This Scope of Work document pertains to water damage repairs at the Douglas County Animal Shelter, a facility located at 2171 Mack Road, Douglasville, Georgia that sustained damage during a winter storm. The document provides detailed line-item estimates for repairs across multiple building areas, including plumbing work, insulation removal and replacement, lighting fixture repairs, drywall repairs, painting, and various finishing work. Major scope areas include the main level (involving blown-in insulation removal at 12,519.57 square feet and replacement), multiple rooms (Room 108, 117, 118, 125, 128, 129, 136, 137, 141), support spaces (break room, grooming area, kitchen, laundry room, pantry, staff halls, interview room, foyer/entry), specialized areas (kennels 1 and 2, public corridor, HVAC room, riser room), and exterior areas. The scope identifies 200 line items with quantities specified in linear feet, square feet, square yards, hours, and units. All repairs must comply with the insurance company's guidelines, with any deviations requiring written approval before work commences. The Douglas County Board of Commissioners is soliciting proposals from qualified construction companies, with a pre-bid meeting scheduled for August 10, 2023 at 10:00 a.m. EST via Microsoft Teams and bids due August 24, 2023 at 2:30 p.m. EST.

The document establishes pricing parameters with all quantities marked as "OPEN ITEM," indicating that bidders must provide unit pricing for labor, materials, and equipment. Work categories are detailed with tax rates, replacement cost value (RCV) ranging from 5 to 150 years, condition assessments (predominantly average), and depreciation percentages. The scope requires comprehensive documentation of costs for services including plumbing repairs (water supply line replacement, pressure testing, debris hauling), commercial supervision and project management at 40 hours, masking and painting operations across all interior spaces, drywall repairs and joint finishing, light fixture installation and protection, content relocation and reset, final cleaning, and specialized items such as smoke detector replacement and scaffolding rental (4 sections for 1 week in the kennel areas). Total building area encompasses approximately 29,293.52 square feet of walls, 12,519.57 square feet of ceiling, and 12,519.57 square feet of floor space, with comprehensive interior and exterior wall areas documented. The contract term, renewal options, insurance requirements, and specific performance standards are governed by the Douglas County Board of Commissioners' procurement policies and insurance company requirements.

Text of this file

DOUGLAS_COUNTY_BOA3

Plumbing

QUANTITY UNIT TAX RCV AGE/LIFE COND. DEP % DEPREC. ACV

DWELLING

1. R&R Water supply line - PVC with fitting and hanger, 1/2" [S 1:2]

4.00 LF 33/65 yrs Avg. 50.77% OPEN ITEM

2. Plumber - per hour [S 1:2]

8.00 HR 33/NA Avg. 0% OPEN ITEM

To locate and pressure test system

3. Haul debris - per pickup truck load - including dump fees [S 1:2]

1.00 EA NA NA NA OPEN ITEM

Totals: Plumbing 0.00 0.00 0.00 0.00

Lighting

4. Tech Loss [S 1:3]

1.00 EA 33/NA Avg. 0% OPEN ITEM

53 light fixtures have evidence of damage from water contamination. Mylinda Fowler of Full Circle

Totals: Lighting 0.00 0.00 0.00 0.00

Main Level

5. Blown-in insulation - 14" depth - R38 [S 1:1]

12519.57 SF 33/150 yrs Avg. 22% OPEN ITEM

6. Remove Blown-in insulation - Machine removal [S 1:1]

12519.57 SF NA NA NA OPEN ITEM

7. Commercial Supervision / Project Management - per hour [S 1:1]

40.00 HR 33/NA Avg. 0% OPEN ITEM

Repairs should take 1 week.

8. Haul debris - per pickup truck load - including dump fees [S 1:1]

1.00 EA NA NA NA OPEN ITEM

3'

' 1

" 1 7'

" 3'

0"

CONTINUED - Main Level

QUANTITY UNIT

9. Taxes, insurance, permits & fees (Bid Item) [S 1:1]

TAX RCV AGE/LIFE COND. DEP % DEPREC. ACV

1.00 EA 33/NA Avg. 33% %

https://www.douglas.co.us/documents/building-fees.pdf/

OPEN ITEM

Total: Main Level 0.00 0.00 0.00 0.00

7' 2" 7'

14' 10" 15' Room 108 Height: 12'

6' 9' In

RoomF1o0y8er Ext F

1861.39 SF Walls

2355.18 SF Walls & Ceiling

54.87 SY Flooring

493.79 SF Ceiling

493.79 SF Floor

151.68 LF Floor Perimeter

19' 6" 2' 8"

4' 2" 4' 6"

19' 9"

20' 1"

12' 2" 3' 11" 4' 3"

12' 6"

163.18 LF Ceil. Perimeter

Window 3' X 5' 3" Opens into Exterior Window 3' X 5' 3" Opens into Exterior Window 3' X 5' 3" Opens into Exterior Door 3' 10" X 8' 5" Opens into Exterior Door 3' 10" X 8' 5" Opens into Exterior Door 3' 10" X 8' 5" Opens into STAFF_HALL Window 3' X 5' 3" Opens into Exterior Window 3' X 5' 3" Opens into Exterior Window 3' X 5' 3" Opens into Exterior Window 3' X 5' 3" Opens into Exterior

10. Contents - move out then reset [S 1:1]

11. Detach & Reset Recessed light fixture - trim only [S 1:1]

3.00 EA 0/20 yrs Avg. 0% OPEN ITEM

12. Mask and cover large light fixture [S 1:1]

10.00 EA 33/15 yrs Avg. 90% M

13. Mask and cover light fixture [S 1:1]

2.00 EA 33/15 yrs Avg. 90% M

2 Vents

' 5

' 5

5' http://www.douglas.co.us/documents/building-fees.pdf/

CONTINUED - Room 108

14. Drywall tape joint / repair - per LF [S 1:1]

TAX RCV AGE/LIFE COND. DEP % DEPREC. ACV

13.33 LF 33/150 yrs Avg. 22% OPEN ITEM

15. Mask and prep for paint - plastic, paper, tape (per LF) [S 1:1]

163.18 LF 33/15 yrs Avg. 90% M

16. Seal/prime then paint (2 coats) [S 1:1]

13.33 SF 33/15 yrs Avg. 90% M

17. Paint - one coat [S 1:1]

493.79 SF 33/15 yrs Avg. 90% M

18. Final cleaning - construction - Commercial [S 1:1]

OPEN ITEM

OPEN ITEM

493.79 SF 33/NA Avg. 0% OPEN ITEM

Totals: Room 108 0.00 0.00 0.00 0.00

Room 117 Height: 12'

770.05 SF Walls

1066.72 SF Walls & Ceiling

32.96 SY Flooring

69.67 LF Ceil. Perimeter

296.67 SF Ceiling

296.67 SF Floor

65.83 LF Floor Perimeter

Window 6' 5" X 5' 3" Opens into STAFF_HALL Door 3' 10" X 8' 5" Opens into STAFF_HALL

