Phase I Go/No-Go Evaluation Criteria Summary
This document establishes the Phase I gatekeeper evaluation criteria for the Brigade UAS Prototype Project (RFW-DOTAC-ARMY-2026-003) sponsored by PM UAS and the DoW Drone OTA Consortium. All submissions must achieve a "GO" rating on every Administrative, Eligibility, and Basic Formatting criterion to advance to Phase II (Flight Demonstration); any single "NO-GO" results in immediate rejection without technical review. The submission deadline is October 2, 2026, with submissions sent directly to BDE_UAS@army.mil with the solicitation number explicitly included in the email subject line.
The evaluation comprises four sequential gates. Gate 1 (Gatekeeper Criteria) is evaluated immediately upon receipt and includes submission email address verification, solicitation number in subject line, and deadline compliance. Gate 2 (Mandatory Eligibility & Security) requires proof of registration under the DoW Drone OTA Consortium (Pool 1, 2, or 3), active Unique Entity ID and SAM.gov registration, approved DD Form 2345 (Joint Certification Program), NIST SP 800-171 cybersecurity compliance verification, explicit ITAR and EAR export control compliance confirmation, and either cost-sharing documentation or partnership with a Non-Traditional Defense Contractor for traditional contractors. Gate 3 (Document Formatting) mandates a maximum 5-page white paper (excluding cover page) formatted in 11-point Arial, single-spaced. Gate 4 (Required Content Elements) requires the white paper to include four sections: Technical Concept (detailed Group 3 system/component description with payload specifications), Delivery & Production (manufacturing capacity, production rates, lead times, and delivery readiness verification), Demonstration History (past performance data from previous U.S. Government tests/demonstrations), and Rough Order of Magnitude cost estimate (manufacturing, testing, integration, delivery, and personnel support). Evaluation criteria for Phase II and Phase III will be provided only to vendors invited to those phases.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Phase I Go/No-Go Evaluation Criteria
Solicitation: Brigade UAS Prototype Project RFW-DOTAC-ARMY-2026-003 Sponsor: PM UAS / DoW Drone OTA Consortium
Key Takeaway (BLUF)
To advance to the Phase II (Flight Demonstration), a submission must receive a "GO" on all Administrative, Eligibility, and Basic Formatting criteria. Failure to meet even a single "GO" threshold will result in immediate rejection without technical review.
Evaluation criteria for Phase II (Flight Demonstration) and Phase III (Technical and Cost Evaluation) will be provided to those vendors who are invited to the flight demonstration and final evaluation phases.
1. Phase I Gatekeeper Criteria (Immediate Rejection)
These criteria are evaluated immediately upon receipt of the email. If any of these are missed, the package is rejected without being opened.
# Evaluation Factor Criteria for "GO" Result (GO
/ NO-GO)
1.1 Submission
Email Address Send directly to BDE_UAS@army.mil [ ]
1.2 Email Subject
Line
Must explicitly contain the solicitation number: RFW- DOTAC-ARMY-2026-003. (No solicitation number =
NO REVIEW).
1.3 Submission
Deadline Received on or before October 2, 2026. [ ]
2. Mandatory Eligibility & Security (Gate 2)
The offeror must meet these administrative and legal baseline requirements at the time of Phase I submission.
# Evaluation Factor Criteria for "GO"
Result
(GO / NO-
GO)
2.1 Consortium
Membership
Must be registered under Pool 1 (Unrestricted), Pool 2 (Small Business) or Pool 3 (Non-Traditional Defense Contractor) of the DoW Drone OTA Consortium.
2.2 SAM & UEI
Registration
Must have an active Unique Entity ID (UEI) and be registered in SAM.gov. [ ]
2.3 JCP Certification
Must have an approved DD Form 2345 (Joint Certification Program) prior to award to legally receive and handle restricted technical data.
2.4 Cybersecurity
Standards
Verification of compliance with NIST SP 800-171 for the protection of Controlled Unclassified Information. [ ]
2.5 Export Control
Compliance
Explicit confirmation of compliance with ITAR and EAR regulations. [ ]
2.6 Non-Traditional
Partnering
Traditional contractors must identify a cost-sharing approach (per Sec 5.3) or partner with a Non- Traditional Defense Contractor (NDC) per 10 U.S.C.
§ 4022.
3. Document Formatting & Page Constraints (Gate 3)
The physical white paper must strictly adhere to the formatting constraints to protect the integrity of the competitive process.
# Evaluation Factor Criteria for "GO" Result (GO /
NO-GO)
3.1 Page Limit Maximum of 5 pages (excluding the Cover Page).
Any page beyond page 5 will not be evaluated. [ ]
3.2 Typography &
Layout Must be formatted in 11 pt Arial, single-spaced. [ ]
4. Required Content Elements (Gate 4)
The white paper must address all four required structural sections. Missing sections will result in a "NO-GO".
# Required Section Must Contain:
Result
(GO / NO-
GO)
4.1 Technical
Concept
Detailed Group 3 system/component description with applicable payload specifications as related to Brigade UAS mission.
4.2 Delivery &
Production
Current manufacturing capacity, monthly production rates, lead times, and verification of immediate delivery readiness.
4.3 Demonstration
History
Past performance data and reports from previous tests/demos hosted by the United States Government.
4.4 Rough Order of
Magnitude
Cost estimate for manufacturing, testing, integration, delivery, and personnel support. [ ]
Final Evaluation Summary
[ ] ALL GOs --> PASSED Gatekeeper Evaluation. Proceed to Phase I Technical Panel Review.
[ ] ANY NO-GO --> REJECTED. Package is non-compliant and will not be reviewed further.
| Phase I Go/No-Go Evaluation Criteria |
| Key Takeaway (BLUF) |
| 1. Phase I Gatekeeper Criteria (Immediate Rejection) |
| 2. Mandatory Eligibility & Security (Gate 2) |
| 3. Document Formatting & Page Constraints (Gate 3) |
| 4. Required Content Elements (Gate 4) |
| Final Evaluation Summary |