AMENDMENT #03
| RFP Section / Reference |
| Page # |
| Description / RFP Text |
| Question |
| Answer |
| 1 |
| RFP H-031-1: Additional Security requirements, Subcontracting and SOW CLIN 003 Jordan-Language Assistance |
| RFP 24 and SOW 13 |
| Section H-031-1 on page 24 under “Subcontracting” lists the only restrictions on subcontracting contained in the RFP. However, CLIN 003: Jordan Language Assistance on page 13 of the Statement of Work (SOW) indicates that “The Jordan LA positions are the only Labor positions that can be filled by a subcontractor upon COR approval.” |
| Can INL please confirm that there are no restrictions on which labor categories a subcontractor can fill? |
| 60% of the Labor Hours for CLINs 002, 004 and 007 need to come from the prime. The PM, DPM and ADPM must work for the prime. |
No other restrictions.
| 2 |
| RFP L.3.2, Factor 3, Past Performance and Capacity |
| RFP 60 |
| The requirement states, “Provide a list of at least four contracts, demonstrating prior experience with relevant past performance information and references.” |
| In the event that subcontractors are permitted for roles other than the LAs in Jordan, can their past performance information and references provided as part of the list demonstrating qualification for factor 3, Past Performance and Capacity |
| YES |
| 3 |
| RFP M.4. Sub-Factor 2: Key Personnel and SOW 2.13 Key Personnel |
| RFP 70 and SOW 7-9 |
| The requirement states: (a) Program manager shall be an American citizen with at least five years prior prosecution experience, as well as management experience in overseas rule-of-law development projects. Experience working in Middle Eastern criminal justice systems is preferred. |
(b)Deputy Program Manager shall be an American citizen with at least five years prior legal or police experience, as well as program or management experience. Candidate should have excellent English language verbal skills, and should be well versed in relevant criminal substantive and procedural laws.
(c)Assistant Deputy Program Manager shall include a police expert with significant investigatory, administration, and development experience to advise and coordinate police programming. Consideration should be given to retaining a SME from the United States or European law enforcement community with experience working in Middle Eastern criminal justice systems.
| We respectfully request that key requirements for the PM, DPM and ADPM from the SOW be used as the section M evaluation criteria for sub-factor 2. |
| M.4 is updated in |
Amendment #03.
| 5 |
| SOW CLIN 005: Travel and ODCs, International Travel |
| SOW 14 |
| The SOW states, “The Contractor shall make travel arrangements for Contractor personnel…” |
| It is our assumption that the movement of the trainees across the border to Jordan, and the corresponding visa, logistics arrangements, and per diem for the trainees are not within the domain of the PASF project. Can INL please confirm that is correct? |
| The logistics of moving trainees across the border to Jordan and back is part of the contract. There is no per-diem involved, but a bus must be arranged to move the students to the border , exit visas purchased for all students, a bus from the Jordanian side to JIPTC. A TM must accompany the students and ensure the rosters are correct. This activity is coordinated with the USSC. |
| 6 |
| SOW CLIN 007: Subject Matter Experts (SMEs), 9.7 English Language Instructor |
| SOW 21 |
| The Key Requirements state, “Frequent travel to the West Bank is expected.” |
| We interpret this to mean that INL expects this person to be based in Jordan. Can INL please confirm that this is also its preference? |
| English Language SME will be based in the WB. Frequent travel is within the WB. Currently he gives classes in Ramallah and Jericho. |
| 7 |
| RFP B-008 Travel Costs (Labor Hours) |
| RFP 8 |
| The requirement (d) states that hazardous duty premium pay if requested and allowed will be payable. |
| Please clarify if hazardous duty premium pay, (i.e. Danger Pay), should be budgeted as a reimbursable travel cost as indicated by this reference under section B-008 or if danger pay should be incorporated into the negotiated fully-burdened hourly rate as indicated on Page 7, B-010 (d). |
| It should be listed separately under CLIN 005 as an ODC (danger pay). Currently Jordan is not listed as a Danger Pay Post. |
| 8 |
| RFP 8-010 TYPE OF CONTRACT and SOW CLIN 005: Travel and ODCs |
| RFP 7 and SOW 13 |
| Under g), the requirements state, “2. The negotiated fixed fully-loaded hourly labor rates apply to a normal workweek of 50 hours for Training Mentors (TMs) and Subject Matter Experts (SMEs), and 40 hours a week for Language Assistants (LAs)” |
| To allow for more accurate hourly rates, will INL consider including Danger Pay and Post-Differential as a reimbursable ODC under CLIN 005? For example, USN West Bank-based Training Mentors eligible for Danger Pay and Post Differential will only be eligible for allowances for 40 hours per week per US Dept. of State regulations. However, the RFP requires an hourly rate for 50 hours per week which would result in the hourly rate varying depending on the day. |
YES- see #7 above.
