Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE RATING

A1

2. AMENDMENT/MODIFICATION NO.

A004

3. EFFECTIVE DATE

03/24/2016

4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

LMAQMCODE

OFFICE OF ACQUISITION MANAGEMENT

(A/LM/AQM)

6767 NORTH WICKHAM ROAD, SUITE 214

MELBOURNE, FL 32940

Renee Alexander

NAME

TEL.

alexanderrk@State.gov

EMAIL

6. ISSUED BY LMAQMCODE

OFFICE OF ACQUISITION MANAGEMENT (A/LM/AQM)

1038 S PATRICK DRIVE

ATTN: INL AIRWING

PATRICK AFB, FL 32925

7. ADMINISTERED BY (If other than Item 6)

9A. AMENDMENT OF SOLICITATION NO.

SAQMMA15R0653

CONTACT DUNS

CODE FACILITY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, country, state and ZIP Code) (X)

X 9B. DATED (SEE ITEM 11)

02/16/2016

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X XThe above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended, Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning ____copies of the amendment;(b)By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.X

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this Amendment (A004) is to provide a correction to a typo in the Engine number referenced on the following CLINS from PT6A-3B to PT6T-3B: Base year--0007, 0007AA, 0007AB, 0007AC, Option year one--1007, 1007AA, 1007AB, 1007AC, Option year two--2007, 2007AA, 2007AB, 2007AC, Option year three--3007, 3007AA, 3007AB, 3007AC, and Option year four--4007, 4007AA, 4007AB, and 4007AC.

The clarification to the statement of work certification/approval requirements is provided within section 1 on page 61 of 95 not as a change in the statement of work.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Patrick Murphy

(Signature of person authorized to sign)

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED

By (Signature of Contracting Officer)

16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

03/24/2016

NSN 7540-01-152-8070

Previous edition unusable

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

SAQMMA15R0653

Table of Contents

Section Description Page Number

2 Contract Clauses 52.212-4 Contract Terms and Conditions--Commercial Items (May 2015) 52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive Orders--Commercial Items (Oct 2015) 52.216-19 Order Limitations (Oct 1995) 52.216-22 Indefinite Quantity (Oct 1995) 52.217-6 Option for Increased Quantity (Mar 1989) 52.217-8 Option to Extend Services (Nov 1999) 52.217-9 Option to Extend the Term of the Contract (Mar 2000)

652.216-70 ORDERING INDEFINITE-DELIVERY CONTRACTS (APR 2004)

652.229-70 EXCISE TAX EXEMPTION STATEMENT FOR CONTRACTORS WITHIN THE

UNITED STATES (JUL 1988)

652.229-71 PERSONAL PROPERTY DISPOSITION AT POSTS ABROAD (AUG 1999)

652.242-70 CONTRACTING OFFICER'S REPRESENTATIVE (COR) (AUG 1999)

652.243-70 NOTICES (AUG 1999)

652.247-70 NOTICE OF SHIPMENTS (FEB 2015)

652.247-71 SHIPPING INSTRUCTIONS (FEB 2015)

3 Solicitation Provisions 52.212-1 Instructions to Offerors--Commercial Items (Oct 2015)

652.206-70 ADVOCATE FOR COMPETITION/OMBUDSMAN (FEB 2015)

L-008 STANDARD COMMERCIAL WARRANTY

4 Evaluation Factors 52.217-5 Evaluation of Options (July 1990)

M-006 PROPOSAL EVALUATION

5 Representations and Certifications 52.212-3 Offeror Representations and Certifications--Commercial Items (Nov 2015)

652.225-70 ARAB LEAGUE BOYCOTT OF ISRAEL (AUG 1999)

SAQMMA15R0653

001 Overhaul Aircraft Engine PT6A-67AG 1.00 0.00

1.00 EA

This is a Firm-Fixed Priced (FFP) CLIN for a Basic PT6A-67AG Engine Overhaul. Unit Price shall include shipping from Melbourne Florida to Offeror's facility by authorized carrier; receiving inspection; evaluation;

disassembly; complete cleaning; all inspection tasks; all NDI requirements; reassembly; all testing and adjustments;

all functional testing of installed accessories and assemblies; all consumables for complete overhaul; all hardware used including lock cups and seals; strip, inspection, repairing, blending, treating, painting of all aluminum / magnesium housings; complete fuel control and over speed governor overhaul; fuel nozzle overhaul and testing; engine test cell run(s) and adjustments; post test cell run Foreign Object Damage (FOD) check, filter replacement, and oil sampling; preserve and secure engine in shipping container; documentation; and shipment from Offeror's facility to Melbourne Florida by authorized carrier.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2016 to 04/30/2017

AA

Over and Above Labor PT6A-67AG 1.00 0.00

1.00 HR

This is a Firm-Fixed Priced (FFP) CLIN for Overhaul/Analysis fully loaded Labor rate per man-hour for any additional work required outside the basic engine overhaul to complete and make ready to issue (RFI).

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2016 to 04/30/2017

AB

Over and Above Materials PT6A-67AG 0.00 0.00

0.00 LT

This is a Cost Reimbursable CLIN for additional materials required outside the basic overhaul CLIN to complete and make ready to issue (RFI). The proposed unit cost for new materials shall include OEM costs and any related material handling costs but shall not exceed OEM published catalog price. The cost for used approved, overhauled materials shall be cost plus fixed fee but shall not exceed 60% of OEM published catalog prices.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2016 to 04/30/2017

AC

Over and Above Repair and Rework PT6A-67AG 0.00 0.00

0.00 LT

This is a Cost Reimbursable CLIN for all outside vendor repairs and rework not included in the fixed price CLIN.