19. Contents - move out then reset [S 1:1]

20. Detach & Reset Recessed light fixture - trim only [S 1:1]

1.00 EA 0/20 yrs Avg. 0% OPEN ITEM

21. Drywall tape joint / repair - per LF [S 1:1]

14.83 LF 33/150 yrs Avg. 22% OPEN ITEM

22. Mask and prep for paint - plastic, paper, tape (per LF) [S 1:1]

69.67 LF 33/15 yrs Avg. 90% M

23. Seal/prime then paint (2 coats) [S 1:1]

14.83 SF 33/15 yrs Avg. 90% M

24. Paint - one coat [S 1:1]

296.67 SF 33/15 yrs Avg. 90% M

OPEN ITEM

OPEN ITEM

OPEN ITEM

Staff H

Room 117

14' 10" 15'

' 2

' 3

9'

" 4'

1"

5'

9'

4'

" 6 ' 5

' 5

CONTINUED - Room 117

15' 2" 14' 10"

Room 118

' 8 " 3

2"

25. Final cleaning - construction - Commercial [S 1:1]

296.67 SF 33/NA Avg. 0% OPEN ITEM

Totals: Room 117 0.00 0.00 0.00 0.00

Room 118 Height: 12'

Staff Ha

547.74 SF Walls

686.18 SF Walls & Ceiling

15.38 SY Flooring

48.33 LF Ceil. Perimeter

138.44 SF Ceiling

138.44 SF Floor

44.50 LF Floor Perimeter

26. Contents - move out then reset [S 1:1]

27. Drywall tape joint / repair - per LF [S 1:1]

9.67 LF 33/150 yrs Avg. 22% OPEN ITEM

28. Mask and cover large light fixture [S 1:1]

2.00 EA 33/15 yrs Avg. 90% M

29. Mask and cover light fixture [S 1:1]

2.00 EA 33/15 yrs Avg. 90% M

30. Mask and prep for paint - plastic, paper, tape (per LF) [S 1:1]

48.33 LF 33/15 yrs Avg. 90% M

31. Seal/prime then paint (2 coats) [S 1:1]

9.67 SF 33/15 yrs Avg. 90% M

32. Paint - one coat [S 1:1]

138.44 SF 33/15 yrs Avg. 90% M

33. Final cleaning - construction - Commercial [S 1:1]

OPEN ITEM

OPEN ITEM

OPEN ITEM

OPEN ITEM

138.44 SF 33/NA Avg. 0% OPEN ITEM

Totals: Room 118 0.00 0.00 0.00 0.00

9'

1'

Room 125 Height: 12'

677.61 SF Walls

899.28 SF Walls & Ceiling

24.63 SY Flooring

64.33 LF Ceil. Perimeter

221.67 SF Ceiling

221.67 SF Floor

60.50 LF Floor Perimeter

Door 3' 10" X 8' 5" Opens into STAFF_HALL_2 Window 11' 10" X 5' 3" Opens into STAFF_HALL_2

34. Contents - move out then reset [S 1:1]

35. Drywall tape joint / repair - per LF [S 1:1]

10.00 LF 33/150 yrs Avg. 22% OPEN ITEM

36. Mask and prep for paint - plastic, paper, tape (per LF) [S 1:1]

64.33 LF 33/15 yrs Avg. 90% M

37. Mask and cover large light fixture [S 1:1]

4.00 EA 33/15 yrs Avg. 90% M

38. Mask and cover light fixture [S 1:1]

4.00 EA 33/15 yrs Avg. 90% M

OPEN ITEM

OPEN ITEM

OPEN ITEM

4 Vents

39. Seal/prime then paint (2 coats) [S 1:1]

10.00 SF 33/15 yrs Avg. 90% M

40. Paint - one coat [S 1:1]

221.67 SF 33/15 yrs Avg. 90% M

41. Final cleaning - construction - Commercial [S 1:1]

221.67 SF 33/NA Avg. 0% OPEN ITEM

42. R&R Smoke detector [S 1:1]

1.00 EA 33/10 yrs Avg. 90% M OPEN ITEM

Totals: Room 125 0.00 0.00 0.00 0.00

Room 128 Height: 12'

815.74 SF Walls

1101.07 SF Walls & Ceiling

31.70 SY Flooring

70.67 LF Ceil. Perimeter

285.33 SF Ceiling

285.33 SF Floor

66.83 LF Floor Perimeter

9' 6" 16' 1" 3' 10" 11' 10" 1' 2"

2' 3" 9' 2"

Room 125

22' 2"

15' 14' 8" 3' 10"

1' 1" 1' 9"

Room 128

21' 4" 21' 8"

' 8

8'

2'

' 6

' 4

CONTINUED - Room 128

43. Contents - move out then reset [S 1:1]

44. Drywall tape joint / repair - per LF [S 1:1]

14.00 LF 33/150 yrs Avg. 22% OPEN ITEM

45. Mask and prep for paint - plastic, paper, tape (per LF) [S 1:1]

70.67 LF 33/15 yrs Avg. 90% M

46. Mask and cover large light fixture [S 1:1]

4.00 EA 33/15 yrs Avg. 90% M

47. Mask and cover light fixture [S 1:1]

4.00 EA 33/15 yrs Avg. 90% M

OPEN ITEM

OPEN ITEM

OPEN ITEM

4 Vents

48. Seal/prime then paint (2 coats) [S 1:1]

14.00 SF 33/15 yrs Avg. 90% M

49. Paint - one coat [S 1:1]

285.33 SF 33/15 yrs Avg. 90% M

50. Final cleaning - construction - Commercial [S 1:1]

285.33 SF 33/NA Avg. 0% OPEN ITEM

Totals: Room 128 0.00 0.00 0.00 0.00

Room 129 Height: 12'

805.74 SF Walls

1093.51 SF Walls & Ceiling

31.98 SY Flooring

69.83 LF Ceil. Perimeter

287.78 SF Ceiling

287.78 SF Floor

66.00 LF Floor Perimeter

51. Contents - move out then reset [S 1:1]

52. Drywall tape joint / repair - per LF [S 1:1]

14.00 LF 33/150 yrs Avg. 22% OPEN ITEM

53. Mask and prep for paint - plastic, paper, tape (per LF) [S 1:1]

69.83 LF 33/15 yrs Avg. 90% M OPEN ITEM

22' 1" 21' 7"

Room 129 G

14' 9" 3' 10" 2" 1' 10" 1' 14' 11"

CONTINUED - Room 129

54. Mask and cover large light fixture [S 1:1]

TAX RCV AGE/LIFE COND. DEP % DEPREC. ACV

4.00 EA 33/15 yrs Avg. 90% M

55. Mask and cover light fixture [S 1:1]

4.00 EA 33/15 yrs Avg. 90% M

4 Vents

56. Seal/prime then paint (2 coats) [S 1:1]

14.00 SF 33/15 yrs Avg. 90% M

57. Paint - one coat [S 1:1]

287.78 SF 33/15 yrs Avg. 90% M

58. Final cleaning - construction - Commercial [S 1:1]

287.78 SF 33/NA Avg. 0% OPEN ITEM

Totals: Room 129 0.00 0.00 0.00 0.00

Room 136 Height: 12'

