SB1341-16-RQ-0417_LineItems.pdf
PDF 33 KB Posted
- Attached to
- Variable Pressure Scanning Electron Microscope Federal contract opportunity
- Solicitation number
- SB1341-16-RQ-0417
About this file
Line Item Schedule
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SB1341-16-RQ-0417-001_SF30.pdf | ||
| SB1341-16-RQ-0417_PsSOW.pdf | ||
| subcontracting_plan_outline_attachment.pdf | ||
| SB1341-16-RQ-0417_Ps Cs.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LINE ITEMSCHEDULE
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 The contractor shall provide a variable pressure scanning electron microscope in accordance with the statement of work inclusive of FOB Destination Shipping, installation, training and warranty.
1.00 EA
0002 The contractor shall install and integrate the Gata MonoCL4 Elite onto the microscope in accordance with the Statement of Work.
1.00 JB
OPT
0003 The contractor shall provide a complete service technician toolkit.
Period of Performance: 09/30/2016 to 09/29/2017
1.00 EA
OPT
0004 The contractor shall provide a stand-alone benchtop Au/
Pd plasma coater with quartz crystal thickness monitor with spare target and 10 spare crystals.
Period of Performance: 09/30/2016 to 09/29/2017
1.00 EA
OPT
0005 The contractor shall provide a liquid Helium cryo-stage for ultra-cold CL work (He cryo).
Period of Performance: 09/30/2016 to 09/29/2017
1.00 EA
OPT
0006 The contractor shall provide a second SDD detector with take-off angle greater than 30 degrees, 50 mm square or larger, 126eV or better with installation and integration into the required x-ray analysis system.
Period of Performance: 09/30/2016 to 09/29/2017
1.00 EA
OPT
0007 The contractor shall provide software for the Silicon Drift
Detector (SDD) x-ray analysis system that will perform automated particle analysis and reporting.
Period of Performance: 09/30/2016 to 09/29/2017
1.00 EA
OPT
0008 The contractor shall provide maintenance services in accordance with the Statement of Work
Period of Performance: 09/30/2017 to 09/29/2018
1.00 YR
OPT
0009 The contractor shall provide maintenance services in accordance with the Statement of Work
Period of Performance: 09/30/2018 to 09/29/2019
1.00 YR
OPT
0010 The contractor shall provide maintenance services in accordance with the Statement of Work
Period of Performance: 09/30/2019 to 09/29/2020
1.00 YR
File details come from the government source that posted it. Updated .