scope
735 KB Posted
- Attached to
- On Call Plumbing
- Solicitation number
- 23-021
- Issued by
- Fulton County, Georgia
About this file
Summary
This Scope of Work document pertains to water damage repairs at the Douglas County Animal Shelter, a facility located at 2171 Mack Road, Douglasville, Georgia that sustained damage during a winter storm. The document provides detailed line-item estimates for repairs across multiple building areas, including plumbing work, insulation removal and replacement, lighting fixture repairs, drywall repairs, painting, and various finishing work. Major scope areas include the main level (involving blown-in insulation removal at 12,519.57 square feet and replacement), multiple rooms (Room 108, 117, 118, 125, 128, 129, 136, 137, 141), support spaces (break room, grooming area, kitchen, laundry room, pantry, staff halls, interview room, foyer/entry), specialized areas (kennels 1 and 2, public corridor, HVAC room, riser room), and exterior areas. The scope identifies 200 line items with quantities specified in linear feet, square feet, square yards, hours, and units. All repairs must comply with the insurance company's guidelines, with any deviations requiring written approval before work commences. The Douglas County Board of Commissioners is soliciting proposals from qualified construction companies, with a pre-bid meeting scheduled for August 10, 2023 at 10:00 a.m. EST via Microsoft Teams and bids due August 24, 2023 at 2:30 p.m. EST.
The document establishes pricing parameters with all quantities marked as "OPEN ITEM," indicating that bidders must provide unit pricing for labor, materials, and equipment. Work categories are detailed with tax rates, replacement cost value (RCV) ranging from 5 to 150 years, condition assessments (predominantly average), and depreciation percentages. The scope requires comprehensive documentation of costs for services including plumbing repairs (water supply line replacement, pressure testing, debris hauling), commercial supervision and project management at 40 hours, masking and painting operations across all interior spaces, drywall repairs and joint finishing, light fixture installation and protection, content relocation and reset, final cleaning, and specialized items such as smoke detector replacement and scaffolding rental (4 sections for 1 week in the kennel areas). Total building area encompasses approximately 29,293.52 square feet of walls, 12,519.57 square feet of ceiling, and 12,519.57 square feet of floor space, with comprehensive interior and exterior wall areas documented. The contract term, renewal options, insurance requirements, and specific performance standards are governed by the Douglas County Board of Commissioners' procurement policies and insurance company requirements.
Text of this file
DOUGLAS_COUNTY_BOA3
Plumbing
QUANTITY UNIT TAX RCV AGE/LIFE COND. DEP % DEPREC. ACV
DWELLING
1. R&R Water supply line - PVC with fitting and hanger, 1/2" [S 1:2]
4.00 LF 33/65 yrs Avg. 50.77% OPEN ITEM
2. Plumber - per hour [S 1:2]
8.00 HR 33/NA Avg. 0% OPEN ITEM
To locate and pressure test system
3. Haul debris - per pickup truck load - including dump fees [S 1:2]
1.00 EA NA NA NA OPEN ITEM
Totals: Plumbing 0.00 0.00 0.00 0.00
Lighting
4. Tech Loss [S 1:3]
1.00 EA 33/NA Avg. 0% OPEN ITEM
53 light fixtures have evidence of damage from water contamination. Mylinda Fowler of Full Circle
Totals: Lighting 0.00 0.00 0.00 0.00
Main Level
5. Blown-in insulation - 14" depth - R38 [S 1:1]
12519.57 SF 33/150 yrs Avg. 22% OPEN ITEM
6. Remove Blown-in insulation - Machine removal [S 1:1]
12519.57 SF NA NA NA OPEN ITEM
7. Commercial Supervision / Project Management - per hour [S 1:1]
40.00 HR 33/NA Avg. 0% OPEN ITEM
Repairs should take 1 week.
8. Haul debris - per pickup truck load - including dump fees [S 1:1]
1.00 EA NA NA NA OPEN ITEM
3'
' 1
" 1 7'
" 3'
0"
CONTINUED - Main Level
QUANTITY UNIT
9. Taxes, insurance, permits & fees (Bid Item) [S 1:1]
TAX RCV AGE/LIFE COND. DEP % DEPREC. ACV
1.00 EA 33/NA Avg. 33% %
https://www.douglas.co.us/documents/building-fees.pdf/
OPEN ITEM
Total: Main Level 0.00 0.00 0.00 0.00
7' 2" 7'
14' 10" 15' Room 108 Height: 12'
6' 9' In
RoomF1o0y8er Ext F
1861.39 SF Walls
2355.18 SF Walls & Ceiling
54.87 SY Flooring
493.79 SF Ceiling
493.79 SF Floor
151.68 LF Floor Perimeter
19' 6" 2' 8"
4' 2" 4' 6"
19' 9"
20' 1"
12' 2" 3' 11" 4' 3"
12' 6"
163.18 LF Ceil. Perimeter
Window 3' X 5' 3" Opens into Exterior Window 3' X 5' 3" Opens into Exterior Window 3' X 5' 3" Opens into Exterior Door 3' 10" X 8' 5" Opens into Exterior Door 3' 10" X 8' 5" Opens into Exterior Door 3' 10" X 8' 5" Opens into STAFF_HALL Window 3' X 5' 3" Opens into Exterior Window 3' X 5' 3" Opens into Exterior Window 3' X 5' 3" Opens into Exterior Window 3' X 5' 3" Opens into Exterior