991.47 SF Walls

1400.36 SF Walls & Ceiling

45.43 SY Flooring

88.00 LF Ceil. Perimeter

408.89 SF Ceiling

408.89 SF Floor

80.33 LF Floor Perimeter

Door 3' 10" X 8' 5" Opens into PUBLIC_CORR1

59. Mask and cover large light fixture [S 1:1]

8.00 EA 33/15 yrs Avg. 90% M

60. Mask and cover light fixture [S 1:1]

2.00 EA 33/15 yrs Avg. 90% M

OPEN ITEM

OPEN ITEM

1 Vent

61. Drywall tape joint / repair - per LF [S 1:1]

40.00 LF 33/150 yrs Avg. 22% OPEN ITEM

62. Mask and prep for paint - plastic, paper, tape (per LF) [S 1:1]

88.00 LF 33/15 yrs Avg. 90% M

63. Seal/prime then paint (2 coats) [S 1:1]

13.33 SF 33/15 yrs Avg. 90% M

OPEN ITEM

OPEN ITEM

31' 2" 30' 8"

Room 136

3' 10" 16' 4" 3' 10"

1' 4" 1' 1" 16' 2" 4' 5"

' 8

CONTINUED - Room 136

64. Paint - one coat [S 1:1]

TAX RCV AGE/LIFE COND. DEP % DEPREC. ACV

408.89 SF 33/15 yrs Avg. 90% M

65. Final cleaning - construction - Commercial [S 1:1]

408.89 SF 33/NA Avg. 0% OPEN ITEM

Totals: Room 136 0.00 0.00 0.00 0.00

Room 137 Height: 12'

1327.74 SF Walls

1905.51 SF Walls & Ceiling

64.20 SY Flooring

113.33 LF Ceil. Perimeter

577.78 SF Ceiling

577.78 SF Floor

109.50 LF Floor Perimeter

66. R&R 5/8" drywall - hung, taped, floated, ready for paint [S 1:1]

32.00 SF 33/150 yrs Avg. 22% OPEN ITEM

67. Mask and cover large light fixture [S 1:1]

6.00 EA 33/15 yrs Avg. 90% M

68. Mask and cover light fixture [S 1:1]

5.00 EA 33/15 yrs Avg. 90% M

3 small lights 2 vents 1 smoke detector

69. Drywall tape joint / repair - per LF [S 1:1]

40.00 LF 33/150 yrs Avg. 22% OPEN ITEM

70. Mask and prep for paint - plastic, paper, tape (per LF) [S 1:1]

113.33 LF 33/15 yrs Avg. 90% M

71. Seal/prime then paint (2 coats) [S 1:1]

13.33 SF 33/15 yrs Avg. 90% M

72. Paint - one coat [S 1:1]

577.78 SF 33/15 yrs Avg. 90% M

73. R&R Fluorescent light fixture [S 1:1]

1.00 EA 33/20 yrs Avg. 90% M

74. Light bulb - Compact Fluorescent stand. type - mat. only [S 1:1]

2.00 EA 33/5 yrs Avg. 90% M

OPEN ITEM

OPEN ITEM

OPEN ITEM

OPEN ITEM

OPEN ITEM

43' 8" 43' 4"

Room 137 Room

3' 10" 14'

25' 8" 26'

' 4

' 6

1' 4"

CONTINUED - Room 137

75. Final cleaning - construction - Commercial [S 1:1]

577.78 SF 33/NA Avg. 0% OPEN ITEM

Totals: Room 137 0.00 0.00 0.00 0.00

Room 141 Height: 12'

549.47 SF Walls

706.31 SF Walls & Ceiling

17.43 SY Flooring

51.17 LF Ceil. Perimeter

156.83 SF Ceiling

156.83 SF Floor

43.50 LF Floor Perimeter

Door 3' 10" X 8' 5" Opens into Exterior

76. Mask and cover large light fixture [S 1:1]

3.00 EA 33/15 yrs Avg. 90% M

77. Mask and cover light fixture [S 1:1]

2.00 EA 33/15 yrs Avg. 90% M

OPEN ITEM

OPEN ITEM

2 Vents

78. Drywall tape joint / repair - per LF [S 1:1]

13.33 LF 33/150 yrs Avg. 22% OPEN ITEM

79. Mask and prep for paint - plastic, paper, tape (per LF) [S 1:1]

51.17 LF 33/15 yrs Avg. 90% M

80. Seal/prime then paint (2 coats) [S 1:1]

13.33 SF 33/15 yrs Avg. 90% M

81. Paint - one coat [S 1:1]

156.83 SF 33/15 yrs Avg. 90% M

82. Final cleaning - construction - Commercial [S 1:1]

OPEN ITEM

OPEN ITEM

156.83 SF 33/NA Avg. 0% OPEN ITEM

Totals: Room 141 0.00 0.00 0.00 0.00

12' 9" 12' 3"

Room 141

3' 3" 2' 11" 3' 10"

3' 1"

' 6

' 4

2' 4'

4'

0"

' 1

0"

' 2

14' 8" 14'

Aco Room Height: 12'

Aco Room

11' 10" 8"

561.61 SF Walls

748.28 SF Walls & Ceiling

20.74 SY Flooring

54.67 LF Ceil. Perimeter

186.67 SF Ceiling

186.67 SF Floor

39.00 LF Floor Perimeter

1' 10" 10"

Window - Goes to Floor 11' 10" X 5' 3" Opens into STAFF_HALL_2

83. Mask and cover large light fixture [S 1:1]

84. Mask and cover light fixture [S 1:1]

2.00 EA 33/15 yrs Avg. 90% M

OPEN ITEM

OPEN ITEM

2 Vents

85. Drywall tape joint / repair - per LF [S 1:1]

13.33 LF 33/150 yrs Avg. 22% OPEN ITEM

86. Mask and prep for paint - plastic, paper, tape (per LF) [S 1:1]

54.67 LF 33/15 yrs Avg. 90% M

87. Seal/prime then paint (2 coats) [S 1:1]

13.33 SF 33/15 yrs Avg. 90% M

88. Paint - one coat [S 1:1]

186.67 SF 33/15 yrs Avg. 90% M

89. Final cleaning - construction - Commercial [S 1:1]

OPEN ITEM

OPEN ITEM

186.67 SF 33/NA Avg. 0% OPEN ITEM

Totals: Aco Room 0.00 0.00 0.00 0.00

Break Room Height: 12'

533.47 SF Walls

681.35 SF Walls & Ceiling

16.43 SY Flooring

49.83 LF Ceil. Perimeter

147.88 SF Ceiling

147.88 SF Floor

42.17 LF Floor Perimeter

Door 3' 10" X 8' 5" Opens into KITCHEN

10' 8" 10' 10"

4' 4" 4' 4"

