PWS.doc

DOC document 77 KB Posted

Attached to
Robins North - Painting Safety Line
Solicitation number
RFQF3QCCL0141A004
Issued by

View the file

Other files

File Type Posted
Robins North Layout Hangar Doors.pdf PDF
Q and A - Robins North Safety Lines 3 March.docx DOCX document
RFQ F3QCCL1041A004 UPDATED.docx DOCX document
RFQ F3QCCL1041A004 2 March.docx DOCX document
Questions and Answers - Robins North Safety Lines.pdf PDF
pic3.jpg JPG image
pic2.jpg JPG image
pic5.jpg JPG image
pic4.jpg JPG image
pic1.jpg JPG image
pic6.jpg JPG image
CDRL A002 - Accident Incident Report.pdf PDF
DRAWING -- Robins North Layout 01.pdf PDF
1006806868_RFQ F3QCCL0141A004 25 Feb.docx DOCX document
CDRL A001.pdf PDF
Appendix C-Robins North Painting Safety Lines.docx DOCX document
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

Robins North – Painting Safety Lines 12 February 2021

1.0 DESCRIPTION OF SERVICES. The Contractor shall provide all tools, parts, labor, materials, equipment, transportation (to include travel and per diem) and supervision necessary for painting safety lines located in Robins North 4 Hanger Door (West and East side of building) at 1821 Avondale Mill Rd, Macon, GA, hereafter referred to as Robins North.

1.1 Instructions for Painting Safety Lines:

1.1.1 A minimum 5-foot clear zone must be outlined on the ground at each side of the door with a minimum 3-inch wide yellow and black striped painted line.

1.1.2 The area inside the clear zone may have identical diagonal lines.

1.1.3 All sides visible when approaching a hazard area shall have a 14- by 20-inch or larger “DANGER” sign painted on the floor just outside the clear zone IAW AFI 91-203, Figure 29.1. and Table 29.2.

1.1.4 Place the sign so it can be read when approaching the hazard area.

1.1.5 The word “DANGER” shall be printed on the top with white letters with a message below stating “HAZARDOUS AREA – STAND CLEAR DURING DOOR OPERATIONS.”

1.2 Warranty:

1.2.1 Contractor must provide a one (1) year warranty.

1.3 Site Maintenance, Clean-up and Restoration: Maintain the work site in a neat, orderly, and safe manner.

1.3.1 On a daily basis, the Contractor shall dispose of all trash and debris materials generated in the performance of the contract.

1.3.2 Remove scrap, waste and excess materials promptly. Provide signs, barricades and lights as required.

1.4 Over and Above Work. Work discovered during the course of performance that is:

1.4.1 Within the general scope of the contract, not covered by the line item(s) for the basic work under the contract, and necessary in order to satisfactorily complete the contract.

1.4.2 Upon discovery of the need for over and above work, the Contractor shall prepare and furnish to the Government a work request. Upon request the Contractor shall promptly submit to the Contracting Officer, a proposal for the over and above work. The Government and Contractor will then negotiate a settlement for the over and above work. Contract modifications will be executed to definitize all over and above work.

1.5 Requirements upon completion of work: The Contractor shall ensure work has been completed to the satisfaction of the Primary Government POC prior to final acceptance of the work by the Government. A final walk through after completion of work shall be done with five (5) calendar days.

2.0 SERVICES SUMMARY (SS). None.

3.0 GOVERNMENT FURNISHED PROPERTY (GFP) AND SERVICES. None.

4.0 GENERAL INFORMATION.

4.1 Government Representatives. The following individuals will serve as Government Representatives for Robins North.

Primary Government Representative
Alternate Government Representative

Charles Armstrong

402 CMXG/MXDEA

478-222-4080 charles.armstrong.1@us.af.mil Richard Grenon

402 CMXG/MXDEC

478-327-3858 richard.grenon@us.af.mil

4.2 Contractor Program Manager. The Contractor shall provide a Program Manager who shall be the single point of contact between the Contractor and the Government. The name and phone number of the Contractor’s Program manager shall be provided in writing to the Contracting Officer and Government Representative no later than five (5) calendar days after contract award date.

4.3 Place of Performance and Hours of Work. On-site contract services shall be performed at the Robins North, 1821 Avondale Mill Rd, Macon, GA. The work will take place in North 4 Hangar Door (West and East side of building. The Contractor’s work hours (shifts) shall normally be from 7:00 am to 5:00 pm (EST), Monday through Friday. The Government may adjust the Contractor’s work hours based on workload requirements, with the flexibility to start work earlier, work odd shifts, and/or work weekends. The Government will provide the Contractor the required work hours (schedule) for contractor personnel, and will provide a 48-hour notice prior to changing any work hours.

4.4 Recognized Holidays. Unless otherwise required by the Government, the Contractor shall not have access to Government facilities to work on the following federal holidays: New Year’s Day, Martin Luther King Day, Presidents Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans Days, Thanksgiving Day, and Christmas Day. If the holiday falls on Saturday, it is observed on Friday. If the holiday falls on a Sunday, it is observed on Monday.

4.5 Security Requirements.

4.5.1 Government Security Regulations. The Contractor shall ensure personnel, information, system, facility, and international security requirements are met in accordance with DoD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM), Air Force Instruction (AFI) 31-101, Integrated Defense.

4.5.2 Contractor Security Clearance. A security clearance is NOT a requirement of the current effort.

4.5.3 Access to Government Facilities. The Contractor shall ensure Contractor personnel who require access to Robins AFB or other Government facilities comply with the security procedures of the facility.

4.5.3.1 The Contractor shall ensure an ID card is obtained by all contractor/subcontractor personnel who require recurring access to a Government facility, but not local area network (LAN) access. The Contractor shall submit a letter to the PCO listing all contractor/subcontractor personnel requiring access to the facility. The PCO will approve the request and forward it to the issuing/registration office for processing. Contractor/subcontractor personnel shall report to the issuing/registration office to obtain the ID card(s).

4.5.3.2 The Contractor shall submit a letter to the PCO immediately if contractor/subcontractor personnel no longer require access, upon transfer/termination of contractor/subcontractor personnel or upon completion/termination of the contract/order. The letter shall identify the name(s) and social security number(s) of the contractor/subcontractor personnel. The Contractor shall return the ID card(s) to the issuing/registration office upon expiration, upon transfer/termination of contractor/subcontractor personnel, or once contractor/subcontractor personnel no longer require access to the facility. The Contractor shall return any and all ID cards to the issuing/registration office upon completion/termination of the contract.

4.5.4 Operations Security (OPSEC). The Contractor shall ensure compliance with OPSEC requirements including procedures to protect classified and/or sensitive, but unclassified, Government projects and/or programs. The Contractor shall ensure Contractor personnel who perform work at Robins AFB or another Government facility comply with the OPSEC procedures of the facility.

4.5.5 Security Incident or Violation. The Contractor shall immediately notify the Government Security Office of any potential or actual security incidents or violations including potential or actual unauthorized disclosure or compromise of classified and/or sensitive, but unclassified, information.

4.6 Contractor Identification. Contractor personnel shall wear visible identification designating them as Contractors at all times.

4.7 Safety Requirement. The Contractor shall be responsible for the safety and health of all Contractor employees, to include providing all necessary Personal Protective Equipment (PPE) (i.e. hearing protection, gloves, steel-toed shoes, safety glasses, etc.) for their personnel. The Government is not responsible for ensuring Contractor compliance with safety requirements that do not present the potential damage to Government resources; to include medical examinations, hearing testing, and substance abuse testing for Contractor employees. Additionally, the Contractor is responsible for the safety and health of all subcontractor employees.

4.8 Contractor Safety Program. (See Appendix C, Part II, Para 7) The Contractor shall establish and maintain an acceptable safety program in accordance with their accepted Safety and Health Plan. The Air Force is part of the OSHA Voluntary Protection Program (VPP). All shall familiarize themselves with the requirements of VPP. Information on the VPP can be accessed at http://www.osha.gov/dcsp/vpp/index.html. Additionally, the Contractor is responsible for the safety and health of all subcontractor employees. No more than two Class C mishaps per contract year and Zero Class A or B mishaps will be tolerated. All changes to the plan must also be submitted in writing and approved by the Government.

4.8.1 Safety and Health Plan: Within 10 calendar days after contract award, the contractor shall email a copy of their company Safety Plan that is required to ensure compliance with the Occupational Safety and Health Act (OSHA) (Public Law 91-596) to 402mxw.se.wf@us.af.mil. The Safety Plan will be provided to the Safety Office for review. The Safety Office will provide acceptance or non-acceptance within 5 working days of receipt to the government point-of-contact who will notify the CO. (CDRL A001, DI-SAFT-82080/T, Contractor's Safety Plan).

4.8.2 The Contractor Safety Plan shall address in detail the items listed in the Contract Appendix C, Part II through Part IV as applicable. For task specific procedures identified in the Contract Appendix C, the contractor’s internal procedures for those tasks must be identifiable within the submitted Safety Plan or shall be provided in an amendment or addendum to the company’s Safety Plan. If task specific procedures identified in the Contract Appendix C, are not submitted with the contractor’s Safety Plan, the submitted Safety Plan will be returned as NOT ACCEPTED. The contractor will have 5 working days to resubmit the Safety Plan, amendment or addendum to address or correct issues identified for non-acceptance. The Safety Office will provide acceptance or non-acceptance of the resubmission within 5 workings days of receipt to the government POC who will notify the CO.

4.9 Mishap Notification. (See Appendix C, Part II, Para 5) The Contractor shall notify the Robins AFB Safety Office telephonically at (478)-222-0043 during duty hours and (478)-926-3567 after hours, within four (4) hour after initial notification of all mishaps or incidents for damage to DoD property (material plus labor) entrusted by this contract and employee injuries as a result of the contract operation. A follow-up (written or e-mail) of this mishap/incident notification shall be sent within three calendar days to the Government Representative, the Procurement Contracting Officer (PCO) or the Administrative Contracting Officer (ACO) (with a copy to program manager), who will forward it to the Safety Office. The information that is not available at the time of the initial notification shall be provided within 20 calendar days after the mishap. Mishap notification shall contain, as a minimum, the following information:

a. Contract, Contract Number, Name and Title of Person(s) Reporting

b. Date, Time and exact location of accident/incident

c. Brief Narrative of accident/incident (Events leading to accident/incident)

d. Cause of accident/incident, if known

e. Estimated cost of accident/incident (material and labor to repair/replace)

f. Impound Authority Name and Phone Number (as applicable)

g. Nomenclature of equipment and personnel involved in accident/incident

h. Corrective actions (taken or proposed)

i. Other pertinent information (CDRL A002, DI-SAFT-81563 NOT 1, Accident/Incident Report)

4.10 Agency Affirmative Procurement Programs (formerly GPP). In accordance with FAR 23.404(b)(1), 100% of purchases of Environmental Protection Agency (EPA)-designated products included in the Comprehensive Procurement Guidelines (CPG) list [https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program] and/or United States Department of Agriculture (USDA)-designated products included in the bio based product listings [http://www.biopreferred.gov] shall, at a minimum, meet the EPA or USDA standards for recovered materials or bio based content, respectively, unless an item cannot be acquired competitively within a realistic timeframe, meet appropriate performance standards, and/or be acquired at a reasonable price.

4.10.1 In accordance with FAR 23.404(a)(iii), the Contractor shall provide estimates and verification of recovered material for EPA-designated CPG products and certification for both EPA-designated CPG products and USDA-designated bio based products. In accordance with the Robins Air Force Base, Georgia / Green Procurement Program (GPP) Plan, the Contractor shall provide estimates and certifications to the Government for completion of the applicable attachment(s) to be included in the Purchase Request (PR) package

4.11 Environmental Management System (EMS). Environmental Management Systems (EMS) Awareness Training: All contractor personnel working on Robins AFB who perform activities on the installation are required to complete Air Force-provided initial EMS Awareness Training. It is the responsibility of the Prime Contractor to ensure that all sub-contractors, vendors, and employees complete this training prior to beginning work on Robins AFB. Notification of training completion shall be sent to both the Robins AFB Contracting Officer (CO) to be maintained in the contract file and Environmental Management, 78 CEG/CEIE, (78ceg.cev.FrontOfc@us.af.mil) for tracking purposes. Failure to provide documentation of EMS Training may result in termination of the contract.

4.11.1 EMS training is provided by Environmental Management. Request for Robins EMS Awareness training by calling directly to (478) 327-9283 or through email at 78ceg.cev.FrontOfc@us.af.mil. Contractors have two options to satisfy the mandatory EMS Awareness Training requirement. Contractors that do not have a Common Access Card must exercise Option 2.

4.11.2 Option 1 (Preferred Option): The Air Force version of EMS Awareness Training is available through the Advanced Distributed Learning Service (ADLS) website: https://golearn.adls.af.mil/kc/rso/login/ADLS_login.asp. EMS Awareness Training is located under the Miscellaneous tab. This option is only available to contractors who have a CAC and takes approximately 10 minutes to complete.

4.11.3 Option 2: Contractor requests a copy of the Robins EMS Awareness

Training Power Point Presentation from Environmental Management. The request should be sent to the Environment Management Workflow Box at the following email address, 78ceg.cev.FrontOfc@us.af.mil. Once the presentation is received, the contractor is responsible for ensuring that all his/her employees view the training.

5.0 Essential Services During Crisis. The Functional Service Manager (FSM) has determined, by placing in writing their decision, that this requirement is not Mission Essential (M-E) in accordance with DFARS 237.76, Continuation of Essential Contractor Services.

6.0 APPENDICES.

6.1 Drawing—Robins North Layout

PAGE