STRIVE ARGOS Camera Development Statement of Work Summary
This is a Statement of Work (SOW) for NASA Goddard Space Flight Center detailing the development of a camera design for the Aerosol Radiometer for Global Observation of the Stratosphere (ARGOS) instrument on the Stratosphere Troposphere Response using Infrared Vertically-resolved Light Explorer (STRIVE) mission. The contractor is required to develop a camera design concept and define electrical, thermal, mechanical, and flight software interfaces documented in an Interface Control Document over a 12-month period of performance from award. Key deliverables include a non-flight frame mechanical mockup, a Preliminary Interface Control Document due at 3 months post-award, and a Final Interface Control Document due at 6 months post-award, with 4 hours per week of engineering support provided for months 6-12.
The camera must conform to specific technical requirements including a Sensors Unlimited 1280JSX Enclosed Camera form factor or equivalent, operate within a thermal range of +20°C to +30°C, feature Black Anodized Aluminum coating, and include a co-addition acquisition algorithm supporting 1-256 frame accumulation with 16 Most Significant Bits output. Additional specifications mandate LVDS serial output for video and command/control, power input range of +8 to +16 VDC, sub-windowing capabilities for up to 10 rectangular windows, TEC thermal stability within ±1°C, a three-year operational lifetime, and radiation survival capability of less than 18 krad with 100 mils of aluminum shielding. The contractor shall support weekly technical meetings, radiation risk mitigation discussions, preliminary and final Interface Control Document reviews with the customer team, and host a kickoff technical interchange meeting at the vendor facility.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SATPC0042651 Tab 06 RDSS..pdf | ||
| SATPC0042651 Tab 07 Capability Statement.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Effective Date: August 18, 2026
Check https://idptdms.gsfc.nasa.gov to verify that this is the correct version prior to use.
400-FORM-0002 (4/16/2014)
National Aeronautics and Space Administration
Goddard Space Flight Center Greenbelt, Maryland
Reference Document
STRIVE-MGMT-SOW-0004, Revision B Stratosphere Troposphere Response using Infrared
Vertically-resolved Light Explorer, Code 404
STRIVE Aerosol Radiometer for Global Observation of the Stratosphere (ARGOS) Camera Development Statement of Work
(SOW)
https://idptdms.gsfc.nasa.gov/
STRIVE ARGOS Camera Development SOW STRIVE-MGMT-SOW-0004, Revision B
Reference Document ii Check https://idptdms.gsfc.nasa.gov to verify that this is the correct version prior to use.
Change History Log
Revision Effective Date Description of Change Revision - 05/18/2026 Initial Release Revision A 05/27/2026 Revised Section 5 Revision B 08/18/2026 Incorporated mechanical camera mock up
Reference Document iii Check https://idptdms.gsfc.nasa.gov to verify that this is the correct version prior to use.
Table of TBDs
Action Item No.
Location Summary Individual/ Organization
Actionee
Reference Document iv Check https://idptdms.gsfc.nasa.gov to verify that this is the correct version prior to use.
400-FORM-0002 (4/16/2014)
Table of Contents
1 PURPOSE
2 ARGOS CAMERA SPECIFICATIONS
3 PERIOD OF PERFORMANCE
4 DELIVERABLES
5 TECHNICAL EXANGE MEETINGS, REPORTS, AND REVIEWS
Appendix A Abbreviations and Acronyms
Reference Document
Check https://idptdms.gsfc.nasa.gov to verify that this is the correct version prior to use.
1 PURPOSE
The Contractor shall develop a camera design concept and define electrical, thermal, mechanical, and flight software interfaces in an Interface Control Document that will meet the requirements for the Aerosol Radiometer for Global Observation of the Stratosphere (ARGOS) instrument on the Stratosphere Troposphere Response using Infrared Vertically-resolved light Explorer (STRIVE) mission. The electrical interface shall utilize a LVDS for output, serial input, and timing. The Contractor shall produce an example telemetry packet and co-added frame packet.
2 ARGOS CAMERA SPECIFICATIONS
• Mechanical Form Factor: Utilize the Sensors Unlimited standard 1280JSX Enclosed
Camera form factor or equivalent.
• Thermal Requirements: Temperature of the mechanical interface is expected to be held within the range of +20 °C to +30 °C by the Next Higher Assembly during operation.
• Thermal Coating: Outside of camera body to be Black Anodized Aluminum.
• Contamination Considerations: Camera will be fabricated and assembled to remove these sources of outgassing.
• PCBAs Quality Control: PCBAs to be assembled using standard RoHS compliant process.
• Video and Command & Control: 3M 12226-1150-00FR, or equivalent o Trigger and Sync: 3M 12214-1150-00FR, or equivalent o Power: Hirose HR10-7R-6PA (73), or equivalent
• Co-addition acquisition algorithm to be defined as:
o Frame buffer to be established to accumulate N frames of pixel data into a single buffer;
o N is between 1 and 256, inclusive;
o Output pixel value = sum of accumulated pixel data ÷ N;
o 16 Most Significant Bits of pixel data are output from the camera.
• Sub-windowing to be defined as:
o Up to 10 sub-windows are read out for each co-addition acquisition routine;
Col_start, Col_end, Row_start, Row_end o Resulting readout time is error checked to ensure that all data can be read out within each co-addition acquisition period;
o Video Stream to be defined by SUI in future communications;
o Data transfers must be possible while new co-addition frames are acquired (i.e., integrate-while-read).
• Trigger Signal is defined as the start time of co-addition acquisition.
• ROIC exposure and readout timing is automatically generated with the Camera.
• Video data is automatically streamed out of the camera once N frames have been acquired and co-added.
• Power voltage input range is +8 VDC to +16 VDC.
• Max and Average Power
• Trigger and Sync signals are nominally +3.3V TTL.
• Output video is proprietary LVDS serial stream, including data format, max and average rate
• Command & Control is at LVDS signal levels
Reference Document
Check https://idptdms.gsfc.nasa.gov to verify that this is the correct version prior to use.
• Command & Control packet format.
• Pixel pitch is 12.5um.
• TEC thermal stability is defined as locked within +/- 1 °C
• There is no remote on/off signal to this camera. Hard resets may be achieved through external power cycle.
• External monitoring of TEC voltage is not present.
• Included TRR/PDR/CDR/PSR review milestones.
• Meet a three-year lifetime
• Survive radiation environment consisting of a total dose of <18 krad with 100 mils of aluminum shielding
• Have the ability to co-add pixels and window certain sections of the detector so that it minimizes downlink
3 PERIOD OF PERFORMANCE
The period of performance will be 12 months from award.
The Preliminary and Final Interface Control Documents (as defined below) shall be delivered 3 months and 6 months after award, respectively. For months 6-12, 4 hours per week of engineering support shall be provided.
4 DELIVERABLES
The Contractor shall deliver the following:
• Camera non-flight frame mechanical mockup to enable mechanical interfacing.
o Co-addition acquisition algorithm to be defined as:
Frame buffer to be established to accumulate N frames of pixel data into a single buffer;
N is between 1 and 256, inclusive;
Output pixel value = sum of accumulated pixel data ÷ N;
16 Most Significant Bits of pixel data are output from the camera.
o Sub-windowing to be defined as:
Up to 10 sub-windows are read out for each co-addition acquisition routine;
Subwindows are rectangular, individually defined by:
Col_start, Col_end, Row_start, Row_end Resulting readout time is error checked to ensure that all data can be read out within each co-addition acquisition period;
Video Stream to be defined by the Vendor in future communications;
Data transfers must be possible while new co-addition frames are acquired
(i.e., integrate-while-read).
o Trigger Signal is defined as the start time of co-addition acquisition.
o ROIC exposure and readout timing is automatically generated with the Camera.
o Video data is automatically streamed out of the camera once N frames have been acquired and co-added.
• Preliminary Interface Control Document documenting details of:
o Additional interfaces not listed here but mutually agreed are key for the design
Reference Document
Check https://idptdms.gsfc.nasa.gov to verify that this is the correct version prior to use.
o Electrical interfaces: digital, analog, electrical power, inrush, TEC power, camera electronics power, timing, and electrical interface drawing o Mechanical interfaces: envelope, field of view, field of regard, focal plane details, mass, and mechanical interface drawing o Thermal interfaces: locations for conducting away power dissipation, operating, qualification and survival limits.
o FSW interfaces: command interface (TEC settings, exposure times, setting co-adding, windowing), downlink protocol, internal buffering.
Options for early FSW interface development
• Final Interface Control Document documenting details of:
o Additional interfaces not listed here but mutually agreed are key for the design o Electrical interfaces: digital, analog, electrical power, inrush, TEC power, camera electronics power, timing, and electrical interface drawing o Mechanical interfaces: envelope, field of view, field of regard, focal plane details, mass, and mechanical interface drawing o Thermal interfaces: locations for conducting away power dissipation, operating, qualification and survival limits.
o FSW interfaces: command interface (TEC settings, exposure times, setting co-adding, windowing), downlink protocol, internal buffering.
Reference Document
Check https://idptdms.gsfc.nasa.gov to verify that this is the correct version prior to use.
5 TECHNICAL EXANGE MEETINGS, REPORTS, AND REVIEWS
The Contractor shall support the following meetings, reports, and reviews:
• Discussion about alternative parts to mitigate radiation risk with parts list
• Weekly teams/zoom meeting for information exchanges, concerns, questions
• Weekly meetings that document and dress accomplishments, schedule forward, needs from STRIVE team, and status on any open items.
• Camera team will host and organize a kickoff technical interchange meeting at vendor facility
• Camera team will have a preliminary interface control document review with the customer team providing comments
• Camera team will have a final interface control document review with the customer team providing comments
Reference Document
Check https://idptdms.gsfc.nasa.gov to verify that this is the correct version prior to use.
Appendix A Abbreviations and Acronyms
ARGOS Aerosol Radiometer for Global Observation of the Stratosphere CDR Critical Design Review FSW Flight Software LVDS Low Voltage Differential Signaling PDR Preliminary Design Review PSR Pre-Ship Review ROIC Read-Out Integrated Circuit STRIVE Stratosphere Troposphere Response using Infrared Vertically-resolved light
Explorer TBD To be determined TEC Thermo Electric Cooler TRR Test Readiness Review TTL Transistor-Transistor Logic VDC Volts, Direct Current
| 1 Purpose |
| 2 argos camera Specifications |
| 3 Period of Performance |
| 4 Deliverables |
| 5 technical exange meetings, reports, and reviews |
| Appendix A Abbreviations and Acronyms |
File details come from the government source that posted it. Updated .