10. Contents - move out then reset [S 1:1]
11. Detach & Reset Recessed light fixture - trim only [S 1:1]
3.00 EA 0/20 yrs Avg. 0% OPEN ITEM
12. Mask and cover large light fixture [S 1:1]
10.00 EA 33/15 yrs Avg. 90% M
13. Mask and cover light fixture [S 1:1]
2.00 EA 33/15 yrs Avg. 90% M
2 Vents
' 5
' 5
5' http://www.douglas.co.us/documents/building-fees.pdf/
CONTINUED - Room 108
14. Drywall tape joint / repair - per LF [S 1:1]
TAX RCV AGE/LIFE COND. DEP % DEPREC. ACV
13.33 LF 33/150 yrs Avg. 22% OPEN ITEM
15. Mask and prep for paint - plastic, paper, tape (per LF) [S 1:1]
163.18 LF 33/15 yrs Avg. 90% M
16. Seal/prime then paint (2 coats) [S 1:1]
13.33 SF 33/15 yrs Avg. 90% M
17. Paint - one coat [S 1:1]
493.79 SF 33/15 yrs Avg. 90% M
18. Final cleaning - construction - Commercial [S 1:1]
OPEN ITEM
OPEN ITEM
493.79 SF 33/NA Avg. 0% OPEN ITEM
Totals: Room 108 0.00 0.00 0.00 0.00
Room 117 Height: 12'
770.05 SF Walls
1066.72 SF Walls & Ceiling
32.96 SY Flooring
69.67 LF Ceil. Perimeter
296.67 SF Ceiling
296.67 SF Floor
65.83 LF Floor Perimeter
Window 6' 5" X 5' 3" Opens into STAFF_HALL Door 3' 10" X 8' 5" Opens into STAFF_HALL
19. Contents - move out then reset [S 1:1]
20. Detach & Reset Recessed light fixture - trim only [S 1:1]
1.00 EA 0/20 yrs Avg. 0% OPEN ITEM
21. Drywall tape joint / repair - per LF [S 1:1]
14.83 LF 33/150 yrs Avg. 22% OPEN ITEM
22. Mask and prep for paint - plastic, paper, tape (per LF) [S 1:1]
69.67 LF 33/15 yrs Avg. 90% M
23. Seal/prime then paint (2 coats) [S 1:1]
14.83 SF 33/15 yrs Avg. 90% M
24. Paint - one coat [S 1:1]
296.67 SF 33/15 yrs Avg. 90% M
OPEN ITEM
OPEN ITEM
OPEN ITEM
Staff H
Room 117
14' 10" 15'
' 2
' 3
9'
" 4'
1"
5'
9'
4'
" 6 ' 5
' 5
CONTINUED - Room 117
15' 2" 14' 10"
Room 118
' 8 " 3
2"
25. Final cleaning - construction - Commercial [S 1:1]
296.67 SF 33/NA Avg. 0% OPEN ITEM
Totals: Room 117 0.00 0.00 0.00 0.00
Room 118 Height: 12'
Staff Ha
547.74 SF Walls
686.18 SF Walls & Ceiling
15.38 SY Flooring
48.33 LF Ceil. Perimeter
138.44 SF Ceiling
138.44 SF Floor
44.50 LF Floor Perimeter
26. Contents - move out then reset [S 1:1]
27. Drywall tape joint / repair - per LF [S 1:1]
9.67 LF 33/150 yrs Avg. 22% OPEN ITEM
28. Mask and cover large light fixture [S 1:1]
2.00 EA 33/15 yrs Avg. 90% M
29. Mask and cover light fixture [S 1:1]
2.00 EA 33/15 yrs Avg. 90% M
30. Mask and prep for paint - plastic, paper, tape (per LF) [S 1:1]
48.33 LF 33/15 yrs Avg. 90% M
31. Seal/prime then paint (2 coats) [S 1:1]
9.67 SF 33/15 yrs Avg. 90% M
32. Paint - one coat [S 1:1]
138.44 SF 33/15 yrs Avg. 90% M
33. Final cleaning - construction - Commercial [S 1:1]
OPEN ITEM
OPEN ITEM
OPEN ITEM
OPEN ITEM
138.44 SF 33/NA Avg. 0% OPEN ITEM
Totals: Room 118 0.00 0.00 0.00 0.00
9'
1'
Room 125 Height: 12'
677.61 SF Walls
899.28 SF Walls & Ceiling
24.63 SY Flooring
64.33 LF Ceil. Perimeter
221.67 SF Ceiling
221.67 SF Floor
60.50 LF Floor Perimeter
Door 3' 10" X 8' 5" Opens into STAFF_HALL_2 Window 11' 10" X 5' 3" Opens into STAFF_HALL_2
34. Contents - move out then reset [S 1:1]
35. Drywall tape joint / repair - per LF [S 1:1]
10.00 LF 33/150 yrs Avg. 22% OPEN ITEM
36. Mask and prep for paint - plastic, paper, tape (per LF) [S 1:1]
64.33 LF 33/15 yrs Avg. 90% M
37. Mask and cover large light fixture [S 1:1]
4.00 EA 33/15 yrs Avg. 90% M
38. Mask and cover light fixture [S 1:1]
4.00 EA 33/15 yrs Avg. 90% M
OPEN ITEM
OPEN ITEM
OPEN ITEM
4 Vents
39. Seal/prime then paint (2 coats) [S 1:1]
10.00 SF 33/15 yrs Avg. 90% M
40. Paint - one coat [S 1:1]
221.67 SF 33/15 yrs Avg. 90% M
41. Final cleaning - construction - Commercial [S 1:1]
221.67 SF 33/NA Avg. 0% OPEN ITEM
42. R&R Smoke detector [S 1:1]
1.00 EA 33/10 yrs Avg. 90% M OPEN ITEM
Totals: Room 125 0.00 0.00 0.00 0.00
Room 128 Height: 12'
815.74 SF Walls
1101.07 SF Walls & Ceiling
31.70 SY Flooring
70.67 LF Ceil. Perimeter
285.33 SF Ceiling
285.33 SF Floor
66.83 LF Floor Perimeter
9' 6" 16' 1" 3' 10" 11' 10" 1' 2"
2' 3" 9' 2"
Room 125
22' 2"
15' 14' 8" 3' 10"
1' 1" 1' 9"
Room 128
21' 4" 21' 8"
' 8
8'
2'
' 6
' 4
CONTINUED - Room 128
43. Contents - move out then reset [S 1:1]
44. Drywall tape joint / repair - per LF [S 1:1]
14.00 LF 33/150 yrs Avg. 22% OPEN ITEM
45. Mask and prep for paint - plastic, paper, tape (per LF) [S 1:1]
70.67 LF 33/15 yrs Avg. 90% M
46. Mask and cover large light fixture [S 1:1]
4.00 EA 33/15 yrs Avg. 90% M
47. Mask and cover light fixture [S 1:1]
4.00 EA 33/15 yrs Avg. 90% M
OPEN ITEM
OPEN ITEM
OPEN ITEM
4 Vents
48. Seal/prime then paint (2 coats) [S 1:1]
14.00 SF 33/15 yrs Avg. 90% M
49. Paint - one coat [S 1:1]
285.33 SF 33/15 yrs Avg. 90% M
50. Final cleaning - construction - Commercial [S 1:1]
285.33 SF 33/NA Avg. 0% OPEN ITEM