This cost includes but is not limited to: precision machining;

brazing; welding; plasma spray; air flow and adjustment;

accessary overhaul; proprietary specialty coatings; electron beam (EB) welding; Electrical Discharge Machining (EDMs). Repairs and reworks performed in-house and not

SAQMMA15R0653

Line Item Summary

Solicitation Number:

SAQMMA15R0653

Contract Number: Title: Pratt & Whitney/Canada (PWC) Engine Overhaul

Date of Solicitation:

03/24/2016

Line Item No. Description Quantity Unit Unit Price Total Cost included in the fixed price CLIN will be reimbursed at the over and above labor rate and material will be provided under the Over and Above Materials CLIN AA and AB.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2016 to 04/30/2017

002 Overhaul Aircraft Engine PT6A-67F 1.00 0.00

1.00 EA

This is a Firm-Fixed Priced (FFP) CLIN for a Basic PT6A-67F Engine Overhaul. Unit Price shall include shipping from Melbourne Florida to Offeror's facility by authorized carrier; receiving inspection; evaluation;

disassembly; complete cleaning; all inspection tasks; all NDI requirements; reassembly; all testing and adjustments;

all functional testing of installed accessories and assemblies; all consumables for complete overhaul; all hardware used including lock cups and seals; strip, inspection, repairing, blending, treating, painting of all aluminum / magnesium housings; complete fuel control and over speed governor overhaul; fuel nozzle overhaul and testing; engine test cell run(s) and adjustments; post test cell run Foreign Object Damage (FOD) check, filter replacement, and oil sampling; preserve and secure engine in shipping container; documentation; and shipment from Offeror's facility to Melbourne Florida by authorized carrier

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2016 to 04/30/2017

AA

Over and Above Labor PT6A-67F 1.00 0.00

1.00 HR

This is a Firm-Fixed Priced (FFP) CLIN for Overhaul/Analysis fully loaded Labor rate per man-hour for any additional work required outside the basic engine overhaul to complete and make ready to issue (RFI).

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2016 to 04/30/2017

AB

Over and Above Materials PT6A-67F 0.00 0.00

0.00 LT

This is a Cost Reimbursable CLIN for additional materials required outside the basic overhaul CLIN to complete and make ready to issue (RFI). The proposed unit cost for new materials shall include OEM costs and any related material handling costs but shall not exceed OEM published catalog price. The cost for used approved, overhauled materials shall be cost plus fixed fee but shall not exceed 60% of OEM published catalog prices.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2016 to 04/30/2017

002 Over and Above Repair and Rework PT6A-67F 0.00

SAQMMA15R0653

Line Item Summary

Solicitation Number:

SAQMMA15R0653

Contract Number: Title: Pratt & Whitney/Canada (PWC) Engine Overhaul

Date of Solicitation:

03/24/2016

AC 0.00

0.00 LT

This is a Cost Reimbursable CLIN for all outside vendor repairs and rework not included in the fixed price CLIN.

This cost includes but is not limited to: precision machining;

brazing; welding; plasma spray; air flow and adjustment;

accessary overhaul; proprietary specialty coatings; electron beam (EB) welding; Electrical Discharge Machining (EDMs). Repairs and reworks performed in-house and not included in the fixed price CLIN will be reimbursed at the over and above labor rate and material will be provided under the Over and Above Materials CLIN AA and AB.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2016 to 04/30/2017

003 Overhaul Aircraft Engine PT6A-67D 2.00 0.00

2.00 EA

This is a Firm-Fixed Priced (FFP) CLIN for a Basic PT6A-67D Engine Overhaul. Unit Price shall include shipping from Melbourne Florida to Offeror's facility by authorized carrier; receiving inspection; evaluation;

disassembly; complete cleaning; all inspection tasks; all NDI requirements; reassembly; all testing and adjustments;

all functional testing of installed accessories and assemblies; all consumables for complete overhaul; all hardware used including lock cups and seals; strip, inspection, repairing, blending, treating, painting of all aluminum / magnesium housings; complete fuel control and over speed governor overhaul; fuel nozzle overhaul and testing; engine test cell run(s) and adjustments; post test cell run Foreign Object Damage (FOD) check, filter replacement, and oil sampling; preserve and secure engine in shipping container; documentation; and shipment from Offeror's facility to Melbourne Florida by authorized carrier

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2016 to 04/30/2017

AA

Over and Above Labor PT6A-67D 1.00 0.00

1.00 HR

This is a Firm-Fixed Priced (FFP) CLIN for Overhaul/Analysis fully loaded Labor rate per man-hour for any additional work required outside the basic engine overhaul to complete and make ready to issue (RFI).

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2016 to 04/30/2017

AB

Over and Above Materials PT6A-67D 0.00 0.00

0.00 LT

This is a Cost Reimbursable CLIN for additional materials required outside the basic overhaul CLIN to complete and make ready to issue (RFI). The proposed unit cost for new materials shall include OEM costs and any related material handling costs but shall not exceed OEM published catalog

SAQMMA15R0653

Line Item Summary

Solicitation Number:

SAQMMA15R0653

Contract Number: Title: Pratt & Whitney/Canada (PWC) Engine Overhaul

Date of Solicitation:

03/24/2016 price. The cost for used approved, overhauled materials shall be cost plus fixed fee but shall not exceed 60% of OEM published catalog prices.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2016 to 04/30/2017

AC

Over and Above Repair and Rework PT6A-67D 0.00 0.00

0.00 LT

This is a Cost Reimbursable CLIN for all outside vendor repairs and rework not included in the fixed price CLIN.

