SAQMMA15R0653 _Amendment_A003 __changes_Mar_22 _2016.pdf

PDF 181 KB Posted

Attached to
INL/A - P&W Engine Overhaul
Solicitation number
SAQMMA15R0653
Issued by

About this file

SAQMMA15R0653 Amendment A003 dated Mar 22 2016

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE RATING

A1

2. AMENDMENT/MODIFICATION NO.

A003

3. EFFECTIVE DATE

03/21/2016

4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

LMAQMCODE

OFFICE OF ACQUISITION MANAGEMENT

(A/LM/AQM)

6767 NORTH WICKHAM ROAD, SUITE 214

MELBOURNE, FL 32940

Renee Alexander

NAME

TEL.

alexanderrk@State.gov

EMAIL

6. ISSUED BY LMAQMCODE

OFFICE OF ACQUISITION MANAGEMENT (A/LM/AQM)

1038 S PATRICK DRIVE

ATTN: INL AIRWING

PATRICK AFB, FL 32925

7. ADMINISTERED BY (If other than Item 6)

9A. AMENDMENT OF SOLICITATION NO.

SAQMMA15R0653

CONTACT DUNS

CODE FACILITY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, country, state and ZIP Code) (X)

X 9B. DATED (SEE ITEM 11)

02/16/2016

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X XThe above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended, Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning ____copies of the amendment;(b)By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.X

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

See Continuation Page for Changes

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Patrick Murphy

(Signature of person authorized to sign)

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED

By (Signature of Contracting Officer)

16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

03/22/2016

NSN 7540-01-152-8070

Previous edition unusable

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

SAQMMA15R0653

Table of Contents

Section Description Page Number

2 Contract Clauses 52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive Orders--Commercial Items (Oct 2015) 52.217-6 Option for Increased Quantity (Mar 1989) 52.217-9 Option to Extend the Term of the Contract (Mar 2000)

SAQMMA15R0653

Section 1- Solicitation/Contract Form

A.3 Description of Amendment/Modification Question and Answers

The purpose of this Amendment (A003) is to provide the Government's responses to request for proposal (RFP) received from prospective offerors under solicitation SAQMMA15R0653, issued on Feb. 16, 2016 and outlined in the summary of Changes below:

1. Additional Questions and Answers:

(l). by only accepting partial offers we feel government has restricted open and fair competition. Does the state department agree?

(l) RESPONSE: As indicated in Amendment A002 NO partial Offers will be accepted. Currently approved and maintained approval status by Pratt and Whitney Contractors are free to work with other approved Pratt and Whitney Contractors as a Subcontractor to submit a proposal which is complaint with all CLINS. Due the qual-ity requirements of Pratt and Whitney Engine for air worthiness approval by Pratt and Whitney is mandatory, the Government believes this requirement has to be met to be technically complaint.

(m) Why couldn’t the bidder sub out the engine model they do not have certification on?

(m) RESPONSE: An approved Contractor has the ability to subcontract out engines which they are not ap-proved by Pratt and Whitney with subcontractor(s) who are approved by Pratt and Whitney and meet all of the requirements of the statement of work for those engines. Documentation for the Contractor and Subcontract-or(s) must be provided and maintained as part of the proposal to be complaint with the term and conditions of the solicitation.

(n) Does INL have the manuals for the particular model engines in question on the solicitation?

(n) RESPONSE: All of the manuals are commercially available by Pratt and Whitney and for them to be re-leased to your company it must be approved currently by Pratt and Whitney.

(o) Could INL provide to the contractor that is awarded these manuals so they can perform the required main-tenance on the particular engine that they are not certified on?

(o) RESPONSE: All of the manuals are commercially available by Pratt and Whitney and for them to be re-leased your company it must be approved with Pratt and Whitney.

2. This amendment provides clarification in all of the descriptions contained within the CLINs contained in this amendment. Please review in detail section 1 CLINS which contain the revised CLINs.

3. In addition in Section C Statement of Work Clause C-3 is added to clarify the certification requirements and documentation required as part of this solicitation.

001 Overhaul Aircraft Engine PT6A-67AG 0.00 1.00

1.00 EA

This is a Firm-Fixed Priced (FFP) CLIN for a Basic PT6A-67AG Engine Overhaul. Unit Price shall include shipping from Melbourne Florida to Offeror's facility by authorized carrier; receiving inspection; evaluation;

disassembly; complete cleaning; all inspection tasks; all NDI requirements; reassembly; all testing and adjustments;

SAQMMA15R0653

Line Item Summary

Solicitation Number:

SAQMMA15R0653

Contract Number: Title: Pratt & Whitney/Canada (PWC) Engine Overhaul

Date of Solicitation:

03/21/2016

Line Item No. Description Quantity Unit Unit Price Total Cost all functional testing of installed accessories and assemblies; all consumables for complete overhaul; all hardware used including lock cups and seals; strip, inspection, repairing, blending, treating, painting of all aluminum / magnesium housings; complete fuel control and over speed governor overhaul; fuel nozzle overhaul and testing; engine test cell run(s) and adjustments; post test cell run Foreign Object Damage (FOD) check, filter replacement, and oil sampling; preserve and secure engine in shipping container; documentation; and shipment from Offeror's facility to Melbourne Florida by authorized carrier.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2016 to 04/30/2017

AA

Over and Above Labor PT6A-67AG 1.00 0.00

1.00 HR

This is a Firm-Fixed Priced (FFP) CLIN for Overhaul/Analysis fully loaded Labor rate per man-hour for any additional work required outside the basic engine overhaul to complete and make ready to issue (RFI).