Break Room

Kitch 15' 2" taff Hall

0"

' 1 0"

2'

3'

2'

1"

' 8

2'

1"

' 1 0"

' 1

" 3 ' 6

4'

4'

" 3

CONTINUED - Break Room

90. Contents - move out then reset [S 1:1]

TAX RCV AGE/LIFE COND. DEP % DEPREC. ACV

1.00 EA 33/NA Avg. 0% OPEN ITEM

91. Drywall tape joint / repair - per LF [S 1:1]

9.75 LF 33/150 yrs Avg. 22% OPEN ITEM

92. Mask and cover large light fixture [S 1:1]

3.00 EA 33/15 yrs Avg. 90% M

93. Mask and prep for paint - plastic, paper, tape (per LF) [S 1:1]

49.83 LF 33/15 yrs Avg. 90% M

94. Seal/prime then paint (2 coats) [S 1:1]

9.75 SF 33/15 yrs Avg. 90% M

95. Paint - one coat [S 1:1]

147.88 SF 33/15 yrs Avg. 90% M

96. Final cleaning - construction - Commercial [S 1:1]

OPEN ITEM

OPEN ITEM

OPEN ITEM

147.88 SF 33/NA Avg. 0% OPEN ITEM

Totals: Break Room 0.00 0.00 0.00 0.00

Grooming Area Height: 12'

607.74 SF Walls

785.51 SF Walls & Ceiling

19.75 SY Flooring

53.33 LF Ceil. Perimeter

177.78 SF Ceiling

177.78 SF Floor

49.50 LF Floor Perimeter

97. Mask and cover large light fixture [S 1:1]

98. Mask and cover light fixture [S 1:1]

3.00 EA 33/15 yrs Avg. 90% M

OPEN ITEM

OPEN ITEM

3 Vents

99. Drywall tape joint / repair - per LF [S 1:1]

13.33 LF 33/150 yrs Avg. 22% OPEN ITEM

100. Mask and prep for paint - plastic, paper, tape (per LF) [S 1:1]

53.33 LF 33/15 yrs Avg. 90% M OPEN ITEM

13' 10"

13' 4"

Grooming Area

' 4

2'

3'

" 3

' 6

2'

3'

CONTINUED - Grooming Area

101. Seal/prime then paint (2 coats) [S 1:1]

TAX RCV AGE/LIFE COND. DEP % DEPREC. ACV

13.33 SF 33/15 yrs Avg. 90% M

102. Paint - one coat [S 1:1]

177.78 SF 33/15 yrs Avg. 90% M

103. Final cleaning - construction - Commercial [S 1:1]

OPEN ITEM

177.78 SF 33/NA Avg. 0% OPEN ITEM

Totals: Grooming Area 0.00 0.00 0.00 0.00

5' 7" Interview Room Foyer/Entry Height: 9' 10" 5' 3" 10' 8" 3"

859.28 SF Walls

243.89 SF Ceiling

1' 8" 2' 4"

Foyer/Entry

6' 2" 5' 10"

2' 8"

1103.17 SF Walls & Ceiling

27.10 SY Flooring

97.15 LF Ceil. Perimeter

243.89 SF Floor

86.48 LF Floor Perimeter

Window - Goes to Floor 10' 8" X 9' Opens into INTERVIEW_RO

104. Mask and cover large light fixture [S 1:1]

105. Mask and cover light fixture [S 1:1]

1.00 EA 33/15 yrs Avg. 90% M

106. Detach & Reset Recessed light fixture - trim only [S 1:1]

3.00 EA 0/20 yrs Avg. 0% OPEN ITEM

107. Drywall tape joint / repair - per LF [S 1:1]

11.00 LF 33/150 yrs Avg. 22% OPEN ITEM

108. Mask and prep for paint - plastic, paper, tape (per LF) [S 1:1]

97.15 LF 33/15 yrs Avg. 90% M

109. Seal/prime then paint (2 coats) [S 1:1]

11.00 SF 33/15 yrs Avg. 90% M

110. Paint - one coat [S 1:1]

243.89 SF 33/15 yrs Avg. 90% M

111. Final cleaning - construction - Commercial [S 1:1]

OPEN ITEM

OPEN ITEM

243.89 SF 33/NA Avg. 0% OPEN ITEM

Totals: Foyer/Entry 0.00 0.00 0.00 0.00

' 3

' 7

7'

6'

' 3

' 9

13' 7" 15' 9" 7' 9" 3' 10" 6' 8" 7' 1" 7' 7" 6' 11"

13' 5" 15' 7"

HVAC

27'

27' 6"

Foyer Ext Height: 12'

754.00 SF Walls

906.50 SF Walls & Ceiling

16.94 SY Flooring

62.83 LF Ceil. Perimeter

152.50 SF Ceiling

152.50 SF Floor

62.83 LF Floor Perimeter

112. Mask and cover light fixture [S 1:1]

113. Detach & Reset Recessed light fixture - trim only [S 1:1]

5.00 EA 0/20 yrs Avg. 0% OPEN ITEM

114. Drywall tape joint / repair - per LF [S 1:1]

6.00 LF 33/150 yrs Avg. 22% OPEN ITEM

115. Mask and prep for paint - plastic, paper, tape (per LF) [S 1:1]

62.83 LF 33/15 yrs Avg. 90% M

116. Seal/prime then paint (2 coats) [S 1:1]

6.00 SF 33/15 yrs Avg. 90% M

117. Paint - one coat [S 1:1]

152.50 SF 33/15 yrs Avg. 90% M

118. Final cleaning - construction - Commercial [S 1:1]

OPEN ITEM

OPEN ITEM

152.50 SF 33/NA Avg. 0% OPEN ITEM

Totals: Foyer Ext 0.00 0.00 0.00 0.00

HVAC Height: 12'

860.74 SF Walls

1175.74 SF Walls & Ceiling

35.00 SY Flooring

77.33 LF Ceil. Perimeter

315.00 SF Ceiling

315.00 SF Floor

73.50 LF Floor Perimeter

Window 6' 8" X 5' 3" Opens into PUBLIC_CORR1

119. Mask and cover large light fixture [S 1:1]

120. Drywall tape joint / repair - per LF [S 1:1]

23.33 LF 33/150 yrs Avg. 22% OPEN ITEM

6' 6" 6'

0FF8oyer Ext

' 1

' 8

CONTINUED - HVAC

121. Mask and prep for paint - plastic, paper, tape (per LF) [S 1:1]

77.33 LF 33/15 yrs Avg. 90% M OPEN ITEM

122. Seal/prime then paint (2 coats) [S 1:1]

23.33 SF

123. Painter - per hour [S 1:1]

33/15 yrs Avg. 90% M OPEN ITEM

4.00 HR 33/15 yrs Avg. 90% M OPEN ITEM

Additional labor to paint around pipes and ducts.