This cost includes but is not limited to: precision machining;

brazing; welding; plasma spray; air flow and adjustment;

accessary overhaul; proprietary specialty coatings; electron beam (EB) welding; Electrical Discharge Machining (EDMs). Repairs and reworks performed in-house and not included in the fixed price CLIN will be reimbursed at the over and above labor rate and material will be provided under the Over and Above Materials CLIN AA and AB.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2016 to 04/30/2017

004 Overhaul Aircraft Engine PT6A-114A 1.00 0.00

1.00 EA

This is a Firm-Fixed Priced (FFP) CLIN for a Basic PT6A-114A Engine Overhaul. Unit Price shall include shipping from Melbourne Florida to Offeror's facility by authorized carrier; receiving inspection; evaluation;

disassembly; complete cleaning; all inspection tasks; all NDI requirements; reassembly; all testing and adjustments;

all functional testing of installed accessories and assemblies; all consumables for complete overhaul; all hardware used including lock cups and seals; strip, inspection, repairing, blending, treating, painting of all aluminum / magnesium housings; complete fuel control and over speed governor overhaul; fuel nozzle overhaul and testing; engine test cell run(s) and adjustments; post test cell run Foreign Object Damage (FOD) check, filter replacement, and oil sampling; preserve and secure engine in shipping container; documentation; and shipment from Offeror's facility to Melbourne Florida by authorized carrier

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2016 to 04/30/2017

AA

Over and Above Labor PT6A-114A 1.00 0.00

1.00 HR

This is a Firm-Fixed Priced (FFP) CLIN for Overhaul/Analysis fully loaded Labor rate per man-hour for any additional work required outside the basic engine overhaul to complete and make ready to issue (RFI).

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2016 to 04/30/2017

SAQMMA15R0653

Line Item Summary

Solicitation Number:

SAQMMA15R0653

Contract Number: Title: Pratt & Whitney/Canada (PWC) Engine Overhaul

Date of Solicitation:

03/24/2016

AB

Over and Above Materials PT6A-114A 0.00 0.00

0.00 LT

This is a Cost Reimbursable CLIN for additional materials required outside the basic overhaul CLIN to complete and make ready to issue (RFI). The proposed unit cost for new materials shall include OEM costs and any related material handling costs but shall not exceed OEM published catalog price. The cost for used approved, overhauled materials shall be cost plus fixed fee but shall not exceed 60% of OEM published catalog prices

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2016 to 04/30/2017

AC

Over and Above Repair and Rework PT6A-114A 0.00 0.00

0.00 LT

This is a Cost Reimbursable CLIN for all outside vendor repairs and rework not included in the fixed price CLIN.

This cost includes but is not limited to: precision machining;

brazing; welding; plasma spray; air flow and adjustment;

accessary overhaul; proprietary specialty coatings; electron beam (EB) welding; Electrical Discharge Machining (EDMs). Repairs and reworks performed in-house and not included in the fixed price CLIN will be reimbursed at the over and above labor rate and material will be provided under the Over and Above Materials CLIN AA and AB.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2016 to 04/30/2017

005 Overhaul Aircraft Engine PT6A-67R 1.00 0.00

1.00 EA

This is a Firm-Fixed Priced (FFP) CLIN for a Basic PT6A-67R Engine Overhaul. Unit Price shall include shipping from Melbourne Florida to Offeror's facility by authorized carrier; receiving inspection; evaluation;

disassembly; complete cleaning; all inspection tasks; all NDI requirements; reassembly; all testing and adjustments;

all functional testing of installed accessories and assemblies; all consumables for complete overhaul; all hardware used including lock cups and seals; strip, inspection, repairing, blending, treating, painting of all aluminum / magnesium housings; complete fuel control and over speed governor overhaul; fuel nozzle overhaul and testing; engine test cell run(s) and adjustments; post test cell run Foreign Object Damage (FOD) check, filter replacement, and oil sampling; preserve and secure engine in shipping container; documentation; and shipment from Offeror's facility to Melbourne Florida by authorized carrier

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2016 to 04/30/2017

AA

Over and Above Labor PT6A-67R 1.00 0.00

1.00 HR

SAQMMA15R0653

Line Item Summary

Solicitation Number:

SAQMMA15R0653

Contract Number: Title: Pratt & Whitney/Canada (PWC) Engine Overhaul

Date of Solicitation:

03/24/2016

This is a Firm-Fixed Priced (FFP) CLIN for Overhaul/Analysis fully loaded Labor rate per man-hour for any additional work required outside the basic engine overhaul to complete and make ready to issue (RFI).

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2016 to 04/30/2017

AB

Over and Above Materials PT6A-67R 0.00 0.00

0.00 LT

This is a Cost Reimbursable CLIN for additional materials required outside the basic overhaul CLIN to complete and make ready to issue (RFI). The proposed unit cost for new materials shall include OEM costs and any related material handling costs but shall not exceed OEM published catalog price. The cost for used approved, overhauled materials shall be cost plus fixed fee but shall not exceed 60% of OEM published catalog prices.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2016 to 04/30/2017

AC

Over and Above Repair and Rework PT6A-67R 0.00 0.00

0.00 LT

This is a Cost Reimbursable CLIN for all outside vendor repairs and rework not included in the fixed price CLIN.

This cost includes but is not limited to: precision machining;

brazing; welding; plasma spray; air flow and adjustment;

accessary overhaul; proprietary specialty coatings; electron beam (EB) welding; Electrical Discharge Machining (EDMs). Repairs and reworks performed in-house and not included in the fixed price CLIN will be reimbursed at the over and above labor rate and material will be provided under the Over and Above Materials CLIN AA and AB.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2016 to 04/30/2017

