S02 - ICRA.xlsx

XLSX spreadsheet 29 KB Posted

Attached to
Z2DA--660-22-111 Patient Lift Site Prep
Solicitation number
36C25922Q0003
Issued by

View the file

Other files

File Type Posted
S04 - Questions and Answers No 1.docx DOCX document
36C25922Q0003 0001.docx DOCX document
S02 - Site Prep Specifications.pdf PDF
S02 - CSRA.pdf PDF
36C25922Q0003.docx DOCX document
S02- WetPipeSprinklerSyst Specifications.pdf PDF
S02 - Drawings - QC-05131911 Va Salt Lake City - REV 3.pdf PDF
S02 - OSH-2021-019 Limited Asbestos Survey ISO.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ICRA

Project Name / EWO Description:Installation of Ceiling LiftsProject # / EWO #:660-22-111
Location of Activity:Nuclear Med, Podiatry, CT, 2E, 3W, Mixed ICU, RICU, GI, ED, Dialysis, SDS/PACU, SIM LabStart Date:TBDEstimated Duration:90 days
Project Manager:Brandon FarrimondContractor:TBDICN:Diane Franke
Project Manager Phone #:801 582 1565 ext 4315Contractor Phone #:TBDICN Phone #:801 582 1565 ex 1708
STEP #1: Using the following table, identify the Type of Construction Project Activity (Type A-D)
A)CONSTRUCTION ACTIVITY TYPES:
Type AInspection and Non-Invasive Activities, includes but is not limited to one or more of the following:
(1) removal of ceiling tiles for visual inspection only, e.g., limited to 1 tile per 50 square
(2) painting (but not sanding) (3) wallcovering (4) electrical trim work (5) minor plumbing,
(6) activities which do not generate dust or require cutting of walls or access to ceilings other than for visual inspection
Type BSmall scale, short duration activities which create minimal dust. Includes, but is not limited to one or more of the following:
(1) access to chase spaces (2) cutting of walls or ceilings where dust migration can be controlled (3) installation of telephone and computer cabling
Type CAny work which generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies.
Includes, but is not limited to one or more of the following:
(1) sanding of walls for painting or wall covering (2) removal of floorcoverings (3) removal of ceiling tiles (4) casework (5) new wall construction (6) minor duct work
(7) electrical work above ceilings (8) major cabling activities (9) any activity which cannot be restored back to original state within a single workshift
Type DMajor demolition and construction projects. Includes, but is not limited to one or more of the following:
(1) requires heavy demolition (2) removal of a complete cabling system (3) new construction connected to occupied area
STEP #2: Using the following table, identify the Risk Groups that will be affected. If more than one group will be affected, select the higher risk group.
B)INFECTION CONTROL RISK GROUPS
Group 1Group 2Group 3Group 4
Low RiskMedium RiskHigh RiskHighest Risk
Office Areas orLaboratoriesImagingEmergency Room (ECU)All OR's
Nonmedical3 WestLaundryPost Antesthesia CareSterile Processing
associated spaceAcute Medicine (2 East, 2 North)Nuclear MedicineAll ICUsAmbulatory Medicine Unit (2 West)
B.2Out Patient ClinicsCardiac Cath/Angiography
B.3 Inpatient Mental Health WardOut Patient SurgeryDialysis Unit
Canteen KitchenPatient Kitchen & DiningPharmacy IV Prep (Inpatient)
CardiologyPharmacy (In & Out Patient)
DecontaminationPT / OT
DentalPublic Corridor (patient activity)
DistributionPulmonary / Bronchoscopy
G.I. LabTelemetry
Hoptel
STEP 3: Determine Class of Precautions (I, II, III or IV) Using Matrix Below:
ICN must be consulted when the assessment indicates that Class II, III, or IV precautions are required.
Construction Project Type
Risk GroupTYPE ATYPE BTYPE CTYPE D
Group 1IIIIIIII/IV
Group 2IIIIIIIV
Group 3IIIIII/IVIV
Group 4IIIII/IVIII/IVIV

&"Arial,Bold"Attachment B &"Arial,Bold"&20Infection Control Risk Assessment Matrix of Precautions for Construction & Renovation

IC Precautions

Infection Control Construction Precautions
During Construction ProjectUpon Completion of Project
CLASS I1Execute work by methods to minimize raising dust.1Clean work area upon completion of task.
2Immediately replace a ceiling tile displaced for visual inspection
3Contaminated materials kept away from patient transportation route and storage for clean supplies.
4Worker traffic routes should minimize contact with patients.
In Addition to Class I Precautions:
1Consult Infection Control Nurse prior to beginning work.1Wipe work surfaces with cleaner/disinfectant.
2Educate VA staff regarding construction activity.2Contain construction waste before transport in tightly covered containers.
CLASS II3Block and seal air vents before starting.3Wet mop and/or vacuum with HEPA filtered vacuum before leaving work area.
4Coordinate air filter maintenance with Operations.4Use only designated elevators (e.g. utility) for debris removal.
5Seal unused doors with duct tape.5Remove and replace wet ceiling tiles.
6Place dust mat at entrance and exit of work area
In Addition to Class I and II Precautions:
CLASS III1Consult Infection Control Nurse prior to beginning work.1Do not remove barriers from work area until completed project is inspected by the owner’s Safety Department and Infection Prevention & Control Department and thoroughly cleaned by the owner’s Environmental Services Department.
2Complete all critical barriers i.e. sheetrock, plywood, plastic, to seal area from non work area or implement control cube method (cart with plastic covering and sealed connection to work site with HEPA vacuum for vacuuming prior to exit) before construction begins.2Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
3Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.3Vacuum work area with HEPA filtered vacuums.
4Contain construction waste before transport in tightly covered containers.4Wet mop area with cleaner/disinfectant.
5Cover transport receptacles or carts. Tape covering unless solid lid.5Upon completion, restore/clean HVAC system as needed where work was performed.
6Water lines flushed at site and adjacent areas.
CLASS IVIn Addition to Class I and II and III Precautions:
1Consult Infection Control Nurse prior to beginning work.
2Relocate patients to area remote from construction area.
IP Signature: Diane Franke, Infection Prevention
Date Reviewed: 8/30/2021
Physicial ICRA needs to be signed at work site.

&"Arial,Bold"&12Description of Required Infection Control Precautions by &UClass