| 9 |
| SOW CLINs 002, 003, 004, and 007 |
| SOW 12-13 and 16-21 |
| N/A |
| To more accurately budget for allowances and uplifts, will INL please clarify if all employees under CLINS 002, 003, 004, and 007 will be full time employees anticipated to be at post for at least 42 calendar days? |
| Staffers under CLINs 002, 004 and 007 will be employees under full-time assignments for the base year of the contract. CLIN003 LAs are anticipated to be on assignment for the base year. |
| 10 |
| RFP H-032 Permits |
| RFP 26 |
| The requirements state, “Without additional cost to the Government, the Contractor shall obtain all permits, licenses . . . for the prosecution of work under this contractor.” |
| When opening operation in a new country(ies), it is common practice to obtain the services of locally-based legal expertise. We envision that this will be necessary in both the West Bank and Jordan for our firm. Please confirm that these requisite legal fees would be allowable under the contract. |
Those costs should be included in PM-CLIN001. You should include them as base year transition costs.
| 11 |
| RFP 652.219-70 Department of State Subcontracting Goals (Apr 2004) |
| RFP 55 |
| The requirements state that “the offeror shall provide a small, small disadvantaged, small woman-owned, HUBZone Small, and Service-Disabled Veteran-Owned Small Enterprise Subcontracting Plan…” |
| Please confirm that if the offeror is a small business they are not required to submit a plan. |
Confirmed
| 13 |
| SOW CLIN 002, 004, and 007 |
| SOW 12-13 and 16-21 |
| N/A |
| To ensure the strongest responses to factor 2, personnel management, under M4 evaluation factors of the RFP, and to ensure that both INL and the PASF project have access to the strongest personnel for the project, we request that INL require only non-exclusive arrangements for non-key personnel. |
| INL requires only non-exclusive arrangements for non-key personnel. |
| 14 |
| SOW Background |
| SOW 2 |
| N/A |
| If INL has conducted any evaluations of the current PASF project, would it be possible to make those evaluations available to bidders to supplement the background section of the statement of work? |
| No evaluations are available. The prior contract was a task order under the |
CJPS world-wide contract. PASF is a new stand-alone contract.
| 15 |
| RFP Line Item Summary |
| RFP 2-6 |
| Within the Line Item Summary Table, the Quantity column provides LOE figures. |
| Please clarify whether the NTE LOE figures include holidays, leave, and other time off. If they do, please confirm that contractors may adjust the LOE if they recover holidays, leave and other time off indirectly |
The NTE LOE figures do not include holidays, time off. They are hours to be billed for work under the contract. The billing rate shall account for all time-off.
| 16 |
| RFP Section M, Factor 1, Sub-Factor 3 |
| RFP 70 |
| The requirement states, “Offeror needs to provide a Sustainability Plan. The AGO, PCP, PSO, and Security Justice Commission must take full ownership of |
improved systems.”
| Will INL consider replacing “AGO, PCP, PSO, and Security Justice Commission” with one or more of the primary stakeholders of the PASF program? |
| Section M, Factor 1, Sub-Factor 3 will be modified in Amendment 03. |
| 17 |
| RFP Section M, Factor 2(b) and Factor 2(c) |
| RFP 70 |
| The requirement states, “b) Experience specifically in gathering, securing, documenting, and maintaining physical evidence. Also, demonstrated experience in producing standard operating procedures (SOPs) to govern the collection, custody, storage, transfer, archiving, and disposal of criminal physical evidence. |
c) Experience in training of law enforcement, prosecution, and judicial personnel on proper evidence management.”
| Please confirm that these requirements do not apply to the evaluation of this procurement. |
| RFP Section M, Factor 2(b) and Factor 2(c) will be |
Modified in Amendment 03
| 18 |
| RFP Section M, Factor 2(a) |
| RFP 70 |
| The requirement states, “a) This Factor will be evaluated on the basis of the Contractor's proposed staffing of the TM and SME positions.” |
| Please confirm that when INL says “proposed staffing”, they are referring to a proposed staffing plan, as opposed to individuals who are proposed for those positions |
The reference is to the proposed staffing plan.
