RFQ941700-01 - HCR Golf Pro Shop Concrete Repairs.pdf
PDF 5 MB Posted
- Attached to
- HCR Golf Pro Shop Concrete Repairs
- Solicitation number
- 005-RFQ-1632-2025
- Issued by
- Muscatine County, Iowa
About this file
This is a Request for Quote (RFQ) issued by the Iowa Department of Administrative Services (DAS) for the Honey Creek Resort Golf Pro Shop Concrete Replacement project. The RFQ seeks a contractor to remove and replace the concrete patio, improve drainage around the building, and perform final grading for landscaping at the Honey Creek Resort Golf Pro Shop located at 12633 Resort Drive in Moravia, Iowa. The exterior improvements must be completed by May 14th, 2025. Potential respondents are required to submit their quote using the provided Exhibit A pricing form via email to construction.procurement@iowa.gov by April 1st, 2025 at 2:00 PM (CT). All questions regarding the solicitation must be submitted by email by March 26th, 2025 at 2:00 PM (CT).
The project will result in a purchase order, and no performance and payment bond will be required. Contractors must provide a one-year warranty from the date of completion. The insurance requirements are detailed in a sample Certificate of Insurance (Exhibit D), which outlines required limits, additional insured requirements, and waiver of subrogation. The scope of work includes removing approximately 135 square yards of existing concrete, installing drainage tile, grading around the building, and preparing the site for landscaping. The contractor will be responsible for all labor, materials, equipment, and incidental work necessary to complete the project, including temporary facilities, protection of the work, and site cleanup. The State reserves the right to reject any or all quotes and to make a single award for the project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Contract Terms and Conditions.pdf | ||
| RFQ941700-01 - Exhibit A - Pricing Form.pdf | ||
| 1300343-event.pdf | ||
| 1302370-event.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
3/20/2025
To: All Potential Respondents From: Construction Procurement Subject: RFQ941700-01 Golf Pro Shop Concrete Replacement
Request for Quote
The State of Iowa is conducting a Request for Quote for a contractor to remove and replace the concrete patio, improve drainage around building and final grading for landscaping to be planted by others around the Honey Creek Resort Golf Pro Shop in Moravia, Iowa. See Exhibit B and C for additional detail.
The exterior improvements shall be completed no later than May 14th, 2025.
The Project is located at Honey Creek Resort, 12633 Resort Drive, Moravia, IA 52571.
Please email your quote using the Exhibit A pricing form to construction.procurement@iowa.gov prior to April 1th, 2025 at 02:00PM (CT).
All questions regarding this solicitation must be received by email to construction.procurement@iowa.gov by 2:00PM (CT) ON March 26th, 2025.
Contract Terms and Conditions This procurement will result in a Purchase Order. By submitting a quote, respondent agrees to the contract terms and conditions available at:
https://das.iowa.gov/sites/default/files/procurement/pdf/050116%20terms%20services.pdf
Performance Bond
No Performance and Payment Bond will be required.
Insurance Requirements
See sample Certificate of Insurance attached as Exhibit D for required limits, additional insured requirements and waiver of subrogation.
Warranty Respondent must provide a one-year warranty from the date of completion.
mailto:construction.procurement@iowa.gov mailto:construction.procurement@iowa.gov https://das.iowa.gov/sites/default/files/procurement/pdf/050116%20terms%20services.pdf
Exhibit A Pricing Form
Honey Creek Resort Golf Pro Shop Concrete Replacement Honey Creek Resort
Request for Quote RFQ941700-01
Due Tuesday, 04/01/25 at 02:00 PM (CT)
Please submit this completed form with your Quote to:
Attention: Michael Bradbury Iowa Department of Administrative Services - Central Procurement construction.procurement@iowa.gov
This form is to be completed in ink or typewritten.
Only pricing on this form or an exact copy of this form will be accepted.
Pricing Form shall be signed by an officer of the firm with authority to bind Respondent to Contract.
Respondent acknowledges receipt of the following Addenda (if issued) which are part of the RFQ documents:
Addendum No. _______________ Date_____________________
Addendum No. _______________ Date _____________________
Freight Terms: FOB Destination, Freight Pre-Paid
The State reserves the right to reject any or all quotes without penalty and to waive minor deficiencies and informalities if, in the judgement of the State, it's best interests will be served.
Respondents must submit pricing for all scope of work items indicated per the attached Exhibit B. The State reserves the right to evaluate pricing. The State intends to make one Award for this project.
Lump Sum Price for HCR Golf Pro Shop Concrete Replacement
Labor & Material Total $____________________________
*Please note all pricing is to be delivered price. That is why we are stating FOB Destination, Freight Pre-Paid.*
Signature _______________________________________________
Name (Print) ____________________________________________
Title __________________________________________________
Company _______________________________________________
Address ________________________________________________
City, St., Zip ____________________________________________
Phone #____________________ Fax #_______________________
E-mail _________________________________________________ mailto:construction.procurement@iowa.gov
Exhibit B Scope of Work
Honey Creek Resort Golf Pro Shop Concrete Replacement
Honey Creek Resort Request for Quote RFQ941700-01
Due Tuesday, 04/01/25 at 02:00 PM (CT)
Description: Includes all drawings in Exhibit C and all specification sections, including but not limited to removal and replacement of the concrete patio and sidewalk, installation of drainage tile to storm sewer, grading around building to insure proper drainage and final grading to prepare for planting around the Honey Creek Resort Golf Pro Shop.
Landscaping materials, mulch, rock and plants will be provided and installed by others.
1. The Contractor’s Work includes all labor, supervision, materials, equipment, services, supplies, tools, facilities, transportation, hoisting, storage, receiving, licenses, inspections, certifications, overhead, profit, or other items required or reasonably inferable to properly and timely perform and complete all work and services to be performed by the Contractor pursuant to this Agreement. Unless specifically stated otherwise, incidental work required to accomplish the work of this Bid Package shall be included the bid. This would include, but not be limited to, temporary facilities, protection of the work, security of equipment, materials, and work in progress, etc. Contractor’s Work shall be performed in accordance with the Drawings and Specifications.
2. Contractor is responsible for all labor and equipment to unload, account for all material delivered, stock, and delivery for this scope of work. Storage and delivery of materials and equipment at the Site shall be permitted only to the extent approved in advance by the Construction Manager, and if anything so stored obstructs the progress of any portion of the work, it shall be promptly removed or relocated by the Contractor without reimbursement.
3. On site supervision by Prime Contractor at all times work by that contractor or their subcontractors/suppliers is taking place.
4. Provide all temporary facilities required for this scope of work including trailer, trailer power, telephone, secured storage, temporary power for work, temporary and task lighting for work, etc. as determined necessary by Contractor. Coordinate location of trailers, material storage and utility lines with Construction Manager. Limited space is available, and permission to bring any such facility or excess materials on to the site shall be approved by the Construction Manager.
5. Contractor shall provide all equipment and tools for Contractor’s own cleanup. Clean up shall be done at end of every shift or more frequently if required for the Contractor to perform their work, for other Contractors to perform their work, as required by the Owner’s operations, and at the discretion of the Construction Manager.
6. All turf, landscaping, and subgrade disturbances caused by equipment traffic or other activities related to the Contractor’s scope shall be repaired or restored to proper conditions by the owner, but the contractor is responsible to minimize any damage caused to the facility’s landscaping.
7. Protect adjacent existing building elements from damage from Scope of work. Repair existing building elements damaged during Contractor’s Scope of work.
Quote Scope Summary – Bid Package #01 Includes Divisions 00-33 & Drawings C0.1-L1.1
Specifications
• 00 0107 – Seals Page
• 02 4100 – Demolition
• 31 2000 – Earthwork
• 31 2200 – Grading
• 31 2316 – Excavation
• 31 2323 – Fill
• 31 2513 – Erosion Control
• 32 1313 – Concrete Paving
• 32 9219 – Seeding
• 33 4100 – Storm Drainage
Architectural Drawings
• CO – Cover Page
• C0.1 – Civil Legends and Notes
• C1.1 – Civil Site Plan and Details
• L1.1 – Landscape Planting Plan
Project 9417.00
Honey Creek Resort - Sidewalk 12633 Resort Drive Moravia, Iowa
SEALS PAGE
00 0107 - 1
END OF SECTION
02500060.001 DEMOLITION
Honey Creek Resort � Sidewalk DAS Project #9417.00 02 4100 - 1
SECTION 02 4100
DEMOLITION
PART 1 � GENERAL
1.1 RELATED REQUIREMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.
B. Section 01 3000 - Administrative Requirements: Submittal procedures, project meetings, progress schedules and documentation, reports, coordination.
1.2 SUMMARY
A. Section includes:
1. Demolition and removal of pavement as indicated in the plans.
2. Cap and identify active utilities as indicated in the plans.
B. Related Sections:
1. Section 31 20 00: Earth Moving
1.3 DESCRIPTION OF WORK
A. Removing and disposing of existing concrete.
1.4 SUBMITTALS
A. Demolition procedures and operational sequence for review and acceptance by Contracting Officer.
B. See Section 01 3000 - Administrative Requirements, for submittal procedures.
1.5 EXISTING CONDITIONS
A. Identify existing conditions and become familiar with the major demolition work.
1.6 PROTECTION
A. Do not interfere with use of adjacent buildings not in contract. Maintain free and safe passage to and from.
B. Prevent movement, settlement, or collapse of adjacent structure(s) and services. Provide and place bracing or shoring and be responsible for safety and support.
C. Cease operations and notify the Contracting Officer immediately if the safety of any structure appears to be endangered. Take precautions to properly support structure. Do not resume operations until safety is restored.
D. Provide, erect, and maintain barricades, lighting, and guard rails, as required, to protect occupants of building and workers.
E. Protect existing sidewalks, drives, curbs, utilities, and other features or facilities on or adjacent to the site from damage from the work of this Section where such items are to remain.
F. Locate all existing active utility lines traversing the work area and determine the requirements for their protection.
PART 2 - PRODUCTS
2.1 MATERIALS
A. Except where noted otherwise, maintain possession of materials being demolished and immediately remove from site.
B. Carefully remove designated materials and equipment noted to be delivered to Owner. Deliver and store where directed by the Contracting Officer.
02500060.001 DEMOLITION
Honey Creek Resort � Sidewalk DAS Project #9417.00 02 4100 - 2
C. Carefully remove materials and equipment, to be re-used per Project requirements. Store and protect as required.
PART 3 � EXECUTION
3.1 PREPARATION
A. Survey: Before any work is started, Contractor shall make a thorough survey, with the Construction Manager, of where alterations will occur and exterior areas which are anticipated routes of access, and submit a signed report to the Construction Manager. This report shall list by spaces and areas:
1. Existence and conditions of items, such as equipment and other items required by Drawings to be either reused or relocated or both.
2. Shall note any discrepancies between Drawings and existing conditions at site.
3. Shall designate areas for working space, material storage and routes of access to areas where alterations occur, and which have been agreed upon by Contractor and the Construction Manager.
4. Existing exterior conditions related to roadways, walkways and landscaped areas.
B. Resurvey: Before expected final inspection date, Contractor and Construction Manager together shall make a resurvey of the areas and grounds involved. Contractor shall submit a report on conditions, then existing, of surfaces as compared with conditions of same as noted in first condition survey report.
1. Resurvey report shall list any damage caused by Contractor to surfaces despite protection measures; and will form the basis for determining extent of repair work required of Contractor to restore damage caused by Contractor's workmen in executing work of this Contract.
3.2 DEMOLITION
A. The term demolition, as used herein, includes the complete removal of all existing objects as noted on the Drawings.
B. Remove miscellaneous items, as indicated on the Drawings or as otherwise necessary, to execute the work of the Project.
C. Avoid interference with the use of, passage to and from streets adjacent to the Construction Site.
D. Demolish in an orderly and careful manner, as required, to accommodate new work.
E. Protect existing structures to remain. Repair damage.
F. Repair all demolition performed in excess of that required, at no cost to the Owner.
G. Remove all debris from the site and leave site in a neat and orderly condition. Burning of materials on site is not permitted.
H. Remove from the site contaminated, vermin infected, or dangerous material encountered and dispose of by safe means so as not to endanger health of workers and public.
I. Remove demolished materials, tools, and equipment from site upon completion of work. Leave site in a condition acceptable to the Contracting Officer.
J. Repair damaged areas to the grounds (wheel tracks, etc.) caused by vehicles used in performance of this Contract.
02500060.001 EARTHWORK
Honey Creek Resort � Sidewalk DAS Project #9417.00 31 2000 - 1
SECTION 31 20 00
EARTHWORK
PART 1 - GENERAL
1.1 SECTION INCLUDES
A. Extent of Earthwork is indicated on Drawings B. Work includes:
1. Stripping, topsoil stockpiling
2. Excavation
3. Fill
4. Compaction
5. Preparation of subgrade for walls, parking and drives, and steps and walks.
6. Grading.
7. Topsoil placement.
8. Finish grading.
9. Erosion control.
10. Import of embankment material.
11. Export of excess and unsuitable material.
1.2 RELATED SECTIONS
A. Section 31 22 00: Grading.
B. Section 31 23 23: Fill.
C. Section 31 23 16: Excavation
1.3 PROJECT CONDITIONS
A. Verify that survey bench mark and intended elevations for the Work are as indicated.
B. Protect bench marks, survey control points, existing structures, fences, sidewalks, paving, and curbs from excavating equipment and vehicular traffic.
C. The Contractor shall supply all construction layout staking for this project, including for exterior improvements and utilities. Engineer will supply geometric information for purposes of staking upon request. Contractor shall give Engineer 48-hour notice per request for said information.
D. Soil Borings:
1. Test borings and other exploratory operations may be made by Contractor at no cost to Owner with Owner approval.
E. Existing Utilities:
1. Locate existing underground utilities in areas of work. If utilities are to remain in place, provide adequate means of support and protection during earthwork operations.
2. Underground utilities shown on the drawings have been taken from existing public records, Owner's records and available as-built drawings and are correct to the best of our knowledge and provided for information only.
3. Should uncharted, or incorrectly charted, piping or other utilities be encountered during excavation, consult utility owner immediately for directions. Cooperate with Owner and utility companies in keeping respective services and facilities in operation. Repair damaged utilities caused by Contractor's negligence to the satisfaction of utility owner at no cost to the Project Owner.
4. Do not interrupt existing utilities serving facilities occupied and used by Owner or others, during occupied hours, except when permitted in writing by Engineer and then only after acceptable temporary utility services have been provided.
5. Provide minimum of 48-hour notice to Owner and Engineer and receive written notice to proceed before interrupting any utility.
6. Demolish and completely remove from site existing underground utilities indicated to be removed.
Coordinate with utility companies for shut-off of services if lines are active.
1.4 PROTECTION OF PERSONS AND PROPERTY
Honey Creek Resort � Sidewalk DAS Project #9417.00 31 2000 - 2
A. Barricade open excavations occurring as part of this work and post with warning lights.
B. Operate warning lights as recommended by authorities having jurisdiction.
C. Protect structures, utilities, sidewalks, pavements, and other facilities from damage caused by settlement, lateral movement, undermining, washout and other hazards created by earthwork operations.
1.5 QUALITY ASSURANCE
A. Codes and Standards:
1. Perform excavation work in compliance with applicable requirements of governing authorities having jurisdiction.
2. The entire installation shall fully comply with all local and state laws and ordinances, and with all established codes applicable thereto.
B. Testing and Inspection Service:
1. Cost of field and laboratory testing will be borne by the Contractor. Testing by laboratory approved by the Owner.
2. Contractor will cooperate with testing laboratory and geotechnical Engineer in coordinating compaction testing, installation and protection of settlement monitoring devices.
1.6 SUBMITTALS
A. Testing Reports - Excavating: Submit the following reports directly to the Architect from the testing services, with copies to the Contractor and the Owner
1. Test reports on borrow material/lab analysis of fill materials.
2. Field density test reports.
3. One optimum moisture-maximum density curve for each type of soil encountered.
4. Report of actual unconfined compressive strength and/or results of bearing tests of each strata tested.
PART 2 - PRODUCTS
2.1 SOIL MATERIALS/ DEFINITIONS
A. Satisfactory soil materials are defined as those complying with ASTM D2487 soil classification groups CL, GC, GW, CP, GM, ML, SC, SM, SW, and SP.
B. Unsatisfactory soil materials are defined as those complying with ASTM D2487 soil classification groups MG, DH, OL, OH, PT and any bedrock material.
C. Subbase material (granular fill): Naturally or artificially graded mixture of natural or crushed gravel, crushed stone, crushed slag, natural or crushed sand.
D. Fill materials:
1. The fill material type shall be cohesive, non-expansive soil having a "CL" or "CL-ML" classification in accordance with the Unified Soil Classification System and shall have a maximum laboratory dry density (100%) of 100 pounds per cubic foot or more as determined by ASTM D698 (Standard Proctor).
2. No organic dark colored soils or plastic and potentially expansive soils, such as clay shale, are considered suitable engineered fill materials. Topsoils should be sorted and stockpiled for landscaping purposes.
3. When fill material includes rock, the maximum rock size acceptable shall be three inches (3"). No large rocks shall be allowed to nest and all voids must be carefully filled with small stones or earth, properly compacted. No large rocks will be permitted within twelve inches (12") of the finished grade.
E. Topsoil: Secure and stockpile from naturally well drained areas during stripping operations; use satisfactory soil materials free of admixture of subsoil, reasonably free from clay lumps, stone or other debris a greater than 1-1/2" in diameter.
F. Erosion Fence: Three (3) foot wide, 10 mil, 100 percent spunbonded nylon reinforced silt fence fabric with a maximum vertical water flow of 500 gallons per minute per square foot. Posts shall be steel T posts, minimum length 5 foot.
G. Straw Bales: Bound, rectangular, straw bales and suitable stakes. Straw bales to be in good condition.
Loose, broken or deteriorated bales will not be accepted.
Honey Creek Resort � Sidewalk DAS Project #9417.00 31 2000 - 3
PART 3 � EXECUTION
3.1 EXCAVATION
A. Excavation is unclassified, and includes excavation to subgrade elevations indicated, regardless of character of materials and obstructions encountered.
B. Unauthorized Excavation:
1. Consists of removal of materials beyond indicated subgrade elevations or dimensions without specific direction of Engineer.
2. Unauthorized excavation, as well as remedial work directed by Engineer shall be at Contractor's expense.
3. Backfill and compact unauthorized excavations as specified for authorized excavations of same classification, unless otherwise directed by Engineer.
C. Additional Excavation:
1. When excavation has reached required subgrade elevations, notify Engineer who will make an inspection of conditions. Engineer shall evaluate and advise if bearing material is suitable and shall provide unconfined compressive strength tests.
2. If unsuitable bearing materials are encountered at required elevations, carry excavations deeper and replace excavated material with engineered compacted backfill as directed by Engineer.
3. Unsuitable soil shall be removed to the dimension and grade as directed by the Engineer. This area shall be refilled with compacted crushed stone to 98 percent standard proctor D698 (70 percent relative density D2049).
4. Removal or reworking of unsuitable material and its replacement as directed will be paid on basis of contract conditions relative to changes in work.
D. Stability of Excavations:
1. Slope sides of excavations to comply with local codes and ordinances having jurisdiction.
2. Shore and brace where sloping is not possible because of space restrictions or stability of material excavated.
3. Maintain sides and slopes of excavations in safe condition until completion of backfilling.
E. Dewatering:
1. Prevent surface water and subsurface or ground water from flowing into excavations and from flooding project site and surrounding area.
2. Do not allow water to accumulate in excavations.
3. Remove water to prevent softening of foundation bottoms, undercutting footings, and soil changes detrimental to stability of subgrades and foundations.
4. Provide and maintain pumps, well points, sumps, suction and discharge lines, and other dewatering system components necessary to convey water away from excavations.
5. Establish and maintain temporary drainage ditches and other diversions outside excavation limits to convey rain water and water removed from excavations to collecting or run-off areas.
6. Do not use trench excavations as temporary drainage ditches.
F. Material Storage:
1. Stockpile satisfactory excavated materials where directed, until required for backfill or fill.
2. Place, grade and shape stockpiles for proper drainage.
3. Locate and retain soil materials away from edge of excavations.
4. Do not store within drip line of trees indicated to remain.
5. Dispose of excess soil material and waste materials as herein specified.
G. Subgrade Preparation: Pavements (Parking and Roadways and Sidewalks):
1. Provide a 12" compacted depth subgrade for Parking and Roadways including crushed rock surfaces, 6-inches for Sidewalks.
2. Scarify, mix and recompact materials to provide uniform composition at least 12" below top of subgrade for parking lots and drives and 6" below top of subgrade for sidewalks for full width of subgrade plus 2'-0" each side of parking lots and drives and 1'-0" on each side of sidewalks.
3. Construct 12" thick uniform subgrade by excavating top 6" of subgrade, scarifying, mixing, and recompacting next 6" of subgrade base and proof rolling.
4. Construct 6" thick uniform subgrade (sidewalks) by scarifying, mixing, and recompacting the top 6" of subgrade.
Honey Creek Resort � Sidewalk DAS Project #9417.00 31 2000 - 4
5. Proof roll existing soils prior to placing fill to determine location of unsuitable bearing materials.
Proof roll with heavy rubber-tired construction equipment in the presence of the Geotechnical Engineer. Unsuitable material encountered in the subgrade base shall be over excavated and replaced with suitable material and re-compacted. Notify Engineer if unsuitable conditions are encountered for direction.
6. Compact as per Paragraph 3.2 Compaction requirements.
3.2 COMPACTION
A. General: Control soil compaction during construction providing minimum percentage of density specified for each area classification indicated below.
B. Compaction Requirements: Compaction shall be not less than the following percentages of maximum dry density:
Standard Proctor
ASTM D698
Construction Cohesive Type Soils
Paving, roadway, 95% Parking lot and critical backfill area beneath same; e.g. trenches
Backfill adjacent to 95% structures not supporting other structures- minor subsidence possible.
Lawn areas. Non-critical areas-
90% moderate subsidence possible.
*Use relative density technique (ASTM D4253 and D4254) where standard proctor technique (ASTM D698) does not result in a definable maximum dry density and optimum moisture content.
C. Moisture Control and Content:
1. When subgrade or layer of soil material must be moisture conditioned before compaction, uniformly apply water to surface of subgrade, or layer of soil material, to prevent free water appearing on surface during or subsequent to compaction operations.
2. Remove and replace, or scarify and air dry, soil material that is too wet to permit compaction to specified density.
D. Soil material that has been removed because it is too wet to permit compaction may be stockpiled or spread and allowed to dry. Assist drying by discing, harrowing or pulverizing until moisture content is reduced to a satisfactory value.
E. Protect The fill material shall be compacted at a moisture content typically within a range of minus two percent to plus four percent (-0% to +4%) of optimum moisture content as determined by ASTM D698 (Standard Proctor). Other acceptable moisture content ranges determined by the Engineer may be necessary to produce desirable results with specific soils.
3.3 BACKFILL AND FILL
A. General: Place acceptable soil material in layers to required subgrade elevations, for each area classification listed below.
1. In excavations, use satisfactory excavated or borrow material.
2. Under grassed areas, use satisfactory excavated or borrow material.
3. Under walks and pavements, use subbase material, or satisfactory excavated or borrow material, or combination of both.
4. Under steps, use subbase material.
Honey Creek Resort � Sidewalk DAS Project #9417.00 31 2000 - 5
5. Under piping and conduit, use subbase material where subbase is indicated under piping or conduit; shape to fit bottom 90 degrees of cylinder.
6. Utilize loess soil for fill only in the lower portion of deep fill sections or below frost depth under pavement/structures.
B. Ground Surface Preparation:
1. Clearing area to be filled: All timber, logs, trees, brush and rubbish shall be removed, piled or burned or otherwise acceptably disposed of.
2. Scarifying area to be filled:
a. All vegetable matter and dark colored organic soil shall be removed from the surface upon which the fill is to be placed, and the surface shall then be plowed or scarified to a depth of at least six inches and until the surface is free from ruts, hummocks or other uneven features which would tend to prevent uniform compaction by the equipment to be used.
b. Where fills are made on hillsides or slopes, the slope of the original ground upon which the fill is to be placed shall be plowed or scarified deeply or where the slope ratio of the original ground is steeper than 5 horizontals to 1 vertical, the bank shall be stepped or benched.
Ground slopes which are flatter than 5 to 1 shall be benched when considered necessary by the Engineer.
3. Compaction area to be filled: After the foundation for the fill has been cleared and plowed or scarified, it shall be disced or bladed until it is uniform and free from large clods, brought to within the specified moisture content range and compacted to not less than ninety-five percent (95%) of maximum dry density in accordance with current ASTM D698 (Standard Proctor).
C. Placement and Compaction:
1. Depth and Mixing of Fill Layers: The selected fill material shall be placed in level, uniform layers which, when compacted, shall have a density conforming to a minimum of ninety-five percent (95%) of maximum dry density in accordance with ASTM D698 (Standard Proctor). Each layer shall be thoroughly blade mixed during the spreading to insure uniformity of material in each layer.
Compacted layer thickness will be compatible with the demonstrated compatibility of the compaction equipment being used, with a compacted layer thickness of 6" considered typical.
2. Amount of Compaction: After each layer (lift) has been placed, mixed and spread evenly, it shall be thoroughly compacted to a minimum of ninety-five percent (95%) of the material's maximum dry density as determined by ASTM D698 (Standard Proctor) for areas supporting building foundations and floor slabs. Grassed areas or areas not supporting buildings or slabs-on-grade should be compacted to a minimum of ninety percent (90%).
3. Compaction of Fill Layer: Compaction equipment shall be of such design to be able to compact the fill to the specified density. Compaction shall be accomplished while the fill material is within the specified moisture content range. Compaction of each layer shall be continuous over its entire area and the compaction equipment shall make sufficient trips to ensure that the required density has been obtained.
4. Compaction of Slopes: Fill slopes shall be compacted. Compacting operations shall be continued until the slopes are stable but not too dense for planting on the slopes. Compacting of the slopes may be done progressively in increments of three to five feet (3' to 5') in fill height or after the fill is brought to its total height.
5. Do not place backfill or fill material on surfaces that are muddy, frozen, or contain frost or ice.
3.4 GRADING
A. General:
1. Uniformly grade areas within limits of grading under this Section, including adjacent transition areas.
2. Smooth finished surface within specified tolerances, compact with uniform levels or slopes between points where elevations are indicated, or between such points and existing grades.
B. Grading Outside Paving Lines:
1. Grade areas to adjacent to paving lines to drain away from structures and to prevent ponding.
2. Finish surfaces free from irregular surface changes, and as follows:
a. Lawn or Unpaved Areas: Finish areas to receive topsoil to within not more than 0.10' above or below required subgrade elevations.
b. Walks: Shape surface of areas under walks to line, grade and cross-section, with finish surface not more than 0.10' above or below required subgrade elevation.
C. Grading Surface of Fill Under Paving:
1. Grade smooth and even, free of voids, compacted as specified, and to required elevation.
Honey Creek Resort � Sidewalk DAS Project #9417.00 31 2000 - 6
2. Compaction: After grading, compact subgrade surfaces to the depth and indicated percentage of maximum or relative density for each area classification.
3.5 EMBANKMENTS
A. General: Prepare site, place and compact excavated materials to required elevation and cross section.
B. Construction:
1. Construct embankment in horizontal layers not more than 6" in loose thickness.
2. Deposit each layer over full width of embankment as separate and distinct operation.
3. After layer is deposited, smooth to uniform depth by means of suitable motor patrol or bulldozer.
4. Compact layer by rolling with tamping type roller until full weight of roller is supported by tamping feet, but with not less than one pass per inch of loose thickness of layer.
5. Roller will be considered to be supported entirely on its tamping feet when feet do not penetrate more than 3" into material being compacted.
6. If soil is wet so that it will not sufficiently compact by one passing of roller per inch of loose thickness, provide one discing per 2" of loose thickness.
a. Cut and stir full depth of layer.
b. Allow interval of not longer than two hours between successive discings, or as directed by
Engineer.
c. After discing is completed compact layer by specified rolling.
7. If soil is dry so that it will not satisfactorily compact by rolling, moisten material before compaction;
manipulate material to secure proper distribution of moisture before compaction.
8. Whenever operations are suspended during periods rain is likely to occur, smooth and compact surface to shed water readily.
9. Compact to not less than 95% maximum density with moisture content not more than three percentage points above or below optimum; maximum density determined by ASTM D698.
3.6 TOPSOIL SPREADING
See Section 31 22 00 - Grading
3.7 FINISH GRADING
See Section 31 22 00 - Grading
3.8 MAINTENANCE
A. Protection of Graded Areas:
1. Newly graded areas from traffic and erosion. Keep free of trash and debris.
2. Repair and re-establish grades in settled, eroded, and rutted areas to specified tolerances.
3. Keep public streets clean from soil, soil tracking and debris at all times.
B. Reconditioning Compacted Areas: Where completed graded areas are disturbed by subsequent construction operations, erosion or adverse weather, scarify surface, re-shape and compact to required density prior to further construction.
C. Settling: Where settling is measurable or observable at excavated areas during general project warranty period, remove surface (pavement, lawn or other finish), add backfill material, compact, and replace surface treatment. Restore appearance, quality, and condition of surface or finish to match adjacent work and eliminate evidence of restoration to greatest extent possible.
3.9 EROSION PROTECTION
A. The Contractor shall comply with soil erosion control requirements of the Iowa Code, and the local ordinances. The Contractor shall take all necessary measurements to protect against erosion and dust pollution on this project site and all off-site borrow or deposit areas, during performance or as a result of performance.
Honey Creek Resort � Sidewalk DAS Project #9417.00 31 2000 - 7
B. The Contractor shall take all steps necessary to protect adjoining property, including public sanitary and storm drainage systems and streets, from any damage resulting from the movement of earth or other debris thereto from the site; and such steps as are necessary to prevent the accumulation of earth or debris on adjoining public or private property from the construction site. The Contractor shall take into consideration all factors which might cause the movement of earth or debris from the construction site onto any adjoining public or private property.
C. The Contractor shall take immediate corrective action should damage occur to adjoining public or private property (including sanitary or storm drainage systems and streets). The Contractor shall take immediate corrective action to remove any debris should any earth or other debris move from the construction site to adjoining public or private property. Further, the Contractor shall take steps required to prevent the repetition of any instance where dirt or other debris moves from the construction site to adjoining public or private property.
D. The Contractor will hold the Owner harmless from any and all claims of any type whatsoever resulting from damages to adjoining public or private property, including reasonable attorney's fees incurred to Owner. Further, if the Contractor fails to take necessary steps to promptly remove earth or debris which comes onto adjoining public or private property, the Owner may, but need not, remove such debris and deduct the cost thereof from amounts due the Contractor.
E. The Contractor shall maintain storm sewer systems throughout construction and provide erosion control measures acceptable to protect against siltation and erosion or any adverse conditions resulting from storm water. Use straw bales and other means at all intakes and outfall structures and at all locations where erosion or siltation is anticipated or occurring; including drainage courses and swales.
F. Silt fences shall be installed as shown on drawings, in locations as directed by Engineer, and in locations as required by Contractors erosion control plan.
1. Drive T-posts 5' O.C. in drainage swales, 8' O.C. for slope control, to a minimum depth of 2 1/2'.
Attach fabric to posts with continuous cord or wire. Bury 12" of fabric in continuous trench in front of posts.
2. Contractor to routinely inspect condition of fences and repair and clean, as necessary to maintain them in good working order.
3. After vegetative cover is established, silt fences will be removed by Contractor and disposed of off site.
G. In lieu of silt fences, straw bale dikes may be installed with the approval of the Engineer. Contractor shall furnish a detail of the dike for approval to the Engineer. Contractor shall routinely inspect the conditions of the straw bales and replace damaged bales or dikes as necessary. Periodic cleaning of sediment and removal of straw bale dikes shall conform to similar requirements for silt fences.
3.10 FIELD QUALITY CONTROL
A. Allow testing service to inspect and approve subgrades and fill layers before further construction work is performed.
B. Perform field density tests in accordance with ASTM D2922 (nuclear method) or ASTM D1556 (sand cone method), as applicable.
C. Footing Subgrade: For each strata of soil on which footings will be placed, conduct at least one test every 50 lineal feet to verify required design bearing capacities. Subsequent verification and approval of each footing subgrade may be based on a visual comparison of each subgrade with related tested strata, when acceptable to Engineer.
D. Paved Areas and Building Slab Subgrade: Make at least one field density test of subgrade for every 2000 sq. ft. of paved area, but in no case less than 3 tests. In each compacted fill layer, make one field density test for every 2000 sq. ft. of overlaying building slab or paved area, but in no case less than 3 tests.
E. If, in opinion of Engineer, based on testing service reports and inspection, subgrade or fills which have been placed are below specified density, provide additional compaction and testing at no additional expense.
3.11 NATURAL AND ARTIFICAL DRAINAGE
A. If necessary during the progress of the work to interrupt the natural drainage of the surface water, Contractor shall provide approved temporary drainage facilities.
B. All excess excavation shall be removed from site to location determined by Contractor.
Honey Creek Resort � Sidewalk DAS Project #9417.00 31 2000 - 8
3.12 DISPOSAL OF EXCESS AND WASTE MATERIALS
A. Removal from Owner's Property: Remove waste materials, including unacceptable excavated material, trash and debris from site to an approved location for disposal by Contractor.
B. All excess excavation shall be removed from site to location determined by Contractor.
02500060.001 GRADING
Honey Creek Resort � Sidewalk DAS Project #9417.00 31 2200 - 1
SECTION 31 22 00
GRADING
PART 1 - GENERAL
1.1 SECTION INCLUDES
A. Rough grading and finish grading the site for site structures and pavements.
1.2 RELATED SECTIONS
A. Section 31 23 16, Excavation.
B. Section 31 23 23, Fill.
C. Section 31 20 00, Earthwork
1.3 PROJECT CONDITIONS
A. Protect above- and below-grade utilities that remain.
B. Protect bench marks, survey control points, existing structures, fences, sidewalks, paving, and curbs from grading equipment and vehicular traffic.
C. The Contractor shall supply all construction layout staking for this project, including for exterior improvements and utilities. Engineer will supply geometric information for purposes of staking upon request. Contractor shall give Engineer 48-hour notice per request for said information.
PART 2 - PRODUCTS
2.1 MATERIALS
A. Topsoil: See Section 31 23 23 Non-Building Fill.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Verify that survey bench mark and intended elevations for the Work are as indicated.
3.2 PREPARATION
A. Identify required lines, levels, contours, and datum.
B. Stake and flag locations of known utilities.
3.3 ROUGH GRADING
A. Remove subsoil from areas to be further excavated, re-landscaped, or re-graded.
B. Stability: Replace damaged or displaced subsoil to same requirements as for specified fill.
3.4 SOIL REMOVAL
A. Stockpile topsoil to be re-used on site; remove remainder from site.
B. Stockpile subsoil to be re-used on site; remove remainder from site.
3.5 FINISH GRADING
A. Remove debris, roots, branches, stones, in excess of 1/2 inch (13 mm) in size. Remove soil contaminated with petroleum products.
B. In areas where vehicles or equipment have compacted soil, scarify surface to depth of 3 inches (75 mm).
C. Place topsoil to nominal depth of 6 inches (150 mm).
02500060.001 GRADING
Honey Creek Resort � Sidewalk DAS Project #9417.00 31 2200 - 2
D. Remove roots, weeds, rocks, and foreign material while spreading.
E. Fine grade topsoil to eliminate uneven areas and low spots. Maintain profiles and contour of subgrade.
3.6 CLEANING AND PROTECTION
A. Leave site clean and raked, ready to receive landscaping.
02500060.001 EXCAVATION
Honey Creek Resort � Sidewalk DAS Project #9417.00 32 2316 - 1
SECTION 31 23 16
EXCAVATION
PART 1 � GENERAL
1.1 SECTION INCLUDES
A. Excavating for building volume below grade, footings, slabs-on-grade, site structures, and utilities within the building.
1.2 RELATED SECTIONS
A. Section 31 22 00, Grading.
B. Section 31 23 23, Fill.
C. Section 31 20 00, Earthwork.
1.3 PROJECT CONDITIONS
A. Verify that survey bench mark and intended elevations for the Work are as indicated.
B. Protect bench marks, survey control points, existing structures, fences, sidewalks, paving, and curbs from excavating equipment and vehicular traffic.
C. The Contractor shall supply all construction layout staking for this project, including for exterior improvements and utilities. Engineer will supply geometric information for purposes of staking upon request. Contractor shall give Engineer 48-hour notice per request for said information.
PART 2 - PRODUCTS - NOT USED
PART 3 - EXECUTION
3.1 PREPARATION
A. Identify required lines, levels, contours, and datum locations.
B. Locate, identify, and protect utilities that remain and protect from damage.
3.2 EXCAVATING
A. Excavate to accommodate new structures and construction operations.
B. Notify Architect of unexpected subsurface conditions and discontinue affected Work in area until notified to resume work.
C. Slope banks of excavations deeper than 4 feet (1.2 meters) to angle of repose or less until shored.
D. Do not interfere with 45 degree bearing splay of foundations.
E. Cut utility trenches wide enough to allow inspection of installed utilities.
F. Correct areas that are over-excavated and load-bearing surfaces that are disturbed; See Section 31
23 23.
G. Grade top perimeter of excavation to prevent surface water from draining into excavation.
H. Remove excavated material that is unsuitable for re-use from site.
I. Remove excess excavated material from site.
3.3 PROTECTION
A. Prevent displacement of banks and keep loose soil from falling into excavation; maintain soil stability.
B. Protect bottom of excavations and soil adjacent to and beneath foundation from freezing.
02500060.001 FILL
Honey Creek Resort � Sidewalk DAS Project #9417.00 31 2323 - 1
SECTION 31 23 23
FILL
PART 1 - GENERAL
1.1 SECTION INCLUDES
A. Filling, backfilling, and compacting for building volume below grade, footings, slabs-on-grade, and paving.
B. Backfilling and compacting for per notes and details outside the building at replaced sidewalk/patio areas.
1.2 RELATED SECTIONS
A. Section 31 22 00, Grading.
B. Section 31 23 16, Excavation.
C. Section 31 20 00, Earthwork.
1.3 REFERENCES
A. AASHTO T 180 - Standard Specification for Moisture-Density Relations of Soils Using a 4.54 kg (10-
lb) Rammer and a 457 mm (18 in.) Drop; American Association of State Highway and Transportation Officials; 2001 (2004).
B. ASTM D 698 - Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Standard Effort (12,400 ft-lbf/ft3 (600 kN-m/m3)); 2000a.
C. ASTM D 1556 - Standard Test Method for Density and Unit Weight of Soil in Place by the Sand-Cone Method; 2000.
D. ASTM D 1557 - Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Modified Effort (56,000 ft-lbf/ft3 (2,700 kN m/m3)); 2002.
E. ASTM D 2167 - Standard Test Method for Density and Unit Weight of Soil in Place by the Rubber Balloon Method; 1994(R 2001).
F. ASTM D 2922 - Standard Test Methods for Density of Soil and Soil-Aggregate in Place by Nuclear Methods (Shallow Depth); 2005.
G. ASTM D 3017 - Standard Test Method for Water Content of Soil and Rock in Place by Nuclear Methods (Shallow Depth); 2005.
1.4 PROJECT CONDITIONS
A. Verify field conditions for the Work as indicated.
B. The Contractor shall supply all construction layout staking for this project, including for exterior improvements and utilities. Engineer will supply geometric information for purposes of staking upon request. Contractor shall give Engineer 48-hour notice per request for said information.
PART 2 � PRODUCTS
2.1 FILL MATERIALS
A. General Fill - Fill Type Landscaped Areas: Subsoil excavated on-site.
1. Free of lumps larger than 3 inches (75 mm), rocks larger than 2 inches (50 mm), and debris.
B. Structural Fill - Fill Type Paved Areas: Subsoil excavated on-site. Compacted Free-Draining Granular Backfill
1. Free of lumps larger than 3 inches (75 mm), rocks larger than 2 inches (50 mm), and debris.
C. Topsoil - Fill Type Landscaped Areas: Topsoil excavated on-site.
1. Free of roots, rocks larger than 1/2 inch (12 mm), subsoil, debris, large weeds and foreign matter.
PART 3 � EXECUTION
3.1 EXAMINATION
02500060.001 FILL
Honey Creek Resort � Sidewalk DAS Project #9417.00 31 2323 - 2
A. Identify required lines, levels, contours, and datum locations.
3.2 PREPARATION
A. Scarify subgrade surface to a depth of 6 inches (150 mm) under concrete paving.
B. Cut out soft areas of subgrade not capable of compaction in place. Backfill with Structural Fill.
C. Compact subgrade to 95 percent of maximum dry density.
D. Until ready to fill, maintain excavations and prevent loose soil from falling into excavation.
3.3 FILLING
A. Fill to contours and elevations indicated using unfrozen materials.
B. Employ a placement method that does not disturb or damage other work.
C. Systematically fill to allow maximum time for natural settlement. Do not fill over porous, wet, frozen or spongy subgrade surfaces.
D. Maintain optimum moisture content of fill materials to attain required compaction density.
E. Slope grade away from building minimum 2 inches in 10 ft (50 mm in 3 m), unless noted otherwise.
Make gradual grade changes. Blend slope into level areas.
F. Correct areas that are over-excavated.
1. Other areas: Use general fill, flush to required elevation, compacted to minimum 95 percent of maximum dry density.
G. Compaction Density Unless Otherwise Specified or Indicated:
1. Under paving, slabs-on-grade, and similar construction: 95 percent of maximum dry density.
2. At other locations: 95 percent of maximum dry density.
H. Reshape and re-compact fills subjected to vehicular traffic.
3.4 FIELD QUALITY CONTROL
A. Compaction density testing will be performed on compacted fill in accordance with ASTM D1556, ASTM D2167, ASTM D2922, or ASTM D3017.
B. Evaluate results in relation to compaction curve determined by testing uncompacted material in accordance with ASTM D 698 ("standard Proctor"), ASTM D 1557 ("modified Proctor"), or AASHTO T 180.
C. If tests indicate work does not meet specified requirements, remove work, replace and retest at Contractor's expense.
D. Owner will select and pay for independent testing laboratory and Contractor shall coordinate work with testing laboratory before proceeding with each phase or stage of work.
3.5 CLEAN-UP
A. Remove unused stockpiled materials, leave area in a clean and neat condition. Grade stockpile area to prevent standing surface water.
02500060.001 EROSION CONTROL
Honey Creek Resort � Sidewalk DAS Project #9417.00 31 2513 - 1
SECTION 31 25 13
EROSION CONTROL
PART 1 � GENERAL
1.1 SECTION INCLUDES
A. Description of Work B. Filter Berm for PCC Curb and Gutter C. Filter Berms D. Inlet Filters E. Silt Fence F. Maintenance G. Cleanup H. Removal of Erosion Control Devices
1.2 DESCRIPTION OF WORK
A. This section shall include the furnishing of materials, installation, and construction and removal of various erosion control devices at locations shown on the plans or where specified by the Engineer in accordance with the contract documents.
B. The Contractor shall be responsible for accomplishing the required construction work on this project in such a manner as to effectively minimize and control the water pollution which might be caused by soil erosion from the project. It is intended that these features be maintained in appropriate functional condition from initial construction stages to final completion of project.
C. Contractor shall be responsible for conformance with local, state, and federal soil erosion and siltation controls.
1.3 SUBMITTALS
A. Submit under provisions of General Conditions.
B. Certification of materials used for erosion control devices.
C. Upon request the Contractor will provide Material Certifications to the Engineer.
1.4 GENERAL
A. The Contractor shall comply with soil erosion control requirements of the Iowa Code, and the local ordinances. The Contractor shall take all necessary measurements to protect against erosion and dust pollution on this project site and all off-site borrow or deposit areas, during performance or as a result of performance.
B. The Contractor shall take all steps necessary to protect adjoining property, including public sanitary and storm drainage systems and streets, from any damage resulting from the movement of earth or other debris thereto from the site; and such steps as are necessary to prevent the accumulation of earth or debris on adjoining public or private property from the construction site. The Contractor shall take into consideration all factors which might cause the movement of earth or debris from the construction site onto any adjoining public or private property.
C. The Contractor shall take immediate corrective action should damage occur to adjoining public or private property (including sanitary or storm drainage systems and streets). The Contractor shall take immediate corrective action to remove any debris should any earth or other debris move from the construction site to adjoining public or private property. Further, the Contractor shall take steps required to prevent the repetition of any instance where dirt or other debris moves from the construction site to adjoining public or private property.
D. The Contractor will hold the Owner harmless from any and all claims of any type whatsoever resulting from damages to adjoining public or private property, including reasonable attorney's fees incurred to Owner. Further, if the Contractor fails to take necessary steps to promptly remove earth or debris which comes onto adjoining public or private property, the Owner may, but need not, remove such debris and deduct the cost thereof from amounts due the Contractor.
Honey Creek Resort � Sidewalk DAS Project #9417.00 31 2513 - 2
E. The Contractor shall maintain storm sewer systems throughout construction and provide erosion control measures acceptable to protect against siltation and erosion or…
This is the start of the file's text. The full file is on GovTribe.