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2016 to 04/30/2017

AB

Over and Above Materials PT6A-67AG 1.00 -1.00

0.00 LT

This is a Cost Reimbursable CLIN for additional materials required outside the basic overhaul CLIN to complete and make ready to issue (RFI). The proposed unit cost for new materials shall include OEM costs and any related material handling costs but shall not exceed OEM published catalog price. The cost for used approved, overhauled materials shall be cost plus fixed fee but shall not exceed 60% of OEM published catalog prices.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2016 to 04/30/2017

AC

Over and Above Repair and Rework PT6A-67AG 1.00 -1.00

0.00 LT

This is a Cost Reimbursable CLIN for all outside vendor repairs and rework not included in the fixed price CLIN.

This cost includes but is not limited to: precision machining;

brazing; welding; plasma spray; air flow and adjustment;

accessary overhaul; proprietary specialty coatings; electron beam (EB) welding; Electrical Discharge Machining (EDMs). Repairs and reworks performed in-house and not included in the fixed price CLIN will be reimbursed at the over and above labor rate and material will be provided under the Over and Above Materials CLIN AA and AB.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2016 to 04/30/2017

SAQMMA15R0653

Line Item Summary

Solicitation Number:

SAQMMA15R0653

Contract Number: Title: Pratt & Whitney/Canada (PWC) Engine Overhaul

Date of Solicitation:

03/21/2016

002 Overhaul Aircraft Engine PT6A-67F 1.00 0.00

1.00 EA

This is a Firm-Fixed Priced (FFP) CLIN for a Basic PT6A-67F Engine Overhaul. Unit Price shall include shipping from Melbourne Florida to Offeror's facility by authorized carrier; receiving inspection; evaluation;

disassembly; complete cleaning; all inspection tasks; all NDI requirements; reassembly; all testing and adjustments;

all functional testing of installed accessories and assemblies; all consumables for complete overhaul; all hardware used including lock cups and seals; strip, inspection, repairing, blending, treating, painting of all aluminum / magnesium housings; complete fuel control and over speed governor overhaul; fuel nozzle overhaul and testing; engine test cell run(s) and adjustments; post test cell run Foreign Object Damage (FOD) check, filter replacement, and oil sampling; preserve and secure engine in shipping container; documentation; and shipment from Offeror's facility to Melbourne Florida by authorized carrier

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2016 to 04/30/2017

AA

Over and Above Labor PT6A-67F 1.00 0.00

1.00 HR

This is a Firm-Fixed Priced (FFP) CLIN for Overhaul/Analysis fully loaded Labor rate per man-hour for any additional work required outside the basic engine overhaul to complete and make ready to issue (RFI).

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2016 to 04/30/2017

AB

Over and Above Materials PT6A-67F 1.00 -1.00

0.00 LT

This is a Cost Reimbursable CLIN for additional materials required outside the basic overhaul CLIN to complete and make ready to issue (RFI). The proposed unit cost for new materials shall include OEM costs and any related material handling costs but shall not exceed OEM published catalog price. The cost for used approved, overhauled materials shall be cost plus fixed fee but shall not exceed 60% of OEM published catalog prices.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2016 to 04/30/2017

AC

Over and Above Repair and Rework PT6A-67F 1.00 -1.00

0.00 LT

This is a Cost Reimbursable CLIN for all outside vendor repairs and rework not included in the fixed price CLIN.

This cost includes but is not limited to: precision machining;

brazing; welding; plasma spray; air flow and adjustment;

accessary overhaul; proprietary specialty coatings; electron beam (EB) welding; Electrical Discharge Machining (EDMs). Repairs and reworks performed in-house and not

SAQMMA15R0653

Line Item Summary

Solicitation Number:

SAQMMA15R0653

Contract Number: Title: Pratt & Whitney/Canada (PWC) Engine Overhaul

Date of Solicitation:

03/21/2016 included in the fixed price CLIN will be reimbursed at the over and above labor rate and material will be provided under the Over and Above Materials CLIN AA and AB.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2016 to 04/30/2017

003 Overhaul Aircraft Engine PT6A-67D 2.00 0.00

2.00 EA

This is a Firm-Fixed Priced (FFP) CLIN for a Basic PT6A-67D Engine Overhaul. Unit Price shall include shipping from Melbourne Florida to Offeror's facility by authorized carrier; receiving inspection; evaluation;

disassembly; complete cleaning; all inspection tasks; all NDI requirements; reassembly; all testing and adjustments;

all functional testing of installed accessories and assemblies; all consumables for complete overhaul; all hardware used including lock cups and seals; strip, inspection, repairing, blending, treating, painting of all aluminum / magnesium housings; complete fuel control and over speed governor overhaul; fuel nozzle overhaul and testing; engine test cell run(s) and adjustments; post test cell run Foreign Object Damage (FOD) check, filter replacement, and oil sampling; preserve and secure engine in shipping container; documentation; and shipment from Offeror's facility to Melbourne Florida by authorized carrier

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2016 to 04/30/2017

AA

Over and Above Labor PT6A-67D 1.00 0.00

1.00 HR

This is a Firm-Fixed Priced (FFP) CLIN for Overhaul/Analysis fully loaded Labor rate per man-hour for any additional work required outside the basic engine overhaul to complete and make ready to issue (RFI).

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2016 to 04/30/2017

AB

Over and Above Materials PT6A-67D 1.00 -1.00

0.00 LT

This is a Cost Reimbursable CLIN for additional materials required outside the basic overhaul CLIN to complete and make ready to issue (RFI). The proposed unit cost for new materials shall include OEM costs and any related material handling costs but shall not exceed OEM published catalog price. The cost for used approved, overhauled materials shall be cost plus fixed fee but shall not exceed 60% of OEM published catalog prices.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2016 to 04/30/2017

003 Over and Above Repair and Rework PT6A-67D 1.00

SAQMMA15R0653

Line Item Summary

Solicitation Number:

SAQMMA15R0653

Contract Number: Title: Pratt & Whitney/Canada (PWC) Engine Overhaul

Date of Solicitation:

03/21/2016

AC -1.00

0.00 LT

This is a Cost Reimbursable CLIN for all outside vendor repairs and rework not included in the fixed price CLIN.

This cost includes but is not limited to: precision machining;

brazing; welding; plasma spray; air flow and adjustment;

accessary overhaul; proprietary specialty coatings; electron beam (EB) welding; Electrical Discharge Machining (EDMs). Repairs and reworks performed in-house and not included in the fixed price CLIN will be reimbursed at the over and above labor rate and material will be provided under the Over and Above Materials CLIN AA and AB.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2016 to 04/30/2017

004 Overhaul Aircraft Engine PT6A-114A 0.00 1.00

1.00 EA

This is a Firm-Fixed Priced (FFP) CLIN for a Basic PT6A-114A Engine Overhaul. Unit Price shall include shipping from Melbourne Florida to Offeror's facility by authorized carrier; receiving inspection; evaluation;

disassembly; complete cleaning; all inspection tasks; all NDI requirements; reassembly; all testing and adjustments;

all functional testing of installed accessories and assemblies; all consumables for complete overhaul; all hardware used including lock cups and seals; strip, inspection, repairing, blending, treating, painting of all aluminum / magnesium housings; complete fuel control and over speed governor overhaul; fuel nozzle overhaul and testing; engine test cell run(s) and adjustments; post test cell run Foreign Object Damage (FOD) check, filter replacement, and oil sampling; preserve and secure engine in shipping container; documentation; and shipment from Offeror's facility to Melbourne Florida by authorized carrier

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2016 to 04/30/2017

AA

Over and Above Labor PT6A-114A 1.00 0.00

1.00 HR

This is a Firm-Fixed Priced (FFP) CLIN for Overhaul/Analysis fully loaded Labor rate per man-hour for any additional work required outside the basic engine overhaul to complete and make ready to issue (RFI).

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2016 to 04/30/2017

AB

Over and Above Materials PT6A-114A 1.00 -1.00

0.00 LT

This is a Cost Reimbursable CLIN for additional materials required outside the basic overhaul CLIN to complete and make ready to issue (RFI). The proposed unit cost for new materials shall include OEM costs and any related material handling costs but shall not exceed OEM published catalog

SAQMMA15R0653

Line Item Summary

Solicitation Number:

SAQMMA15R0653

Contract Number: Title: Pratt & Whitney/Canada (PWC) Engine Overhaul

Date of Solicitation:

03/21/2016 price. The cost for used approved, overhauled materials shall be cost plus fixed fee but shall not exceed 60% of OEM published catalog prices

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2016 to 04/30/2017

AC

Over and Above Repair and Rework PT6A-114A 1.00 -1.00

0.00 LT

This is a Cost Reimbursable CLIN for all outside vendor repairs and rework not included in the fixed price CLIN.

This cost includes but is not limited to: precision machining;

brazing; welding; plasma spray; air flow and adjustment;

accessary overhaul; proprietary specialty coatings; electron beam (EB) welding; Electrical Discharge Machining (EDMs). Repairs and reworks performed in-house and not included in the fixed price CLIN will be reimbursed at the over and above labor rate and material will be provided under the Over and Above Materials CLIN AA and AB.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2016 to 04/30/2017

005 Overhaul Aircraft Engine PT6A-67R 0.00 1.00

1.00 EA

This is a Firm-Fixed Priced (FFP) CLIN for a Basic PT6A-67R Engine Overhaul. Unit Price shall include shipping from Melbourne Florida to Offeror's facility by authorized carrier; receiving inspection; evaluation;

disassembly; complete cleaning; all inspection tasks; all NDI requirements; reassembly; all testing and adjustments;

all functional testing of installed accessories and assemblies; all consumables for complete overhaul; all hardware used including lock cups and seals; strip, inspection, repairing, blending, treating, painting of all aluminum / magnesium housings; complete fuel control and over speed governor overhaul; fuel nozzle overhaul and testing; engine test cell run(s) and adjustments; post test cell run Foreign Object Damage (FOD) check, filter replacement, and oil sampling; preserve and secure engine in shipping container; documentation; and shipment from Offeror's facility to Melbourne Florida by authorized carrier

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2016 to 04/30/2017

AA

Over and Above Labor PT6A-67R 1.00 0.00

1.00 HR

This is a Firm-Fixed Priced (FFP) CLIN for Overhaul/Analysis fully loaded Labor rate per man-hour for any additional work required outside the basic engine overhaul to complete and make ready to issue (RFI).

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2016 to 04/30/2017

SAQMMA15R0653

Line Item Summary

Solicitation Number:

SAQMMA15R0653

Contract Number: Title: Pratt & Whitney/Canada (PWC) Engine Overhaul

Date of Solicitation:

03/21/2016

AB

Over and Above Materials PT6A-67R 1.00 -1.00

0.00 LT

This is a Cost Reimbursable CLIN for additional materials required outside the basic overhaul CLIN to complete and make ready to issue (RFI). The proposed unit cost for new materials shall include OEM costs and any related material handling costs but shall not exceed OEM published catalog price. The cost for used approved, overhauled materials shall be cost plus fixed fee but shall not exceed 60% of OEM published catalog prices.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2016 to 04/30/2017

AC

Over and Above Repair and Rework PT6A-67R 1.00 -1.00

0.00 LT

This is a Cost Reimbursable CLIN for all outside vendor repairs and rework not included in the fixed price CLIN.