| 19 |
| RFP Section L.3.2, 3. Past Performance and Capacity |
| RFP 60 |
| The requirement states, “Provide a list of at least four contracts demonstrating prior experience with relevant past performance information and references.” |
| Can grants be used as examples of past performance and capacity instead of only contracts? |
| YES |
| Resume Format Template |
| Item G. requires the offeror to provide personal information for each key personnel candidate, including the social security number and date and place of birth. This is personally identifiable information (PII), which cannot be submitted unless encrypted. |
| Given that an electronic submission is not required, how does the government suggest that we provide this information in our proposal? |
| Only provide last four digits of SSN. |
DOB is not necessary for the proposal.
| L.3 |
| Section L.3.1 states the Offeror must detail type of office equipment and supplies and the required quantities. |
Please confirm that this cost would apply against CLIN006 Mission Support, for which the Government has supplied a plug value of $1,000,000 annually for bidding purposes only
Office equipment and supplies are to be included in CLIN001 Program Management.
Per the SOW, CLIN006 is for procurements directed by the COR that will be donated to the PA. The COR will request a price proposal for each procurement under this CLIN. Do not use the $1,000,000 under this CLIN to cover your operating costs.
| 22 |
| SOW Section 3.2, Table 1.2 Maximum Required Full Time Equivalents |
| SOW 10 |
| The table provides Maximum Required Full Time Equivalents. |
| Please confirm that bidders can include additional support staff in CLIN 001, such as travel coordinator, field accountant, warehouse personnel, etc. |
Confirmed
Volume 1
| Section L.3.1 |
| This section also states the offeror shall provide a detailed cost breakdown. |
| Is the Government agreeable to an all-inclusive document created in MS Word with a supporting Excel workbook with active formulas to facilitate the Government’s evaluation of total quantity and cost calculations |
| YES. It must break out the costs by CLINs as presented in the Pricing Format attachment |
Section B-010
| Section B-010 |
| Type of Contract states this is a Total Small Business Set-Aside RFP but clause 652.219-70 a. (page 55) states that offeror shall provide a Small Business Subcontracting Plan. |
Question: Was this inserted to inform offerors of the Department of State’s small business contracting goals and not a requirement of this RFP?
NO subcontracting plan is required.
| 25 |
| RFP Section M.4, Factor 1, Subfactor 1 (c) |
| 69 |
| The government will evaluate the extent to which the Quality Control Plan adequately addresses how the Offeror will ensure quality, schedule, cost, and performance. |
| Is the Quality Control Plan a subset of the Performance Measurement Plan (PMP)? |
| NO |
| 26 |
| Factor 2, a), Third sentence |
| 70 |
| The Government will evaluate the extent of the Contractor’s experience, including planning and implementation of contracts similar size, scope, and complexity to the |
| What is the conclusion of the sentence, “The Government will evaluate the extent of the Contractor’s experience, including planning and implementation of contracts similar size, scope, and complexity to the.” |
| This section is modified in Amendment 03 |
| 27 |
| Factor 3, a), Second sentence |
| 70 |
| Past performance will be evaluated for relevant contracts performed by the Contractor during the last five (5) years consistent with the size, scope, and complexity of the Scope of Objectives. |
| Is Scope of Objectives the same as Statement of Work? |
| YES |
| 28 |
| Section M. Sub-Factor 2: Key Personnel and SOW CLIN001, C.2.13 – Key Personnel |
| 70 on RFP and p. 7-9 on SOW |
The RFP implies that the proposed Program Manager, Deputy Program Manager, and Assistant Deputy Program Manager should hold previous experience working in the “Middle Eastern criminal justice,” and “legal or police,” sector. The requirements outlined in the Statement of Work, CLIN 001, C.2.13 – Key Personnel (p.7-9)
This section M.4 was modified in Amendment 03.
| Will this be tax exempt in country? Or will offeror be responsible for country imposed taxes? |
| Monthly invoices to the USG will be tax exempt. Local purchases will incur VAT. |
| 30 |
| SOW 2.8.3 |
| 5 |
| Pre-deployment training will be provided by INL |
| How long does the Pre-screening process take? Is there a cost involved to submit for pre-screening? |
How long is the Pre-deployment training?
Is there a cost involved for the training?
Are all materials for the training provided by the government or will the contractor need to procure them or reimburse the government for the training materials?