124. Paint - one coat [S 1:1]

315.00 SF 33/15 yrs Avg. 90% M

125. Final cleaning - construction - Commercial [S 1:1]

315.00 SF 33/NA Avg. 0% OPEN ITEM

Totals: HVAC 0.00 0.00 0.00 0.00

Interview Room Height: 9' 10"

275.71 SF Walls

362.41 SF Walls & Ceiling

9.63 SY Flooring

37.80 LF Ceil. Perimeter

86.69 SF Ceiling

86.69 SF Floor

27.13 LF Floor Perimeter

Window - Goes to Floor 10' 8" X 9' Opens into FOYER_ENTRY

126. Mask and cover large light fixture [S 1:1]

127. Mask and cover light fixture [S 1:1]

128. Detach & Reset Recessed light fixture - trim only [S 1:1]

3.00 EA 0/20 yrs Avg. 0% OPEN ITEM

129. Drywall tape joint / repair - per LF [S 1:1]

6.00 LF 33/150 yrs Avg. 22% OPEN ITEM

130. Seal/prime then paint (2 coats) [S 1:1]

6.00 SF 33/15 yrs Avg. 90% M

131. Paint - one coat [S 1:1]

362.41 SF 33/15 yrs Avg. 90% M

OPEN ITEM

OPEN ITEM

11' 9"

11' 1"

Interview Room

10' 8" 3"

6"

2'

5'

5'

7'

8'

CONTINUED - Interview Room

Room 136 Room

14' 5" 13' 1" 5 12' 9"

KennPeul b1lic

13' 9"

Co

132. Final cleaning - construction - Commercial [S 1:1]

86.69 SF 33/NA Avg. 0% OPEN ITEM

Totals: Interview Room 0.00 0.00 0.00 0.00

Kennel 1 Height: 12'

1931.47 SF Walls

r 4078.14 SF Walls & Ceiling

238.52 SY Flooring

201.33 LF Ceil. Perimeter

2146.67 SF Ceiling

2146.67 SF Floor

193.67 LF Floor Perimeter

Window 6' 8" X 5' 3" Opens into PUBLIC_CORRI Window 6' 8" X 5' 3" Opens into PUBLIC_CORRI Window 6' 8" X 5' 3" Opens into PUBLIC_CORRI Window 6' 8" X 5' 3" Opens into PUBLIC_CORRI Window 6' 8" X 5' 3" Opens into PUBLIC_CORRI Window 6' 8" X 5' 3" Opens into PUBLIC_CORRI Door 3' 10" X 8' 5" Opens into PUBLIC_CORR1 Window 6' 8" X 5' 3" Opens into PUBLIC_CORR1 Window 6' 8" X 5' 3" Opens into PUBLIC_CORR1 Window 6' 8" X 5' 3" Opens into PUBLIC_CORR1 Window 6' 8" X 5' 3" Opens into PUBLIC_CORR1 Window 6' 8" X 5' 3" Opens into PUBLIC_CORR1 Window 6' 8" X 5' 3" Opens into ROOM2

133. Mask and cover large light fixture [S 1:1]

25.00 EA 33/15 yrs Avg. 90% M

134. Mask and cover light fixture [S 1:1]

3.00 EA 33/15 yrs Avg. 90% M

OPEN ITEM

OPEN ITEM

3 Vents

6'

6'

' 7

' 6

' 2

6'

" 4 1'

' 9

' 2 1'

3'

6'

" 4

2'

6'

31' 4" 30' 8" ic CorriKdeonr nel 2

CONTINUED - Kennel 1

135. Drywall tape joint / repair - per LF [S 1:1]

TAX RCV AGE/LIFE COND. DEP % DEPREC. ACV

61.33 LF 33/150 yrs Avg. 22% OPEN ITEM

136. Mask and prep for paint - plastic, paper, tape (per LF) [S 1:1]

201.33 LF 33/15 yrs Avg. 90% M

137. Seal/prime then paint (2 coats) [S 1:1]

61.33 SF 33/15 yrs Avg. 90% M

138. Paint - one coat [S 1:1]

2146.67 SF 33/15 yrs Avg. 90% M

139. Final cleaning - construction - Commercial [S 1:1]

OPEN ITEM

OPEN ITEM

OPEN ITEM

2146.67 SF 33/NA Avg. 0% OPEN ITEM

140. Scaffold - per section (per week) [S 1:1]

4.00 WK 33/NA Avg. 0% OPEN ITEM

4 sections for 1 week

Totals: Kennel 1 0.00 0.00 0.00 0.00

Kennel 2 Height: 12'

1963.74 SF Walls

4110.40 SF Walls & Ceiling

238.52 SY Flooring

201.33 LF Ceil. Perimeter

2146.67 SF Ceiling

2146.67 SF Floor

197.50 LF Floor Perimeter

13' 9" 3'

Window 6' 8" X 5' 3" Opens into PUBLIC_CORR1 Window 6' 8" X 5' 3" Opens into PUBLIC_CORR1 Window 6' 8" X 5' 3" Opens into PUBLIC_CORR1 Window 6' 8" X 5' 3" Opens into PUBLIC_CORR1 Window 6' 8" X 5' 3" Opens into PUBLIC_CORRI Window 6' 8" X 5' 3" Opens into PUBLIC_CORRI Window 6' 8" X 5' 3" Opens into PUBLIC_CORRI Window 6' 8" X 5' 3" Opens into PUBLIC_CORRI Window 6' 8" X 5' 3" Opens into PUBLIC_CORRI Window 6' 8" X 5' 3" Opens into PUBLIC_CORRI Door 3' 10" X 8' 5" Opens into PUBLIC_CORR1

' 8

' 7

3"

6'

7"

' 2

' 9

' 6

' 7

' 2

' 2

2"

6'

" 6

' 8

6'

141. Mask and cover large light fixture [S 1:1]

25.00 EA 33/15 yrs Avg. 90% M

142. Mask and cover light fixture [S 1:1]

3.00 EA 33/15 yrs Avg. 90% M

OPEN ITEM

OPEN ITEM

3 Vents

143. Drywall tape joint / repair - per LF [S 1:1]

61.33 LF 33/150 yrs Avg. 22% OPEN ITEM

144. Mask and prep for paint - plastic, paper, tape (per LF) [S 1:1]

201.33 LF 33/15 yrs Avg. 90% M

145. Seal/prime then paint (2 coats) [S 1:1]

61.33 SF 33/15 yrs Avg. 90% M

146. Paint - one coat [S 1:1]

2146.67 SF 33/15 yrs Avg. 90% M

147. Final cleaning - construction - Commercial [S 1:1]

OPEN ITEM

OPEN ITEM

OPEN ITEM

2146.67 SF 33/NA Avg. 0% OPEN ITEM

148. Scaffold - per section (per week) [S 1:1]

4.00 WK 33/NA Avg. 0% OPEN ITEM

4 sections for 1 week

Totals: Kennel 2 0.00 0.00 0.00 0.00

Kitchen Height: 12'

