Score_Sheets.xlsx

XLSX spreadsheet 29 KB Posted

Attached to
Competitive Selection OH|DOT52824-1
Contract number
DOT52824-1
Issued by
Ohio

About this file

The document is a comprehensive score sheet for a competitive bid evaluation, specifically for a transportation roadway attribute data collection and spatial data project. The solicitation appears to be from the Ohio Department of Transportation (ODOT), with five vendors participating: National Data & Surveying Services, Inc., Polygon Solutions, Johnson Mirmiran & Thompson Inc., The Sanborn Map Company, Inc., and Cultivate Geospatial Solutions LLC and Timmons Group Inc.

The contract involves centerline inventory projects requiring data collection, GIS mapping, and spatial data services with a three-year project timeframe. Two vendors, National Data & Surveying Services and Polygon Solutions, met the minimum technical score of 342 points and were eligible for cost consideration. Polygon Solutions scored the highest with 358 points and submitted a total price of $1,995,474.00, while National Data & Surveying Services scored 352 points with a submitted price of $425,220.00. The evaluation criteria included technical capabilities, experience in transportation asset data collection, GIS expertise, and methodology for data collection. The contract will be awarded to the vendor with the lowest cost per quality point, which in this case appears to be National Data & Surveying Services at $1,208.01 per quality point.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

National Data & Surveying 352

VendorNational Data & Surveying Services, Inc.
Item #Evaluation CriteriaWeightingDoesn't Meet 0Partially Meets 6Meets 8Exceeds 10
PROPOSAL ACCEPTANCE CRITERIA
Phase 1YesNo
1Did the vendor provide adequate information proving that they are experienced in transportation roadway attribute data collection and spatial data and shall have a minimum of five (5) years’ experience with centerline inventory projects.xThe proposal must meet all of the following Phase I proposal acceptance criteria in order to be considered for further evaluation. Any proposal receiving a “no” response to any of the following qualifying criteria shall be disqualified from consideration.
2Did the vendor provide through written proposal content, a minimum of 3 completed projects, within the previous 84 months, where data review, collection, and extraction services, along with the use of GIS with linear referencing, were used successfully.x
3Did the vendor provide 3 samples as required (See Process for Data Collection in section 2.1).x
WORK REQUIREMENTS
PROPOSED WORK PLAN
1The Vendor has demonstrated an understanding of the project objective.540
2The Vendor has demonstrated a technical knowledge of how to perform data collection on centerlines.540
3The vendor has explained how they plan to collect the data (imagery, video log, and other resources, etc.).432
4The Vendor has provided a logical schedule and methodology for meeting the project’s 3-year timeframe or earlier.324
5The vendor has provided their methods of collecting the data, along with samples of more than one Route Type for the following data items: FACILITY TYPE, NUMBER OF THROUGH LANES, AND LANE WIDTH, in a FGDB540
6The vendor has agreed that ODOT owns all the collected/reported data obtained through the project.540
BUSINESS REQUIREMENTSSection Subtotals02160
7The Vendor has experience in the transportation asset data collection and spatial data.432
8The Vendor has a minimum of five years (5) experience with centerline inventory projects and data collection.324
9The Vendor has demonstrated the ability to provide all deliverables432
10The vendor has GIS experience324
11The vendor has Esri R&H experience324
Specifications of Deliverables - Proposed Work PlanSection Subtotals01360
Column Subtotal of Partially Meets Points0
Column Subtotal of Meets Points352
Column Subtotal of Exceeds Points0
Grand Total Score352

Based upon the Grand Total Technical Score earned, does the vendor’s proposal meet or exceed the minimum Technical score of 342 points?

YESxNo
(If No, Vendor's Cost Propsal will NOT be opened.)
Cost Per Quality Point
Vendors Total Submitted Price$425,220.00/Grand Total Techincal Score352
Cost Per Quality Point:$1,208.01
The Technical Proposal with the lowest Cost per Quality point will be recommended for award of the contract.

Polygon Solutions 358

VendorPolygon Solutions
Item #Evaluation CriteriaWeightingDoesn't Meet 0Partially Meets 6Meets 8Exceeds 10
PROPOSAL ACCEPTANCE CRITERIA
Phase 1YesNo
1Did the vendor provide adequate information proving that they are experienced in transportation roadway attribute data collection and spatial data and shall have a minimum of five (5) years’ experience with centerline inventory projects.xThe proposal must meet all of the following Phase I proposal acceptance criteria in order to be considered for further evaluation. Any proposal receiving a “no” response to any of the following qualifying criteria shall be disqualified from consideration.
2Did the vendor provide through written proposal content, a minimum of 3 completed projects, within the previous 84 months, where data review, collection, and extraction services, along with the use of GIS with linear referencing, were used successfully.x
3Did the vendor provide 3 samples as required (See Process for Data Collection in section 2.1).x
WORK REQUIREMENTS
PROPOSED WORK PLAN
1The Vendor has demonstrated an understanding of the project objective.540
2The Vendor has demonstrated a technical knowledge of how to perform data collection on centerlines.540
3The vendor has explained how they plan to collect the data (imagery, video log, and other resources, etc.).432
4The Vendor has provided a logical schedule and methodology for meeting the project’s 3-year timeframe or earlier.324
5The vendor has provided their methods of collecting the data, along with samples of more than one Route Type for the following data items: FACILITY TYPE, NUMBER OF THROUGH LANES, AND LANE WIDTH, in a FGDB540
6The vendor has agreed that ODOT owns all the collected/reported data obtained through the project.540
BUSINESS REQUIREMENTSSection Subtotals02160
7The Vendor has experience in the transportation asset data collection and spatial data.432
8The Vendor has a minimum of five years (5) experience with centerline inventory projects and data collection.324
9The Vendor has demonstrated the ability to provide all deliverables432
10The vendor has GIS experience330
11The vendor has Esri R&H experience324
Specifications of Deliverables - Proposed Work PlanSection Subtotals011230
Column Subtotal of Partially Meets Points0
Column Subtotal of Meets Points328
Column Subtotal of Exceeds Points30
Grand Total Score358

Based upon the Grand Total Technical Score earned, does the vendor’s proposal meet or exceed the minimum Technical score of 342 points?

YESxNo
(If No, Vendor's Cost Propsal will NOT be opened.)
Cost Per Quality Point
Vendors Total Submitted Price$1,995,474.00/Grand Total Techincal Score358
Cost Per Quality Point:$5,573.95
The Technical Proposal with the lowest Cost per Quality point will be recommended for award of the contract.

JOHNSON MIRMIRAN -330

VendorJOHNSON MIRMIRAN & THOMPSON INC
Item #Evaluation CriteriaWeightingDoesn't Meet 0Partially Meets 6Meets 8Exceeds 10
PROPOSAL ACCEPTANCE CRITERIA
Phase 1YesNo
1Did the vendor provide adequate information proving that they are experienced in transportation roadway attribute data collection and spatial data and shall have a minimum of five (5) years’ experience with centerline inventory projects.xThe proposal must meet all of the following Phase I proposal acceptance criteria in order to be considered for further evaluation. Any proposal receiving a “no” response to any of the following qualifying criteria shall be disqualified from consideration.
2Did the vendor provide through written proposal content, a minimum of 3 completed projects, within the previous 84 months, where data review, collection, and extraction services, along with the use of GIS with linear referencing, were used successfully.x
3Did the vendor provide 3 samples as required (See Process for Data Collection in section 2.1).x
WORK REQUIREMENTS
PROPOSED WORK PLAN
1The Vendor has demonstrated an understanding of the project objective.540
2The Vendor has demonstrated a technical knowledge of how to perform data collection on centerlines.540
3The vendor has explained how they plan to collect the data (imagery, video log, and other resources, etc.).424
4The Vendor has provided a logical schedule and methodology for meeting the project’s 3-year timeframe or earlier.318
5The vendor has provided their methods of collecting the data, along with samples of more than one Route Type for the following data items: FACILITY TYPE, NUMBER OF THROUGH LANES, AND LANE WIDTH, in a FGDB540
6The vendor has agreed that ODOT owns all the collected/reported data obtained through the project.540
BUSINESS REQUIREMENTSSection Subtotals421600
7The Vendor has experience in the transportation asset data collection and spatial data.432
8The Vendor has a minimum of five years (5) experience with centerline inventory projects and data collection.324
9The Vendor has demonstrated the ability to provide all deliverables424
10The vendor has GIS experience324
11The vendor has Esri R&H experience324
Specifications of Deliverables - Proposed Work PlanSection Subtotals241040
Column Subtotal of Partially Meets Points66
Column Subtotal of Meets Points264
Column Subtotal of Exceeds Points0
Grand Total Score330

Based upon the Grand Total Technical Score earned, does the vendor’s proposal meet or exceed the minimum Technical score of 342 points?

YESNox
(If No, Vendor's Cost Propsal will NOT be opened.)
Cost Per Quality Point
Vendors Total Submitted Price/Grand Total Techincal Score330
Cost Per Quality Point:$0.00
The Technical Proposal with the lowest Cost per Quality point will be recommended for award of the contract.

The Sanborn Map Company, Inc.

VendorThe Sanborn Map Company, Inc.
Item #Evaluation CriteriaWeightingDoesn't Meet 0Partially Meets 6Meets 8Exceeds 10
PROPOSAL ACCEPTANCE CRITERIA
Phase 1YesNo
1Did the vendor provide adequate information proving that they are experienced in transportation roadway attribute data collection and spatial data and shall have a minimum of five (5) years’ experience with centerline inventory projects.xThe proposal must meet all of the following Phase I proposal acceptance criteria in order to be considered for further evaluation. Any proposal receiving a “no” response to any of the following qualifying criteria shall be disqualified from consideration.
2Did the vendor provide through written proposal content, a minimum of 3 completed projects, within the previous 84 months, where data review, collection, and extraction services, along with the use of GIS with linear referencing, were used successfully.x
3Did the vendor provide 3 samples as required (See Process for Data Collection in section 2.1).x
WORK REQUIREMENTS
PROPOSED WORK PLAN
1The Vendor has demonstrated an understanding of the project objective.5
2The Vendor has demonstrated a technical knowledge of how to perform data collection on centerlines.5
3The vendor has explained how they plan to collect the data (imagery, video log, and other resources, etc.).4
4The Vendor has provided a logical schedule and methodology for meeting the project’s 3-year timeframe or earlier.3
5The vendor has provided their methods of collecting the data, along with samples of more than one Route Type for the following data items: FACILITY TYPE, NUMBER OF THROUGH LANES, AND LANE WIDTH, in a FGDB5
6The vendor has agreed that ODOT owns all the collected/reported data obtained through the project.5
BUSINESS REQUIREMENTSSection Subtotals000
7The Vendor has experience in the transportation asset data collection and spatial data.4
8The Vendor has a minimum of five years (5) experience with centerline inventory projects and data collection.3
9The Vendor has demonstrated the ability to provide all deliverables4
10The vendor has GIS experience3
11The vendor has Esri R&H experience3
Specifications of Deliverables - Proposed Work PlanSection Subtotals000
Column Subtotal of Partially Meets Points0
Column Subtotal of Meets Points0
Column Subtotal of Exceeds Points0
Grand Total Score0

Based upon the Grand Total Technical Score earned, does the vendor’s proposal meet or exceed the minimum Technical score of 342 points?

YESNo
(If No, Vendor's Cost Propsal will NOT be opened.)
Cost Per Quality Point
Vendors Total Submitted Price/Grand Total Techincal Score0
Cost Per Quality Point:ERROR:#DIV/0!
The Technical Proposal with the lowest Cost per Quality point will be recommended for award of the contract.

Cultivate Geospatial

VendorCultivate Geospatial Solutions LLC
Item #Evaluation CriteriaWeightingDoesn't Meet 0Partially Meets 6Meets 8Exceeds 10
PROPOSAL ACCEPTANCE CRITERIA
Phase 1YesNo
1Did the vendor provide adequate information proving that they are experienced in transportation roadway attribute data collection and spatial data and shall have a minimum of five (5) years’ experience with centerline inventory projects.xThe proposal must meet all of the following Phase I proposal acceptance criteria in order to be considered for further evaluation. Any proposal receiving a “no” response to any of the following qualifying criteria shall be disqualified from consideration.
2Did the vendor provide through written proposal content, a minimum of 3 completed projects, within the previous 84 months, where data review, collection, and extraction services, along with the use of GIS with linear referencing, were used successfully.x
3Did the vendor provide 3 samples as required (See Process for Data Collection in section 2.1).x
WORK REQUIREMENTS
PROPOSED WORK PLAN
1The Vendor has demonstrated an understanding of the project objective.5
2The Vendor has demonstrated a technical knowledge of how to perform data collection on centerlines.5
3The vendor has explained how they plan to collect the data (imagery, video log, and other resources, etc.).4
4The Vendor has provided a logical schedule and methodology for meeting the project’s 3-year timeframe or earlier.3
5The vendor has provided their methods of collecting the data, along with samples of more than one Route Type for the following data items: FACILITY TYPE, NUMBER OF THROUGH LANES, AND LANE WIDTH, in a FGDB5
6The vendor has agreed that ODOT owns all the collected/reported data obtained through the project.5
BUSINESS REQUIREMENTSSection Subtotals000
7The Vendor has experience in the transportation asset data collection and spatial data.4
8The Vendor has a minimum of five years (5) experience with centerline inventory projects and data collection.3
9The Vendor has demonstrated the ability to provide all deliverables4
10The vendor has GIS experience3
11The vendor has Esri R&H experience3
Specifications of Deliverables - Proposed Work PlanSection Subtotals000
Column Subtotal of Partially Meets Points0
Column Subtotal of Meets Points0
Column Subtotal of Exceeds Points0
Grand Total Score0

Based upon the Grand Total Technical Score earned, does the vendor’s proposal meet or exceed the minimum Technical score of 342 points?

YESNo
(If No, Vendor's Cost Propsal will NOT be opened.)
Cost Per Quality Point
Vendors Total Submitted Price/Grand Total Techincal Score0
Cost Per Quality Point:ERROR:#DIV/0!
The Technical Proposal with the lowest Cost per Quality point will be recommended for award of the contract.

TIMMONS GROUP INC_x0009_

VendorTIMMONS GROUP INC
Item #Evaluation CriteriaWeightingDoesn't Meet 0Partially Meets 6Meets 8Exceeds 10
PROPOSAL ACCEPTANCE CRITERIA
Phase 1YesNo
1Did the vendor provide adequate information proving that they are experienced in transportation roadway attribute data collection and spatial data and shall have a minimum of five (5) years’ experience with centerline inventory projects.xThe proposal must meet all of the following Phase I proposal acceptance criteria in order to be considered for further evaluation. Any proposal receiving a “no” response to any of the following qualifying criteria shall be disqualified from consideration.
2Did the vendor provide through written proposal content, a minimum of 3 completed projects, within the previous 84 months, where data review, collection, and extraction services, along with the use of GIS with linear referencing, were used successfully.x
3Did the vendor provide 3 samples as required (See Process for Data Collection in section 2.1).x
WORK REQUIREMENTS
PROPOSED WORK PLAN
1The Vendor has demonstrated an understanding of the project objective.5
2The Vendor has demonstrated a technical knowledge of how to perform data collection on centerlines.5
3The vendor has explained how they plan to collect the data (imagery, video log, and other resources, etc.).4
4The Vendor has provided a logical schedule and methodology for meeting the project’s 3-year timeframe or earlier.3
5The vendor has provided their methods of collecting the data, along with samples of more than one Route Type for the following data items: FACILITY TYPE, NUMBER OF THROUGH LANES, AND LANE WIDTH, in a FGDB5
6The vendor has agreed that ODOT owns all the collected/reported data obtained through the project.5
BUSINESS REQUIREMENTSSection Subtotals000
7The Vendor has experience in the transportation asset data collection and spatial data.4
8The Vendor has a minimum of five years (5) experience with centerline inventory projects and data collection.3
9The Vendor has demonstrated the ability to provide all deliverables4
10The vendor has GIS experience3
11The vendor has Esri R&H experience3
Specifications of Deliverables - Proposed Work PlanSection Subtotals000
Column Subtotal of Partially Meets Points0
Column Subtotal of Meets Points0
Column Subtotal of Exceeds Points0
Grand Total Score0

Based upon the Grand Total Technical Score earned, does the vendor’s proposal meet or exceed the minimum Technical score of 342 points?

YESNo
(If No, Vendor's Cost Propsal will NOT be opened.)
Cost Per Quality Point
Vendors Total Submitted Price/Grand Total Techincal Score0
Cost Per Quality Point:ERROR:#DIV/0!
The Technical Proposal with the lowest Cost per Quality point will be recommended for award of the contract.