This cost includes but is not limited to: precision machining;

brazing; welding; plasma spray; air flow and adjustment;

accessary overhaul; proprietary specialty coatings; electron beam (EB) welding; Electrical Discharge Machining (EDMs). Repairs and reworks performed in-house and not included in the fixed price CLIN will be reimbursed at the over and above labor rate and material will be provided under the Over and Above Materials CLIN AA and AB.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2016 to 04/30/2017

006 Overhaul Aircraft Engine PW123E 1.00 0.00

1.00 EA

This is a Firm-Fixed Priced (FFP) CLIN for a Basic PW123E Engine Overhaul. Unit Price shall include shipping from Melbourne Florida to Offeror's facility by authorized carrier; receiving inspection; evaluation;

disassembly; complete cleaning; all inspection tasks; all NDI requirements; reassembly; all testing and adjustments;

all functional testing of installed accessories and assemblies; all consumables for complete overhaul; all hardware used including lock cups and seals; strip, inspection, repairing, blending, treating, painting of all aluminum / magnesium housings; complete fuel control and over speed governor overhaul; fuel nozzle overhaul and testing; engine test cell run(s) and adjustments; post test cell run Foreign Object Damage (FOD) check, filter replacement, and oil sampling; preserve and secure engine in shipping container; documentation; and shipment from Offeror's facility to Melbourne Florida by authorized carrier

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2016 to 04/30/2017

AA

Over and Above Labor PW123E 1.00 0.00

1.00 HR

SAQMMA15R0653

Line Item Summary

Solicitation Number:

SAQMMA15R0653

Contract Number: Title: Pratt & Whitney/Canada (PWC) Engine Overhaul

Date of Solicitation:

03/21/2016

This is a Firm-Fixed Priced (FFP) CLIN for Overhaul/Analysis fully loaded Labor rate per man-hour for any additional work required outside the basic engine overhaul to complete and make ready to issue (RFI).

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2016 to 04/30/2017

AB

Over and Above Materials PW123E 1.00 -1.00

0.00 LT

This is a Cost Reimbursable CLIN for additional materials required outside the basic overhaul CLIN to complete and make ready to issue (RFI). The proposed unit cost for new materials shall include OEM costs and any related material handling costs but shall not exceed OEM published catalog price. The cost for used approved, overhauled materials shall be cost plus fixed fee but shall not exceed 60% of OEM published catalog prices.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

03/01/2016 to 02/28/2017

AC

Over and Above Repair and Rework PW123E 1.00 -1.00

0.00 LT

This is a Cost Reimbursable CLIN for all outside vendor repairs and rework not included in the fixed price CLIN.

This cost includes but is not limited to: precision machining;

brazing; welding; plasma spray; air flow and adjustment;

accessary overhaul; proprietary specialty coatings; electron beam (EB) welding; Electrical Discharge Machining (EDMs). Repairs and reworks performed in-house and not included in the fixed price CLIN will be reimbursed at the over and above labor rate and material will be provided under the Over and Above Materials CLIN AA and AB.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2016 to 04/30/2017

007 Overhaul Aircraft Engine PT6A-3B 1.00 0.00

1.00 EA

This is a Firm-Fixed Priced (FFP) CLIN for a Basic PT6A-3B Engine Twin Pack Overhaul. Unit Price shall include shipping from Melbourne Florida to Offeror's facility by authorized carrier; receiving inspection; evaluation;

disassembly; complete cleaning; all inspection tasks; all NDI requirements; reassembly; all testing and adjustments;

all functional testing of installed accessories and assemblies; all consumables for complete overhaul; all hardware used including lock cups and seals; strip, inspection, repairing, blending, treating, painting of all aluminum / magnesium housings; complete fuel control and over speed governor overhaul; fuel nozzle overhaul and testing; engine test cell run(s) and adjustments; post test cell run Foreign Object Damage (FOD) check, filter replacement, and oil sampling; preserve and secure engine in shipping container; documentation; and shipment from Offeror's facility to Melbourne Florida by authorized carrier

SAQMMA15R0653

Line Item Summary

Solicitation Number:

SAQMMA15R0653

Contract Number: Title: Pratt & Whitney/Canada (PWC) Engine Overhaul

Date of Solicitation:

03/21/2016

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2016 to 04/30/2017

AA

Over and Above Labor PT6A-3B 1.00 0.00

1.00 HR

This is a Firm-Fixed Priced (FFP) CLIN for Overhaul/Analysis fully loaded Labor rate per man-hour for any additional work required outside the basic engine overhaul to complete and make ready to issue (RFI).

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2016 to 04/30/2017

AB

Over and Above Materials PT6A-3B 1.00 -1.00

0.00 LT

This is a Cost Reimbursable CLIN for additional materials required outside the basic overhaul CLIN to complete and make ready to issue (RFI). The proposed unit cost for new materials shall include OEM costs and any related material handling costs but shall not exceed OEM published catalog price. The cost for used approved, overhauled materials shall be cost plus fixed fee but shall not exceed 60% of OEM published catalog prices.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2016 to 04/30/2017

AC

Over and Above Repair and Rework PT6A-3B 1.00 -1.00

0.00 LT

This is a Cost Reimbursable CLIN for all outside vendor repairs and rework not included in the fixed price CLIN.

This cost includes but is not limited to: precision machining;

brazing; welding; plasma spray; air flow and adjustment;

accessary overhaul; proprietary specialty coatings; electron beam (EB) welding; Electrical Discharge Machining (EDMs). Repairs and reworks performed in-house and not included in the fixed price CLIN will be reimbursed at the over and above labor rate and material will be provided under the Over and Above Materials CLIN AA and AB.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2016 to 04/30/2017

008 Overhaul Aircraft Engine PT6A-27 0.00 1.00

1.00 EA

This is a Firm-Fixed Priced (FFP) CLIN for a Basic PT6A-27 Engine Overhaul. Unit Price shall include shipping from Melbourne Florida to Offeror's facility by authorized carrier; receiving inspection; evaluation;

disassembly; complete cleaning; all inspection tasks; all NDI requirements; reassembly; all testing and adjustments;

all functional testing of installed accessories and assemblies; all consumables for complete overhaul; all

SAQMMA15R0653

Line Item Summary

Solicitation Number:

SAQMMA15R0653

Contract Number: Title: Pratt & Whitney/Canada (PWC) Engine Overhaul

Date of Solicitation:

03/21/2016 hardware used including lock cups and seals; strip, inspection, repairing, blending, treating, painting of all aluminum / magnesium housings; complete fuel control and over speed governor overhaul; fuel nozzle overhaul and testing; engine test cell run(s) and adjustments; post test run Foreign Object Damage (FOD) check, filter replacement, and oil sampling; preserve and secure engine in shipping container; documentation; and shipment from Offeror's facility to Melbourne Florida by authorized carrier

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2016 to 04/30/2017

AA

Over and Above Labor PT6A-27 1.00 0.00

1.00 HR

This is a Firm-Fixed Priced (FFP) CLIN for Overhaul/Analysis fully loaded Labor rate per man-hour for any additional work required outside the basic engine overhaul to complete and make ready to issue (RFI).

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2016 to 04/30/2017

AB

Over and Above Materials PT6A-27 1.00 -1.00

0.00 LT

This is a Cost Reimbursable CLIN for additional materials required outside the basic overhaul CLIN to complete and make ready to issue (RFI). The proposed unit cost for new materials shall include OEM costs and any related material handling costs but shall not exceed OEM published catalog price. The cost for used approved, overhauled materials shall be cost plus fixed fee but shall not exceed 60% of OEM published catalog prices.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2016 to 04/30/2017

AC

Over and Above Repair and Rework PT6A-27 1.00 -1.00

0.00 LT

This is a Cost Reimbursable CLIN for all outside vendor repairs and rework not included in the fixed price CLIN.

This cost includes but is not limited to: precision machining;

brazing; welding; plasma spray; air flow and adjustment;

accessary overhaul; proprietary specialty coatings; electron beam (EB) welding; Electrical Discharge Machining (EDMs). Repairs and reworks performed in-house and not included in the fixed price CLIN will be reimbursed at the over and above labor rate and material will be provided under the Over and Above Materials CLIN AA and AB.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2016 to 04/30/2017

009 Engine Performance Run 5.00 -4.00

SAQMMA15R0653

Line Item Summary

Solicitation Number:

SAQMMA15R0653

Contract Number: Title: Pratt & Whitney/Canada (PWC) Engine Overhaul

Date of Solicitation:

03/21/2016

1.00 LT

This is a Firm Fixed Price (FFP) CLIN to perform Engine test cell run evaluation. Unit Price shall include shipping from Melbourne Florida to Offeror's facility by authorized carrier; receiving inspection; evaluation; pre run cleaning;

all consumables; any hardware used; engine test cell run(s) and evaluation; post test cell run FOD check, filter replacement, and oil sampling; preserve and secure engine in shipping container; documentation; and shipment from Offeror's facility to Melbourne Florida by authorized carrier.

PT6A-67D FFP $

PTA-67AG FFP $

PT6A-67F FFP $

PT6A-114A FFP $

PT6A-67R FFP $

PW123E FFP $

PT6T-3B FFP $

PT6A-27 FFP $

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2016 to 04/30/2017

010 Over and Above Property Disposal 1.00 -1.00

0.00 LT

Cost reimbursable CLIN for outside vendor disposal of those government materials deemed extremely hazardous and beyond the capability of the Offeror's facility to dispose properly. Contractor shall provide an estimate for Government approval prior to disposal.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2016 to 04/30/2017

011 Demilitarization and Property Disposal 1.00 0.00

1.00 LT

This is a Firm Fixed Price (FFP) CLIN for Unit Labor Cost per man-hour for demilitarization and disposal of government provided materials that are deemed Beyond Economical to Repair (BER), at or near life limit, excess, salvage, and or scrap.

PT6A-67D FFP $

PTA-67AG FFP $

PT6A-67F FFP $

PT6A-114A FFP $

PT6A-67R FFP $

PW123E FFP $

PT6T-3B FFP $

PT6A-27 FFP $

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2016 to 04/30/2017

012 Shipping Container Refurbishment Not to exceed 1.00 0.00

1.00 LT

This is a FFP CLIN for refurbishing metal containers if used for shipment of PT engines. Unit Price shall include

SAQMMA15R0653

Line Item Summary

Solicitation Number:

SAQMMA15R0653

Contract Number: Title: Pratt & Whitney/Canada (PWC) Engine Overhaul

Date of Solicitation:

03/21/2016 inspection; evaluation; complete cleaning; all inspections tasks; rust removal; repair; complete strip and paint of inside and outside of the container; and reapplication of DoS markings.

PT6A-67D FFP $

PTA-67AG FFP $

PT6A-67F FFP $

PT6A-114A FFP $

PT6A-67R FFP $

PW123E FFP $

PT6T-3B FFP $

PT6A-27 FFP $

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2016 to 04/30/2017

013 Two-Way Surface Transportation Cost for five Engines 1.00 0.00

1.00 LT

This is a Firm-Fixed Price CLIN to provide OEM approved shipment, packaged and transported by a qualified source of P&W engines, components, and materials to the Contractor repair facility from Melbourne, FL and return to Melbourne, FL upon completion of work as per attached

SOW

PT6A-67D FFP $

PTA-67AG FFP $

PT6A-67F FFP $

PT6A-114A FFP $

PT6A-67R FFP $

PW123E FFP $

PT6T-3B FFP $

PT6A-27 FFP $

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2016 to 04/30/2017

014 Off-site Field Services 1.00 0.00

1.00 HR

This is a Firm-fixed priced CLIN at a field service per man hour rate to provide on-demand technical and logistics support services at CONUS and austere OCONUS locations. This could include but is not limited to evaluations, scheduled inspections, and repairs.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2016 to 04/30/2017

015 Contractor Travel 1.00 0.00

1.00 LT

This is a Not-to-Exceed Cost Reimbursable in accordance with JTR rates. CLIN for approved Offeror's travel to perform engine evaluations and repairs at locations other than Offeror's facility. Contractor shall submit a proposal for each travel request to the Contracting Officer or the Contracting Officer's Representative (COR) for approval in advance.

SAQMMA15R0653

Line Item Summary

Solicitation Number:

SAQMMA15R0653

Contract Number: Title: Pratt & Whitney/Canada (PWC) Engine Overhaul

Date of Solicitation:

03/21/2016

Date (Start to End) Date FOB:

05/01/2016 to 04/30/2017

016 Engineering, Training, and System Safety 1.00 0.00

1.00 LT

This is a Cost Reimbursable CLIN to perform Engineering studies and prepare technical documentation, training in the classroom and or field, and participate in Accident and Incident analysis, on a demand basis, in both CONUS and austere OCONUS when required

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2016 to 04/30/2017

1001 Overhaul Aircraft Engine PT6A-67AG 1.00 0.00

1.00 EA

This is a Firm-Fixed Priced (FFP) CLIN for a Basic PT6A-67AG Engine Overhaul. Unit Price shall include shipping from Melbourne Florida to Offeror's facility by authorized carrier; receiving inspection; evaluation;

disassembly; complete cleaning; all inspection tasks; all NDI requirements; reassembly; all testing and adjustments;

all functional testing of installed accessories and assemblies; all consumables for complete overhaul; all hardware used including lock cups and seals; strip, inspection, repairing, blending, treating, painting of all aluminum / magnesium housings; complete fuel control and over speed governor overhaul; fuel nozzle overhaul and testing; engine test cell run(s) and adjustments; post test cell run Foreign Object Damage (FOD) check, filter replacement, and oil sampling; preserve and secure engine in shipping container; documentation; and shipment from Offeror's facility to Melbourne Florida by authorized carrier

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2017 to 04/30/2018

AA

Over and Above Labor PT6A-67AG 1.00 0.00

1.00 HR

This is a Firm-Fixed Priced (FFP) CLIN for Overhaul/Analysis fully loaded Labor rate per man-hour for any additional work required outside the basic engine overhaul to complete and make ready to issue (RFI).

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2017 to 04/30/2018

AB

Over and Above Materials PT6A-67AG 1.00 -1.00

0.00 LT

This is a Cost Reimbursable CLIN for additional materials required outside the basic overhaul CLIN to complete and make ready to issue (RFI). The proposed unit cost for new materials shall include OEM costs and any related material

SAQMMA15R0653

Line Item Summary

Solicitation Number:

SAQMMA15R0653

Contract Number: Title: Pratt & Whitney/Canada (PWC) Engine Overhaul

Date of Solicitation:

03/21/2016 handling costs but shall not exceed OEM published catalog shall be cost plus fixed fee but shall not exceed 60% of OEM published catalog prices

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

03/01/2017 to 02/28/2018

AC

Over and Above Repair and Rework PT6A-67AG 1.00 -1.00

0.00 LT

This is a Cost Reimbursable CLIN for all outside vendor repairs and rework not included in the fixed price CLIN.

This cost includes but is not limited to: precision machining;

brazing; welding; plasma spray; air flow and adjustment;

accessary overhaul; proprietary specialty coatings; electron beam (EB) welding; Electrical Discharge Machining (EDMs). Repairs and reworks performed in-house and not included in the fixed price CLIN will be reimbursed at the over and above labor rate and material will be provided under the Over and Above Materials CLIN AA and AB.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2017 to 04/30/2018

1002 Overhaul Aircraft Engine PT6A-67F 2.00 0.00

2.00 EA

This is a Firm-Fixed Priced (FFP) CLIN for a Basic PT6A-67F Engine Overhaul. Unit Price shall include shipping from Melbourne Florida to Offeror's facility by authorized carrier; receiving inspection; evaluation;

disassembly; complete cleaning; all inspection tasks; all NDI requirements; reassembly; all testing and adjustments;

all functional testing of installed accessories and assemblies; all consumables for complete overhaul; all hardware used including lock cups and seals; strip, inspection, repairing, blending, treating, painting of all aluminum / magnesium housings; complete fuel control and over speed governor overhaul; fuel nozzle overhaul and testing; engine test cell run(s) and adjustments; post test cell run Foreign Object Damage (FOD) check, filter replacement, and oil sampling; preserve and secure engine in shipping container; documentation; and shipment from Offeror's facility to Melbourne Florida by authorized carrier

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2017 to 04/30/2018

AA

Over and Above Labor PT6A-67F 1.00 0.00

1.00 HR

This is a Firm-Fixed Priced (FFP) CLIN for Overhaul/Analysis fully loaded Labor rate per man-hour for any additional work required outside the basic engine overhaul to complete and make ready to issue (RFI).