Are trainings based on an existing schedule, if so can the government provide the schedule or intervals in which the training is held?
Where in the DC metro area are the trainings held, i.e. are they metro accessible or will the trainee need to drive back and forth to the training site daily?
Pre-screening should only take about 2 weeks depending on the resources applied by the contractor.
ECTC-training is 8 days. INL provides room and board. Contractor responsible for transport to and from ECTC. Schedule will be provided at contract award to accommodate new staff. Ashburn, VA is the site of ECTC-Google ECTC for info.
| 31 |
| Section L – Section B and detailed price breakdown, |
| 70 |
| What level of detail is the Government expecting to see? Line item, quantity, price, or are you looking for a full cost buildup of in-directs? |
| YES. CLIN 001 in particular should show all elements from SOW. |
| Would the government entertain providing the awardee(s) authorization to procure items off another Government GWAC or contract vehicle in which the prices to the government are more favorable? i.e. SEWP V, GSA, CHESS..? |
| NO |
| Pricing for several CLINs are based on a 50 hour work week. Is the offeror to assume (outside of its own uncompensated over time policy) that they would be providing a fixed blended rate? |
| YES. |
| 34 |
| SOW Training Database |
| 22 |
| The contractor will responsible for a non-proprietary COTS training management database that will store all of the historical training and mentoring data necessary for the report deliverables. |
| Attachment A: Deliverables states that the Contractor will be responsible for a non-proprietary COTS training management database that will store all of the historical training and mentoring data necessary for the report deliverables,” (p.22). Are offerors responsible for developing the COTS training management database? Or, will the customer provide a pre-existing platform to be maintained by the Contractor? |
| All historical data is available in EXCEL spreadsheets that can be used as starting point. A hard drive will be made available post award with the current format. |
| 35 |
| SOW 3.1 Training Mentors |
| 9 |
| The Contractor shall provide TMs that shall focus on the training conducted at JIPTC, ACP and various locations throughout the West Bank. |
| Can the government provide a full and complete course list from all relevant locations, and provide anticipated courses that the contractor should plan to deliver from Aug 2017 to July 2018? |
| The contractor TMs will provide technical support during training, Courses in JIPTC are provided by Jordanian staff. Courses at CTI/WB will be delivered by local staff. TMs provide technical mentoring and curriculum development |
| 36 |
| SOW CLIN006 Equipment Procurement and Logistics |
| 16 |
| Recognition that the locations for delivery will include but are not limited to Jerusalem and all areas in the West Bank. |
| What type of logistics support is required for importing materials into Jordan to JIPTC? |
Does INL purchase all required materials (including any ITARS materials), or is the contractor required to purchase some of these materials? Please provide a comprehensive list of all materials (including ITARS materials) that the contractor should price, along with frequency of purchases for the entire period of performance.
NO ITAR material is currently required at JIPTC. Office space, desks, chairs will be provided from current program. Contractor should consider providing laptops, and cell phones for TMs and SMEs. A printer and copy machine should also be included.
Question #21, reference SOW CLIN 002.
| The SOW, Section 3.2.2, has been amended to reflect minimum requirements for TMs |
| There does not appear to be any minimum experience requirements related to physical evidence for the TMs. Will the government remove these experience requirements from the evaluative criteria under Section M.4, Factor 2? |
| NO. the medical exam guidance in Attachment # |
should ensure that the TM and SME candidates can function in these positions. If they can pass the physical they can perform the job. There is no heavy lifting.
| CLIN001 |
| Question #40, reference Attachment 3 breakout of CLIN001 |
| Since Attachment 3 has since been deleted from the RFP, will the government provide direction regarding the use or necessary acquisition of vehicles? How many vehicles are required by the government for transportation needs? |
NO. you will need to determine how many vehicles to buy or lease to meet the SOW. There is no USG direction in terms of how many TMs or SMEs need individual vehicles, or how many vans are needed.
| M.4, Ll.3 |
| Question #47, reference M.4 Evaluation Factors |
| According to Section M.4, the Quality Control Plan is a component of Sub-Factor 1: Performance Measurement Plan (PMP). When cross-referenced to section L.3, the Performance Evaluation (Measurement) Plan is required pursuant to subsection iv. and there is no reference to Sub-Factors. Will the government consider aligning proposal requirements as listed within L.3 to the evaluation factors under M.4? |
M.4 modified in Amendment 03.