531.74 SF Walls

658.69 SF Walls & Ceiling

14.11 SY Flooring

47.00 LF Ceil. Perimeter

126.95 SF Ceiling

126.95 SF Floor

43.17 LF Floor Perimeter

Door 3' 10" X 8' 5" Opens into BREAK_ROOM

149. Contents - move out then reset [S 1:1]

150. Drywall tape joint / repair - per LF [S 1:1]

17.00 LF 33/150 yrs Avg. 22% OPEN ITEM

151. Mask and cover large light fixture [S 1:1]

2.00 EA 33/15 yrs Avg. 90% M

152. Mask and prep for paint - plastic, paper, tape (per LF) [S 1:1]

47.00 LF 33/15 yrs Avg. 90% M

153. Seal/prime then paint (2 coats) [S 1:1]

17.00 SF 33/15 yrs Avg. 90% M

OPEN ITEM

OPEN ITEM

OPEN ITEM

8' 9" 8' 5"

Kitchen

9' 1"

5'

4'

5'

4'

" 3

CONTINUED - Kitchen

154. Paint - one coat [S 1:1]

TAX RCV AGE/LIFE COND. DEP % DEPREC. ACV

126.95 SF 33/15 yrs Avg. 90% M

155. Final cleaning - construction - Commercial [S 1:1]

126.95 SF 33/NA Avg. 0% OPEN ITEM

Totals: Kitchen 0.00 0.00 0.00 0.00

Laundry Room Height: 12'

703.47 SF Walls

945.81 SF Walls & Ceiling

26.93 SY Flooring

64.00 LF Ceil. Perimeter

242.34 SF Ceiling

242.34 SF Floor

56.33 LF Floor Perimeter

156. Contents - move out then reset [S 1:1]

157. Drywall tape joint / repair - per LF [S 1:1]

13.00 LF 33/150 yrs Avg. 22% OPEN ITEM

158. Mask and prep for paint - plastic, paper, tape (per LF) [S 1:1]

64.00 LF 33/15 yrs Avg. 90% M

159. Mask and cover large light fixture [S 1:1]

2.00 EA 33/15 yrs Avg. 90% M

160. Mask and cover light fixture [S 1:1]

4.00 EA 33/15 yrs Avg. 90% M

OPEN ITEM

OPEN ITEM

OPEN ITEM

2 Vents

161. Seal/prime then paint (2 coats) [S 1:1]

13.00 SF 33/15 yrs Avg. 90% M

162. Paint - one coat [S 1:1]

242.34 SF 33/15 yrs Avg. 90% M

163. Final cleaning - construction - Commercial [S 1:1]

242.34 SF 33/NA Avg. 0% OPEN ITEM

Totals: Laundry Room 0.00 0.00 0.00 0.00

Staff Hall 2 3' 10" 5'

1' 7" 2' 11" 3' 3"

Laundry Room

4' 4" 8' 9" 4' 4" 8' 5"

' 8

8'

3'

Pantry Height: 12'

671.74 SF Walls

870.85 SF Walls & Ceiling

22.12 SY Flooring

58.67 LF Ceil. Perimeter

199.11 SF Ceiling

199.11 SF Floor

54.83 LF Floor Perimeter

164. Contents - move out then reset [S 1:1]

165. Drywall tape joint / repair - per LF [S 1:1]

10.67 LF 33/150 yrs Avg. 22% OPEN ITEM

166. Mask and prep for paint - plastic, paper, tape (per LF) [S 1:1]

58.67 LF 33/15 yrs Avg. 90% M

167. Mask and cover large light fixture [S 1:1]

2.00 EA 33/15 yrs Avg. 90% M

168. Mask and cover light fixture [S 1:1]

2.00 EA 33/15 yrs Avg. 90% M

OPEN ITEM

OPEN ITEM

OPEN ITEM

2 Vents

169. Seal/prime then paint (2 coats) [S 1:1]

10.67 SF 33/15 yrs Avg. 90% M

170. Paint - one coat [S 1:1]

199.11 SF 33/15 yrs Avg. 90% M

171. Final cleaning - construction - Commercial [S 1:1]

199.11 SF 33/NA Avg. 0% OPEN ITEM

Totals: Pantry 0.00 0.00 0.00 0.00

4' 10" 3' 10" 4' 6" 2' 4"

Pantry La

10' 8" 10' 10"

' 2

Public Corridor Height: 12'

1253.55 SF Walls

1670.94 SF Walls & Ceiling

46.38 SY Flooring

139.46 LF Ceil. Perimeter

417.39 SF Ceiling

417.39 SF Floor

139.46 LF Floor Perimeter

Window 6' 8" X 5' 3" Opens into KENNEL_2

Window 6' 8" X 5' 3" Opens into KENNEL_2 Window 6' 8" X 5' 3" Opens into KENNEL_2 Window 6' 8" X 5' 3" Opens into KENNEL_2 Window 6' 8" X 5' 3" Opens into KENNEL_2 Window 6' 8" X 5' 3" Opens into KENNEL_1 Window 6' 8" X 5' 3" Opens into KENNEL_1 Window 6' 8" X 5' 3" Opens into KENNEL_1 Window 6' 8" X 5' 3" Opens into KENNEL_1 Window 6' 8" X 5' 3" Opens into KENNEL_1 Window 6' 8" X 5' 3" Opens into KENNEL_1

Subroom: Room2 (2) Height: 12'

288.74 SF Walls

377.24 SF Walls & Ceiling

9.83 SY Flooring

29.67 LF Ceil. Perimeter

88.50 SF Ceiling

88.50 SF Floor

25.83 LF Floor Perimeter

Missing Wall 6' X 12' Opens into PUBLIC_CORR1 Window 6' 8" X 5' 3" Opens into KENNEL_1 Missing Wall 6' X 12' Opens into PUBLIC_CORR1 Door 3' 10" X 8' 5" Opens into Exterior

Room 1 b1lic rKKid

Co

' 1

0" 6'

' 4

5'

3'

' 1

0"

3'

0' 9"

1'

6'

6' m Ro1o6m' 411"3613' 1R0o"om21153' 87"Roo3m' 101"41

2" 1 m m ' 1"

31' 4" 30' 8"

KenPnuebl l1ic CorKKriednonrel 2

15' 9"

H"VAC " iser Room7' 7

9" ' 9" 1 13' 13' 9"

4' 6

6'

16' 25 14

Subroom: Room3 (1) Height: 12'

5659.83 SF Walls

7528.97 SF Walls & Ceiling

207.68 SY Flooring

571.00 LF Ceil. Perimeter

1869.14 SF Ceiling

1869.14 SF Floor

525.00 LF Floor Perimeter

8' 2RR 7' 8"