006 Overhaul Aircraft Engine PW123E 1.00 0.00

1.00 EA

This is a Firm-Fixed Priced (FFP) CLIN for a Basic PW123E Engine Overhaul. Unit Price shall include shipping from Melbourne Florida to Offeror's facility by authorized carrier; receiving inspection; evaluation;

disassembly; complete cleaning; all inspection tasks; all NDI requirements; reassembly; all testing and adjustments;

all functional testing of installed accessories and assemblies; all consumables for complete overhaul; all hardware used including lock cups and seals; strip, inspection, repairing, blending, treating, painting of all aluminum / magnesium housings; complete fuel control and over speed governor overhaul; fuel nozzle overhaul and testing; engine test cell run(s) and adjustments; post test cell run Foreign Object Damage (FOD) check, filter replacement, and oil sampling; preserve and secure engine in shipping container; documentation; and shipment from Offeror's facility to Melbourne Florida by authorized carrier

SAQMMA15R0653

Line Item Summary

Solicitation Number:

SAQMMA15R0653

Contract Number: Title: Pratt & Whitney/Canada (PWC) Engine Overhaul

Date of Solicitation:

03/24/2016

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2016 to 04/30/2017

AA

Over and Above Labor PW123E 1.00 0.00

1.00 HR

This is a Firm-Fixed Priced (FFP) CLIN for Overhaul/Analysis fully loaded Labor rate per man-hour for any additional work required outside the basic engine overhaul to complete and make ready to issue (RFI).

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2016 to 04/30/2017

AB

Over and Above Materials PW123E 0.00 0.00

0.00 LT

This is a Cost Reimbursable CLIN for additional materials required outside the basic overhaul CLIN to complete and make ready to issue (RFI). The proposed unit cost for new materials shall include OEM costs and any related material handling costs but shall not exceed OEM published catalog price. The cost for used approved, overhauled materials shall be cost plus fixed fee but shall not exceed 60% of OEM published catalog prices.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

03/01/2016 to 02/28/2017

AC

Over and Above Repair and Rework PW123E 0.00 0.00

0.00 LT

This is a Cost Reimbursable CLIN for all outside vendor repairs and rework not included in the fixed price CLIN.

This cost includes but is not limited to: precision machining;

brazing; welding; plasma spray; air flow and adjustment;

accessary overhaul; proprietary specialty coatings; electron beam (EB) welding; Electrical Discharge Machining (EDMs). Repairs and reworks performed in-house and not included in the fixed price CLIN will be reimbursed at the over and above labor rate and material will be provided under the Over and Above Materials CLIN AA and AB.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2016 to 04/30/2017

007 Overhaul Aircraft Engine PT6T-3B 1.00 0.00

1.00 EA

This is a Firm-Fixed Priced (FFP) CLIN for a Basic PT6T-3B Engine Twin Pack Overhaul. Unit Price shall include shipping from Melbourne Florida to Offeror's facility by authorized carrier; receiving inspection; evaluation;

disassembly; complete cleaning; all inspection tasks; all NDI requirements; reassembly; all testing and adjustments;

all functional testing of installed accessories and assemblies; all consumables for complete overhaul; all

SAQMMA15R0653

Line Item Summary

Solicitation Number:

SAQMMA15R0653

Contract Number: Title: Pratt & Whitney/Canada (PWC) Engine Overhaul

Date of Solicitation:

03/24/2016 hardware used including lock cups and seals; strip, inspection, repairing, blending, treating, painting of all aluminum / magnesium housings; complete fuel control and over speed governor overhaul; fuel nozzle overhaul and testing; engine test cell run(s) and adjustments; post test cell run Foreign Object Damage (FOD) check, filter replacement, and oil sampling; preserve and secure engine in shipping container; documentation; and shipment from Offeror's facility to Melbourne Florida by authorized carrier

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2016 to 04/30/2017

AA

Over and Above Labor PT6T-3B 1.00 0.00

1.00 HR

This is a Firm-Fixed Priced (FFP) CLIN for Overhaul/Analysis fully loaded Labor rate per man-hour for any additional work required outside the basic engine overhaul to complete and make ready to issue (RFI).

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2016 to 04/30/2017

AB

Over and Above Materials PT6T-3B 0.00 0.00

0.00 LT

This is a Cost Reimbursable CLIN for additional materials required outside the basic overhaul CLIN to complete and make ready to issue (RFI). The proposed unit cost for new materials shall include OEM costs and any related material handling costs but shall not exceed OEM published catalog price. The cost for used approved, overhauled materials shall be cost plus fixed fee but shall not exceed 60% of OEM published catalog prices.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2016 to 04/30/2017

AC

Over and Above Repair and Rework PT6T-3B 0.00 0.00

0.00 LT

This is a Cost Reimbursable CLIN for all outside vendor repairs and rework not included in the fixed price CLIN.

This cost includes but is not limited to: precision machining;

brazing; welding; plasma spray; air flow and adjustment;

accessary overhaul; proprietary specialty coatings; electron beam (EB) welding; Electrical Discharge Machining (EDMs). Repairs and reworks performed in-house and not included in the fixed price CLIN will be reimbursed at the over and above labor rate and material will be provided under the Over and Above Materials CLIN AA and AB.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2016 to 04/30/2017

008 Overhaul Aircraft Engine PT6A-27 1.00 0.00

SAQMMA15R0653

Line Item Summary

Solicitation Number:

SAQMMA15R0653

Contract Number: Title: Pratt & Whitney/Canada (PWC) Engine Overhaul

Date of Solicitation:

03/24/2016

1.00 EA

This is a Firm-Fixed Priced (FFP) CLIN for a Basic PT6A-27 Engine Overhaul. Unit Price shall include shipping from Melbourne Florida to Offeror's facility by authorized carrier; receiving inspection; evaluation;

disassembly; complete cleaning; all inspection tasks; all NDI requirements; reassembly; all testing and adjustments;

all functional testing of installed accessories and assemblies; all consumables for complete overhaul; all hardware used including lock cups and seals; strip, inspection, repairing, blending, treating, painting of all aluminum / magnesium housings; complete fuel control and over speed governor overhaul; fuel nozzle overhaul and testing; engine test cell run(s) and adjustments; post test run Foreign Object Damage (FOD) check, filter replacement, and oil sampling; preserve and secure engine in shipping container; documentation; and shipment from Offeror's facility to Melbourne Florida by authorized carrier

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2016 to 04/30/2017

AA

Over and Above Labor PT6A-27 1.00 0.00

1.00 HR

This is a Firm-Fixed Priced (FFP) CLIN for Overhaul/Analysis fully loaded Labor rate per man-hour for any additional work required outside the basic engine overhaul to complete and make ready to issue (RFI).

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2016 to 04/30/2017

AB

Over and Above Materials PT6A-27 0.00 0.00

0.00 LT

This is a Cost Reimbursable CLIN for additional materials required outside the basic overhaul CLIN to complete and make ready to issue (RFI). The proposed unit cost for new materials shall include OEM costs and any related material handling costs but shall not exceed OEM published catalog price. The cost for used approved, overhauled materials shall be cost plus fixed fee but shall not exceed 60% of OEM published catalog prices.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2016 to 04/30/2017

AC

Over and Above Repair and Rework PT6A-27 0.00 0.00

0.00 LT

This is a Cost Reimbursable CLIN for all outside vendor repairs and rework not included in the fixed price CLIN.

This cost includes but is not limited to: precision machining;

brazing; welding; plasma spray; air flow and adjustment;

accessary overhaul; proprietary specialty coatings; electron beam (EB) welding; Electrical Discharge Machining (EDMs). Repairs and reworks performed in-house and not included in the fixed price CLIN will be reimbursed at the

SAQMMA15R0653

Line Item Summary

Solicitation Number:

SAQMMA15R0653

Contract Number: Title: Pratt & Whitney/Canada (PWC) Engine Overhaul

Date of Solicitation:

03/24/2016 under the Over and Above Materials CLIN AA and AB.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2016 to 04/30/2017

009 Engine Performance Run 1.00 0.00

1.00 LT

This is a Firm Fixed Price (FFP) CLIN to perform Engine test cell run evaluation. Unit Price shall include shipping from Melbourne Florida to Offeror's facility by authorized carrier; receiving inspection; evaluation; pre run cleaning;

all consumables; any hardware used; engine test cell run(s) and evaluation; post test cell run FOD check, filter replacement, and oil sampling; preserve and secure engine in shipping container; documentation; and shipment from Offeror's facility to Melbourne Florida by authorized carrier.

PT6A-67D FFP $

PTA-67AG FFP $

PT6A-67F FFP $

PT6A-114A FFP $

PT6A-67R FFP $

PW123E FFP $

PT6T-3B FFP $

PT6A-27 FFP $

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2016 to 04/30/2017

010 Over and Above Property Disposal 0.00 0.00

0.00 LT

Cost reimbursable CLIN for outside vendor disposal of those government materials deemed extremely hazardous and beyond the capability of the Offeror's facility to dispose properly. Contractor shall provide an estimate for Government approval prior to disposal.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2016 to 04/30/2017

011 Demilitarization and Property Disposal 1.00 0.00

1.00 LT

This is a Firm Fixed Price (FFP) CLIN for Unit Labor Cost per man-hour for demilitarization and disposal of government provided materials that are deemed Beyond Economical to Repair (BER), at or near life limit, excess, salvage, and or scrap.

PT6A-67D FFP $

PTA-67AG FFP $

PT6A-67F FFP $

PT6A-114A FFP $

PT6A-67R FFP $

PW123E FFP $

PT6T-3B FFP $

PT6A-27 FFP $

Doc Ref No:

SAQMMA15R0653

Line Item Summary

Solicitation Number:

SAQMMA15R0653

Contract Number: Title: Pratt & Whitney/Canada (PWC) Engine Overhaul

Date of Solicitation:

03/24/2016

Date

(Start to End) Date FOB:

05/01/2016 to 04/30/2017

012 Shipping Container Refurbishment Not to exceed 1.00 0.00

1.00 LT

This is a FFP CLIN for refurbishing metal containers if used for shipment of PT engines. Unit Price shall include inspection; evaluation; complete cleaning; all inspections tasks; rust removal; repair; complete strip and paint of inside and outside of the container; and reapplication of DoS markings.

PT6A-67D FFP $

PTA-67AG FFP $

PT6A-67F FFP $

PT6A-114A FFP $

PT6A-67R FFP $

PW123E FFP $

PT6T-3B FFP $

PT6A-27 FFP $

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2016 to 04/30/2017

013 Two-Way Surface Transportation Cost for five Engines 1.00 0.00

1.00 LT

This is a Firm-Fixed Price CLIN to provide OEM approved shipment, packaged and transported by a qualified source of P&W engines, components, and materials to the Contractor repair facility from Melbourne, FL and return to Melbourne, FL upon completion of work as per attached

SOW

PT6A-67D FFP $

PTA-67AG FFP $

PT6A-67F FFP $

PT6A-114A FFP $

PT6A-67R FFP $

PW123E FFP $

PT6T-3B FFP $

PT6A-27 FFP $

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2016 to 04/30/2017

014 Off-site Field Services 1.00 0.00

1.00 HR

This is a Firm-fixed priced CLIN at a field service per man hour rate to provide on-demand technical and logistics support services at CONUS and austere OCONUS locations. This could include but is not limited to evaluations, scheduled inspections, and repairs.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2016 to 04/30/2017

015 Contractor Travel 1.00

SAQMMA15R0653

Line Item Summary

Solicitation Number:

SAQMMA15R0653

Contract Number: Title: Pratt & Whitney/Canada (PWC) Engine Overhaul

Date of Solicitation:

03/24/2016

1.00 LT

This is a Not-to-Exceed Cost Reimbursable in accordance with JTR rates. CLIN for approved Offeror's travel to perform engine evaluations and repairs at locations other than Offeror's facility. Contractor shall submit a proposal for each travel request to the Contracting Officer or the Contracting Officer's Representative (COR) for approval in advance.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2016 to 04/30/2017