Totals: Room 128 0.00 0.00 0.00 0.00
Room 129 Height: 12'
805.74 SF Walls
1093.51 SF Walls & Ceiling
31.98 SY Flooring
69.83 LF Ceil. Perimeter
287.78 SF Ceiling
287.78 SF Floor
66.00 LF Floor Perimeter
51. Contents - move out then reset [S 1:1]
52. Drywall tape joint / repair - per LF [S 1:1]
14.00 LF 33/150 yrs Avg. 22% OPEN ITEM
53. Mask and prep for paint - plastic, paper, tape (per LF) [S 1:1]
69.83 LF 33/15 yrs Avg. 90% M OPEN ITEM
22' 1" 21' 7"
Room 129 G
14' 9" 3' 10" 2" 1' 10" 1' 14' 11"
CONTINUED - Room 129
54. Mask and cover large light fixture [S 1:1]
TAX RCV AGE/LIFE COND. DEP % DEPREC. ACV
4.00 EA 33/15 yrs Avg. 90% M
55. Mask and cover light fixture [S 1:1]
4.00 EA 33/15 yrs Avg. 90% M
4 Vents
56. Seal/prime then paint (2 coats) [S 1:1]
14.00 SF 33/15 yrs Avg. 90% M
57. Paint - one coat [S 1:1]
287.78 SF 33/15 yrs Avg. 90% M
58. Final cleaning - construction - Commercial [S 1:1]
287.78 SF 33/NA Avg. 0% OPEN ITEM
Totals: Room 129 0.00 0.00 0.00 0.00
Room 136 Height: 12'
991.47 SF Walls
1400.36 SF Walls & Ceiling
45.43 SY Flooring
88.00 LF Ceil. Perimeter
408.89 SF Ceiling
408.89 SF Floor
80.33 LF Floor Perimeter
Door 3' 10" X 8' 5" Opens into PUBLIC_CORR1
59. Mask and cover large light fixture [S 1:1]
8.00 EA 33/15 yrs Avg. 90% M
60. Mask and cover light fixture [S 1:1]
2.00 EA 33/15 yrs Avg. 90% M
OPEN ITEM
OPEN ITEM
1 Vent
61. Drywall tape joint / repair - per LF [S 1:1]
40.00 LF 33/150 yrs Avg. 22% OPEN ITEM
62. Mask and prep for paint - plastic, paper, tape (per LF) [S 1:1]
88.00 LF 33/15 yrs Avg. 90% M
63. Seal/prime then paint (2 coats) [S 1:1]
13.33 SF 33/15 yrs Avg. 90% M
OPEN ITEM
OPEN ITEM
31' 2" 30' 8"
Room 136
3' 10" 16' 4" 3' 10"
1' 4" 1' 1" 16' 2" 4' 5"
' 8
CONTINUED - Room 136
64. Paint - one coat [S 1:1]
TAX RCV AGE/LIFE COND. DEP % DEPREC. ACV
408.89 SF 33/15 yrs Avg. 90% M
65. Final cleaning - construction - Commercial [S 1:1]
408.89 SF 33/NA Avg. 0% OPEN ITEM
Totals: Room 136 0.00 0.00 0.00 0.00
Room 137 Height: 12'
1327.74 SF Walls
1905.51 SF Walls & Ceiling
64.20 SY Flooring
113.33 LF Ceil. Perimeter
577.78 SF Ceiling
577.78 SF Floor
109.50 LF Floor Perimeter
66. R&R 5/8" drywall - hung, taped, floated, ready for paint [S 1:1]
32.00 SF 33/150 yrs Avg. 22% OPEN ITEM
67. Mask and cover large light fixture [S 1:1]
6.00 EA 33/15 yrs Avg. 90% M
68. Mask and cover light fixture [S 1:1]
5.00 EA 33/15 yrs Avg. 90% M
3 small lights 2 vents 1 smoke detector
69. Drywall tape joint / repair - per LF [S 1:1]
40.00 LF 33/150 yrs Avg. 22% OPEN ITEM
70. Mask and prep for paint - plastic, paper, tape (per LF) [S 1:1]
113.33 LF 33/15 yrs Avg. 90% M
71. Seal/prime then paint (2 coats) [S 1:1]
13.33 SF 33/15 yrs Avg. 90% M
72. Paint - one coat [S 1:1]
577.78 SF 33/15 yrs Avg. 90% M
73. R&R Fluorescent light fixture [S 1:1]
1.00 EA 33/20 yrs Avg. 90% M
74. Light bulb - Compact Fluorescent stand. type - mat. only [S 1:1]
2.00 EA 33/5 yrs Avg. 90% M
OPEN ITEM
OPEN ITEM
OPEN ITEM
OPEN ITEM
OPEN ITEM
43' 8" 43' 4"
Room 137 Room
3' 10" 14'
25' 8" 26'
' 4
' 6
1' 4"
CONTINUED - Room 137
75. Final cleaning - construction - Commercial [S 1:1]
577.78 SF 33/NA Avg. 0% OPEN ITEM
Totals: Room 137 0.00 0.00 0.00 0.00
Room 141 Height: 12'
549.47 SF Walls
706.31 SF Walls & Ceiling
17.43 SY Flooring
51.17 LF Ceil. Perimeter
156.83 SF Ceiling
156.83 SF Floor
43.50 LF Floor Perimeter
Door 3' 10" X 8' 5" Opens into Exterior
76. Mask and cover large light fixture [S 1:1]
3.00 EA 33/15 yrs Avg. 90% M
77. Mask and cover light fixture [S 1:1]
2.00 EA 33/15 yrs Avg. 90% M
OPEN ITEM
OPEN ITEM
2 Vents
78. Drywall tape joint / repair - per LF [S 1:1]
13.33 LF 33/150 yrs Avg. 22% OPEN ITEM
79. Mask and prep for paint - plastic, paper, tape (per LF) [S 1:1]
51.17 LF 33/15 yrs Avg. 90% M
80. Seal/prime then paint (2 coats) [S 1:1]
13.33 SF 33/15 yrs Avg. 90% M
81. Paint - one coat [S 1:1]
156.83 SF 33/15 yrs Avg. 90% M
82. Final cleaning - construction - Commercial [S 1:1]
OPEN ITEM
OPEN ITEM
156.83 SF 33/NA Avg. 0% OPEN ITEM
Totals: Room 141 0.00 0.00 0.00 0.00
12' 9" 12' 3"
Room 141
3' 3" 2' 11" 3' 10"
3' 1"
' 6
' 4
2' 4'
4'
0"
' 1
0"
' 2
14' 8" 14'
Aco Room Height: 12'
Aco Room
11' 10" 8"
561.61 SF Walls
748.28 SF Walls & Ceiling
20.74 SY Flooring
54.67 LF Ceil. Perimeter
186.67 SF Ceiling
186.67 SF Floor
39.00 LF Floor Perimeter
1' 10" 10"
Window - Goes to Floor 11' 10" X 5' 3" Opens into STAFF_HALL_2
83. Mask and cover large light fixture [S 1:1]
84. Mask and cover light fixture [S 1:1]
2.00 EA 33/15 yrs Avg. 90% M
OPEN ITEM
OPEN ITEM
2 Vents
85. Drywall tape joint / repair - per LF [S 1:1]
13.33 LF 33/150 yrs Avg. 22% OPEN ITEM
86. Mask and prep for paint - plastic, paper, tape (per LF) [S 1:1]
54.67 LF 33/15 yrs Avg. 90% M
87. Seal/prime then paint (2 coats) [S 1:1]
13.33 SF 33/15 yrs Avg. 90% M
88. Paint - one coat [S 1:1]
186.67 SF 33/15 yrs Avg. 90% M
89. Final cleaning - construction - Commercial [S 1:1]
OPEN ITEM
OPEN ITEM
186.67 SF 33/NA Avg. 0% OPEN ITEM
Totals: Aco Room 0.00 0.00 0.00 0.00
Break Room Height: 12'
533.47 SF Walls
681.35 SF Walls & Ceiling
16.43 SY Flooring
49.83 LF Ceil. Perimeter
147.88 SF Ceiling
147.88 SF Floor
42.17 LF Floor Perimeter
Door 3' 10" X 8' 5" Opens into KITCHEN
10' 8" 10' 10"
4' 4" 4' 4"
Break Room
Kitch 15' 2" taff Hall
0"
' 1 0"
2'
3'
2'
1"
' 8
2'
1"
' 1 0"
' 1
" 3 ' 6
4'
4'
" 3
CONTINUED - Break Room
90. Contents - move out then reset [S 1:1]
TAX RCV AGE/LIFE COND. DEP % DEPREC. ACV
1.00 EA 33/NA Avg. 0% OPEN ITEM
91. Drywall tape joint / repair - per LF [S 1:1]
9.75 LF 33/150 yrs Avg. 22% OPEN ITEM
92. Mask and cover large light fixture [S 1:1]
3.00 EA 33/15 yrs Avg. 90% M
93. Mask and prep for paint - plastic, paper, tape (per LF) [S 1:1]
49.83 LF 33/15 yrs Avg. 90% M
94. Seal/prime then paint (2 coats) [S 1:1]
9.75 SF 33/15 yrs Avg. 90% M
95. Paint - one coat [S 1:1]
147.88 SF 33/15 yrs Avg. 90% M
96. Final cleaning - construction - Commercial [S 1:1]
OPEN ITEM
OPEN ITEM
OPEN ITEM
147.88 SF 33/NA Avg. 0% OPEN ITEM
Totals: Break Room 0.00 0.00 0.00 0.00
Grooming Area Height: 12'
607.74 SF Walls
785.51 SF Walls & Ceiling
19.75 SY Flooring
53.33 LF Ceil. Perimeter
177.78 SF Ceiling
177.78 SF Floor
49.50 LF Floor Perimeter
97. Mask and cover large light fixture [S 1:1]
98. Mask and cover light fixture [S 1:1]
3.00 EA 33/15 yrs Avg. 90% M
OPEN ITEM
OPEN ITEM
3 Vents
99. Drywall tape joint / repair - per LF [S 1:1]
13.33 LF 33/150 yrs Avg. 22% OPEN ITEM
100. Mask and prep for paint - plastic, paper, tape (per LF) [S 1:1]
53.33 LF 33/15 yrs Avg. 90% M OPEN ITEM
13' 10"
13' 4"
Grooming Area
' 4
2'
3'
" 3
' 6
2'
3'
CONTINUED - Grooming Area
101. Seal/prime then paint (2 coats) [S 1:1]
TAX RCV AGE/LIFE COND. DEP % DEPREC. ACV
13.33 SF 33/15 yrs Avg. 90% M
102. Paint - one coat [S 1:1]
177.78 SF 33/15 yrs Avg. 90% M
103. Final cleaning - construction - Commercial [S 1:1]
OPEN ITEM
177.78 SF 33/NA Avg. 0% OPEN ITEM
Totals: Grooming Area 0.00 0.00 0.00 0.00
5' 7" Interview Room Foyer/Entry Height: 9' 10" 5' 3" 10' 8" 3"
859.28 SF Walls
243.89 SF Ceiling
1' 8" 2' 4"
Foyer/Entry
6' 2" 5' 10"
2' 8"
1103.17 SF Walls & Ceiling
27.10 SY Flooring
97.15 LF Ceil. Perimeter
243.89 SF Floor
86.48 LF Floor Perimeter
Window - Goes to Floor 10' 8" X 9' Opens into INTERVIEW_RO
104. Mask and cover large light fixture [S 1:1]
105. Mask and cover light fixture [S 1:1]
1.00 EA 33/15 yrs Avg. 90% M
106. Detach & Reset Recessed light fixture - trim only [S 1:1]
3.00 EA 0/20 yrs Avg. 0% OPEN ITEM
107. Drywall tape joint / repair - per LF [S 1:1]
11.00 LF 33/150 yrs Avg. 22% OPEN ITEM
108. Mask and prep for paint - plastic, paper, tape (per LF) [S 1:1]
97.15 LF 33/15 yrs Avg. 90% M
109. Seal/prime then paint (2 coats) [S 1:1]
11.00 SF 33/15 yrs Avg. 90% M
110. Paint - one coat [S 1:1]
243.89 SF 33/15 yrs Avg. 90% M
111. Final cleaning - construction - Commercial [S 1:1]
OPEN ITEM
OPEN ITEM
243.89 SF 33/NA Avg. 0% OPEN ITEM
Totals: Foyer/Entry 0.00 0.00 0.00 0.00
' 3
' 7
7'
6'
' 3
' 9
13' 7" 15' 9" 7' 9" 3' 10" 6' 8" 7' 1" 7' 7" 6' 11"
13' 5" 15' 7"
HVAC
27'
27' 6"
Foyer Ext Height: 12'
754.00 SF Walls
906.50 SF Walls & Ceiling
16.94 SY Flooring
62.83 LF Ceil. Perimeter
152.50 SF Ceiling
152.50 SF Floor
62.83 LF Floor Perimeter
112. Mask and cover light fixture [S 1:1]
113. Detach & Reset Recessed light fixture - trim only [S 1:1]
5.00 EA 0/20 yrs Avg. 0% OPEN ITEM
114. Drywall tape joint / repair - per LF [S 1:1]
6.00 LF 33/150 yrs Avg. 22% OPEN ITEM
115. Mask and prep for paint - plastic, paper, tape (per LF) [S 1:1]
62.83 LF 33/15 yrs Avg. 90% M
116. Seal/prime then paint (2 coats) [S 1:1]
6.00 SF 33/15 yrs Avg. 90% M
117. Paint - one coat [S 1:1]
152.50 SF 33/15 yrs Avg. 90% M
118. Final cleaning - construction - Commercial [S 1:1]
OPEN ITEM
OPEN ITEM
152.50 SF 33/NA Avg. 0% OPEN ITEM
Totals: Foyer Ext 0.00 0.00 0.00 0.00
HVAC Height: 12'
860.74 SF Walls
1175.74 SF Walls & Ceiling
35.00 SY Flooring
77.33 LF Ceil. Perimeter
315.00 SF Ceiling
315.00 SF Floor
73.50 LF Floor Perimeter
Window 6' 8" X 5' 3" Opens into PUBLIC_CORR1
119. Mask and cover large light fixture [S 1:1]
120. Drywall tape joint / repair - per LF [S 1:1]
23.33 LF 33/150 yrs Avg. 22% OPEN ITEM
6' 6" 6'
0FF8oyer Ext
' 1
' 8
CONTINUED - HVAC
121. Mask and prep for paint - plastic, paper, tape (per LF) [S 1:1]
77.33 LF 33/15 yrs Avg. 90% M OPEN ITEM
122. Seal/prime then paint (2 coats) [S 1:1]
23.33 SF
123. Painter - per hour [S 1:1]
33/15 yrs Avg. 90% M OPEN ITEM
4.00 HR 33/15 yrs Avg. 90% M OPEN ITEM
Additional labor to paint around pipes and ducts.
124. Paint - one coat [S 1:1]
315.00 SF 33/15 yrs Avg. 90% M
125. Final cleaning - construction - Commercial [S 1:1]
315.00 SF 33/NA Avg. 0% OPEN ITEM
Totals: HVAC 0.00 0.00 0.00 0.00
Interview Room Height: 9' 10"
275.71 SF Walls
362.41 SF Walls & Ceiling
9.63 SY Flooring
37.80 LF Ceil. Perimeter
86.69 SF Ceiling
86.69 SF Floor
27.13 LF Floor Perimeter
Window - Goes to Floor 10' 8" X 9' Opens into FOYER_ENTRY
126. Mask and cover large light fixture [S 1:1]
127. Mask and cover light fixture [S 1:1]
128. Detach & Reset Recessed light fixture - trim only [S 1:1]
3.00 EA 0/20 yrs Avg. 0% OPEN ITEM
129. Drywall tape joint / repair - per LF [S 1:1]
6.00 LF 33/150 yrs Avg. 22% OPEN ITEM
130. Seal/prime then paint (2 coats) [S 1:1]
6.00 SF 33/15 yrs Avg. 90% M
131. Paint - one coat [S 1:1]
362.41 SF 33/15 yrs Avg. 90% M
OPEN ITEM
OPEN ITEM
11' 9"
11' 1"
Interview Room
10' 8" 3"
6"
2'
5'
5'
7'
8'
CONTINUED - Interview Room
Room 136 Room
14' 5" 13' 1" 5 12' 9"
KennPeul b1lic
13' 9"
Co
132. Final cleaning - construction - Commercial [S 1:1]
86.69 SF 33/NA Avg. 0% OPEN ITEM
Totals: Interview Room 0.00 0.00 0.00 0.00
Kennel 1 Height: 12'
1931.47 SF Walls
r 4078.14 SF Walls & Ceiling
238.52 SY Flooring
201.33 LF Ceil. Perimeter
2146.67 SF Ceiling
2146.67 SF Floor
193.67 LF Floor Perimeter
Window 6' 8" X 5' 3" Opens into PUBLIC_CORRI Window 6' 8" X 5' 3" Opens into PUBLIC_CORRI Window 6' 8" X 5' 3" Opens into PUBLIC_CORRI Window 6' 8" X 5' 3" Opens into PUBLIC_CORRI Window 6' 8" X 5' 3" Opens into PUBLIC_CORRI Window 6' 8" X 5' 3" Opens into PUBLIC_CORRI Door 3' 10" X 8' 5" Opens into PUBLIC_CORR1 Window 6' 8" X 5' 3" Opens into PUBLIC_CORR1 Window 6' 8" X 5' 3" Opens into PUBLIC_CORR1 Window 6' 8" X 5' 3" Opens into PUBLIC_CORR1 Window 6' 8" X 5' 3" Opens into PUBLIC_CORR1 Window 6' 8" X 5' 3" Opens into PUBLIC_CORR1 Window 6' 8" X 5' 3" Opens into ROOM2
133. Mask and cover large light fixture [S 1:1]
25.00 EA 33/15 yrs Avg. 90% M
134. Mask and cover light fixture [S 1:1]
3.00 EA 33/15 yrs Avg. 90% M
OPEN ITEM
OPEN ITEM
3 Vents
6'
6'
' 7
' 6
' 2
6'
" 4 1'
' 9
' 2 1'
3'
6'
" 4
2'
6'
31' 4" 30' 8" ic CorriKdeonr nel 2
CONTINUED - Kennel 1
135. Drywall tape joint / repair - per LF [S 1:1]
TAX RCV AGE/LIFE COND. DEP % DEPREC. ACV
61.33 LF 33/150 yrs Avg. 22% OPEN ITEM
136. Mask and prep for paint - plastic, paper, tape (per LF) [S 1:1]
201.33 LF 33/15 yrs Avg. 90% M
137. Seal/prime then paint (2 coats) [S 1:1]
61.33 SF 33/15 yrs Avg. 90% M
138. Paint - one coat [S 1:1]
2146.67 SF 33/15 yrs Avg. 90% M
139. Final cleaning - construction - Commercial [S 1:1]
OPEN ITEM
OPEN ITEM
OPEN ITEM
2146.67 SF 33/NA Avg. 0% OPEN ITEM
140. Scaffold - per section (per week) [S 1:1]
4.00 WK 33/NA Avg. 0% OPEN ITEM
4 sections for 1 week
Totals: Kennel 1 0.00 0.00 0.00 0.00
Kennel 2 Height: 12'
1963.74 SF Walls
4110.40 SF Walls & Ceiling
238.52 SY Flooring
201.33 LF Ceil. Perimeter
2146.67 SF Ceiling
2146.67 SF Floor
197.50 LF Floor Perimeter
13' 9" 3'
Window 6' 8" X 5' 3" Opens into PUBLIC_CORR1 Window 6' 8" X 5' 3" Opens into PUBLIC_CORR1 Window 6' 8" X 5' 3" Opens into PUBLIC_CORR1 Window 6' 8" X 5' 3" Opens into PUBLIC_CORR1 Window 6' 8" X 5' 3" Opens into PUBLIC_CORRI Window 6' 8" X 5' 3" Opens into PUBLIC_CORRI Window 6' 8" X 5' 3" Opens into PUBLIC_CORRI Window 6' 8" X 5' 3" Opens into PUBLIC_CORRI Window 6' 8" X 5' 3" Opens into PUBLIC_CORRI Window 6' 8" X 5' 3" Opens into PUBLIC_CORRI Door 3' 10" X 8' 5" Opens into PUBLIC_CORR1
' 8
' 7
3"
6'
7"
' 2
' 9
' 6
' 7
' 2
' 2
2"
6'
" 6
' 8
6'
141. Mask and cover large light fixture [S 1:1]
25.00 EA 33/15 yrs Avg. 90% M
142. Mask and cover light fixture [S 1:1]
3.00 EA 33/15 yrs Avg. 90% M
OPEN ITEM
OPEN ITEM
3 Vents
143. Drywall tape joint / repair - per LF [S 1:1]
61.33 LF 33/150 yrs Avg. 22% OPEN ITEM
144. Mask and prep for paint - plastic, paper, tape (per LF) [S 1:1]
201.33 LF 33/15 yrs Avg. 90% M
145. Seal/prime then paint (2 coats) [S 1:1]
61.33 SF 33/15 yrs Avg. 90% M
146. Paint - one coat [S 1:1]
2146.67 SF 33/15 yrs Avg. 90% M
147. Final cleaning - construction - Commercial [S 1:1]
OPEN ITEM
OPEN ITEM
OPEN ITEM
2146.67 SF 33/NA Avg. 0% OPEN ITEM
148. Scaffold - per section (per week) [S 1:1]
4.00 WK 33/NA Avg. 0% OPEN ITEM
4 sections for 1 week
Totals: Kennel 2 0.00 0.00 0.00 0.00
Kitchen Height: 12'
531.74 SF Walls
658.69 SF Walls & Ceiling
14.11 SY Flooring
47.00 LF Ceil. Perimeter
126.95 SF Ceiling
126.95 SF Floor
43.17 LF Floor Perimeter
Door 3' 10" X 8' 5" Opens into BREAK_ROOM
149. Contents - move out then reset [S 1:1]
150. Drywall tape joint / repair - per LF [S 1:1]
17.00 LF 33/150 yrs Avg. 22% OPEN ITEM
151. Mask and cover large light fixture [S 1:1]
2.00 EA 33/15 yrs Avg. 90% M
152. Mask and prep for paint - plastic, paper, tape (per LF) [S 1:1]
47.00 LF 33/15 yrs Avg. 90% M
153. Seal/prime then paint (2 coats) [S 1:1]
17.00 SF 33/15 yrs Avg. 90% M
OPEN ITEM
OPEN ITEM
OPEN ITEM
8' 9" 8' 5"
Kitchen
9' 1"
5'
4'
5'
4'
" 3
CONTINUED - Kitchen
154. Paint - one coat [S 1:1]
TAX RCV AGE/LIFE COND. DEP % DEPREC. ACV
126.95 SF 33/15 yrs Avg. 90% M
155. Final cleaning - construction - Commercial [S 1:1]
126.95 SF 33/NA Avg. 0% OPEN ITEM
Totals: Kitchen 0.00 0.00 0.00 0.00
Laundry Room Height: 12'
703.47 SF Walls
945.81 SF Walls & Ceiling
26.93 SY Flooring
64.00 LF Ceil. Perimeter
242.34 SF Ceiling
242.34 SF Floor
56.33 LF Floor Perimeter
156. Contents - move out then reset [S 1:1]
157. Drywall tape joint / repair - per LF [S 1:1]
13.00 LF 33/150 yrs Avg. 22% OPEN ITEM
158. Mask and prep for paint - plastic, paper, tape (per LF) [S 1:1]
64.00 LF 33/15 yrs Avg. 90% M
159. Mask and cover large light fixture [S 1:1]
2.00 EA 33/15 yrs Avg. 90% M
160. Mask and cover light fixture [S 1:1]
4.00 EA 33/15 yrs Avg. 90% M
OPEN ITEM
OPEN ITEM
OPEN ITEM
2 Vents
161. Seal/prime then paint (2 coats) [S 1:1]
13.00 SF 33/15 yrs Avg. 90% M
162. Paint - one coat [S 1:1]
242.34 SF 33/15 yrs Avg. 90% M
163. Final cleaning - construction - Commercial [S 1:1]
242.34 SF 33/NA Avg. 0% OPEN ITEM
Totals: Laundry Room 0.00 0.00 0.00 0.00
Staff Hall 2 3' 10" 5'
1' 7" 2' 11" 3' 3"
Laundry Room
4' 4" 8' 9" 4' 4" 8' 5"
' 8
8'
3'
Pantry Height: 12'
671.74 SF Walls
870.85 SF Walls & Ceiling
22.12 SY Flooring
58.67 LF Ceil. Perimeter
199.11 SF Ceiling
199.11 SF Floor
54.83 LF Floor Perimeter
164. Contents - move out then reset [S 1:1]
165. Drywall tape joint / repair - per LF [S 1:1]
10.67 LF 33/150 yrs Avg. 22% OPEN ITEM
166. Mask and prep for paint - plastic, paper, tape (per LF) [S 1:1]
58.67 LF 33/15 yrs Avg. 90% M
167. Mask and cover large light fixture [S 1:1]
2.00 EA 33/15 yrs Avg. 90% M
168. Mask and cover light fixture [S 1:1]
2.00 EA 33/15 yrs Avg. 90% M
OPEN ITEM
OPEN ITEM
OPEN ITEM
2 Vents
169. Seal/prime then paint (2 coats) [S 1:1]
10.67 SF 33/15 yrs Avg. 90% M
170. Paint - one coat [S 1:1]
199.11 SF 33/15 yrs Avg. 90% M
171. Final cleaning - construction - Commercial [S 1:1]
199.11 SF 33/NA Avg. 0% OPEN ITEM
Totals: Pantry 0.00 0.00 0.00 0.00
4' 10" 3' 10" 4' 6" 2' 4"
Pantry La
10' 8" 10' 10"
' 2
Public Corridor Height: 12'
1253.55 SF Walls
1670.94 SF Walls & Ceiling
46.38 SY Flooring
139.46 LF Ceil. Perimeter
417.39 SF Ceiling
417.39 SF Floor
139.46 LF Floor Perimeter
Window 6' 8" X 5' 3" Opens into KENNEL_2
Window 6' 8" X 5' 3" Opens into KENNEL_2 Window 6' 8" X 5' 3" Opens into KENNEL_2 Window 6' 8" X 5' 3" Opens into KENNEL_2 Window 6' 8" X 5' 3" Opens into KENNEL_2 Window 6' 8" X 5' 3" Opens into KENNEL_1 Window 6' 8" X 5' 3" Opens into KENNEL_1 Window 6' 8" X 5' 3" Opens into KENNEL_1 Window 6' 8" X 5' 3" Opens into KENNEL_1 Window 6' 8" X 5' 3" Opens into KENNEL_1 Window 6' 8" X 5' 3" Opens into KENNEL_1
Subroom: Room2 (2) Height: 12'
288.74 SF Walls
377.24 SF Walls & Ceiling
9.83 SY Flooring
29.67 LF Ceil. Perimeter
88.50 SF Ceiling
88.50 SF Floor
25.83 LF Floor Perimeter
Missing Wall 6' X 12' Opens into PUBLIC_CORR1 Window 6' 8" X 5' 3" Opens into KENNEL_1 Missing Wall 6' X 12' Opens into PUBLIC_CORR1 Door 3' 10" X 8' 5" Opens into Exterior
Room 1 b1lic rKKid
Co
' 1
0" 6'
' 4
5'
3'
' 1
0"
3'
0' 9"
1'
6'
6' m Ro1o6m' 411"3613' 1R0o"om21153' 87"Roo3m' 101"41
2" 1 m m ' 1"
31' 4" 30' 8"
KenPnuebl l1ic CorKKriednonrel 2
15' 9"
H"VAC " iser Room7' 7
9" ' 9" 1 13' 13' 9"
4' 6
6'
16' 25 14
Subroom: Room3 (1) Height: 12'
5659.83 SF Walls
7528.97 SF Walls & Ceiling
207.68 SY Flooring
571.00 LF Ceil. Perimeter
1869.14 SF Ceiling
1869.14 SF Floor
525.00 LF Floor Perimeter
8' 2RR 7' 8"
Window 6' 8" X 5' 3" Opens into KENNEL_2 Window 6' 8" X 5' 3" Opens into KENNEL_2 Window 6' 8" X 5' 3" Opens into KENNEL_2 Window 6' 8" X 5' 3" Opens into KENNEL_2 Door 3' 10" X 8' 5" Opens into KENNEL_2 Missing Wall 6' X 12' Opens into PUBLIC_CORRI Door 3' 10" X 8' 5" Opens into KENNEL_1 Missing Wall 6' X 12' Opens into ROOM2 Door 3' 10" X 8' 5" Opens into Exterior Door 3' 4" X 6' 8" Opens into RISER_ROOM Door 3' 4" X 6' 8" Opens into RISER_ROOM Window 6' 8" X 5' 3" Opens into HVAC2 Door 3' 10" X 8' 5" Opens into HVAC2 Window 6' 8" X 5' 3" Opens into Exterior Door 3' 10" X 8' 5" Opens into Exterior Window 6' 8" X 5' 3" Opens into Exterior Window 6' 8" X 5' 3" Opens into Exterior Window 6' 8" X 5' 3" Opens into Exterior Window 6' 8" X 5' 3" Opens into Exterior Window 6' 8" X 5' 3" Opens into Exterior Window 6' 8" X 5' 3" Opens into Exterior Window 6' 8" X 5' 3" Opens into Exterior Window 6' 8" X 5' 3" Opens into Exterior Door 3' 10" X 8' 5" Opens into ROOM_141 Door 3' 10" X 8' 5" Opens into ROOM_137 Door 3' 10" X 8' 5" Opens into ROOM_136 Door 3' 10" X 8' 5" Opens into STAFF_HALL_2 Window 3' X 5' 3" Opens into Exterior Door 3' 10" X 8' 5" Opens into Exterior Window 6' 8" X 5' 3" Opens into Exterior Window 6' 8" X 5' 3" Opens into Exterior
' 2
" 40
' 3
' 8
' 1
' 4
' 9
' 2
' 6
" 79 ' 48
' 1 0"
6'
' 1 0"
6'
" 60 ' 6
" 2 7'
' 5
" 7 9'
8'
Missing Wall 6' X 12' Opens into ROOM2 Window 6' 8" X 5' 3" Opens into KENNEL_1 Window 6' 8" X 5' 3" Opens into KENNEL_1 Window 6' 8" X 5' 3" Opens into KENNEL_1 Window 6' 8" X 5' 3" Opens into KENNEL_1 Window 6' 8" X 5' 3" Opens into KENNEL_1 Door 3' 10" X 8' 5" Opens into KENNEL_1 Missing Wall 6' X 12' Opens into PUBLIC_CORR2
Subroom: Room1 (3) Height: 12'
22.45 SF Walls
27.06 SF Walls & Ceiling
0.51 SY Flooring
1.87 LF Ceil. Perimeter
4.61 SF Ceiling
4.61 SF Floor
1.87 LF Floor Perimeter
Missing Wall 6' X 12' Opens into PUBLIC_CORR1 Missing Wall 6' X 12' Opens into PUBLIC_CORRI
172. Mask and cover large light fixture [S 1:1]
44.00 EA 33/15 yrs Avg. 90% M
173. Mask and cover light fixture [S 1:1]
2.00 EA 33/15 yrs Avg. 90% M
OPEN ITEM
OPEN ITEM
4 Vents
174. Drywall tape joint / repair - per LF [S 1:1]
30.00 LF 33/150 yrs Avg. 22% OPEN ITEM
175. Seal/prime then paint (2 coats) [S 1:1]
30.00 SF 33/15 yrs Avg. 90% M
176. Mask and prep for paint - plastic, paper, tape (per LF) [S 1:1]
742.00 LF 33/15 yrs Avg. 90% M
177. Paint - one coat [S 1:1]
2379.64 SF 33/15 yrs Avg. 90% M
178. Final cleaning - construction - Commercial [S 1:1]
OPEN ITEM
OPEN ITEM
2379.64 SF 33/NA Avg. 0% OPEN ITEM
Totals: Public Corridor 0.00 0.00 0.00 0.00
18' 7" 18' 8" 5' 4" 3' 4" 3' 4" 5' 5"
18' 5" 18' 6"
Riser Room
5' 3" 5' 2"
Riser Room Height: 12'
928.00 SF Walls
1243.00 SF Walls & Ceiling
35.00 SY Flooring
77.33 LF Ceil. Perimeter
315.00 SF Ceiling
315.00 SF Floor
77.33 LF Floor Perimeter
Door 3' 4" X 6' 8" Opens into PUBLIC_CORR1 Door 3' 4" X 6' 8" Opens into PUBLIC_CORR1
179. Mask and cover large light fixture [S 1:1]
180. Mask and cover light fixture [S 1:1]
181. Drywall tape joint / repair - per LF [S 1:1]
23.33 LF 33/150 yrs Avg. 22% OPEN ITEM
182. Mask and prep for paint - plastic, paper, tape (per LF) [S 1:1]
77.33 LF 33/15 yrs Avg. 90% M
183. Seal/prime then paint (2 coats) [S 1:1]
23.33 SF 33/15 yrs Avg. 90% M
184. Paint - one coat [S 1:1]
315.00 SF 33/15 yrs Avg. 90% M
185. Final cleaning - construction - Commercial [S 1:1]
OPEN ITEM
OPEN ITEM
315.00 SF 33/NA Avg. 0% OPEN ITEM
Totals: Riser Room 0.00 0.00 0.00 0.00
PL
1"
' 6
5' 6"
' 2
9'
' 1 0"
5' r2o9oming
6' 8"
Staff Hall Height: 12' aan
1238.47 SF Walls
1631.24 SF Walls & Ceiling
392.78 SF Ceiling
392.78 SF Floor
taff Hal
Inter 1' 2"
43.64 SY Flooring
124.83 LF Ceil. Perimeter
98.00 LF Floor Perimeter
Door Door Door Door Window Door Door Door t Foy 3' 10" X 8' 5" Opens into BREAK_ROOM 3' 10" X 8' 5" Opens into Exterior 3' 10" X 8' 5" Opens into Exterior 3' 10" X 8' 5" Opens into ROOM_108 6' 5" X 5' 3" Opens into ROOM_117 3' 10" X 8' 5" Opens into ROOM_117 3' 10" X 8' 5" Opens into ROOM_118 3' 10" X 8' 5" Opens into Exterior
Missing Wall 6' 8" X 12' Opens into STAFF_HALL_2
186. Detach & Reset Recessed light fixture - trim only [S 1:1]
3.00 EA 0/20 yrs Avg. 0% OPEN ITEM
187. Mask and cover large light fixture [S 1:1]
9.00 EA 33/15 yrs Avg. 90% M
188. Drywall tape joint / repair - per LF [S 1:1]
OPEN ITEM
20.00 LF 33/150 yrs Avg. 22% OPEN ITEM
189. Mask and prep for paint - plastic, paper, tape (per LF) [S 1:1]
124.83 LF 33/15 yrs Avg. 90% M
190. Seal/prime then paint (2 coats) [S 1:1]
25.00 SF 33/15 yrs Avg. 90% M
191. Paint - one coat [S 1:1]
1631.24 SF 33/15 yrs Avg. 90% M
192. Final cleaning - construction - Commercial [S 1:1]
OPEN ITEM
OPEN ITEM
392.78 SF 33/NA Avg. 0% OPEN ITEM
Totals: Staff Hall 0.00 0.00 0.00 0.00
Bre
Staff Hall 2 Height: 12'
1300.85 SF Walls
1693.68 SF Walls & Ceiling
43.65 SY Flooring
148.33 LF Ceil. Perimeter
392.83 SF Ceiling
392.83 SF Floor
94.33 LF Floor Perimeter
Door 3' 10" X 8' 5" Opens into PANTRY Missing Wall 6' 8" X 12' Opens into STAFF_HALL Door 3' 10" X 8' 5" Opens into ROOM_128 Door 3' 10" X 8' 5" Opens into ROOM_129 Door 3' 10" X 8' 5" Opens into GROOMING_ARE Door 3' 10" X 8' 5" Opens into Exterior Door 3' 10" X 8' 5" Opens into ACO_ROOM Window - Goes to Floor 11' 10" X 5' 3" Opens into ACO_ROOM Window 3' X 5' 3" Opens into Exterior Door 3' 10" X 8' 5" Opens into Exterior Door 3' 10" X 8' 5" Opens into ROOM_136 Door 3' 10" X 8' 5" Opens into PUBLIC_CORR1 Door 3' 10" X 8' 5" Opens into ROOM_125 Window 11' 10" X 5' 3" Opens into ROOM_125 Door 3' 10" X 8' 5" Opens into LAUNDRY_ROOM
193. Detach & Reset Recessed light fixture - trim only [S 1:1]
3.00 EA 0/20 yrs Avg. 0% OPEN ITEM
194. Mask and cover large light fixture [S 1:1]
10.00 EA 33/15 yrs Avg. 90% M
195. Mask and cover light fixture [S 1:1]
7.00 EA 33/15 yrs Avg. 90% M
4 Speakers 2 Vents 1 Smoke Detector
196. Drywall tape joint / repair - per LF [S 1:1]
26.67 LF 33/150 yrs Avg. 22% OPEN ITEM
197. Mask and prep for paint - plastic, paper, tape (per LF) [S 1:1]
148.33 LF 33/15 yrs Avg. 90% M
198. Seal/prime then paint (2 coats) [S 1:1]
25.00 SF 33/15 yrs Avg. 90% M
199. Paint - one coat [S 1:1]
1693.68 SF 33/15 yrs Avg. 90% M
200. Final cleaning - construction - Commercial [S 1:1]
OPEN ITEM
OPEN ITEM
392.83 SF 33/NA Avg. 0% OPEN ITEM
3' 10" oom 12G9rooming AreaAco Room 6' 3" Room
3' 10" 13' 4" 11' 10" 16' 1" St3a'f1f 0H"all 2
4' 6" 1' 7" 11' 10"
Roo6m' 51"25
13' 10" 3'
CONTINUED - Staff Hall 2
Totals: Staff Hall 2 0.00 0.00 0.00 0.00
[%] - Indicates that depreciate by percent was used for this item [M] - Indicates that the depreciation percentage was limited by the maximum allowable depreciation for this item
Grand Total Areas:
29,293.52 SF Walls 12,519.57 SF Ceiling 41,813.09 SF Walls and Ceiling 12,519.57 SF Floor 1,391.06 SY Flooring 2,576.63 LF Floor Perimeter
0.00 SF Long Wall 0.00 SF Short Wall 2,836.30 LF Ceil. Perimeter
12,519.57 Floor Area 13,154.15 Total Area 29,293.52 Interior Wall Area 11,373.85 Exterior Wall Area 957.89 Exterior Perimeter of
Walls
0.00 Surface Area 0.00 Number of Squares 0.00 Total Perimeter Length
0.00 Total Ridge Length 0.00 Total Hip Length
' 5
' 1
' 5
9'
' 2
5'
5'
' 8
9'
9'
9'
' 5
' 9
' 5
1'
' 6
' 4
' 4
22' 1" 21' 7"
13' 10" 13' 4"
8' 4"
14'
31' 2" 30' 8"
43' 8" 43' 4"
12' 9" 12' 3"
Room 129 Grooming Area Aco Room Room 136 Room 137 Room 141 3' 3"
14' 9" 14' 11"
6' 10" 6' 10"
14' 6"
10' 5" 17' 6' 2" 24' 5"
43' 10"
2' 11" 9' 9' 4"
11' 2" Staf1f0' H7" all 2
22' 6"
31' 4"
6' 31' 4"
Room 128
6' 8" 10' 8" 10' 1" 2' 11" 3' 3"
22' 2"
Room 125 30' 8" 30' 8"
21' 4" 21' 8"
PantryLaundry Room
10' 10"
4' 4" 4' 4"
8' 9" 3" 8' 5" 5"
14' 10"
Room 118 Break Room
Kitchen
Staff Hall
Room 117
9' 1" Kennel 1 Public Corridor Kennel 2
6' 6"
15'
11' 9" 6' 11' 1"
Interview Room 5' 3"
Room 1F0o8yer Ext
13' 10"
11' 5"
Foyer/Entry 6' 2"
5' 10"
1' 8"
8' 2"
27' 4"
HVAC
17' 10" 18'
26' 8"
13' 8" 2' 4" 2' 8"
Riser Room
' 8
' 2
9'
9'
6'
7'
' 1
' 2
' 3
' 7
5'
5'
3'
3'
7'
6'
' 9
8'
8'
8'
' 8
8'
8'
' 9
' 7
' 9
' 5
' 8
' 6
| DOUGLAS_COUNTY_BOA3 |
| CONTINUED - Main Level |
| Room 108 Height: 12' |
| 1861.39 SF Walls |
| 163.18 LF Ceil. Perimeter |
| 547.74 SF Walls |
| Aco Room Height: 12' |
| 561.61 SF Walls |
| Door 3' 10" X 8' 5" Opens into STAFF_HALL_2 |
| CONTINUED - Break Room |
| CONTINUED - Grooming Area |
| Foyer/Entry Height: 9' 10" |
| 859.28 SF Walls |
| 1103.17 SF Walls & Ceiling |
| 860.74 SF Walls |
| CONTINUED - HVAC |
| CONTINUED - Kennel 1 |
| CONTINUED - Kitchen |
| Door 3' 10" X 8' 5" Opens into Exterior |
| 22.45 SF Walls |
| 928.00 SF Walls |
| Staff Hall Height: 12' |
| 1238.47 SF Walls |
| 43.64 SY Flooring |
| 3' 10" X 8' 5" Opens into BREAK_ROOM |
| CONTINUED - Staff Hall 2 |
| Grand Total Areas: |
| Main Level |
| Room 129 |
| Room 128 |
| Room 125 |
| PantryLaundry Room |
| Room 118 |
| Kitchen |
| Kennel 1 Public Corridor Kennel 2 |
| Interview Room |
| Room 1F0o8yer Ext |
| Foyer/Entry |
| HVAC |
Other files
| File | Type | Posted |
|---|---|---|
| Award Information | — | |
| On Call Plumbing Services | — | |
| Ad | — | |
| Award Information | — | |
| RFP | — | |
| Award Information | — | |
| 23-021 AMENDMENT F | — | |
| Award Information | — | |
| 23-021 | — | |
| Addendum 1 | — | |
| Jefferson St Booker Basin | — | |
| Award Information | — |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .