- Z2DA--660-22-111 Patient Lift Site Prep
- Solicitation number
- 36C25922Q0003
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S04 - Questions and Answers No 1.docx | DOCX document | |
| 36C25922Q0003 0001.docx | DOCX document | |
| S02 - Site Prep Specifications.pdf | ||
| 36C25922Q0003.docx | DOCX document | |
| S02- WetPipeSprinklerSyst Specifications.pdf | ||
| S02 - ICRA.xlsx | XLSX spreadsheet | |
| S02 - Drawings - QC-05131911 Va Salt Lake City - REV 3.pdf | ||
| S02 - OSH-2021-019 Limited Asbestos Survey ISO.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment C - Construction Safety Risk Assessment Checklist
Construction Safety Risk Assessment Checklist, VA Salt Lake City Healthcare System
Hazard Likelihood: High: 76% - 100%
Medium: 51% - 75%
Low: 0% - 50%
Identify Hazards Evaluator
Is Hazard
Likely?
H-M-L
Severity
H-M-L
Mitigation
Needed?
Y/N
Mitigation Strategies
Mitigation
Strategies
Implemented?
Comments
**Hazardous
Waste/Storage
BF L L N .
**Chemical Use/ PPE BF M L Y
Users/operators must read the SDS' associated with their products and use
PPE accordingly.
• See Hazard
Communication below for chemical use requirements.
• See Personal Protective
Equipment below for general requirements.
Hazard
Communication
BF M L Y
• Review Safety Data Sheets prior to starting work and whenever new products are introduced into the area.
• Maintain copies on site.
• Ensure all containers are properly labeled with approved GHS labels.
• Provide list of chemicals to Safety/GEMS and upload current SDSs via
3EProtect (formerly
3EOnline) ten days in advance for approval.
• Notify when uploaded.
Respiratory
Protection
BF L L N
Personal Protective
Equipment
BF H H Y
• Minimum requirement are hard hats safety glasses and safety boots.
• Other PPE shall be required based on the Job Hazard Analysis (JHA).
• Wear proper footwear and keep them clean to reduce the potential slipping hazards such as dirt, saw dust, oil, and grease.
• Proper ARC Flash rated
PPE to worn when conducting electrical work.
• All PPE to be inspected prior to commencing work.
Fire Protection BF H H Y
• Establish fire extinguisher locations within job site for easy access.
• Review location with area walk through.
• Maintain housekeeping to prevent accumulation of combustible material.
• Maintain fire and smoke barriers.
Traffic Control & Site
Security
BF M H Y
• All personnel shall wear VA badges.
• Install and maintain controlled access as appropriate. (i.e. fencing, doors, gates)
• Worksite access to remain locked when there is no activity.
• Restrict access to construction crew only.
Wire Rope and
Rigging Equipment
BF L L N
Demolition/
**Recycling
BF M L Y
• Dust control during all interior demolition.
• Use PPE at all times.
• Stay clear of falling objects.
• Remove debris as generated.
• Document amount of materials recycled.
Any debris contaminated with asbestos must be disposed of as regulated waste and can NOT be recycled.
Project Manager: Brandon FarrimondDate: 8/17/2020
Project Name: Patient Lift Site Prep (Multiple Wards - Bldg. 1&14)
Project Number:
CSRA Patient Lift Site prep 1 of 4
Hazard Likelihood: High: 76% - 100%
Medium: 51% - 75%
Low: 0% - 50%
Identify Hazards Evaluator
Is Hazard
Likely?
H-M-L
Severity
H-M-L
Mitigation
Needed?
Y/N
Mitigation Strategies
Mitigation
Strategies
Implemented?
Comments
Project Manager: Brandon FarrimondDate: 8/17/2020
Project Name: Patient Lift Site Prep (Multiple Wards - Bldg. 1&14)
Project Number:
Hand and Power
Tools
BF H H Y
• Inspect tools prior to use.
• Only double insulated or neutrally grounded tools can be used.
• Properly store tools when not in use.
• All guards to be in place and in good condition.
Electrical BF H H Y
• Develop, communicate, and follow a written plan before performing electrical work to maximize safety.
• Persons conducting electrical work shall have the knowledge, skills and abilities necessary to perform the task.
• Identify hazards and establish safety limits of approach.
• All work shall comply with NFPA 70 most recent edition.
• Verify code compliance prior to energizing.
• Inspect electrical cords before use.
• Do not use cords with damaged insulation or daisy chain them. Use
GFCI's.
• Wear properly rated and well maintained PPE.
• Adhere to all ARC Flash requirements and NO
ENGERGIZED work is authorized without approved permit.
Lockout / Tagout
Electrical
BF H H Y
• Open circuit breaker that supplies power.
• Open visual disconnects.
• Lock-out and tag-out visual disconnect yourself and NEVER rely on someone to do this for you.
• VA first lock on/last lock off.
• Follow Engineering LO/TO SOP.
• Include Operations & Maintenance
Electricians in LO/TO plans.
Please refer to SLC VAMC
Engineering Services SOP
#91 for approved lockout tagout procedures
Lockout / Tagout Med
Gas or Oxygen
BF L L N
Lockout / Tagout
Other Systems
(Specify)
BF L L L
Welding and Cutting BF M H Y
• Hot Work Permits required daily for any work to include cutting, welding, brazing, soldering, thawing pipe, grinding, or other spark or flame producing operations.
• Any process that involves an open flames used temporarily for repair or temporary heating is considered a hot work operation.
Please refer to SLC VAMC
Engineering Services SOP
#90 for approved hot work procedures.
Confined Spaces BF L L N
Tunnels and Shafts BF L L N
CSRA Patient Lift Site prep 2 of 4
Hazard Likelihood: High: 76% - 100%
Medium: 51% - 75%
Low: 0% - 50%
Identify Hazards Evaluator
Is Hazard
Likely?
H-M-L
Severity
H-M-L
Mitigation
Needed?
Y/N
Mitigation Strategies
Mitigation
Strategies
Implemented?
Comments
Project Manager: Brandon FarrimondDate: 8/17/2020
Project Name: Patient Lift Site Prep (Multiple Wards - Bldg. 1&14)
Project Number:
Process Safety
Management N/A N/A N/A N/A N/A N/A N/A
Cranes and Hoists BF L L N
Steel Erection BF L L N
Fall Protection BF M H Y
• Use fall protection when working in an elevated position over 6' and securely tie-off where the danger of falling exists.
• Inspect harnesses before use.
• Use shock absorbing lanyards.
Scaffolds BF L L N
Ladders BF H H Y
• Inspect before use.
• Do not use the top two steps on a ladder.
• Cracked frames, missing feet or bent rungs will not be allowed on any ladders.
• Use ladder only on stable and level surfaces.
• Keep ladders free of any slippery materials on the steps.
• Always face the ladder and maintain three points of contact when climbing or descending.
• Do not carry items or supplies when climbing or descending a ladder.
• Use a cord or rope to life or lower supplies or tools.
Trenching and
Excavation/
** SWPPP
BF L L N
Motor Vehicles, Earthmoving, and
Mechanized Equip
BF L L N
Concrete and
Masonry
BF M M Y
Respiratory protection required with a minimum assigned protection factor
(APF) of ten.
• Ensure the use of PPE.
Lead, Asbestos, and
Silica
BF H H Y
• Concrete dust to be kept to a minimum.
• Prevent dust from becoming airborne.
• Utilize wet methods and approved
HEPA vacuums as safely practical.
Contact Asbestos
Coordinator with any questions or concerns.
Utility Interruptions BF L L N
Dust BF H H Y
• Maintain barriers to control dust.
• Use particulate filter masks when generating dust.
• Control dusts as needed for excavation work.
Moisture/Water Leaks BF L L N
CSRA Patient Lift Site prep 3 of 4
Hazard Likelihood: High: 76% - 100%
Medium: 51% - 75%
Low: 0% - 50%
Identify Hazards Evaluator
Is Hazard
Likely?
H-M-L
Severity
H-M-L
Mitigation
Needed?
Y/N
Mitigation Strategies
Mitigation
Strategies
Implemented?
Comments
Project Manager: Brandon FarrimondDate: 8/17/2020
Project Name: Patient Lift Site Prep (Multiple Wards - Bldg. 1&14)
Project Number:
Vapors/Fumes/
**Air Emissions
BF L L N
Noise BF H M Y
• Notify tenants in the area before demolition or drilling.
• Hearing protection required when identified by job hazard analysis.
Vibration BF H M Y Notify COR and tenants in the area before demolition or drilling.
Open Outside Walls BF L L N
Impact to Levels
Above and Below
BF H M Y
Coordinate all activities having an adverse impact on floors above or below project work with COR and affected occupants.
Proximity of Air
Intakes
BF L L N
Tuberculosis
Transmission
BF L L N N/A
Until such time that the hospital is no longer low-risk for TB transmission per annual TB risk assessment, this will remain unchanged for all projects.
Pest Control within
Construction Area
BF L M Y
• Keep area clear of any substances that could attract rodents or other animals.
• Remove debris at the end of each work shift.
No eating in work areas
Project Manager: Date: 6/2/2021
Contractor: Date:
Safety Manager: Date:
Service / Section /
Program Director:
Date:
** These construction activities have been identified as significant based on potential environmental impacts.
Approval Signatures:
Brandon Farrimond
CSRA Patient Lift Site prep 4 of 4
| 2021-08-17T09:02:54-0600 | |
| BRIAN W TREASURE 1390258 |
| 2021-08-17T10:08:35-0600 | |
| JOSHUA B. FARBER 363741 |
File details come from the government source that posted it. Updated .