR

AND ELECTRICAL

REFRIGERANT LINES

F

IL

E

S

D

A T

E

T

IM

E

N

A M

E

A

B

C

D

E

F

G

H

8 7 6 5 4 3 2 1

H

G

F

E

D

C

12345678

REVDRAWING NO

DATE JCN

APPROVED BY

ISSUED BY

CHECKED

DRAWN

DESIGNED

SUBMITTED BY

REVIEWED BY

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

REV

DATE

APPROVED

DESCRIPTION JCN

DATE

REDLINE

APVD

A

GENERAL NOTES:

NEW EQUIPMENT

WITH SCREEN TO PREVENT INSECT ENTRY

LEVEL; MATERIAL SHALL BE UV RESISTANT SCH 40 PVC WITH END COVERED

THEN DOWN 90 DEGREES AND TERMINATE APPROXIMATELY 6" ABOVE GROUND

MINI-SPLIT CONDENSATE LINE SHALL BE RUN THROUGH EXTERIOR WALL,16.

SHALL HAVE AN EXTRUDED STEEL ICE GUARD AND FRAME INSTALLED

ALL EXTERIOR DUCTWORK BETWEEN THE BUILDING AND RADOME FOUNDATION15.

SUPPLY PROPERLY SIZED BREAKERS

NEW SUPPLY POWER TO BE SUPPLIED BY PANEL F; CONTRACTOR SHALL

CONTROLLED BY INDIVIDUAL THERMOSTAT IN THE SUPPORTED ZONE.

NEW MINI-SPLIT SHALL BE INSTALLED IN GENERAL AREA SHOWN AND14.

APPROVED BY ONSITE FAA REPRESENTATIVE

RELOCATE INTERFERENCES AS-REQUIRED; ALL RELOCATIONS MUST BE13.

FAA APPROVED EQUIVALENT

UTILIZE PROTECTIVE JACKET AROUND INSULATION; VENTURECLAD OR

DUCTWORK SHALL BE EXTERNALLY INSULATED. EXTERIOR DUCTWORK SHALL

DUCT DIMENSIONS SHOWN ARE INTERIOR (AIRWAY) DIMENSIONS. ALL12.

DOORS AND PANELS; MANUFACTURER MAY REQUIRE MORE

NEW HVAC UNITS SHALL HAVE A MIN 18" CLEARANCE AROUND ALL ACCESS11.

SECURITY PURPOSES

HARDENED STEEL BARS WITH MAXIMUM 6 INCHES BETWEEN BARS FOR

NEW DUCTWORK. PENETRATIONS REQUIRE INSTALLATION OF 1/2 INCH

MODIFY EXTERIOR WALL PENETRATIONS AS REQUIRED TO INSTALL10.

APPROVED EQUAL

NEW HVAC UNITS SHALL BE MOUNTED ONTO FACTORY CURBS OR FAA9.

POINT CAN BE PERFORMED TO ACCOMODATE GROUNDING.

OR BY MEANS OF MULTIPOINT. RELOCATION OF EXISTING MULTI-

NEW HVAC UNITS SHALL BE GROUNDED TO COUNTERPOISE DIRECTLY8.

LOCKABLE, AND SIZED CORRECTLY FOR SERVICED EQUIPMENT

ALL NEW DISCONNECTS SHALL BE HEAVY DUTY, OUTDOOR RATED,7.

SHALL BE MOUNTED BY STUDS TO CONCRETE PAD

BUILD EXTERIOR DUCTING SUPPORT USING 2"x2" UNISTRUT. SUPPORTS 6.

TO AIRFLOW SPECIFIED +/- 10%

ALL DIFFUSERS SHALL HAVE VOLUME DAMPERS; BALANCE DIFFUSERS5.

DETAILED IN THE SOW; EXTEND/REMOVE CIRCUITS AS REQUIRED

REPLACE ALL FLUORESCENT LIGHTS THROUGHOUT THE FACILITY AS 4.

IN THE SOW

REPLACE ALL CEILING TILES THROUGHOUT THE FACILITY AS DETAILED3.

DUCTWORK; NO GAPS SHALL REMAIN WHEN PROJECT IS COMPLETED

MODIFY HANDRAIL AROUND RADOME PAD AS REQUIRED TO INSTALL NEW2.

FABRICATION

FIELD VERIFY ALL ON-SITE MEASUREMENTS PRIOR TO FINAL

ALL DIMENSION PROVIDED ARE FOR REFERENCE. CONTRACTOR SHALL 1.

FAA PROVIDED OAS HVAC CONTROLLER8

8 EA - 24"x24" RETURN GRILL - TITUS 300RS7

SUPPORTING 1 EA 1 TON INDOOR UNIT

(OR FAA APPROVED EQUIVALENT) - 1 TON CONDENSING UNIT

1 EA - MINI-SPLIT HVAC UNIT - MITSUBISHI M-SERIES H2I6

1 EA - JET DIFFUSER - TITUS TND-AA-165

7 EA - JET DIFFUSERS - TITUS TND-AA-124

2 EA - CIRCULAR DIFFUSERS - TITUS TMRA-AA-123

2 EA - BACKDRAFT DAMPERS - GREENHECK HB SERIES2

CURBS

FAA APPROVED EQUIVALENT) WITH ASSOCIATED FACTORY

2 EA - PACKAGED HVAC UNITS - YORK SUNLINE (OR1

M001(I)

SEE NOTE 15

NEW ICE GUARD;

777777

NEW DISCONNECT

NEW DISCONNECT

MECHANICAL INSTALLATION DRAWING

QWO ARSR: ROOF AND HVAC REPLACEMENT PROJECT

CASSETTE

NEW CEILING