Sch B3 Welcome Center Snow Removal specs Monroe.docx
DOCX document 43 KB Posted
- Attached to
- Monroe Welcome Center Janitorial
- Solicitation number
- RFP 591 260000002444 1
- Issued by
- Michigan
About this file
Monroe Welcome Center Snow Removal Specifications
This document is a Schedule B.3 specification sheet for snow and ice removal services at the Monroe Welcome Center in Michigan, issued as part of Request for Proposal (RFP) No. 260000002444 for Janitorial/Grounds/Snow Services. The specification outlines comprehensive snow removal requirements on all driving surfaces, including entrance ramps, car parking areas, truck parking areas, and exit ramps. Snow removal must be completed by 7:00 a.m. following any accumulation of 2 inches or more of snow, occurring on any day including weekends and holidays. The contractor must respond to additional service calls or emergency snow and ice removal requests within one hour of notification from the Program Manager. Snow storage areas must not create vision obstructions or hazards to the public, cannot be piled on sidewalks or sidewalk cuts, and cannot be pushed onto adjacent roads and shoulders in compliance with state law.
The contractor is responsible for furnishing, operating, and maintaining all suitable and adequate equipment necessary to maintain the facility free from ice and snow, with equipment subject to inspection by the Program Manager for compliance with local, state, and federal codes. Equipment failure does not constitute acceptable justification for failure to provide scheduled service. The contractor must apply granular or approved liquid deicer following snow removal operations when hard-packed snow or ice remains on pavement, and during any periods of freezing precipitation as directed by the Program Manager. The contractor must notify the Program Manager no later than the next day after work is performed and consult with the Program Manager for inspection and tentative approval to allow time for corrective action if needed. Equipment storage on state property is prohibited, and the state assumes no responsibility for theft, vandalism, or damage to the contractor's equipment.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sch B1 Welcome Center Janitorial specs Monroe.docx | DOCX document | |
| Schedule C - Monroe Welcome Center LSS final Harmony.xlsx | XLSX spreadsheet | |
| Sch A Monroe Welcome Center.docx | DOCX document | |
| Proposal Instructions Monroe WC.docx | DOCX document | |
| Vendor Questions Worksheet Monroe WC.docx | DOCX document | |
| Confidential Treatment Form Monroe WC.docx | DOCX document | |
| Standard Contract Terms Monroe WC.docx | DOCX document | |
| Sch B2 Welcome Center Grounds Maint specs Monroe WC.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Michigan.gov/MiProcurement
SCHEDULE B.3 – SNOW REMOVAL SPECIFICATIONS
Michigan.gov/MiProcurement
SCHEDULE B.3 – SNOW REMOVAL SPECIFICATIONS
Request for Proposal (RFP) No. 260000002444 Janitorial/Grounds/Snow Services for the Monroe Welcome Center
SNOW AND ICE REMOVAL SPECIFICATIONS
A. General Requirements:
“TIME IS OF THE ESSENCE” in respect to snow and/or ice removal Contract Activities. The Contractor must perform Contract Activities in conformance with the provisions set forth herein and use due diligence to complete the work within the shortest reasonable period of time.
B. Snow Removal on Driving Surfaces
1. Snow removal shall be completed by 7:00 a.m. after each accumulation of 2” or more of snow on any given day including weekends and holidays. In cases of heavy snowfall, multiple service occurrences may be required during the day. Typical service is plowing 2” to 6” of snow accumulation. The Program Manager may request additional service trips to remove snow which has accumulated.
2. Areas for snow removal shall include entrance ramps, car parking areas, truck parking areas, and exit ramps.
3. Snow shall not be piled to cause a vision obstruction or hazard to the public; nor shall it be piled on sidewalks, or sidewalk “cuts”. All snow shall be pushed away from sidewalks and stored in the areas shown on the map (if provided) or in areas designed by the Program Manager.
4. BY STATE LAW no snow shall be pushed across or on to adjacent roads and shoulders.
5. Any accidents or damages on the premises must be reported immediately to the Program Manager.
C. Ice Removal
1. Granular or approved liquid deicer shall be applied anytime hard packed snow or ice remains on pavement after snow removal operation has been completed.
2. Deicer shall be applied during any period(s) of freezing precipitation as directed by the Program Manager.
D. Calls for Additional Services
1. The Program Manager may request additional or emergency snow/ice removal services as needed (drifting snow or other circumstances) and as determined by the Program Manager or designee.
2. The Contractor must respond and be in route to the call out location(s) within one hour of notification from the Program Manager or designee.
E. Work Approval
1. The Contractor must notify the Program Manager or designee no later than the next day after any work is performed.
2. The Contractor shall consult the Program Manager for inspection and tentative approval of work being accomplished, so that in the event of unsatisfactory work, sufficient time will be available for the Contractor to make corrections in a satisfactory manner within the time specified.
F. Equipment
1. The Contractor shall furnish, operate and maintain suitable and adequate equipment necessary to maintain entrance/exit ramps and all parking areas free from ice and snow.
2. The Contractor's snow removal equipment WILL NOT be stored on State property for any reason.
3. Under no circumstances shall the State be responsible for any theft, vandalism, or damage to the Contractor’s equipment.
4. The Program Manager shall have the right to inspect all equipment which is to be used in carrying out the terms of the Contract. Any equipment which does not comply with local, state, and federal codes, or with the Contract, may be rejected.
5. Equipment failure WILL NOT constitute an acceptable reason for failure to provide scheduled service.