This document is Attachment No. 3: Vendor and Installation Requirements for a federal contract solicitation dated March 24, 2026, outlining performance specifications and installation constraints for equipment procurement by NLR (likely a research facility).
Vendor Performance Requirements: Offerors must demonstrate successful manufacture, delivery, and installation of a minimum of five comparable units within the past five years for research laboratories, universities, or equivalent institutions. Comparable equipment is defined as equipment of equal or greater complexity, capability, and performance specifications relative to the solicitation requirements. Offerors must provide evidence including customer organization name and address, contact person information, delivery and installation dates, and operational performance summaries. NLR reserves the right to independently verify installations and may require a demonstration of previously delivered equipment at a customer site or factory prior to award, with failure to satisfactorily demonstrate resulting in removal from technical consideration. Offerors must provide written warranties with coverage terms, duration, and guaranteed on-site service response times, and document availability of replacement parts and trained service personnel for a minimum of seven years post-delivery.
Installation Location and Utility Requirements: Equipment must fit through an 8-foot wide by 10-foot tall roll-up loading dock door and through a hallway transit area with 9-foot overhead clearance. The fully assembled tool must fit within a designated cross-hatched area with a minimum 36-inch wide egress path for emergency evacuation. Equipment access panels must not interfere with egress paths, and maintenance areas require minimum 28-inch clearance from walls or fixed obstacles. Final tool height is restricted to 12 feet within 3 feet of facility walls but may reach 18 feet 11 inches in the interior. Electrical power consumption must not exceed 160 kilowatts. Chamber cooling water requirements must be less than 239,000 BTU/hour (70 kilowatts) with a 16-degree Fahrenheit temperature differential between inlet and outlet. The system must dissipate less than 12,000 BTU/hour of heat to ambient air. Offerors must submit expected water temperature rise and chilled water flow specifications at 55-degree Fahrenheit entering water temperature and document heat dissipation into the lab environment. LN2 cooling is not available at this location.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment No. 3
Vendor and Installation Requirements Dated 3/24/2026
Vendor performance requirements Vendor Experience & Proven Installations Offeror shall have successfully manufactured, delivered, and installed a minimum of five
(5) units of comparable equipment within the past five (5) years for research laboratories, universities, or equivalent institutions.
“Comparable equipment” is defined as equipment of equal or greater complexity, capability, and performance specifications as described in this solicitation.
Evidence of such installations shall include:
Customer organization name and address Contact person (name, title, phone, email) Date of delivery and installation Summary of operational performance and period in service NLR reserves the right to independently verify each stated installation prior to determination of technical acceptability.
After-Sales Service & Lifecycle Support Offeror shall provide a written warranty with coverage terms, duration, and guaranteed response times for on-site service.
Offeror shall document the availability of replacement parts and trained service personnel for a period of not less than seven (7) years after delivery.
Demonstrated Capability Requirement NLR reserves the right, at its sole discretion, to require the offeror to provide a demonstration of previously delivered comparable equipment in operation, either at a customer site or through a factory demonstration, prior to award.
Failure to satisfactorily demonstrate equipment performance will result in removal from further technical consideration.
Installation location and utility requirements Physical Space & Location Constraints Pathing to the installation location has the following restrictions:
• The unit(s) must be able to fit through a roll-up loading dock door that is 8’ wide and 10’ tall. See the attached drawing.
• The unit(s) must be moved through a section of hallway (transit area) that has overhead obstacles at 9’ above floor level. See attached drawing.
The installation location has the following restrictions:
• The fully assembled tool, including all ancillary equipment and egress requirements, must fit in the cross-hatched area defined within the attached drawing.
• Egress-related requirements:
o There is a safety-related egress requirement that necessities a ≥36” wide path exist to allows people to vacate the adjacent lab. One example path that satisfies this criterion is shown in the drawing.
o Equipment access and maintenance panels must be configured such that they do not interfere with the egress path. An example of a configuration violating this would be an access panel that opens in a way that blocks the path of egress for the worker, such as a door that only open 90 degrees blocking their only path around equipment. In such a case, the door would need to either open 180 degrees, open 90 degrees but into the dead-end direction, or be a panel that needs to be removed entirely for work.
o Any area requiring access for equipment maintenance requires a minimum of 28” of clearance between the tool and the wall, or other fixed obstacle.
o Positioning must allow for chamber door positioning and module loading, given the positioning of adjacent equipment and walls.
• Final tool height is restricted to 12’ high within 3’ of the facility walls (to accommodate existing utility lines) but can be up to 18’11” high within the interior of the space.
Utility constraints:
• Electrical power consumption shall be less than 160 kW
• Chamber cooling water energy requirement must be less than 239,000 btu/h (70
KW) with a cooling water ΔT between inlet and outlet of 16 deg F (8.9 deg C).
• The system (chamber and all associated equipment) must dissipate less than 12,000 btu/h of heat to ambient air.
• To assist with ensuring cooling requirements can be met, please submit the following information:
o With 55 deg F (12.8 deg C) entering water temperature (EWT), what is the expected water temperature rise (delta T) and chilled water (CHW) flow through the chamber?
o How much heat will the chamber dissipate into the lab space environment under normal operating conditions?
• Note, this location does not have access to LN2 for chamber cooling.
ATLAS
SYSTEM
(8'-0")
9'-0" C
LEAR
O
VER
H
EAD
(TR
AN
SIT AR
EA)
FLO
O
R D
R
AIN
9'-0" C
LEAR
O
VER
H
EAD
18'-11" C
LEAR
O
VER
H
EAD
21'-11 1/2"
8'-8 1/2"
R O
LL U
P D
O C
K D O
O R
8'-0 W X 10'-0" H
3'-0" EG
R
ESS PATH
(EXAM
PLE)
6'-3" 9'-0"
10'-0 1/2" 5'-9"
File details come from the government source that posted it. Updated .