Window 6' 8" X 5' 3" Opens into KENNEL_2 Window 6' 8" X 5' 3" Opens into KENNEL_2 Window 6' 8" X 5' 3" Opens into KENNEL_2 Window 6' 8" X 5' 3" Opens into KENNEL_2 Door 3' 10" X 8' 5" Opens into KENNEL_2 Missing Wall 6' X 12' Opens into PUBLIC_CORRI Door 3' 10" X 8' 5" Opens into KENNEL_1 Missing Wall 6' X 12' Opens into ROOM2 Door 3' 10" X 8' 5" Opens into Exterior Door 3' 4" X 6' 8" Opens into RISER_ROOM Door 3' 4" X 6' 8" Opens into RISER_ROOM Window 6' 8" X 5' 3" Opens into HVAC2 Door 3' 10" X 8' 5" Opens into HVAC2 Window 6' 8" X 5' 3" Opens into Exterior Door 3' 10" X 8' 5" Opens into Exterior Window 6' 8" X 5' 3" Opens into Exterior Window 6' 8" X 5' 3" Opens into Exterior Window 6' 8" X 5' 3" Opens into Exterior Window 6' 8" X 5' 3" Opens into Exterior Window 6' 8" X 5' 3" Opens into Exterior Window 6' 8" X 5' 3" Opens into Exterior Window 6' 8" X 5' 3" Opens into Exterior Window 6' 8" X 5' 3" Opens into Exterior Door 3' 10" X 8' 5" Opens into ROOM_141 Door 3' 10" X 8' 5" Opens into ROOM_137 Door 3' 10" X 8' 5" Opens into ROOM_136 Door 3' 10" X 8' 5" Opens into STAFF_HALL_2 Window 3' X 5' 3" Opens into Exterior Door 3' 10" X 8' 5" Opens into Exterior Window 6' 8" X 5' 3" Opens into Exterior Window 6' 8" X 5' 3" Opens into Exterior

' 2

" 40

' 3

' 8

' 1

' 4

' 9

' 2

' 6

" 79 ' 48

' 1 0"

6'

' 1 0"

6'

" 60 ' 6

" 2 7'

' 5

" 7 9'

8'

Missing Wall 6' X 12' Opens into ROOM2 Window 6' 8" X 5' 3" Opens into KENNEL_1 Window 6' 8" X 5' 3" Opens into KENNEL_1 Window 6' 8" X 5' 3" Opens into KENNEL_1 Window 6' 8" X 5' 3" Opens into KENNEL_1 Window 6' 8" X 5' 3" Opens into KENNEL_1 Door 3' 10" X 8' 5" Opens into KENNEL_1 Missing Wall 6' X 12' Opens into PUBLIC_CORR2

Subroom: Room1 (3) Height: 12'

22.45 SF Walls

27.06 SF Walls & Ceiling

0.51 SY Flooring

1.87 LF Ceil. Perimeter

4.61 SF Ceiling

4.61 SF Floor

1.87 LF Floor Perimeter

Missing Wall 6' X 12' Opens into PUBLIC_CORR1 Missing Wall 6' X 12' Opens into PUBLIC_CORRI

172. Mask and cover large light fixture [S 1:1]

44.00 EA 33/15 yrs Avg. 90% M

173. Mask and cover light fixture [S 1:1]

2.00 EA 33/15 yrs Avg. 90% M

OPEN ITEM

OPEN ITEM

4 Vents

174. Drywall tape joint / repair - per LF [S 1:1]

30.00 LF 33/150 yrs Avg. 22% OPEN ITEM

175. Seal/prime then paint (2 coats) [S 1:1]

30.00 SF 33/15 yrs Avg. 90% M

176. Mask and prep for paint - plastic, paper, tape (per LF) [S 1:1]

742.00 LF 33/15 yrs Avg. 90% M

177. Paint - one coat [S 1:1]

2379.64 SF 33/15 yrs Avg. 90% M

178. Final cleaning - construction - Commercial [S 1:1]

OPEN ITEM

OPEN ITEM

2379.64 SF 33/NA Avg. 0% OPEN ITEM

Totals: Public Corridor 0.00 0.00 0.00 0.00

18' 7" 18' 8" 5' 4" 3' 4" 3' 4" 5' 5"

18' 5" 18' 6"

Riser Room

5' 3" 5' 2"

Riser Room Height: 12'

928.00 SF Walls

1243.00 SF Walls & Ceiling

35.00 SY Flooring

77.33 LF Ceil. Perimeter

315.00 SF Ceiling

315.00 SF Floor

77.33 LF Floor Perimeter

Door 3' 4" X 6' 8" Opens into PUBLIC_CORR1 Door 3' 4" X 6' 8" Opens into PUBLIC_CORR1

179. Mask and cover large light fixture [S 1:1]

180. Mask and cover light fixture [S 1:1]

181. Drywall tape joint / repair - per LF [S 1:1]

23.33 LF 33/150 yrs Avg. 22% OPEN ITEM

182. Mask and prep for paint - plastic, paper, tape (per LF) [S 1:1]

77.33 LF 33/15 yrs Avg. 90% M

183. Seal/prime then paint (2 coats) [S 1:1]

23.33 SF 33/15 yrs Avg. 90% M

184. Paint - one coat [S 1:1]

315.00 SF 33/15 yrs Avg. 90% M

185. Final cleaning - construction - Commercial [S 1:1]

OPEN ITEM

OPEN ITEM

315.00 SF 33/NA Avg. 0% OPEN ITEM

Totals: Riser Room 0.00 0.00 0.00 0.00

PL

1"

' 6

5' 6"

' 2

9'

' 1 0"

5' r2o9oming

6' 8"

Staff Hall Height: 12' aan

1238.47 SF Walls

1631.24 SF Walls & Ceiling

392.78 SF Ceiling

392.78 SF Floor

taff Hal

Inter 1' 2"

43.64 SY Flooring

124.83 LF Ceil. Perimeter

98.00 LF Floor Perimeter

Door Door Door Door Window Door Door Door t Foy 3' 10" X 8' 5" Opens into BREAK_ROOM 3' 10" X 8' 5" Opens into Exterior 3' 10" X 8' 5" Opens into Exterior 3' 10" X 8' 5" Opens into ROOM_108 6' 5" X 5' 3" Opens into ROOM_117 3' 10" X 8' 5" Opens into ROOM_117 3' 10" X 8' 5" Opens into ROOM_118 3' 10" X 8' 5" Opens into Exterior

Missing Wall 6' 8" X 12' Opens into STAFF_HALL_2

186. Detach & Reset Recessed light fixture - trim only [S 1:1]

3.00 EA 0/20 yrs Avg. 0% OPEN ITEM

187. Mask and cover large light fixture [S 1:1]

9.00 EA 33/15 yrs Avg. 90% M

188. Drywall tape joint / repair - per LF [S 1:1]

OPEN ITEM

20.00 LF 33/150 yrs Avg. 22% OPEN ITEM

189. Mask and prep for paint - plastic, paper, tape (per LF) [S 1:1]

124.83 LF 33/15 yrs Avg. 90% M

190. Seal/prime then paint (2 coats) [S 1:1]

25.00 SF 33/15 yrs Avg. 90% M

191. Paint - one coat [S 1:1]

1631.24 SF 33/15 yrs Avg. 90% M

192. Final cleaning - construction - Commercial [S 1:1]

OPEN ITEM

OPEN ITEM

392.78 SF 33/NA Avg. 0% OPEN ITEM

Totals: Staff Hall 0.00 0.00 0.00 0.00

Bre

Staff Hall 2 Height: 12'

1300.85 SF Walls

1693.68 SF Walls & Ceiling

43.65 SY Flooring

148.33 LF Ceil. Perimeter

392.83 SF Ceiling

392.83 SF Floor

94.33 LF Floor Perimeter

Door 3' 10" X 8' 5" Opens into PANTRY Missing Wall 6' 8" X 12' Opens into STAFF_HALL Door 3' 10" X 8' 5" Opens into ROOM_128 Door 3' 10" X 8' 5" Opens into ROOM_129 Door 3' 10" X 8' 5" Opens into GROOMING_ARE Door 3' 10" X 8' 5" Opens into Exterior Door 3' 10" X 8' 5" Opens into ACO_ROOM Window - Goes to Floor 11' 10" X 5' 3" Opens into ACO_ROOM Window 3' X 5' 3" Opens into Exterior Door 3' 10" X 8' 5" Opens into Exterior Door 3' 10" X 8' 5" Opens into ROOM_136 Door 3' 10" X 8' 5" Opens into PUBLIC_CORR1 Door 3' 10" X 8' 5" Opens into ROOM_125 Window 11' 10" X 5' 3" Opens into ROOM_125 Door 3' 10" X 8' 5" Opens into LAUNDRY_ROOM

193. Detach & Reset Recessed light fixture - trim only [S 1:1]

3.00 EA 0/20 yrs Avg. 0% OPEN ITEM

194. Mask and cover large light fixture [S 1:1]

10.00 EA 33/15 yrs Avg. 90% M

195. Mask and cover light fixture [S 1:1]

7.00 EA 33/15 yrs Avg. 90% M

4 Speakers 2 Vents 1 Smoke Detector

196. Drywall tape joint / repair - per LF [S 1:1]

26.67 LF 33/150 yrs Avg. 22% OPEN ITEM

197. Mask and prep for paint - plastic, paper, tape (per LF) [S 1:1]

148.33 LF 33/15 yrs Avg. 90% M

198. Seal/prime then paint (2 coats) [S 1:1]

25.00 SF 33/15 yrs Avg. 90% M

199. Paint - one coat [S 1:1]

1693.68 SF 33/15 yrs Avg. 90% M

200. Final cleaning - construction - Commercial [S 1:1]

OPEN ITEM

OPEN ITEM

392.83 SF 33/NA Avg. 0% OPEN ITEM

3' 10" oom 12G9rooming AreaAco Room 6' 3" Room

3' 10" 13' 4" 11' 10" 16' 1" St3a'f1f 0H"all 2

4' 6" 1' 7" 11' 10"

Roo6m' 51"25

13' 10" 3'

CONTINUED - Staff Hall 2

Totals: Staff Hall 2 0.00 0.00 0.00 0.00

[%] - Indicates that depreciate by percent was used for this item [M] - Indicates that the depreciation percentage was limited by the maximum allowable depreciation for this item

Grand Total Areas:

29,293.52 SF Walls 12,519.57 SF Ceiling 41,813.09 SF Walls and Ceiling 12,519.57 SF Floor 1,391.06 SY Flooring 2,576.63 LF Floor Perimeter

0.00 SF Long Wall 0.00 SF Short Wall 2,836.30 LF Ceil. Perimeter

12,519.57 Floor Area 13,154.15 Total Area 29,293.52 Interior Wall Area 11,373.85 Exterior Wall Area 957.89 Exterior Perimeter of

Walls

0.00 Surface Area 0.00 Number of Squares 0.00 Total Perimeter Length

0.00 Total Ridge Length 0.00 Total Hip Length

' 5

' 1

' 5

9'

' 2

5'

5'

' 8

9'

9'

9'

' 5

' 9

' 5

1'

' 6

' 4

' 4

22' 1" 21' 7"

13' 10" 13' 4"

8' 4"

14'

31' 2" 30' 8"

43' 8" 43' 4"

12' 9" 12' 3"

Room 129 Grooming Area Aco Room Room 136 Room 137 Room 141 3' 3"

14' 9" 14' 11"

6' 10" 6' 10"

14' 6"

10' 5" 17' 6' 2" 24' 5"

43' 10"

2' 11" 9' 9' 4"

11' 2" Staf1f0' H7" all 2

22' 6"

31' 4"

6' 31' 4"

Room 128

6' 8" 10' 8" 10' 1" 2' 11" 3' 3"

22' 2"

Room 125 30' 8" 30' 8"

21' 4" 21' 8"

PantryLaundry Room

10' 10"

4' 4" 4' 4"

8' 9" 3" 8' 5" 5"

14' 10"

Room 118 Break Room

Kitchen

Staff Hall

Room 117

9' 1" Kennel 1 Public Corridor Kennel 2

6' 6"

15'

11' 9" 6' 11' 1"

Interview Room 5' 3"

Room 1F0o8yer Ext

13' 10"

11' 5"

Foyer/Entry 6' 2"

5' 10"

1' 8"

8' 2"

27' 4"

HVAC

17' 10" 18'

26' 8"

13' 8" 2' 4" 2' 8"

Riser Room

' 8

' 2

9'

9'

6'

7'

' 1

' 2

' 3

' 7

5'

5'

3'

3'

7'

6'

' 9

8'

8'

8'

' 8

8'

8'

' 9

' 7

' 9

' 5

' 8

' 6

DOUGLAS_COUNTY_BOA3
CONTINUED - Main Level
Room 108 Height: 12'
1861.39 SF Walls
163.18 LF Ceil. Perimeter
547.74 SF Walls
Aco Room Height: 12'
561.61 SF Walls
Door 3' 10" X 8' 5" Opens into STAFF_HALL_2
CONTINUED - Break Room
CONTINUED - Grooming Area
Foyer/Entry Height: 9' 10"
859.28 SF Walls
1103.17 SF Walls & Ceiling
860.74 SF Walls
CONTINUED - HVAC
CONTINUED - Kennel 1
CONTINUED - Kitchen
Door 3' 10" X 8' 5" Opens into Exterior
22.45 SF Walls
928.00 SF Walls
Staff Hall Height: 12'
1238.47 SF Walls
43.64 SY Flooring
3' 10" X 8' 5" Opens into BREAK_ROOM
CONTINUED - Staff Hall 2
Grand Total Areas:
Main Level
Room 129
Room 128
Room 125
PantryLaundry Room
Room 118
Kitchen
Kennel 1 Public Corridor Kennel 2
Interview Room
Room 1F0o8yer Ext
Foyer/Entry
HVAC

Other files

File Type Posted
Award Information —
On Call Plumbing Services —
Ad —
Award Information —
RFP —
Award Information —
23-021 AMENDMENT F —
Award Information —
23-021 —
Addendum 1 —
Jefferson St Booker Basin —
Award Information —
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .