This solicitation is seeking proposals to replace the roof and HVAC systems at a Federal Aviation Administration facility. The scope of work includes removing the existing roof and two HVAC units along with associated ductwork, heaters supporting the office, and kitchen sink wastewater piping. Installation of a new roof, two 15-ton packaged HVAC units with ductwork, one mini-split system, HVAC controls, kitchen sink wastewater piping connected to the septic system, and all associated components is required. Equipment and materials must be approved by an FAA representative prior to installation. The project also involves asbestos abatement and air monitoring. Proposals are due by July 26, 2022. The estimated cost is between $450,000 to $550,000 and the period of performance is approximately 120 calendar days. The NAICS code is 238220 and the contracting vehicle is a firm fixed price contract set aside for small businesses.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ROOM
EQUIPMENT
N
OFFICE
M A
T C
H L
IN
E
N O
M E
C H
A N
IC
A
L W
O R
K B
E Y
O N
D T
H
IS
L
IN
E
EQUIPMENT ROOM LAYOUT PLAN
SCALE: NOT TO SCALE
48"x20"
RETURN
48"x16"
SUPPLY
OFF PAD (TYP)
ROUTE CONDENSATE
CONNECTION (TYP)
FLEXIBLE
SEE NOTE 2
AS REQUIRED;
MODIFY HANDRAIL
VANES (TYP)
TURNING
SCREEN
CEILING WITH
TO DROP
RETURN DUCT
750 CFM
16x16
700 CFM
30x16 18x16
(TYP)
550 CFM
�14
700 CFM
OAS CONTROLLER
PAD
NEW CONCRETE
OUTDOOR UNIT
NEW MINI-SPLIT
NEW DISCONNECT
CONDENSATE LINE
LINE
VENTILATION AIR
AND ELECTRICAL
REFRIGERANT LINES
F
IL
E
S
D
A T
E
T
IM
E
N
A M
E
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
H
G
F
E
D
C
12345678
REVDRAWING NO
DATE JCN
APPROVED BY
ISSUED BY
CHECKED
DRAWN
DESIGNED
SUBMITTED BY
REVIEWED BY
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV
DATE
APPROVED
DESCRIPTION JCN
DATE
REDLINE
APVD
A
GENERAL NOTES:
NEW EQUIPMENT
WITH SCREEN TO PREVENT INSECT ENTRY
LEVEL; MATERIAL SHALL BE UV RESISTANT SCH 40 PVC WITH END COVERED
THEN DOWN 90 DEGREES AND TERMINATE APPROXIMATELY 6" ABOVE GROUND
MINI-SPLIT CONDENSATE LINE SHALL BE RUN THROUGH EXTERIOR WALL,16.
SHALL HAVE AN EXTRUDED STEEL ICE GUARD AND FRAME INSTALLED
ALL EXTERIOR DUCTWORK BETWEEN THE BUILDING AND RADOME FOUNDATION15.
SUPPLY PROPERLY SIZED BREAKERS
NEW SUPPLY POWER TO BE SUPPLIED BY PANEL F; CONTRACTOR SHALL
CONTROLLED BY INDIVIDUAL THERMOSTAT IN THE SUPPORTED ZONE.
NEW MINI-SPLIT SHALL BE INSTALLED IN GENERAL AREA SHOWN AND14.
APPROVED BY ONSITE FAA REPRESENTATIVE
RELOCATE INTERFERENCES AS-REQUIRED; ALL RELOCATIONS MUST BE13.
FAA APPROVED EQUIVALENT
UTILIZE PROTECTIVE JACKET AROUND INSULATION; VENTURECLAD OR
DUCTWORK SHALL BE EXTERNALLY INSULATED. EXTERIOR DUCTWORK SHALL
DUCT DIMENSIONS SHOWN ARE INTERIOR (AIRWAY) DIMENSIONS. ALL12.
DOORS AND PANELS; MANUFACTURER MAY REQUIRE MORE
NEW HVAC UNITS SHALL HAVE A MIN 18" CLEARANCE AROUND ALL ACCESS11.
SECURITY PURPOSES
HARDENED STEEL BARS WITH MAXIMUM 6 INCHES BETWEEN BARS FOR
NEW DUCTWORK. PENETRATIONS REQUIRE INSTALLATION OF 1/2 INCH
MODIFY EXTERIOR WALL PENETRATIONS AS REQUIRED TO INSTALL10.
APPROVED EQUAL
NEW HVAC UNITS SHALL BE MOUNTED ONTO FACTORY CURBS OR FAA9.
POINT CAN BE PERFORMED TO ACCOMODATE GROUNDING.
OR BY MEANS OF MULTIPOINT. RELOCATION OF EXISTING MULTI-
NEW HVAC UNITS SHALL BE GROUNDED TO COUNTERPOISE DIRECTLY8.
LOCKABLE, AND SIZED CORRECTLY FOR SERVICED EQUIPMENT
ALL NEW DISCONNECTS SHALL BE HEAVY DUTY, OUTDOOR RATED,7.
SHALL BE MOUNTED BY STUDS TO CONCRETE PAD
BUILD EXTERIOR DUCTING SUPPORT USING 2"x2" UNISTRUT. SUPPORTS 6.
TO AIRFLOW SPECIFIED +/- 10%
ALL DIFFUSERS SHALL HAVE VOLUME DAMPERS; BALANCE DIFFUSERS5.
DETAILED IN THE SOW; EXTEND/REMOVE CIRCUITS AS REQUIRED
REPLACE ALL FLUORESCENT LIGHTS THROUGHOUT THE FACILITY AS 4.
IN THE SOW
REPLACE ALL CEILING TILES THROUGHOUT THE FACILITY AS DETAILED3.
DUCTWORK; NO GAPS SHALL REMAIN WHEN PROJECT IS COMPLETED
MODIFY HANDRAIL AROUND RADOME PAD AS REQUIRED TO INSTALL NEW2.
FABRICATION
FIELD VERIFY ALL ON-SITE MEASUREMENTS PRIOR TO FINAL
ALL DIMENSION PROVIDED ARE FOR REFERENCE. CONTRACTOR SHALL 1.
FAA PROVIDED OAS HVAC CONTROLLER8
8 EA - 24"x24" RETURN GRILL - TITUS 300RS7
SUPPORTING 1 EA 1 TON INDOOR UNIT
(OR FAA APPROVED EQUIVALENT) - 1 TON CONDENSING UNIT
1 EA - MINI-SPLIT HVAC UNIT - MITSUBISHI M-SERIES H2I6
1 EA - JET DIFFUSER - TITUS TND-AA-165
7 EA - JET DIFFUSERS - TITUS TND-AA-124
2 EA - CIRCULAR DIFFUSERS - TITUS TMRA-AA-123
2 EA - BACKDRAFT DAMPERS - GREENHECK HB SERIES2
CURBS
FAA APPROVED EQUIVALENT) WITH ASSOCIATED FACTORY
2 EA - PACKAGED HVAC UNITS - YORK SUNLINE (OR1
M001(I)
SEE NOTE 15
NEW ICE GUARD;
777777
NEW DISCONNECT
NEW DISCONNECT
MECHANICAL INSTALLATION DRAWING
QWO ARSR: ROOF AND HVAC REPLACEMENT PROJECT