016 Engineering, Training, and System Safety 1.00 0.00

1.00 LT

This is a Cost Reimbursable CLIN to perform Engineering studies and prepare technical documentation, training in the classroom and or field, and participate in Accident and Incident analysis, on a demand basis, in both CONUS and austere OCONUS when required

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2016 to 04/30/2017

1001 Overhaul Aircraft Engine PT6A-67AG 1.00 0.00

1.00 EA

This is a Firm-Fixed Priced (FFP) CLIN for a Basic PT6A-67AG Engine Overhaul. Unit Price shall include shipping from Melbourne Florida to Offeror's facility by authorized carrier; receiving inspection; evaluation;

disassembly; complete cleaning; all inspection tasks; all NDI requirements; reassembly; all testing and adjustments;

all functional testing of installed accessories and assemblies; all consumables for complete overhaul; all hardware used including lock cups and seals; strip, inspection, repairing, blending, treating, painting of all aluminum / magnesium housings; complete fuel control and over speed governor overhaul; fuel nozzle overhaul and testing; engine test cell run(s) and adjustments; post test cell run Foreign Object Damage (FOD) check, filter replacement, and oil sampling; preserve and secure engine in shipping container; documentation; and shipment from Offeror's facility to Melbourne Florida by authorized carrier

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2017 to 04/30/2018

AA

Over and Above Labor PT6A-67AG 1.00 0.00

1.00 HR

This is a Firm-Fixed Priced (FFP) CLIN for Overhaul/Analysis fully loaded Labor rate per man-hour for any additional work required outside the basic engine overhaul to complete and make ready to issue (RFI).

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2017 to 04/30/2018

SAQMMA15R0653

Line Item Summary

Solicitation Number:

SAQMMA15R0653

Contract Number: Title: Pratt & Whitney/Canada (PWC) Engine Overhaul

Date of Solicitation:

03/24/2016

Over and Above Materials PT6A-67AG 0.00 0.00

0.00 LT

This is a Cost Reimbursable CLIN for additional materials required outside the basic overhaul CLIN to complete and make ready to issue (RFI). The proposed unit cost for new materials shall include OEM costs and any related material handling costs but shall not exceed OEM published catalog price. The cost for used approved, overhauled materials shall be cost plus fixed fee but shall not exceed 60% of OEM published catalog prices

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

03/01/2017 to 02/28/2018

AC

Over and Above Repair and Rework PT6A-67AG 0.00 0.00

0.00 LT

This is a Cost Reimbursable CLIN for all outside vendor repairs and rework not included in the fixed price CLIN.

This cost includes but is not limited to: precision machining;

brazing; welding; plasma spray; air flow and adjustment;

accessary overhaul; proprietary specialty coatings; electron beam (EB) welding; Electrical Discharge Machining (EDMs). Repairs and reworks performed in-house and not included in the fixed price CLIN will be reimbursed at the over and above labor rate and material will be provided under the Over and Above Materials CLIN AA and AB.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2017 to 04/30/2018

1002 Overhaul Aircraft Engine PT6A-67F 2.00 0.00

2.00 EA

This is a Firm-Fixed Priced (FFP) CLIN for a Basic PT6A-67F Engine Overhaul. Unit Price shall include shipping from Melbourne Florida to Offeror's facility by authorized carrier; receiving inspection; evaluation;

disassembly; complete cleaning; all inspection tasks; all NDI requirements; reassembly; all testing and adjustments;

all functional testing of installed accessories and assemblies; all consumables for complete overhaul; all hardware used including lock cups and seals; strip, inspection, repairing, blending, treating, painting of all aluminum / magnesium housings; complete fuel control and over speed governor overhaul; fuel nozzle overhaul and testing; engine test cell run(s) and adjustments; post test cell run Foreign Object Damage (FOD) check, filter replacement, and oil sampling; preserve and secure engine in shipping container; documentation; and shipment from Offeror's facility to Melbourne Florida by authorized carrier

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2017 to 04/30/2018

AA

Over and Above Labor PT6A-67F 1.00 0.00

SAQMMA15R0653

Line Item Summary

Solicitation Number:

SAQMMA15R0653

Contract Number: Title: Pratt & Whitney/Canada (PWC) Engine Overhaul

Date of Solicitation:

03/24/2016

1.00 HR

Overhaul/Analysis fully loaded Labor rate per man-hour for any additional work required outside the basic engine overhaul to complete and make ready to issue (RFI).

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2017 to 04/30/2018

AB

Over and Above Materials PT6A-67F 0.00 0.00

0.00 LT

This is a Cost Reimbursable CLIN for additional materials required outside the basic overhaul CLIN to complete and make ready to issue (RFI). The proposed unit cost for new materials shall include OEM costs and any related material handling costs but shall not exceed OEM published catalog price. The cost for used approved, overhauled materials shall be cost plus fixed fee but shall not exceed 60% of OEM published catalog prices.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2017 to 04/30/2018

AC

Over and Above Repair and Rework PT6A-67F 0.00 0.00

0.00 LT

This is a Cost Reimbursable CLIN for all outside vendor repairs and rework not included in the fixed price CLIN.

This cost includes but is not limited to: precision machining;

brazing; welding; plasma spray; air flow and adjustment;

accessary overhaul; proprietary specialty coatings; electron beam (EB) welding; Electrical Discharge Machining (EDMs). Repairs and reworks performed in-house and not included in the fixed price CLIN will be reimbursed at the over and above labor rate and material will be provided under the Over and Above Materials CLIN AA and AB.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2017 to 04/30/2018

1003 Overhaul Aircraft Engine PT6A-67D 2.00 0.00

2.00 EA

This is a Firm-Fixed Priced (FFP) CLIN for a Basic PT6A-67D Engine Overhaul. Unit Price shall include shipping from Melbourne Florida to Offeror's facility by authorized carrier; receiving inspection; evaluation;

disassembly; complete cleaning; all inspection tasks; all NDI requirements; reassembly; all testing and adjustments;

all functional testing of installed accessories and assemblies; all consumables for complete overhaul; all hardware used including lock cups and seals; strip, inspection, repairing, blending, treating, painting of all aluminum / magnesium housings; complete fuel control and over speed governor overhaul; fuel nozzle overhaul and testing; engine test cell run(s) and adjustments; post test cell run Foreign Object Damage (FOD) check, filter replacement, and oil sampling; preserve and secure engine

SAQMMA15R0653

Line Item Summary

Solicitation Number:

SAQMMA15R0653

Contract Number: Title: Pratt & Whitney/Canada (PWC) Engine Overhaul

Date of Solicitation:

03/24/2016 in shipping container; documentation; and shipment from Offeror's facility to Melbourne Florida by authorized carrier

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2017 to 04/30/2018

AA

Over and Above Labor PT6A-67D 1.00 0.00

1.00 HR

This is a Firm-Fixed Priced (FFP) CLIN for Overhaul/Analysis fully loaded Labor rate per man-hour for any additional work required outside the basic engine overhaul to complete and make ready to issue (RFI).

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2017 to 04/30/2018

AB

Over and Above Materials PT6A-67D 0.00 0.00

0.00 LT

This is a Cost Reimbursable CLIN for additional materials required outside the basic overhaul CLIN to complete and make ready to issue (RFI). The proposed unit cost for new materials shall include OEM costs and any related material handling costs but shall not exceed OEM published catalog price. The cost for used approved, overhauled materials shall be cost plus fixed fee but shall not exceed 60% of OEM published catalog prices.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2017 to 04/30/2018

AC

Over and Above Repair and Rework PT6A-67D 0.00 0.00

0.00 LT

This is a Cost Reimbursable CLIN for all outside vendor repairs and rework not included in the fixed price CLIN.

This cost includes but is not limited to: precision machining;

brazing; welding; plasma spray; air flow and adjustment;

accessary overhaul; proprietary specialty coatings; electron beam (EB) welding; Electrical Discharge Machining (EDMs). Repairs and reworks performed in-house and not included in the fixed price CLIN will be reimbursed at the over and above labor rate and material will be provided under the Over and Above Materials CLIN AA and AB.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2017 to 04/30/2018

1004 Overhaul Aircraft Engine PT6A-114A 1.00 0.00

1.00 EA

This is a Firm-Fixed Priced (FFP) CLIN for a Basic PT6A-114A Engine Overhaul. Unit Price shall include shipping from Melbourne Florida to Offeror's facility by authorized carrier; receiving inspection; evaluation;

disassembly; complete cleaning; all inspection tasks; all NDI requirements; reassembly; all testing and adjustments;

SAQMMA15R0653

Line Item Summary

Solicitation Number:

SAQMMA15R0653

Contract Number: Title: Pratt & Whitney/Canada (PWC) Engine Overhaul

Date of Solicitation:

03/24/2016 all functional testing of installed accessories and assemblies; all consumables for complete overhaul; all hardware used including lock cups and seals; strip, inspection, repairing, blending, treating, painting of all aluminum / magnesium housings; complete fuel control and over speed governor overhaul; fuel nozzle overhaul and testing; engine test cell run(s) and adjustments; post test cell run Foreign Object Damage (FOD) check, filter replacement, and oil sampling; preserve and secure engine in shipping container; documentation; and shipment from Offeror's facility to Melbourne Florida by authorized carrier

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2017 to 04/30/2018

AA

Over and Above Labor PT6A-114A 1.00 0.00

1.00 HR

This is a Firm-Fixed Priced (FFP) CLIN for Overhaul/Analysis fully loaded Labor rate per man-hour for any additional work required outside the basic engine overhaul to complete and make ready to issue (RFI).

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2017 to 04/30/2018

AB

Over and Above Materials PT6A-114A 0.00 0.00

0.00 LT

This is a Cost Reimbursable CLIN for additional materials required outside the basic overhaul CLIN to complete and make ready to issue (RFI). The proposed unit cost for new materials shall include OEM costs and any related material handling costs but shall not exceed OEM published catalog price. The cost for used approved, overhauled materials shall be cost plus fixed fee but shall not exceed 60% of OEM published catalog prices.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2017 to 04/30/2018

AC

Over and Above Repair and Rework PT6A-114A 0.00 0.00

0.00 LT

This is a Cost Reimbursable CLIN for all outside vendor repairs and rework not included in the fixed price CLIN.

This cost includes but is not limited to: precision machining;

brazing; welding; plasma spray; air flow and adjustment;

accessary overhaul; proprietary specialty coatings; electron beam (EB) welding; Electrical Discharge Machining (EDMs). Repairs and reworks performed in-house and not included in the fixed price CLIN will be reimbursed at the over and above labor rate and material will be provided under the Over and Above Materials CLIN AA and AB.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2017 to 04/30/2018

SAQMMA15R0653

Line Item Summary

Solicitation Number:

SAQMMA15R0653

Contract Number: Title: Pratt & Whitney/Canada (PWC) Engine Overhaul

Date of Solicitation:

03/24/2016

1005 Overhaul Aircraft Engine PT6A-67R 1.00

1.00 EA

This is a Firm-Fixed Priced (FFP) CLIN for a Basic PT6A-67R Engine Overhaul. Unit Price shall include shipping from Melbourne Florida to Offeror's facility by authorized carrier; receiving inspection; evaluation;

disassembly; complete cleaning; all inspection tasks; all NDI requirements; reassembly; all testing and adjustments;

all functional testing of installed accessories and assemblies; all consumables for complete overhaul; all hardware used including lock cups and seals; strip, inspection, repairing, blending, treating, painting of all aluminum / magnesium housings; complete fuel control and over speed governor overhaul; fuel nozzle overhaul and testing; engine test cell run(s) and adjustments; post test cell run Foreign Object Damage (FOD) check, filter replacement, and oil sampling; preserve and secure engine in shipping container; documentation; and shipment from Offeror's facility to Melbourne Florida by authorized carrier

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2017 to 04/30/2018

AA

Over and Above Labor PT6A-67R 1.00 0.00

1.00 HR

This is a Firm-Fixed Priced (FFP) CLIN for Overhaul/Analysis fully loaded Labor rate per man-hour for any additional work required outside the basic engine overhaul to complete and make ready to issue (RFI).

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2017 to 04/30/2018

AB

Over and Above Materials PT6A-67R 0.00 0.00

0.00 LT

This is a Cost Reimbursable CLIN for additional materials required outside the basic overhaul CLIN to complete and make ready to issue (RFI). The proposed unit cost for new materials shall include OEM costs and any related material handling costs but shall not exceed OEM published catalog price. The cost for used approved, overhauled materials shall be cost plus fixed fee but shall not exceed 60% of OEM published catalog prices.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2017 to 04/30/2018

AC

Over and Above Repair and Rework PT6A-67R 0.00 0.00

0.00 LT

This is a Cost Reimbursable CLIN for all outside vendor repairs and rework not included in the fixed price CLIN.

This cost includes but is not limited to: precision machining;

brazing; welding; plasma spray; air flow and adjustment;

accessary overhaul; proprietary specialty coatings; electron beam (EB) welding; Electrical Discharge Machining (EDMs). Repairs and reworks performed in-house and not

SAQMMA15R0653

Line Item Summary

Solicitation Number:

SAQMMA15R0653

Contract Number: Title: Pratt & Whitney/Canada (PWC) Engine Overhaul

Date of Solicitation:

03/24/2016 under the Over and Above Materials CLIN AA and AB.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2017 to 04/30/2018

1006 Overhaul Aircraft Engine PW123E 0.00 0.00

0.00 EA

This is a Firm-Fixed Priced (FFP) CLIN for a Basic PW123E Engine Overhaul. Unit Price shall include shipping from Melbourne Florida to Offeror's facility by authorized carrier; receiving inspection; evaluation;

disassembly; complete cleaning; all inspection tasks; all NDI requirements; reassembly; all testing and adjustments;

all functional testing of installed accessories and assemblies; all consumables for complete overhaul; all hardware used including lock cups and seals; strip, inspection, repairing, blending, treating, painting of all aluminum / magnesium housings; complete fuel control and over speed governor overhaul; fuel nozzle overhaul and testing; engine test cell run(s) and adjustments; post test cell run Foreign Object Damage (FOD) check, filter replacement, and oil sampling; preserve and secure engine in shipping container; documentation; and shipment from Offeror's facility to Melbourne Florida by authorized carrier

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2017 to 04/30/2018

AA

Over and Above Labor PW123E 0.00 0.00

0.00 HR

This is a Firm-Fixed Priced (FFP) CLIN for Overhaul/Analysis fully loaded Labor rate per man-hour for any additional work required outside the basic engine overhaul to complete and make ready to issue (RFI).

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2017 to 04/30/2018

AB

Over and Above Materials PW123E 0.00 0.00

0.00 LT

This is a Cost Reimbursable CLIN for additional materials required outside the basic overhaul CLIN to complete and make ready to issue (RFI). The proposed unit cost for new materials shall include OEM costs and any related material handling costs but shall not exceed OEM published catalog price. The cost for used approved, overhauled materials shall be cost plus fixed fee but shall not exceed 60% of OEM published catalog prices.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2017 to 04/30/2018

1006 Over and Above Repair and Rework PW123E 0.00

SAQMMA15R0653

Line Item Summary

Solicitation Number:

SAQMMA15R0653

Contract Number: Title: Pratt & Whitney/Canada (PWC) Engine Overhaul

Date of Solicitation:

03/24/2016

This is a Cost Reimbursable CLIN for all outside vendor repairs and rework not included in the fixed price CLIN.

This cost includes but is not limited to: precision machining;

brazing; welding; plasma spray; air flow and adjustment;

accessary overhaul; proprietary specialty coatings; electron beam (EB) welding; Electrical Discharge Machining (EDMs). Repairs and reworks performed in-house and not included in the fixed price CLIN will be reimbursed at the over and above labor rate and material will be provided under the Over and Above Materials CLIN AA and AB.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2017 to 04/30/2018

1007 Overhaul Aircraft Engine PT6T-3B 1.00 0.00

1.00 EA

This is a Firm-Fixed Priced (FFP) CLIN for a Basic PT6T-3B Engine Twin Pack Overhaul. Unit Price shall include shipping from Melbourne Florida to Offeror's facility by authorized carrier; receiving inspection; evaluation;

disassembly; complete cleaning; all inspection tasks; all NDI requirements; reassembly; all testing and adjustments;

all functional testing of installed accessories and assemblies; all consumables for complete overhaul; all hardware used including lock cups and seals; strip, inspection, repairing, blending, treating, painting of all aluminum / magnesium housings; complete fuel control and over speed governor overhaul; fuel nozzle overhaul and testing; engine test cell run(s) and adjustments; post test cell run Foreign Object Damage (FOD) check, filter replacement, and oil sampling; preserve and secure engine in shipping container; documentation; and shipment from Offeror's facility to Melbourne Florida by authorized carrier

Doc Ref No:

Delivery

Date (Start to End) Date…