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2017 to 04/30/2018

SAQMMA15R0653

Line Item Summary

Solicitation Number:

SAQMMA15R0653

Contract Number: Title: Pratt & Whitney/Canada (PWC) Engine Overhaul

Date of Solicitation:

03/21/2016

Over and Above Materials PT6A-67F 1.00 -1.00

0.00 LT

This is a Cost Reimbursable CLIN for additional materials required outside the basic overhaul CLIN to complete and make ready to issue (RFI). The proposed unit cost for new materials shall include OEM costs and any related material handling costs but shall not exceed OEM published catalog price. The cost for used approved, overhauled materials shall be cost plus fixed fee but shall not exceed 60% of OEM published catalog prices.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2017 to 04/30/2018

AC

Over and Above Repair and Rework PT6A-67F 1.00 -1.00

0.00 LT

This is a Cost Reimbursable CLIN for all outside vendor repairs and rework not included in the fixed price CLIN.

This cost includes but is not limited to: precision machining;

brazing; welding; plasma spray; air flow and adjustment;

accessary overhaul; proprietary specialty coatings; electron beam (EB) welding; Electrical Discharge Machining (EDMs). Repairs and reworks performed in-house and not included in the fixed price CLIN will be reimbursed at the over and above labor rate and material will be provided under the Over and Above Materials CLIN AA and AB.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2017 to 04/30/2018

1003 Overhaul Aircraft Engine PT6A-67D 2.00 0.00

2.00 EA

This is a Firm-Fixed Priced (FFP) CLIN for a Basic PT6A-67D Engine Overhaul. Unit Price shall include shipping from Melbourne Florida to Offeror's facility by authorized carrier; receiving inspection; evaluation;

disassembly; complete cleaning; all inspection tasks; all NDI requirements; reassembly; all testing and adjustments;

all functional testing of installed accessories and assemblies; all consumables for complete overhaul; all hardware used including lock cups and seals; strip, inspection, repairing, blending, treating, painting of all aluminum / magnesium housings; complete fuel control and over speed governor overhaul; fuel nozzle overhaul and testing; engine test cell run(s) and adjustments; post test cell run Foreign Object Damage (FOD) check, filter replacement, and oil sampling; preserve and secure engine in shipping container; documentation; and shipment from Offeror's facility to Melbourne Florida by authorized carrier

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2017 to 04/30/2018

AA

Over and Above Labor PT6A-67D 1.00 0.00

SAQMMA15R0653

Line Item Summary

Solicitation Number:

SAQMMA15R0653

Contract Number: Title: Pratt & Whitney/Canada (PWC) Engine Overhaul

Date of Solicitation:

03/21/2016

1.00 HR

Overhaul/Analysis fully loaded Labor rate per man-hour for any additional work required outside the basic engine overhaul to complete and make ready to issue (RFI).

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2017 to 04/30/2018

AB

Over and Above Materials PT6A-67D 1.00 -1.00

0.00 LT

This is a Cost Reimbursable CLIN for additional materials required outside the basic overhaul CLIN to complete and make ready to issue (RFI). The proposed unit cost for new materials shall include OEM costs and any related material handling costs but shall not exceed OEM published catalog price. The cost for used approved, overhauled materials shall be cost plus fixed fee but shall not exceed 60% of OEM published catalog prices.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2017 to 04/30/2018

AC

Over and Above Repair and Rework PT6A-67D 1.00 -1.00

0.00 LT

This is a Cost Reimbursable CLIN for all outside vendor repairs and rework not included in the fixed price CLIN.

This cost includes but is not limited to: precision machining;

brazing; welding; plasma spray; air flow and adjustment;

accessary overhaul; proprietary specialty coatings; electron beam (EB) welding; Electrical Discharge Machining (EDMs). Repairs and reworks performed in-house and not included in the fixed price CLIN will be reimbursed at the over and above labor rate and material will be provided under the Over and Above Materials CLIN AA and AB.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2017 to 04/30/2018

1004 Overhaul Aircraft Engine PT6A-114A 1.00 0.00

1.00 EA

This is a Firm-Fixed Priced (FFP) CLIN for a Basic PT6A-114A Engine Overhaul. Unit Price shall include shipping from Melbourne Florida to Offeror's facility by authorized carrier; receiving inspection; evaluation;

disassembly; complete cleaning; all inspection tasks; all NDI requirements; reassembly; all testing and adjustments;

all functional testing of installed accessories and assemblies; all consumables for complete overhaul; all hardware used including lock cups and seals; strip, inspection, repairing, blending, treating, painting of all aluminum / magnesium housings; complete fuel control and over speed governor overhaul; fuel nozzle overhaul and testing; engine test cell run(s) and adjustments; post test cell run Foreign Object Damage (FOD) check, filter replacement, and oil sampling; preserve and secure engine

SAQMMA15R0653

Line Item Summary

Solicitation Number:

SAQMMA15R0653

Contract Number: Title: Pratt & Whitney/Canada (PWC) Engine Overhaul

Date of Solicitation:

03/21/2016 in shipping container; documentation; and shipment from Offeror's facility to Melbourne Florida by authorized carrier

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2017 to 04/30/2018

AA

Over and Above Labor PT6A-114A 1.00 0.00

1.00 HR

This is a Firm-Fixed Priced (FFP) CLIN for Overhaul/Analysis fully loaded Labor rate per man-hour for any additional work required outside the basic engine overhaul to complete and make ready to issue (RFI).

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2017 to 04/30/2018

AB

Over and Above Materials PT6A-114A 1.00 -1.00

0.00 LT

This is a Cost Reimbursable CLIN for additional materials required outside the basic overhaul CLIN to complete and make ready to issue (RFI). The proposed unit cost for new materials shall include OEM costs and any related material handling costs but shall not exceed OEM published catalog price. The cost for used approved, overhauled materials shall be cost plus fixed fee but shall not exceed 60% of OEM published catalog prices.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2017 to 04/30/2018

AC

Over and Above Repair and Rework PT6A-114A 1.00 -1.00

0.00 LT

This is a Cost Reimbursable CLIN for all outside vendor repairs and rework not included in the fixed price CLIN.

This cost includes but is not limited to: precision machining;

brazing; welding; plasma spray; air flow and adjustment;

accessary overhaul; proprietary specialty coatings; electron beam (EB) welding; Electrical Discharge Machining (EDMs). Repairs and reworks performed in-house and not included in the fixed price CLIN will be reimbursed at the over and above labor rate and material will be provided under the Over and Above Materials CLIN AA and AB.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2017 to 04/30/2018

1005 Overhaul Aircraft Engine PT6A-67R 1.00 0.00

1.00 EA

This is a Firm-Fixed Priced (FFP) CLIN for a Basic PT6A-67R Engine Overhaul. Unit Price shall include shipping from Melbourne Florida to Offeror's facility by authorized carrier; receiving inspection; evaluation;

disassembly; complete cleaning; all inspection tasks; all NDI requirements; reassembly; all testing and adjustments;

SAQMMA15R0653

Line Item Summary

Solicitation Number:

SAQMMA15R0653

Contract Number: Title: Pratt & Whitney/Canada (PWC) Engine Overhaul

Date of Solicitation:

03/21/2016 assemblies; all consumables for complete overhaul; all hardware used including lock cups and seals; strip, inspection, repairing, blending, treating, painting of all aluminum / magnesium housings; complete fuel control and over speed governor overhaul; fuel nozzle overhaul and testing; engine test cell run(s) and adjustments; post test cell run Foreign Object Damage (FOD) check, filter replacement, and oil sampling; preserve and secure engine in shipping container; documentation; and shipment from Offeror's facility to Melbourne Florida by authorized carrier

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2017 to 04/30/2018

AA

Over and Above Labor PT6A-67R 1.00 0.00

1.00 HR

This is a Firm-Fixed Priced (FFP) CLIN for Overhaul/Analysis fully loaded Labor rate per man-hour for any additional work required outside the basic engine overhaul to complete and make ready to issue (RFI).

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2017 to 04/30/2018

AB

Over and Above Materials PT6A-67R 1.00 -1.00

0.00 LT

This is a Cost Reimbursable CLIN for additional materials required outside the basic overhaul CLIN to complete and make ready to issue (RFI). The proposed unit cost for new materials shall include OEM costs and any related material handling costs but shall not exceed OEM published catalog price. The cost for used approved, overhauled materials shall be cost plus fixed fee but shall not exceed 60% of OEM published catalog prices.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2017 to 04/30/2018

AC

Over and Above Repair and Rework PT6A-67R 1.00 -1.00

0.00 LT

This is a Cost Reimbursable CLIN for all outside vendor repairs and rework not included in the fixed price CLIN.

This cost includes but is not limited to: precision machining;

brazing; welding; plasma spray; air flow and adjustment;

accessary overhaul; proprietary specialty coatings; electron beam (EB) welding; Electrical Discharge Machining (EDMs). Repairs and reworks performed in-house and not included in the fixed price CLIN will be reimbursed at the over and above labor rate and material will be provided under the Over and Above Materials CLIN AA and AB.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2017 to 04/30/2018

SAQMMA15R0653

Line Item Summary

Solicitation Number:

SAQMMA15R0653

Contract Number: Title: Pratt & Whitney/Canada (PWC) Engine Overhaul

Date of Solicitation:

03/21/2016

1006 Overhaul Aircraft Engine PW123E 2.00 -2.00

0.00 EA

This is a Firm-Fixed Priced (FFP) CLIN for a Basic PW123E Engine Overhaul. Unit Price shall include shipping from Melbourne Florida to Offeror's facility by authorized carrier; receiving inspection; evaluation;

disassembly; complete cleaning; all inspection tasks; all NDI requirements; reassembly; all testing and adjustments;

all functional testing of installed accessories and assemblies; all consumables for complete overhaul; all hardware used including lock cups and seals; strip, inspection, repairing, blending, treating, painting of all aluminum / magnesium housings; complete fuel control and over speed governor overhaul; fuel nozzle overhaul and testing; engine test cell run(s) and adjustments; post test cell run Foreign Object Damage (FOD) check, filter replacement, and oil sampling; preserve and secure engine in shipping container; documentation; and shipment from Offeror's facility to Melbourne Florida by authorized carrier

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2017 to 04/30/2018

AA

Over and Above Labor PW123E 1.00 -1.00

0.00 HR

This is a Firm-Fixed Priced (FFP) CLIN for Overhaul/Analysis fully loaded Labor rate per man-hour for any additional work required outside the basic engine overhaul to complete and make ready to issue (RFI).

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2017 to 04/30/2018

AB

Over and Above Materials PW123E 1.00 -1.00

0.00 LT

This is a Cost Reimbursable CLIN for additional materials required outside the basic overhaul CLIN to complete and make ready to issue (RFI). The proposed unit cost for new materials shall include OEM costs and any related material handling costs but shall not exceed OEM published catalog price. The cost for used approved, overhauled materials shall be cost plus fixed fee but shall not exceed 60% of OEM published catalog prices.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

05/01/2017 to 04/30/2018

AC

Over and Above Repair and Rework PW123E 1.00 -1.00

0.00 LT

This is a Cost Reimbursable CLIN for all outside vendor repairs and rework not included in the fixed price CLIN.

This cost includes but is not limited to: precision machining;

brazing; welding; plasma spray; air flow and adjustment;

accessary overhaul; proprietary specialty coatings; electron beam (EB) welding; Electrical Discharge Machining (EDMs). Repairs and reworks performed in-house and not

SAQMMA15R0653

Line Item Summary

Solicitation Number:

SAQMMA15R0653

Contract Number: Title: Pratt & Whitney/Canada (PWC) Engine Overhaul

Date of Solicitation:

03/21/2016 over and above labor rate and material will be…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .