This solicitation requests proposals for the construction of a pre-engineered metal building addition to serve as a warehouse at the Marion VA Medical Center in Marion, Illinois. The new 4,800 square foot building will connect to an existing warehouse and include a corridor, roll-up doors, sprinklers, HVAC, and electricity. Proposals are due on August 26, 2020 and will be evaluated based on the offeror's technical construction experience, past performance, project execution plan, and key personnel qualifications. The award will be made to the lowest priced technically acceptable offer. The estimated value is between $500,000 and $1,000,000. A site visit is scheduled for August 4 and questions are due by August 10. The construction period is 120 days with Davis Bacon wage rates applying. The set-aside is for Service-Disabled Veteran Owned Small Businesses.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION 3. DATE ISSUED PAGE OF PAGES

4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER

7. ISSUED BY CODE 8. ADDRESS OFFER TO

a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

12b. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

STANDARD FORM 1442 (REV. 8/2014)STANDARD FORM 1442

Prescribed by GSA-FAR (48 CFR) 52.236-1(d)

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

SOLICITATIONSOLICITATION

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR INFORMATION

CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SEALED BID (IFB)

NEGOTIATED (RFP)

11. The Contractor shall begin performance within ____________ calendar days and complete it within ____________ calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).

YES NO

a. Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.

b. An offer guarantee is, is not required.

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

1 155

36C25520R0100 X

07-27-2020

657-506

N 36C255

Department of Veterans Affairs Network Contracting Office (NCO) 15 3450 S 4th Street

Leavenworth KS 66048

Department of Veterans Affairs Network Contracting Office (NCO) 15 3450 S 4th Street

Leavenworth KS 66048

SOTOMAYOR, JENNIFER 913-946-1144

The Department of Veteran Affairs NCO 15 intends to award a Construction Contract for project 657-506 Construct Warehouse Addition for COVID-19 Response at the Marion VAMC, MArion, Illinois.

This project is being solicited as a Service-Disabled Veteran Owned Small Business (SDVOSB) set-aside.

Proposals received in response to this solicitation will be evaluated in accordance with the Federal Acquisition Regulation FAR 15.101-2 Best Value Lowest Price Technically Acceptable source selection process.

Those offerors not providing the documentation outlined in the "Instructions to Offerors" will be deemed non-responsive to the terms of the solicitation and will not be considered for award.

The NAICS code and size standard for this project are: NAICS 236220 - Commercial and Institutional Building Construction with a size standard of $39.5 Million. Estimate of construction magnitude for this project is between:

$500,000 and $1,000,000 There will be only one site visit.

The site visit is scheduled for August 4, 2020 at 10:00 AM,CST at Marion, Illinois VAMC Building 15 Conference Room.

All Questions pertaining to this project are due by August 10, 2020 by 10:00am CDT.

Provide Contractor Duns Number:__________________________ Contractors working at the Medical Center are exempt from state sales tax, and a Project Exemption Certificate will be issued upon award of this contract.

Note: The term Offer and Bid are interchangeable within this solicitation.

**PHYSICAL COPIES OF PROPOSALS WILL NOT BE ACCCEPTED FOR THIS SOLICITATION.

ORIGINAL BID BONDS MUST BE RECEIVED AT THE CONTRACTING OFFICE PRIOR TO THE SOLICITATION CLOSING AT:

ATTN: JENNIFER SOTOMAYOR, 3450 S. 4th STREET, LEAVENWORTH, KANSAS66048. CALL ONE OF THE FOLLOWING NUMBERS FOR PROPOSAL DOCUMENTS TO BE RECEIVED UPON ARRIVAL: 913-946-1143, 913-946-1125 or 913-946-1144 The Government intends to make a single award on Bid Item I.

All contractors and joint ventures must be verified in VetBiz and registered in SAM at the time of proposal due date, in order to be eligible for award.

NOTICE: Clause 52.222-37 Employment Reports on Disabled Veterans and Veterans is incorporated by reference in this solicitation. Public Law (P.L. 105-339), Section 1354 provides that no agency may enter into a contract with a contractor who has not filed a VETS-4212 report for the preceding fiscal year under Title 38 Section 4212(d).

10 120

X X 52.211-10

X 10

ZERO 14:00

08-26-2020

X

14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NUMBER

16. REMITTANCE ADDRESS

CODE FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

AMENDMENT

NUMBER

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO 10 U.S.C. 2304(c)( ) 41 U.S.C. 3304(a) ( )

26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BY

PHONE: FAX:

28. NEGOTIATED AGREEMENT 29. AWARD Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.

shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER

TO SIGN

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE

BY

OFFER

AWARD

STANDARD FORM 1442 (REV. 8/2014) BACK

(Include ZIP Code) (Include area code)

(Include only if different than Item 14.)

(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

(Type or print)

(4 copies unless otherwise specified)

(Type or print) (Type or print)

(Contractor is required to sign this document and return _______ copies to issuing office.)

(Contractor is not required to sign this document.)

(Must be fully completed by offeror)

(To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

Bid Price for all work contained in attached SOO, Drawings and Specifications:

00255

Department of Veterans Affairs Network Contracting Office (NCO) 15 3450 S 4th Street Trafficway

Leavenworth KS 66048

00255 Department of Veterans Affairs Financial Services Center http://www.fsc.va.gov/einvoice.asp

Austin TX 877-353-9791 512-460-5429

X

David P. Holden Contracting Officer

Marion VA Medical Center 2401 West Main Street Marion, Illinois 62959

STATEMENT OF OBJECTIVES

657-506, CONSTRUCT WAREHOUSE ADDITION FOR COVID-19

RESPONSE

MARION VA MEDICAL CENTER

1.0 Purpose

This Statement of Objectives (SOO) describes the basic outcomes for the construction of a new warehouse addition for COVID-19 response, which consists of the acquisition of a pre-engineered metal building, site preparation, installation of the pre-engineered metal building, and ancillary services. The Statement of Objectives is provided in lieu of a Government written Statement of Work (SOW). This approach provides potential offerors the flexibility to develop cost effective solutions and the opportunity to assess the offeror’s understanding of all aspects of the effort to be performed by eliminating the “how to” instructions to accomplish the required effort normally contained in the SOW provided by the Government.

2.0 Period and Place of Performance

Period of performance is 120 days. Location is the Marion VA Medical Center in Marion, Illinois.

3.0 Background

The Marion VA Medical Center has identified a need for additional storage space for COVID-19 emergency supplies. To meet this need, a new building will be constructed south of Building 16, which is the existing warehouse. The new building, referred to as the Warehouse Addition, will be a standalone pre-engineered metal building (PEMB). It will be connected to the existing warehouse with a corridor to allow travel between Building 16 and the Warehouse Addition.

The Warehouse Addition should be considered a turnkey solution for the Government’s need.

The Warehouse Addition will have the following attributes:

4,800 gross square feet (minimum) to be used as a warehouse, not including connecting corridor

Plan dimensions of approximately 120-ft by 40-ft to fit in between Building 16 and South Periphery Road

Type IIB Construction – structural elements of walls and roof to be steel Interior clear height of 15’-0” minimum Connecting corridor to allow for personnel and forklift travel to Building 16

(approximately 120 net square feet) Large roll-up door and short driveway on south side to connect to South Periphery Road Fire sprinklers HVAC system Electricity

4.0 Requirements

A. Basis of Proposal:

1. Proposal is based on the statement of objectives, drawings, and specifications reflected herein. It is the intent of these documents to outline the requirements for construction of a pre-engineered metal building with a corridor to an existing building.

Contractor is responsible for acquisition of pre-engineered metal building, site preparation (including delegated design and installation of substructure/foundation), installation of pre-engineered metal building, connection to existing utilities, and delegated design and installation of Fire-Mechanical-Electrical-Plumbing systems as described in these requirements.

B. Performance and Payment Bonds:

1. Performance and/or Payment Bonds are required.

C. Insurance:

1. Standard general liability and builder’s risk coverage is required until work is complete.

D. Wage Rates:

1. Davis Bacon and prevailing wage rates and certified payroll are excluded for manufacture, delivery, and incidental work relating to installation. Davis Bacon and prevailing wage rates and certified payroll applies to only non-incidental work performed on site.

E. Codes:

1. 2018 International Building Code.

2. VA Standards for Construction.

F. Design Criteria:

1. Occupancy Classification: S-1.

2. Construction Type: IIB, fully sprinklered.

3. VA Facilities Occupancy Category: Ancillary.

4. Wind Uplift: UL 580; Class 90.

5. Maximum Deflection:

a. Roof framing: Per Code.

b. Roof panel vertical deflection: Per Code.

c. Wall panel horizontal deflection: Per Code.

6. Lateral Drift: maximum 1/400 of building height.

G. Minimum Design Loads:

1. Roof live load:

a. 20 PSF uniform.

b. 2,000 LB concentrated (primary structural members).

2. Roof snow load data:

a. Ground snow load, Pg = 15 PSF

b. Flat-roof snow load, Pf = 15 PSF

c. Snow exposure factor, Ce = 1.0

d. Snow load importance factor, Is = 1.0

e. Thermal factor, Ct = 1.0

f. Slope factor, Cs = Per Code.

g. Drift surcharge load, Pd = Per Code.

h. Width of snow drift, w = Per Code.

3. Wind design data:

a. Basic design wind speed, V = 107 MPH

b. Allowable stress design wind speed, Vasd = 83 MPH

c. Risk category II.

d. Wind exposure C.

e. Internal pressure coefficient = ±0.18

f. Design wind pressures for exterior component and cladding materials: Per Code.

4. Earthquake design Data

a. Risk category II.

b. Seismic importance factor, Ie = 1.0

c. Mapped spectral response acceleration parameters:

i. Ss = 0.909 g

ii. S1 = 0.310 g

d. Site class D (assumed) – Site class C may be substantiated by geotechnical investigation.

e. Design spectral response acceleration parameters:

i. SDs = 0.722 g

ii. SD1 = 0.496 g

f. Seismic design category D.

g. Basic seismic force-resisting system to be determined (TBD) by PEMB designer.

h. Design base shear TBD by PEMB designer.

i. Seismic response coefficient TBD by PEMB designer.

j. Response modification coefficient TBD by PEMB designer.

k. Analysis procedure used TBD by PEMB designer.

5. Roof rain load:

a. 3.25-in, 100-year, 1-hour rainfall.

6. Roof collateral dead load:

a. 15 PSF minimum to account for fire sprinklers, HVAC distribution, lighting, 5-in closed cell polyurethane spray foam insulation, 1/2-in gypsum thermal barrier, metal studs, and miscellaneous.

7. Wall collateral dead load:

a. 8 PSF minimum to account for fire sprinklers, HVAC distribution, lighting, 5-in closed cell polyurethane spray foam insulation, 1/2-in gypsum thermal barrier, metal studs, and miscellaneous.

H. Pre-Engineered Metal Building (Warehouse Addition):

1. Structural Frame:

a. Design rigid steel frame with vertical and lateral force resisting systems to meet Code requirements.

b. Bay spacing: 20-ft center-to-center.

c. Span: 40-ft with no interior columns.

d. Minimum interior clear height: 15’-0”.

e. Area: approximately 4,800 gross square feet.

2. Weather Tightness: Form or mold closure strips to match configuration of the roofing or siding. Install closures wherever necessary to insure weather tight construction.

3. Factory Finish and Painting:

a. Factory finish wall and roof panels, including related components, accessories and fastenings per Specifications.

b. Color of Finish Coat:

i. Wall Panels: Tan (Exterior).

ii. Roof Panels: White (Exterior).

c. Coordinate interior finishes with application of closed cell spray polyurethane foam.

4. Roof Slope: 3 to 12 (vertical to horizontal).

I. Floor:

1. Finished floor elevation shall match existing Building 16.

2. Floor shall be reinforced concrete slab on grade. It is expected that the slab on grade will be a structural element and designed by the same engineer responsible for the foundation design.

3. Provide control joints to mitigate cracking.

4. Provide sealed finish.

5. Provide vapor barrier below slab to mitigate humidity.

6. Prepare subgrade below slab as required by foundation design.

J. Foundations:

1. Bottom of footings shall be below frost line – 30-in below grade.

2. All other buildings on campus are supported by shallow foundation systems.

3. Existing soils reports are available upon request.

4. Contractor shall obtain geotechnical services to provide site-specific soils report for with recommendations for subgrade preparation and foundation design.

K. Site Concrete:

1. Provide reinforced concrete pad(s) for package HVAC unit(s) and other exterior equipment as necessary.

L. Site Preparation:

1. Prepare site by grading and excavating for the foundation, utilities, and new driveway. Compact subgrade as required by design.

2. Slope grade down and away from new structure.

M. Thermal Insulation:

1. Approximately 5-inch of closed cell spray polyurethane foam with thermal barrier applied to interior wall panels and underside of roof panels.

2. Rigid insulation N. Gutters, Downspouts, and Storm Sewer:

1. Provide roof drainage system consisting of gutters, downspouts, and underground drains to carry water to existing storm sewer.

2. Existing 24-in diameter reinforced concrete storm drain is located approximately 65 to 90-ft from west face of Building 16. See Sheet C1.0 from 657A5-09-101 As-Built Drawings and other existing reference drawings.

O. Roll-up Doors:

1. Heavy duty, motorized.

2. Provide one insulated, weather resistant, steel roll-up door on south side of

Warehouse Addition and align with new driveway. Include interior latching.

3. Provide one insulated steel roll-up door in connecting corridor between it and existing

Building 16.

4. Provide (1) 10-ft wide by 14-ft tall at south side.

5. Provide (1) 10-ft wide by 10-ft tall at north side in connecting corridor.

6. Provide all necessary supplemental steel framing.

P. Personnel Doors:

1. Provide two heavy duty, insulated, metal personnel doors near north side of

Warehouse Addition at opposite ends of building, complete with weather-strips. Cut, reinforce, drill, and tap doors, frames and related items to receive hardware.

2. Provide (1) 3’-0” wide by 7’-0” tall on east side.

3. Provide (1) 3’-0” wide by 7’-0” tall on west side.

4. Provide egress hardware on door interior per Code.

5. Provide lever handle on door exterior.

6. Doors shall be equipped with an automatic, non-hold door-closer which shall be installed internal to the facility.

7. Hinges shall incorporate non-removable hinge pins.

8. Cores shall be Figure 8 style and removable to be cored into VA key system.

9. Doors shall be equipped with Physical Access Control System and keycard reader.

Q. Fire Sprinkler System:

1. Building shall be fully sprinklered.

2. Provide and install wet pipe fire sprinkler system to include riser and shut off valves within the building.

3. Provide labor and materials to connect sprinkler system together to a single connection point. Design shall be based on adequate water pressure being provided by customer. Include testing.

4. Professionally size and connect building fire sprinkler riser to site water source.

Include backflow preventer, post indicator valve, fire hydrants, pumps, etc. as required by Code.

R. Fire Alarm:

1. Provide and install fire protection flow switch and other alarm devices as required by

Code.

2. Provide devices to communicate fire alarm signals with campus fire alarm system (Siemens). Provide all interconnecting conduit and wiring within the building for a complete, working system.

S. Fire Extinguishers:

1. Provide fire extinguishers in mounted cases as required by Code.

T. HVAC:

1. Provide package HVAC unit(s) with three-phase electricity located on-grade outside

Warehouse Addition.

2. Quantity and size shall be determined by a mechanical designer based on calculated building loads.

3. All HVAC units shall be interconnected to a single HVAC emergency shutoff.

4. Provide galvanized supply ducts with exterior insulation.

5. Registers and returns shall be manufacturer’s standard.

6. Provide seven-day programmable thermostat with occupant override variable.

Include locking cover. Locate near entrance to Warehouse Addition.

7. Provide certified test and balance.

U. Electrical:

1. Provide three-phase, 208-volt service for HVAC units, lighting, etc.

2. Connect and trench to existing switchgear between Building 15 and Building 15 Pole

Barn. Location is approximately 100-ft east from the east face of Building 16. See Sheet C1.0 from 657A5-09-101 As-Built Drawings and other existing reference drawings.

3. Provide and install interior mounted main distribution panel (MDP) for a single point of connection.

4. Provide and install interior sub panels, sized per design criteria and Code. Connect sub panels to MDP or disconnects on site as required.

5. Provide and install conduit and wire to connect sub panels to MDP.

6. Provide and install service ground rod at each MDP.

7. Circuit wiring shall be #12 AWG wire or greater.

8. Conduit shall be EMT, except MC cable may be used for whips no longer than 6-ft.

9. Provide 20-amp, 125-volt, AC, two-pole, three-wire receptacles, installed per Code.

10. Install outlets at exterior perimeter at the following locations: near roll-up door and adjacent to each HVAC unit.

V. Lighting:

1. Provide full coverage, interior lighting per Code.

2. Provide full coverage, emergency lighting with battery backup per Code.

3. Provide general purpose exterior lighting with 360-degree building coverage.

W. Exit signs:

1. Provide signs as required by Code.

X. Connecting Corridor:

1. Minimum Interior Clear Dimensions: 10’ wide by 10’ tall.

2. Corridor shall be structurally independent from Building 16 to allow for lateral movement of each building.

3. Provide weather tight seismic joints between Connecting Corridor and existing

Building 16.

4. It is expected that connecting corridor will be integrated into the pre-engineered metal building design as a lean-to structure.

Y. Building 16 Demolition:

1. Cut new opening in existing Building 16 south exterior wall to align with connecting corridor.

2. Existing wall is 8-inch CMU.

3. Clear opening size shall be 10’ wide by 10’ tall.

4. Locate opening between existing Building 16 columns and Warehouse Addition frame.

5. Reinforce opening with lintel and jambs as required per Code. Submit calculations prepared, sealed, and signed by a licensed civil or structural engineer to justify new opening in existing wall for vertical, out-of-plane, and in-plane forces.

Z. Existing Utilities:

1. Sanitary sewer, storm sewer, electric, gas, steam, and water service are available on-site.

2. Contractor is responsible for making utility connections to Warehouse Addition to for

Fire-Mechanical-Electrical-Plumbing systems.

3. There are underground utilities in the area of the Warehouse Addition. The

Contractor is responsible for locating and protecting all underground utilities during construction. See attached existing drawings for additional details.

4. Relocate existing water spigot to west side of Warehouse Addition.

AA.Existing Structures:

1. Contractor is responsible for protecting existing structures during construction.

2. Note that existing Building 16 is supported by a shallow foundation system with a crawl space. See attached existing drawings for additional details.

BB.Nonstructural Component Anchorage:

1. Marion VAMC is in a moderately high seismic region. Provide anchorage and bracing for nonstructural components per Code. See Specifications.

5.0 Performance Objectives

The purpose of this statement of objectives is to obtain a contractor to support the construction of the Warehouse Addition. Solution shall be turnkey. Under this effort the contractor is responsible for providing all personnel, supplies, and logistics for the completion of this project.

The contractor shall perform the required work in accordance with all industry standards and regulations.

5.1 Mandatory Tasks and Deliverables

A. Contractor’s Statement of Work (CSOW): Contractor shall prepare and submit a

Statement of Work with their Proposal. The CSOW should describe how the Contractor will satisfy the Government Statement of Objectives. The CSOW should include a preliminary site and floor plan, product data for the pre-engineered metal building, and product data for the Fire-Mechanical-Electrical-Plumbing (FMEP) system so that the Government can determine whether its needs are met.

B. Quality Assurance Surveillance Plan: Contractor shall establish a complete Quality Control Program (QCP) to ensure that the requirements of the contract are satisfied.

The QCP shall identify issues in the quality of services before the level of performance is unacceptable and should be contained within a formal written Quality Assurance Surveillance Plan, which must be submitted with the vendor’s final proposal. The program and document shall be subject to the approval of the Contracting Officer (CO) and the Contracting Officer’s Representative (COR).

C. Subcontract Expenditures Report: Contractor shall prepare and deliver a Subcontract Expenditures Report that discloses actual subcontract expenditures by company name, business size standard, and other socioeconomic programs. See FAR Part 19.

D. Pre-Engineered Metal Building:

1. Contractor shall acquire all materials required to assemble pre-engineered metal building, including horizontal framing, vertical framing, roof deck, wall panels, flashing, fasteners, gutters, downspouts, doors, etc.

2. Contractor shall submit delegated design drawings and calculations for the pre-engineered metal building, signed and sealed by the licensed responsible design professional.

3. Contractor shall deliver pre-engineered metal building to place of performance.

Coordinate day and time with the Government.

E. Site Preparation:

1. Contractor shall prepare the site for the installation of the pre-engineered metal building, including all earthwork, grading, utility connections, building foundation system.

2. Contractor shall submit delegated design drawings and calculations for the foundation system, prepared, sealed, and signed by a licensed civil or structural engineer.

F. Installation of Pre-Engineered Metal Building:

1. Contractor shall install the Pre-Engineered Metal Building.

G. Ancillary Services (FMEP Systems):

1. Contractor shall provide all ancillary services required for a turnkey solution, including acquisition and installation of the FMEP system.

2. Contractor shall submit delegated design drawings and calculations for the fire protection system, prepared, sealed, and signed by a licensed design professional.

3. Contractor shall submit delegated design drawings and calculations for the mechanical (HVAC) system, prepared, sealed, and signed by a licensed mechanical engineer.

4. Contractor shall submit delegated design drawings and calculations for the electrical system, prepared, sealed, and signed by a licensed electrical engineer.

H. Close-out Documentation: Contractor shall submit Close-Out Documentation. At a minimum, Close-Out Documentation shall consist of standard operating and maintenance manuals; warranties; and record drawings for the foundation system, pre-engineered metal building, nonstructural component anchorage (if required), and FMEP systems.

6.0 Constraints

Contractor shall work normal hours of 8 a.m. to 4:30 p.m. Monday through Friday. Work outside these hours shall be approved in advance. Contractor shall notify the Contracting Officer’s Representative of any utility interruption 14 days in advance. Normal campus operations shall not be interrupted while the construction is being performed. The Contractor shall supply any temporary equipment or work needed to keep operations functioning with respect to utility interruptions. Roads and parking areas shall be kept operational except for short durations and then only one lane closure is acceptable. Any damage to Government property is the responsibility of the Contractor to repair, including the grounds, roadways, curbs, and sidewalks.

Contractor shall comply with base safety and construction policies and with all state and federal safety requirements.

7.0 Attachments

A. 657-506, Construct Warehouse Addition for COVID-19 Response B. 1519, Storehouse Building No. 16 C. 609-046, Renovate and Expand Warehouse – As-Built Drawings for Reference D. 657A5-09-101, South Periphery Road – As-Built Drawings for Reference E. 657A5-12-117, South Road Corner Correction – As-Built Drawings for Reference

36C25520R0100

Table of Contents

PART I - THE SCHEDULE

SECTION A - SOLICITATION/CONTRACT FORM

A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair)

A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION,

ALTERATION, OR REPAIR)– BACK

A.3PROPOSAL SUBMITTAL INSTRUCTIONS

2. DOCUMENTS TO SUBMIT

Documents to be included in the proposal identified above shall consist of:

3. BASIS OF AWARD

A.4 CALCULATION WORKSHEET FOR SELF-PERFORMED AND SUBCONTRACTED

WORK

A.5 CONTRACTOR CERTIFICATION REGARDING SAFETY AND ENVIRONMENTAL

A.6 INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND

BONDS

INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS

2.1 52.216-1 TYPE OF CONTRACT (APR 1984)

2.2 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE

OF THE WORK (MAY 2014)

2.3 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE

EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

2.4 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION

MATERIALS (MAY 2014)

2.5 52.228-1 BID GUARANTEE (SEP 1996)

2.6 52.233-2 SERVICE OF PROTEST (SEP 2006)

2.7 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995)

2.8 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB

1998)

2.9 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018)

2.10 VAAR 852.236-89 BUY AMERICAN ACT (JAN 2008)

2.11 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE

RESOLUTION (OCT 2018)

REPRESENTATIONS AND CERTIFICATIONS

3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2020) ..34

3.2 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS

AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (DEC 2019)

3.3 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)

3.4 52.209-13 VIOLATION OF ARMS CONTROLS TREATIES OR AGREEMENTS—

CERTIFICATION (JUN 2018)

GENERAL CONDITIONS

4.1 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND

CERTIFICATIONS (DEC 2014)

4.2 52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE,

AND SERVICES DEVELOPED OR PROVIDED BY KASPERSKY LAB AND OTHER

COVERED ENTITIES (JUL 2018)

4.3 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING

RESPONSIBILITY MATTERS (OCT 2018)

4.4 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK

(APR 1984)

4.5 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION

(MAY 2020)

4.6 52.222-35 EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)

4.7 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (MAY 2014)

4.8 SUPPLEMENTAL INSURANCE REQUIREMENTS

4.9 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

4.10 52.225-20 PROHIBITION ON CONDUCTING RESTRICTED BUSINESS

OPERATIONS IN SUDAN—CERTIFICATION (AUG 2009)

4.11 52.209-2 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC

CORPORATIONS—REPRESENTATION (NOV 2015)

4.12 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV

2018)

4.13 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION

(APR 2019)

4.14 VAAR 852.236-72 PERFORMANCE OF WORK BY THE CONTRACTOR (APR

2019)

4.15 VAAR 852.236-79 CONTRACTOR PRODUCTION REPORT (APR 2019)

4.16 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 2019)

ALTERNATE I (APR 2019)

4.17 VAAR 852.242-70 GOVERNMENT CONSTRUCTION CONTRACT

ADMINISTRATION (APR 2019)

4.18 VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT

(SEP 2019)

ADDITIONAL REQUIREMENTS FOR BAR CHART SCHEDULE

4.19 VAAR 852.270-1 REPRESENTATIVES OF CONTRACTING OFFICERS (JAN

2008)

4.20 VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018)

4.21 VAAR 852.219-10 VA NOTICE OF TOTAL SERVICE-DISABLED VETERAN-

OWNED SMALL BUSINESS SET-ASIDE (JUL 2019) (DEVIATION)

4.22 VAAR 852.228-70 BOND PREMIUM ADJUSTMENT (JAN 2008)

4.23 PROJECT WAGE DETERMINATION

4.24 LIST OF ATTACHMENTS

A.3PROPOSAL SUBMITTAL INSTRUCTIONS

PROPOSAL SUBMITTAL

INSTRUCTIONS

FOR LOWEST PRICE TECHNICALLY

ACCEPTABLE COMPETITION

SOLICITATION: 36C25520R0100

PROJECT: Construct Warehouse Addition for COVID-19 Response

Project No. 657-506

LOCATION: Department of Veteran Affairs, Marion, Illinois

1. PREPARATION AND SUBMITTAL OF PROPOSALS

a. GENERAL INFORMATION.

Selection of an offeror for contract award will be made on the basis of an assessment of each offeror’s response to the Request for Proposal (RFP). As a Request for Proposals (RFP) based on Lowest Price Technically Acceptable (LPTA) Source Selection Process, in accordance with Federal Acquisition Regulation (FAR) Part 15.101-2, the VA will make the award based on the lowest evaluated price of proposals meeting or exceeding the acceptability standards for non-price factors. The FOUR (4) evaluation factors for determination of technical acceptability consist of:

1. Technical Construction Experience of Prime Contractor;

2. Past Performance;

3. Project Execution;

4. Key Personnel Experience;

NOTE: Failure to comply with the RFP submittal requirements will be grounds to eliminate the proposal from further consideration for contract award.

b. THE OFFER.

The submission of the documentation specified below will constitute the Offeror’s acceptance of the terms and conditions of the RFP, including the Plans & Specifications for the construction of this project. These instructions prescribe the format for the proposal and describe the approach for the development and presentation of proposal data. These instructions are designed to ensure the submission of necessary information to provide for the understanding and comprehensive evaluation of proposals.

c. AWARD BASED ON INITIAL OFFERS.

Pursuant to clause 52.215-1 (included by reference), the Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)). Therefore, the offeror’s initial proposal should contain the offeror’s best terms from a price, and technical qualifications standpoint. The VA reserves the right to conduct discussions if the Contracting Officer later determines such discussions to be necessary.

d. NUMBER OF COPIES TO SUBMIT. Offerors shall submit proposals electronically by email to the following addresses: jennifer.sotomayor@va.gov and david.holden@va.gov . The email(s) shall include the following as attachments:

(a) Part 1 - Technical Proposal (Item 2.c. below)

(b) Part 2 - Price Proposal (Item 2.a. and 2.b. below)

The total size if any single email must be less than 10 megabytes. Use multiple emails if necessary and label each as 1 of 3, 2 of 3…

Original Bid Bonds must still be received at the Contracting Office prior to the solicitation closing time.

Package shall be marked as follows:

ORIGINAL -RESPONSE TO RFP 36C25520R0100

PROJECT: Construct Warehouse Addition for COVID-19 Response

Project No. 657-506

This package is to contain the signed original copies of the documents listed below:

2. DOCUMENTS TO SUBMIT.

Documents to be included in the proposal identified above shall consist of:

a. STANDARD FORM 1442. Submit the SF 1442 issued under this solicitation, with Blocks 10 (DUNS Number) and Blocks 14 through 20 properly filled-out by the Offeror. Include acknowledgment of any and all Amendments that may have been issued, either by: (1) listing them in Block 19 of the SF 1442, or (2) including copies of the Amendment document(s) (Standard Form 30) with Blocks 8 and 15 filled in and signed, or (3) including signed acknowledgement in the form of a separate letter that includes a reference to the solicitation and amendment numbers. NOTE: Failure to acknowledge any and all Amendments issued pursuant to this solicitation may be cause for rejection of your offer.

b. OFFER GUARANTEE (BID BOND). In accordance with solicitation provision 52.228-1, Bid Guarantee, failure to furnish a bid guarantee, in the proper form and amount, by the deadline established for submitting offers, may be cause for rejection of the offer. Bid guarantee shall be 20% percent of the bid price or $3,000,000.00 whichever is less.

c. DOCUMENTATION OF TECHNICAL ACCEPTABILITY. Proposals received in response to this solicitation will be evaluated in accordance with procedures outlined in Federal Acquisition Regulations (FAR) Part 15.101-2 for the Lowest Price Technically Acceptable (LPTA) Offer.

The following NON-PRICE Evaluation Factors will be used as the basis for determining Technical Acceptability:

1. Technical Construction Experience of Prime Contractor;

2. Past Performance;

3. Project Execution;

4. Key Personnel Experience;

NOTE: There is a possibility that some offerors may choose to submit the same construction project as a qualifying example for both the past performance and the technical experience evaluation factors. This is not prohibited, but the supporting documentation must demonstrate that the submitted projects absolutely do comply with the specific minimal requirements, identified below, for each separate evaluation factor.

FACTOR 1: TECHNICAL CONSTRUCTION EXPERIENCE OF PRIME CONTRACTOR.

To be technically acceptable Offerors should submit a minimum of two (2) and a maximum of three (3) construction projects for the Offeror that best demonstrates your experience on relevant projects that are similar in size, scope, and complexity to the RFP. The projects must demonstrate an Offeror’s construction experience as a prime construction contractor directly responsible to the owner and managing multiple subcontractors.

Project(s) should have a minimum value of $250,000 and be 100% complete. Projects submitted for the Offeror shall be completed within the past five (5) years of the date of issuance of this RFP.

A project is defined as a construction project performed under a single task order or contract.

For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as a whole shall not be submitted as a project; rather Offerors shall submit the work performed under a task order as a project.

Offeror’s submission should include at a minimum:

• Provide the Project Title and Description, Project Location (Physical Address); Contract Type (Example: Design Build, Design Bid Build).

• Provide the project owner name and telephone number of the owner’s contact person.

• Provide a description of the scope of work, to include the work performed by the prime contractor.

• Provide project statistics including start and completion dates (original vs actual) and project cost (original vs actual. If original vs actual completion dates and project cost differ, please explanation as to why they differ.

• Identify percentage of self-performed work by the Prime Contractor

If the Offeror is a Joint Venture (JV), relevant project experience should be submitted for projects completed by the Joint Venture entity. If the Joint Venture does not have shared experience, projects shall be submitted for each Joint Venture partner. Offerors who fail to submit experience for all Joint Venture partners may be rated lower.

Unless you are submitting as a CVE Certified Joint venture the SDVOSB Prime Contractor must submit their own experience not your subcontractors experience. Teaming agreements are Prime -Subcontractor agreement, the teaming agreement subcontractor experience is not considered Prime Contractor experience.

FACTOR 2: RELEVANT PAST PERFORMANCE OF PRIME CONTRACTOR

To be technically acceptable, Offerors should submit a minimum of two (2) and a maximum of three (3) construction projects for the Offeror that best demonstrates your experience on relevant projects that are similar in size, scope, and complexity to the RFP. The projects must demonstrate an Offeror’s construction experience as a prime construction contractor directly responsible to the owner and managing multiple subcontractors. For the purposes of this evaluation.

Project(s) should have a minimum value of $250,000 and be 100% complete. Projects submitted for the Offeror shall be completed within the past five (5) years of the date of issuance of this RFP.

A project is defined as a construction project performed under a single task order or contract.

For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as a whole shall not be submitted as a project; rather Offerors shall submit the work performed under a task order as a project.

Offeror’s submission should include at a minimum:

•Provide the Project Title and Description, Project Location (Physical Address); Contract Type (Example: Design Build, Design Bid Build).

•Provide the project owner name and telephone number of the owner’s contact person.

•Provide a description of the scope of work, to include the work performed by the prime contractor.

•Provide project statistics including start and completion dates (original vs actual) and project cost (original vs actual. If original vs actual completion dates and project cost differ, please explanation as to why they differ.

If the Offeror is a Joint Venture (JV), relevant project experience should be submitted for projects completed by the Joint Venture entity. If the Joint Venture does not have shared experience, projects shall be submitted for each Joint Venture partner. Offerors who fail to submit experience for all Joint Venture partners may be rated lower.

Factor 2 SPECIAL NOTE 1 for Offerors That May Lack Past Performance Information: In accordance with FAR Part 15.305(a)(2), in the case of an offeror that is without a record of relevant past performance, or for whom information on past performance is not available, the offeror may not be evaluated favorably or unfavorably on past performance. Such offerors may submit relevant past performance information regarding predecessor companies; key personnel who have relevant experience; or subcontractors that will be performing major or critical aspects of this requirement; provided that such information is relevant to the construction in this solicitation.

Factor 2 SPECIAL: NOTE 2 for Offerors that have Past Performance: Offerors may provide information on problems encountered on the identified contracts and the offeror’s corrective actions. The government also reserves the right to consider past performance information from all available sources, in addition to any information submitted by offerors.

FACTOR 3. METHEDOLOGY OF PROJECT EXECUTION.

To be Technically Acceptable, qualified offerors must Prepare and submit a practicable construction schedule showing all necessary work elements to complete the project identified under this solicitation. The schedule must be in the form of a progress chart of suitable scale to indicate appropriately the percentage of work scheduled for completion by any given date during the performance period. The submitted schedule must be developed using project scheduling software such as MS Project, Primavera, or any other comparable form.

Each Offeror's construction schedule must address the following:

Order of work elements to include project phasing; Submittals, Mobilization, Demolition, Construction, Punch List, De-Mobilization.

Number of days for each work element

Identification of long lead time materials

Identification of separate work elements

The VA’s review and approval or RFI’s, Submittals and other pertinent documents.

Interruption of VA Facilities utilities, delivery of Government furnished equipment, rough-in drawings, project phasing and any other specification requirements.

Testing for Underground Utilities

The proposed schedule must include the activities which are consistent with those described within the project specifications and drawings and must not exceed the Government's maximum allowable performance period, as noted in Block 11 of the SF 1442. The project will start at the issuance of the Notice to Proceed. For scheduling purposes, assume the Notice to Proceed will be issued thirty (30) calendar days after the award date. (Note that there is no guarantee the Notice to Proceed will be issued within this timeframe.)

*The schedule submitted with the offer should not be construed as the agreed upon schedule as per FAR 52.236-15, the contractor shall, within five (5) days after receiving the Notice to Proceed, submit a revised schedule which will supersede the proposed schedule. The revised schedule will be subject to VA approval and must show the project being accomplished within the time frame specified on the SF 1442.

Provide a Draft Contractor’s Statement of Work (CSOW):

Prepare and submit a Statement of Work with their Proposal. The CSOW should describe how the Contractor will satisfy the Government Statement of Objectives.

Each Offeror's Contractor’s Statement of Work must include the following:

• Preliminary site and floor plan

• Product data for the pre-engineered metal building

• Product data for the Fire-Mechanical-Electrical-Plumbing (FMEP) system

Provide Narrative for Project Challenges:

Describe in a written narrative, the challenges identified for this project and a plan for addressing these challenges. This plan shall include how to minimize the disruption of patient care to the greatest extend possible.

FACTOR 4. TECHNICAL QUALIFICATIONS OF PROPOSED STAFFING.

To be Technically Acceptable, qualified offerors must submit a detailed resume The Offeror shall provide a resume for the Project Manager and On-Site Superintendent. For each resume, include name of company, name of individual, relevant listing of experience, qualifications for each person such as specialized training, education, experience, etc. Please delineate the approximate % of work the prime contractor will perform on this job and the approximate % of work the subcontractors (collectively) will perform on this job.

(a) Project Manager – Must have a minimum of 5 years of experience as a project manager must provide a minimum of 2 projects with similar scope to this project. For each project submitted provide the name of the construction contract, and the contract ID number; The name of the contracting agency or organization the contract was awarded by; The date of the construction contract award and the contract award amount in dollars; The date of the construction contract completion, and the final contract amount, in dollars; A brief description of the construction contract scope of work; Identification of at least one point-of-contact at the organization that awarded the submitted contract, including: the name of the point-of-contact;

their current mailing address; phone number; and email address (if applicable).

(b) On-Site Superintendent – Must have minimum of 5 years of experience as a site superintendent and must have OSHA 30 training. Provide at least 2 projects as a site superintendent with similar scope of this project. For each project submitted provide the name of the construction contract, and the contract ID number; The name of the contracting agency or organization the contract was awarded by; The date of the construction contract award and the contract award amount in dollars; The date of the construction contract completion, and the final contract amount, in dollars; A brief description of the construction contract scope of work; and Identification of at least one point-of-contact at the organization that awarded the submitted contract, including: the name of the point-of-contact; their current mailing address; phone number; and email address (if applicable)

Special Note: During the period of performance of the Contract, the Contractor shall make NO substitutions of the Staffing unless the substitution is necessitated by illness, death, or termination of employment. The contractor shall notify the contracting officer, in writing within five (5) calendar days after the occurrence of any of these events. Any replacement of Staffing shall have equal or better qualifications, subject to the approval by the contracting officer.

D. PRICE PROPOSAL.

Pricing is to be submitted on Page 2 of the Standard Form 1442. Offerors must provide a price for each bid item. In addition, offerors shall include a breakdown of material and labor costs, by specification division for each bid item. Overhead, profit and bond costs shall be added after a subtotal of materials and labor costs has been calculated.

3. BASIS OF AWARD.

VA will make the award based on the lowest evaluated price of those proposals meeting or exceeding the acceptability standards for non-price factors. Note that offers that are not technically acceptable cannot be selected, regardless of price.

4. Special Contract Requirements

SUBSTITUTIONS OF SUBCONTRACTORS AND / OR KEY PERSONNEL

1. When an offeror submits its proposal in response to this Request for Proposal, and key personnel who are proposed to work on the project are required to be submitted, those personnel who are offered will be the same personnel who will actually perform on the project.

If, during performance of the contract, it becomes necessary for the contractor to substitute personnel for one of those whose qualifications were the basis for evaluation of the offer and award of the contract, the contractor shall submit to the Contracting Officer the same information that was required in the initial proposal regarding the proposed substitute employee within one week of the position becoming vacant. The Contracting Officer shall have the right to review the qualifications of the proposed substitute employee and to approve or disapprove his or her qualifications. If the proposed substitute employee's qualifications are disapproved by the Contracting Officer, the contractor will have one additional week to propose another employee who does possess equivalent qualifications.

2. When an offeror submits its proposal in response to this Request for Proposal, and the name and experience of a specific subcontractor is a required evaluation factor, then that subcontractor who is offered will be the same subcontractor who will actually perform the specified work on the project. If, during performance of the contract, it becomes necessary for the contractor to substitute a subcontractor for one of those whose qualifications were the basis for evaluation of the offer and award of the contract, the contractor shall submit to the Contracting Officer within one week the same information that was required in the initial proposal regarding the proposed substitute subcontractor. The Contracting Officer shall have the right to review the qualifications of the proposed substitute subcontractor and to approve or disapprove its qualifications. If the proposed substitute subcontractor's qualifications are disapproved by the Contracting Officer, the contractor will have one additional week to propose another subcontractor who does possess equivalent qualifications.

5. ADDITIONAL PRIME CONTRACTOR SAFETY OR ENVIRONMENTAL VIOLATIONS AND

EXPERIENCE MODIFICATION RATE

See – Contractor Certification Regarding Safety and Environmental

1.) All Bidders/Offerors shall submit information pertaining to their past Safety and Environmental record. The information must contain a certification that the bidder/offeror has no more than three (3) serious, or one (1) repeat or one (1) willful OSHA or any EPA violation(s) in the past three years. If such certification cannot be made, a Bidder/Offeror shall explain why and submit as much information as possible regarding the circumstances of its past safety and environmental record, including the number of EPA violations and/or the number of serious, repeat, and/or willful OSHA violations, along with a detailed…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .