S02 - ICRA.xlsx
XLSX spreadsheet 29 KB Posted
- Attached to
- Z2DA--660-22-111 Patient Lift Site Prep
- Solicitation number
- 36C25922Q0003
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S04 - Questions and Answers No 1.docx | DOCX document | |
| 36C25922Q0003 0001.docx | DOCX document | |
| S02 - Site Prep Specifications.pdf | ||
| S02 - CSRA.pdf | ||
| 36C25922Q0003.docx | DOCX document | |
| S02- WetPipeSprinklerSyst Specifications.pdf | ||
| S02 - Drawings - QC-05131911 Va Salt Lake City - REV 3.pdf | ||
| S02 - OSH-2021-019 Limited Asbestos Survey ISO.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ICRA
| Project Name / EWO Description: | Installation of Ceiling Lifts | Project # / EWO #: | 660-22-111 | ||||
| Location of Activity: | Nuclear Med, Podiatry, CT, 2E, 3W, Mixed ICU, RICU, GI, ED, Dialysis, SDS/PACU, SIM Lab | Start Date: | TBD | Estimated Duration: | 90 days | ||
| Project Manager: | Brandon Farrimond | Contractor: | TBD | ICN: | Diane Franke | ||
| Project Manager Phone #: | 801 582 1565 ext 4315 | Contractor Phone #: | TBD | ICN Phone #: | 801 582 1565 ex 1708 | ||
| STEP #1: Using the following table, identify the Type of Construction Project Activity (Type A-D) | |||||||
| A) | CONSTRUCTION ACTIVITY TYPES: | ||||||
| Type A | Inspection and Non-Invasive Activities, includes but is not limited to one or more of the following: | ||||||
| (1) removal of ceiling tiles for visual inspection only, e.g., limited to 1 tile per 50 square | |||||||
| (2) painting (but not sanding) (3) wallcovering (4) electrical trim work (5) minor plumbing, | |||||||
| (6) activities which do not generate dust or require cutting of walls or access to ceilings other than for visual inspection |
| Type B | Small scale, short duration activities which create minimal dust. Includes, but is not limited to one or more of the following: |
| (1) access to chase spaces (2) cutting of walls or ceilings where dust migration can be controlled (3) installation of telephone and computer cabling |
| Type C | Any work which generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies. |
| Includes, but is not limited to one or more of the following: | |
| (1) sanding of walls for painting or wall covering (2) removal of floorcoverings (3) removal of ceiling tiles (4) casework (5) new wall construction (6) minor duct work | |
| (7) electrical work above ceilings (8) major cabling activities (9) any activity which cannot be restored back to original state within a single workshift |
| Type D | Major demolition and construction projects. Includes, but is not limited to one or more of the following: |
| (1) requires heavy demolition (2) removal of a complete cabling system (3) new construction connected to occupied area |
| STEP #2: Using the following table, identify the Risk Groups that will be affected. If more than one group will be affected, select the higher risk group. | ||||||
| B) | INFECTION CONTROL RISK GROUPS | |||||
| Group 1 | Group 2 | Group 3 | Group 4 | |||
| Low Risk | Medium Risk | High Risk | Highest Risk | |||
| Office Areas or | Laboratories | Imaging | Emergency Room (ECU) | All OR's | ||
| Nonmedical | 3 West | Laundry | Post Antesthesia Care | Sterile Processing | ||
| associated space | Acute Medicine (2 East, 2 North) | Nuclear Medicine | All ICUs | Ambulatory Medicine Unit (2 West) | ||
| B.2 | Out Patient Clinics | Cardiac Cath/Angiography | ||||
| B.3 Inpatient Mental Health Ward | Out Patient Surgery | Dialysis Unit | ||||
| Canteen Kitchen | Patient Kitchen & Dining | Pharmacy IV Prep (Inpatient) | ||||
| Cardiology | Pharmacy (In & Out Patient) | |||||
| Decontamination | PT / OT | |||||
| Dental | Public Corridor (patient activity) | |||||
| Distribution | Pulmonary / Bronchoscopy | |||||
| G.I. Lab | Telemetry | |||||
| Hoptel | ||||||
| STEP 3: Determine Class of Precautions (I, II, III or IV) Using Matrix Below: | ||||||
| ICN must be consulted when the assessment indicates that Class II, III, or IV precautions are required. | ||||||
| Construction Project Type | ||||||
| Risk Group | TYPE A | TYPE B | TYPE C | TYPE D | ||
| Group 1 | I | II | II | III/IV | ||
| Group 2 | I | II | III | IV | ||
| Group 3 | I | II | III/IV | IV | ||
| Group 4 | II | III/IV | III/IV | IV |
&"Arial,Bold"Attachment B &"Arial,Bold"&20Infection Control Risk Assessment Matrix of Precautions for Construction & Renovation
IC Precautions
| Infection Control Construction Precautions | ||||
| During Construction Project | Upon Completion of Project | |||
| CLASS I | 1 | Execute work by methods to minimize raising dust. | 1 | Clean work area upon completion of task. |
| 2 | Immediately replace a ceiling tile displaced for visual inspection | |||
| 3 | Contaminated materials kept away from patient transportation route and storage for clean supplies. | |||
| 4 | Worker traffic routes should minimize contact with patients. | |||
| In Addition to Class I Precautions: | ||||
| 1 | Consult Infection Control Nurse prior to beginning work. | 1 | Wipe work surfaces with cleaner/disinfectant. | |
| 2 | Educate VA staff regarding construction activity. | 2 | Contain construction waste before transport in tightly covered containers. | |
| CLASS II | 3 | Block and seal air vents before starting. | 3 | Wet mop and/or vacuum with HEPA filtered vacuum before leaving work area. |
| 4 | Coordinate air filter maintenance with Operations. | 4 | Use only designated elevators (e.g. utility) for debris removal. | |
| 5 | Seal unused doors with duct tape. | 5 | Remove and replace wet ceiling tiles. | |
| 6 | Place dust mat at entrance and exit of work area | |||
| In Addition to Class I and II Precautions: | ||||
| CLASS III | 1 | Consult Infection Control Nurse prior to beginning work. | 1 | Do not remove barriers from work area until completed project is inspected by the owner’s Safety Department and Infection Prevention & Control Department and thoroughly cleaned by the owner’s Environmental Services Department. |
| 2 | Complete all critical barriers i.e. sheetrock, plywood, plastic, to seal area from non work area or implement control cube method (cart with plastic covering and sealed connection to work site with HEPA vacuum for vacuuming prior to exit) before construction begins. | 2 | Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction. | |
| 3 | Maintain negative air pressure within work site utilizing HEPA equipped air filtration units. | 3 | Vacuum work area with HEPA filtered vacuums. | |
| 4 | Contain construction waste before transport in tightly covered containers. | 4 | Wet mop area with cleaner/disinfectant. | |
| 5 | Cover transport receptacles or carts. Tape covering unless solid lid. | 5 | Upon completion, restore/clean HVAC system as needed where work was performed. | |
| 6 | Water lines flushed at site and adjacent areas. | |||
| CLASS IV | In Addition to Class I and II and III Precautions: | |||
| 1 | Consult Infection Control Nurse prior to beginning work. | |||
| 2 | Relocate patients to area remote from construction area. | |||
| IP Signature: Diane Franke, Infection Prevention | ||||
| Date Reviewed: 8/30/2021 | ||||
| Physicial ICRA needs to be signed at work site. |
&"Arial,Bold"&12Description of Required Infection Control Precautions by &UClass