About this file

This document contains Schedule B.3 Snow Removal Specifications for Request for Proposal No. 260000002373 issued by the State of Michigan for Janitorial/Grounds/Snow Services at the Garden Corners Rest Area in the Superior Region. The specification outlines requirements for snow and ice removal services at the rest area facility. Snow removal must be completed by 7:00 a.m. following any accumulation of 2 inches or more of snow on any day, including weekends and holidays, with multiple service trips potentially required during heavy snowfall events. Services include snow-blowing from all sidewalks and pushing snow 16 inches into parking lots to facilitate plowing operations. The contractor must store snow in designated areas shown on provided maps or as directed by the Program Manager, ensuring no snow obstructs visibility, creates hazards, is piled on sidewalks, or crosses onto adjacent roads and shoulders per state law. Ice removal services require application of granular or approved liquid deicer following snow removal operations or during freezing precipitation events as directed by the Program Manager.

The contractor must furnish, operate, and maintain suitable equipment for maintaining entrance/exit ramps and parking areas free from ice and snow, with the option to store equipment on state property. Equipment must comply with all local, state, and federal codes and is subject to Program Manager inspection and approval; non-compliance may result in equipment rejection. The contractor must respond to calls for additional or emergency snow and ice removal services within one hour of notification from the Program Manager. Equipment failure does not constitute acceptable reason for service failure. The contractor must report any accidents or damages on the premises immediately to the Program Manager. The State assumes no responsibility for theft, vandalism, or damage to contractor-provided equipment.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Michigan.gov/MiProcurement

SCHEDULE B.3 – SNOW REMOVAL SPECIFICATIONS

Michigan.gov/MiProcurement

SCHEDULE B.2 – GROUNDS MAINTENANCE SPECIFICATIONS

Request for Proposal (RFP) No. 260000002373 Janitorial/Grounds/Snow Services for the Garden Corners Rest Area in Superior Region

SNOW AND ICE REMOVAL SPECIFICATIONS

A. General Requirements:

“TIME IS OF THE ESSENCE” in respect to snow and/or ice removal Contract Activities. The Contractor must perform Contract Activities in conformance with the provisions set forth herein and use due diligence to complete the work within the shortest reasonable period of time.

B. Snow Removal on Driving Surfaces

1. Snow removal shall be completed by 7:00 a.m. after each accumulation of 2” or more of snow on any given day including weekends and holidays. In cases of heavy snowfall, multiple service occurrences may be required during the day. Typical service is snow-blowing 2” to 6” of snow accumulation off all sidewalks. The Program Manager may request additional service trips to remove snow which has accumulated.

2. Areas for snow removal shall include all sidewalks; pushing snow 16” in to parking lot so plows can grab with blade. We do not want a ribbon of snow between sidewalks and the parking lot for visitors to slip on.

3. Snow shall not be piled to cause a vision obstruction or hazard to the public; nor shall it be piled on sidewalks, or sidewalk “cuts”. All snow shall be pushed away from sidewalks and stored in the areas shown on the map (if provided) or in areas designed by the Program Manager.

4. BY STATE LAW no snow shall be pushed across or on to adjacent roads and shoulders.

5. Any accidents or damages on the premises must be reported immediately to the Program Manager.

C. Ice Removal

1. Granular or approved liquid deicer shall be applied anytime hard packed snow or ice remains on pavement after snow removal operation has been completed.

2. Deicer shall be applied during any period(s) of freezing precipitation as directed by the Program Manager.

D. Calls for Additional Services

1. The Program Manager may request additional or emergency snow/ice removal services as needed (drifting snow or other circumstances) and as determined by the Program Manager or designee.

2. The Contractor must respond and be in route to the call out location(s) within one hour of notification from the Program Manager or designee.

E. Equipment

1. The Contractor shall furnish, operate and maintain suitable and adequate equipment necessary to maintain entrance/exit ramps and all parking areas free from ice and snow.

2. The Contractor's snow removal equipment can be stored on State property.

3. Under no circumstances shall the State be responsible for any theft, vandalism, or damage to the Contractor’s equipment.

4. The Program Manager shall have the right to inspect all equipment which is to be used in carrying out the terms of the Contract. Any equipment which does not comply with local, state, and federal codes, or with the Contract, may be rejected.

5. Equipment failure WILL NOT constitute an acceptable reason for failure to provide scheduled service.

RFP: 260000002373