RFQ SP3300-21-Q-0056.pdf
PDF 522 KB Posted
- Attached to
- Replace Roof Building 300 Federal contract opportunity
- Solicitation number
- SP3300-21-Q-0056
- Issued by
- Defense Logistics Agency Distribution
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 0001.pdf | ||
| Site Visit Notes and Attendance Sheet.pdf | ||
| Appendix 1 site photos.pdf | ||
| Attachment 3 SF25A (Payment Bond).pdf | ||
| Attachment 8 Submittal Register.pdf | ||
| Attachment 7 Drawings.pdf | ||
| Attachment 4 Wage Determination.pdf | ||
| Attachment 1 SF24 - Bid Bond.pdf | ||
| Attachment 5 Project Division 1 Specifications.pdf | ||
| Attachment 6 Project Technical Specifications.pdf | ||
| Attachment 2 SF25 (Performance Bond).pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(See ).
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair) IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
SOLICITATION
1. SOLICITATION NUMBER
5. REQUISITION/PURCHASE REQUEST NUMBER
CODE
6. PROJECT NUMBER
8. ADDRESS OFFER TO
4. CONTRACT NUMBER
7. ISSUED BY
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
11. The contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and
b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than
STANDARD FORM 1442 (REV. 8/2014)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
is, is not required.
local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.
calendar days and complete it within calendar days after receiving
a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
12b. CALENDAR DAYS
2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED PAGE OF PAGES
SP3300-21-Q-0056
DLA DISTRIBUTION
ACQUISITION OPERATIONS (J7)
430 MIFFLIN AVENUE SUITE 3102A
NEW CUMBERLAND PA 17070-5008
USA
See Continuation Page(s)
DLA DISTRIBUTION
ACQUISITION OPERATIONS (J7)
430 MIFFLIN AVENUE SUITE 3102A
NEW CUMBERLAND PA 17070-5008
USA
Joshua Woodworth 717-770-4192
1 3504/28/2021
05/27/2021
01:00 PM
SECTION F
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
OFFER (Must be fully completed by offeror)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT
NUMBER
DATE.
AWARD (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
CODE FACILITY CODE
15. TELEPHONE NUMBER (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
21. ITEMS ACCEPTED:
22. AMOUNT
26. ADMINISTERED BY
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31c. DATE
STANDARD FORM 1442 (REV. 8/2014) BACK
31b. UNITED STATES OF AMERICA
BY
31a. NAME OF CONTRACTING OFFICER (Type or print)
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30b. SIGNATURE 30c. DATE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.) Contractor agrees to furnish
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
23. ACCOUNTING AND APPROPRIATION DATA
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
27. PAYMENT WILL BE MADE BY
10 U.S.C. 2304(c) ( ) 41 U.S.C. 3304(a) ( )
20b. SIGNATURE 20c. OFFER DATE
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: Page 3 of 35
SP3300-21-Q-0056
CONTINUED ON NEXT PAGE
GENERAL OVERVIEW
This Request for Quote (RFQ)is 100% set-aside for small businesses in accordance with FAR 52.219-6. The resulting award will be a firm fixed-price purchase order, awarded in accordance with FAR Part 13, Simplified Acquisition Procedures.
ELECTRONIC SOLICITATION
This solicitation, including all attachments, and any amendments, is only available electronically at the beta.SAM website, https://beta.sam.gov/ . Offerors are cautioned that it is their responsibility to access the website for any amendments that may be issued under the solicitation. There will be no advance notification of amendment issuance. Offerors are advised to consult the website frequently to check for any amendments since an amendment may be issued up until the due date and time. Failure to acknowledge amendments may render your quote non-responsive and ineligible for award.
MAGNITUDE OF CONSTRUCTION
The estimated magnitude of construction is between $100,000 and $250,000.
SITE VISIT DATE, TIME AND LOCATION
Reference Section L, FAR Provision 52.236-27 for specific date, time and location. Due to security measures currently in place on this installation, anyone planning to attend the site visit needs to provide the following information to Joshua Woodworth at joshua.woodworth@dla.mil and Donna Kautz at donna.kautz@dla.mil.
This information must be submitted at least two (2) working days prior to the site visit date.
Failure to submit this information in the timeframe requested above may result in delays upon your arrival at the installation.
Company Name Employee Name Employee Date of Birth Employee Driver’s License Number and State of Driver’s License
On the date of the site visit, employee will need to present at least one form of photo identification, i.e., valid driver’s license. The employee will also need to present current vehicle registration and insurance for each vehicle entering the installation.
Camera passes will no longer be issued. The COR will coordinate all photography with the Public Affairs office.
QUOTES
Offerors must complete Blocks 14 through 20c on the Standard Form (SF) 1442, which includes total price of all CLINs in Block 17. Offerors must provide all information requested in Section K Representations, Certifications, and Other Statements of Offerors. Offerors must fill in an amount for each CLIN under Schedule B or your quote may be ineligible for award.
BID BOND
A bid bond is required. Failure to provide a bid bond for an adequate amount shall result in rejection of quote. Required amount for bid bond is twenty percent (20%). Reference Section L, FAR Provision 52.228-1.
PERFORMANCE AND PAYMENT BONDS
The successful offeror shall be required to furnish performance and payment bonds to the Contracting Officer as follows: (Reference Section I, FAR Clause 52.228-15)
(1) Performance Bonds (Standard Form 25). The penal amount of performance bonds at the time of contract award shall be 100 percent of the original contract price.
(2) Payment Bonds (Standard Form 25-A). The penal amount of payment bonds at the time of contract award shall be 100 percent of the original contract price.
INSURANCE
Reference FAR Clause 52.228-5 Insurance-Work on a Government Installation located in this solicitation.
The minimum amount/kind of insurance required is shown below:
Workers’ Compensation and Employer’s Liability - $100,000 (except in states with exclusive or monopolistic funds that do not permit workers’ compensation to be written by private carriers.)
General Liability- $500,000 per occurrence Automobile Liability – Property damage $20,000 per occurrence, Bodily injury $200,000 per person and $500,000 per occurrence.
https://beta.sam.gov/ mailto:joshua.woodworth@dla.mil mailto:donna.kautz@dla.mil
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: Page 4 of 35
When requested by the Contracting Officer, the Contractor shall provide a copy of all subcontractors’ proofs of required insurance no later than five (5) days before each subcontractor commences work on the Government installation.
CLAUSES AND PROVISIONS
Clauses and provisions from the Federal Acquisition Regulation (FAR), the Department of Defense (DOD) FAR Supplement (DFARS), and the Defense Logistics Acquisition Directive (DLAD) are incorporated in this document by reference and in full text. Those incorporated by reference have the same force and effect as if they were given in full text.
NOTICE TO ALL PROSPECTIVE OFFERORS
To receive an award resulting from this solicitation, your company must be registered in the System for Award Management (SAM) Database. Reference FAR provision 52.204-7. SAM website is https://www.sam.gov.
INVOICING
The Contractor shall submit payment requests and receiving reports using Wide Area Work Flow (WAWF). Instructions are found in Section G of this solicitation under DFARS Clause 252.232-7006 Wide Area WorkFlow Payment Instructions (MAY 2013)
SCHEDULE OF SUPPLIES/SERVICES
Note: The following project description is for the purpose of general information and is not intended to include and describe every feature or item or to define the scope of work.
PROJECT DESCRIPTION: Replace Roof Building 300
Contractor to provide all necessary labor, material and/or equipment to perform all work associated with the following tasks, but is not intended to be limited to these tasks alone:
Remove and dispose of the existing single ply insulated roof system, metal fascia, gutters, downspouts, and miscellaneous metal flashings. Install new single ply insulated total roof system to include metal fascia, gutters, downspouts, and miscellaneous metal flashings. Scope also includes repairing deteriorated roof deck sheathings, deteriorated roof edge wood trim boards and wood nailing strips by removing, disposal and installing new. Refer to drawings and specifications for more detailed requirements. Also, entire roof field considered to be one homogeneous material containing less than 1% asbestos and shall be removed and handled per 29 CFR 1926.1011.
All work shall be performed complete and in accordance with the specifications, drawings, and solicitation requirements.
HOURS OF WORK
The work to be performed shall be during the regular working which consist of an 8-1/2-hour period established by the Contracting Officer, Monday through Friday, from 7:00am to 3:30pm (including clean-up), excluding Government holidays. Work required to be conducted outside of regular working hours requires prior Contracting Officer approval.
Construction Wage Determinations No: PA20210107 dated 04/23/2021 apply.
PERIOD OF PEFORMANCE
Contractor shall commence after the Notice to Proceed is issued and shall complete the entire work ready for use within 105 calendar days after receipt of Notice to Proceed. (Note: actual construction must be complete and ready for use within 75 calendar days of receiving Notice to Proceed and remaining 30 days are for Final Submittals).
QUESTIONS
To avoid a delay in the procurement process, all questions regarding this RFQ must be received by 3:00 P.M. eastern local time on May 13, 2021. Questions received after this date and time will not receive a response.
https://www.sam.gov/
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: Page 5 of 35
SECTION B - SUPPLIES OR SERVICES AND PRICES
ITEM DESCRIPTION:
Provide the necessary labor, material and/or equipment to perform all work associated with this project per the drawings and specifications, complete in place except as noted in CLIN 0002 and 0003.
PRICING TERMS: Firm Fixed Price
PERIOD OF PERFORMANCE: 75 days after NTP
Provide the necessary labor, material and/or equipment to perform all work associated with removing unforeseen moisture damaged existing 5/8” thick plywood and install 5/8” thick plywood roof sheathing.
Amount: $________ per SF (EA) x 607 SF = $_______________ Not to Exceed (NTE)
•Actual quantity for CLIN 0002 will be measured in the field w/ COR upon completion of field inspection of existing roof sheathing.
Provide the necessary labor, material and/or equipment to perform all work associated with removing unforeseen moisture damaged existing 3/4” thick plywood and install 3/4” thick plywood roof sheathing.
Amount: $________ per SF (EA) x 334 SF = $_______________ Not to Exceed (NTE)
•Actual quantity for CLIN 0003 will be measured in the field w/ COR upon completion of field inspection of existing roof sheathing.
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0003 Z2GZ-V00010014 334.000
Other Warehouse Buildings, REPAIR
OR ALT
JB $ ___________ $ _____________
0002 Z2GZ-V00010014 607.000
Other Warehouse
0001 Z2GZ-V00010014 1.000
Other Warehouse
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: Page 6 of 35
SECTION C - SPECIFICATIONS
The following document is provided as part of the solicitation package and shall be used in the execution of work under this purchase order:
Re-Roof Building 300
Project Specifications
January 2021
Defense Logistics Agency Defense Distribution Center, Susquehanna
New Cumberland, PA
LOCATED AT SECTION J OF THIS SOLICITATION ATTACHMENTS 5 and 6
(END OF SECTION C)
SECTION D - PACKAGING AND MARKING
This section is not used.
(END OF SECTION D)
SECTION E - INSPECTION AND ACCEPTANCE
FAR 52.246-12 INSPECTION OF CONSTRUCTION (AUG 1996)
FAR 52.246-13 INSPECTION-DISMANTLING, DEMOLITION, OR REMOVAL OF IMPROVEMENTS (AUG 1996)
FAR 52.246-21 -- WARRANTY OF CONSTRUCTION (MAR 1994)
(END OF SECTION E)
SECTION F – DELIVERIES OR PERFORMANCE
FAR 52.211-13 TIME EXTENSIONS (SEP 2000)
FAR 52.242-14 SUSPENSION OF WORK (APR 1984)
FAR 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984) (DEVIATION)
The Contractor shall be required to
a. commence work under this contract upon receipt of the notice to proceed (NTP) according to the following schedule:
Complete the entire work ready for use within 75 calendar days after receipt of Notice to Proceed and another 30 calendar days for Final Submittals.
A pre-construction meeting will be scheduled no later than twenty-one (21) days after the Notice to Proceed is issued. The Contractor shall provide all Pre-Construction submittal items indicated as "SD-01 Pre-Construction Submittals" in Section 01 33 00 of the Technical Specifications and on the Submittal Register (Form 4288) for this Section. All submittals not delivered to the Pre-Con Meeting shall be shown in the Form 4288 with scheduled dates of delivery. Exceptions to this Submittal delivery requirement may be granted for Shop Drawings that have a long lead-time, e.g., mechanical system, structural, sprinkler etc. Submittals for all specific definable features of work shall be received and approved before any work shall commence. All manufacturer installation instruction manuals shall be included in the initial submittal package as well as in the close out O&Ms.
1. Special Note regarding submission of Pre-Construction Submittals:
a) The Contractor shall provide the COR with written documentation of the Construction Progress Schedule that will be adhered to ensure that all Pre-
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: Page 7 of 35
CONTINUED ON NEXT PAGE
Construction Submittals not provided during the Pre-Construction Meeting are submitted in a timely fashion.
b) The Construction Progress Schedule shall include activities and durations for submittal review (14/21 calendar day review time allotted by the spec), utility interruption requests, progress/coordination meetings, etc., as well as all definable features of work.
c) If the Construction Progress Schedule is revised so shall the submittal register
01 33 00, paragraph 1.9.
b. Final Submittals:
Contractor shall provide the following submittal items, as applicable, within 30 calendar days after completion of construction and prior to Final Payment:
1. Operation and Maintenance Manuals
2. Warranties / Guaranties
3. Daily Reports
(End of Clause)
FAR 52.211-12 LIQUIDATED DAMAGES – CONSTRUCTION (SEP 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $377.00 for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor’s right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
(END OF SECTION F)
Section G – CONTRACT ADMINISTRATION DATA
DFARS 252.201-7000 CONTRACTING OFFICER'S REPRESENTATIVE (DEC 1991)
(a) Definition. “Contracting officer's representative” means an individual designated in accordance with subsection 201.602-2 of the Defense Federal Acquisition Regulation Supplement and authorized in writing by the contracting officer to perform specific technical or administrative functions.
(b) If the Contracting Officer designates a contracting officer's representative (COR), the Contractor will receive a copy of the written designation. It will specify the extent of the COR's authority to act on behalf of the contracting officer. The COR is not authorized to make any commitments or changes that will affect price, quality, quantity, delivery, or any other term or condition of the contract.
(End of clause)
(Revised October 21, 2016)
DFARS 252.232-7003 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND RECEIVING REPORTS (DEC 2018)
(a) Definitions. As used in this clause—
“Contract financing payment” means an authorized Government disbursement of monies to a contractor prior to acceptance of supplies or services by the Government.
(1) Contract financing payments include—
(i) Advance payments;
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: Page 8 of 35
CONTINUED ON NEXT PAGE
(ii) Performance-based payments;
(iii) Commercial advance and interim payments;
(iv) Progress payments based on cost under the clause at Federal Acquisition Regulation (FAR) 52.232-16, Progress Payments;
(v) Progress payments based on a percentage or stage of completion (see FAR 32.102(e)), except those made under the clause at FAR 52.232-5, Payments Under Fixed-Price Construction Contracts, or the clause at FAR 52.232-10, Payments Under Fixed-Price Architect-Engineer Contracts; and
(vi) Interim payments under a cost reimbursement contract, except for a cost reimbursement contract for services when Alternate I of the clause at FAR 52.232- 25, Prompt Payment, is used.
(2) Contract financing payments do not include—
(i) Invoice payments;
(ii) Payments for partial deliveries; or
(iii) Lease and rental payments.
“Electronic form” means any automated system that transmits information electronically from the initiating system to affected systems.
“Invoice payment” means a Government disbursement of monies to a contractor under a contract or other authorization for supplies or services accepted by the Government.
(1) Invoice payments include—
(i) Payments for partial deliveries that have been accepted by the Government;
(ii) Final cost or fee payments where amounts owed have been settled between the Government and the contractor;
(iii) For purposes of subpart 32.9 only, all payments made under the clause at 52.232-5, Payments Under Fixed-Price Construction Contracts, and the clause at 52.232-10, Payments Under Fixed-Price Architect-Engineer Contracts; and
(iv) Interim payments under a cost-reimbursement contract for services when Alternate I of the clause at 52.232-25, Prompt Payment, is used.
(2) Invoice payments do not include contract financing payments.
“Payment request” means any request for contract financing payment or invoice payment submitted by the Contractor under this contract or task or delivery order.
“Receiving report” means the data prepared in the manner and to the extent required by Appendix F, Material Inspection and Receiving Report, of the Defense Federal Acquisition Regulation Supplement.
(b) Except as provided in paragraph (d) of this clause, the Contractor shall submit payment requests and receiving reports in electronic form using Wide Area WorkFlow (WAWF). The Contractor shall prepare and furnish to the Government a receiving report at the time of each delivery of supplies or services under this contract or task or delivery order.
(c) Submit payment requests and receiving reports to WAWF in one of the following electronic formats:
(1) Electronic Data Interchange.
(2) Secure File Transfer Protocol.
(3) Direct input through the WAWF website.
(d) The Contractor may submit a payment request and receiving report using methods other than WAWF only when—
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: Page 9 of 35
CONTINUED ON NEXT PAGE
(1) The Contractor has requested permission in writing to do so, and the Contracting Officer has provided instructions for a temporary alternative method of submission of payment requests and receiving reports in the contract administration data section of this contract or task or delivery order;
(2) DoD makes payment for commercial transportation services provided under a Government rate tender or a contract for transportation services using a DoD-approved electronic third party payment system or other exempted vendor payment/invoicing system (e.g., PowerTrack, Transportation Financial Management System, and Cargo and Billing System);
(3) DoD makes payment on a contract or task or delivery order for rendered health care services using the TRICARE Encounter Data System; or
(4) The Governmentwide commercial purchase card is used as the method of payment, in which case submission of only the receiving report in WAWF is required.
(e) Information regarding WAWF is available at https://wawf.eb.mil/.
(f) In addition to the requirements of this clause, the Contractor shall meet the requirements of the appropriate payment clauses in this contract when submitting payment requests
(End of clause)
DFARS 252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)
(a) Definitions. As used in this clause—
“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.
“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.
(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall—
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/
(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:
(1) Document type. The Contractor shall submit payment requests using the following document type(s):
(i) For cost-type line items, including labor-hour or time-and-material submit a cost voucher.
(ii) For fixed price line items -
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
___________N/A___________ https://wawf.eb.mil/ http://www.acq.osd.mil/dpap/dars/dfars/html/current/252232.htm https://www.acquisition.gov/ https://wawf.eb.mil/ https://wawf.eb.mil/
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: Page 10 of 35
CONTINUED ON NEXT PAGE
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
__________2 in 1 Invoice Type____
(iii) For customary progress payments based on cost incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial item financing, submit a commercial item financing request.
(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF
Pay Official DoDAAC
SL4701
Issue By DoDAAC
SP3300
Admin DoDAAC
SP3300
Inspect By DoDAAC
SB3222
Ship To Code N/A
Ship From Code N/A
Mark For Code N/A
Service Approver (DoDAAC) N/A
Service Acceptor (DoDAAC)
SB3222
Accept at Other DoDAAC N/A
LPO DoDAAC N/A
DCAA Auditor DoDAAC N/A
Other DoDAAC(s) N/A
(4) Payment Request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: Page 11 of 35
CONTINUED ON NEXT PAGE
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.
N/A
(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
(End of Clause)
THE FOLLOWING LINK IS FOR GOVERNMENT USE ONLY (PAYMENT INSTRUCTIONS)
https://www.acq.osd.mil/dpap/dars/pgi/pgi htm/PGI204 71.htm#payment instructions
(END OF SECTION G)
SECTION H – SPECIAL CONTRACT REQUIREMENTS
INSTALLATION SECURITY REQUIREMENTS:
In accordance with reference (a), Department of Defense (DoD) installations, property and personnel must be protected. Commanders have authority to take reasonably necessary and lawful measures to protect Installation property and personnel. Removal or denial actions will be based on reasonable grounds and be judiciously applied.
Section 21 of the Internal Security Act of 1950 (50 United States Code (U.S.C), 797), any directive issued by the Commander/Director of a military installation or facility, that include parameters for authorized entry to or exit from a military installation, is legally enforceable against all persons, whether or not those persons are subject to the Uniform Code of Military Justice. While on this installation, all personnel and the property under their control are subject to search.
PASS & ID:
The Visitor Center is located adjacent to ACP-3 at Building 2021, Mission Drive. The telephone number is 717-770-5653. Services include visitor processing and badge/pass issuance;
fingerprinting in support of personnel security requirements and facility access credential issuance/enrollment.
The ID Card office is located at Building 2001. The telephone number is 717-770-4910. Services include issuance of CACs, dependent IDs, civilian and military retiree IDs, CAC pin resets, e-mail address and DEERS updates. The ID Card office operates primarily on an appointment schedule, however walk-ins are welcome. Walk-in customers may experience longer wait times depending on the appointment volume. To schedule an appointment please go to the following website: https://rapids-appointments.dmdc.osd.mil/ and select site 170633.
The offices are closed the last Wednesday of the month at 1200 hours for training.
CONTRACTORS:
DBIDS BADGES AND PASSES: DBIDS badges and passes are locally produced credentials issued to visitors which authorize access to the Defense Distribution Center, Susquehanna after obtaining government sponsorship; identity proofing; and favorable vetting. DBIDS passes are issued for a visit of 14 days or less (Exception: commercial delivery operations). DBIDS badges are issued for visits more than 14 days and up to one year.
Contractors will be processed at the VC. All requests must be emailed (DSSusquehannaPassID@dla.mil) to the VC from the government representative and be properly completed in their entirety. Construction contractors with supplies or construction equipment in their vehicle must use ACP-4 (Normandy Drive) for entry.
Government/Commercial/Construction Deliveries/Vendors at ACP-4: All commercial delivery drivers entering ACP-4 will be processed by the DLA Installation Management Susquehanna Police. They will verify delivery schedule as well as identity proof and vet the individual prior to authorizing unescorted access. DBIDS passes will be issued for up to 90 days. Commercial https://www.acq.osd.mil/dpap/dars/pgi/pgi%20htm/PGI204%2071.htm%23payment%20instructions
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: Page 12 of 35
CONTINUED ON NEXT PAGE
delivery drivers in possession of a valid Transportation Workers Identification Card are considered identity proofed; however, must establish purpose and be vetted, with a favorable response, prior to enrolling the credential into the DBIDS system and allowing access to the installation. Government transportation drivers possessing a valid enrollable credential may be processed without additional vetting.
Control of DBIDS and Lenel Badges: Lost, stolen or compromised DBIDS and Lenel badges must be reported within 24-hours or next duty day, to the VC or ID Card Office. The individual must also complete a Lost Badge Form regarding the circumstances surrounding the loss. All stolen badges require a police report. The Lost Badge Form will be maintained by DLA Installation Management Susquehanna Security Management Branch.
All contractors will enter through Post 4 unless processing at the Pass & ID office. At no time will entrance be authorized through Post 3 for a Construction Contractor.
All vehicles are subject to inspection prior to installation access.
Requests by contractors for personnel access to the installation must be coordinated through the COR. Contractors are not authorized sponsors for visitors. No spouses or employees not assigned to work on a current project will be given access to the installation.
All badges issued at Pass & ID must be worn on the outer most garments, between the waist and shoulders, unless the wearing of the badge(s) would be a safety hazard. In this case, it must be on your person at all times. Anyone may be challenged for identification if the badge is not visible. Do not allow photographing or copying of government issued ID.
All visitors over 18 years of age are required to possess a Real ID compliant state or federal government form of photographic identification. Drivers will possess a valid driver’s license, state vehicle registration and current proof of insurance.
Contractor CACs and local badges: The Contracting Officer’s Representative will be responsible for the collection of CACs and local badges from contractors upon contract completion and/or termination. Collected cards will be delivered to the VC.
LOCAL SECURITY POLCIES & PROCEDURES:
Photography requests must be coordinated through the COR. All photographs must be vetted by security personnel before COB at Building 911, prior to departing the installation. Taking photographs in Restricted and Classified areas is prohibited.
DO NOT accept or remove government materials and/or construction supplies from the installation without appropriate approval. If this is found during a vehicle search at the ACP’s there can be legal and/or disciplinary action as well as barrment from the installation.
All personnel are encouraged to report suspicious activity. Should personnel observe behaviors such as unauthorized photography, prolonged periods of observation, unauthorized personnel in the work site, etc…, they should immediately contact the DLA Police.
Privately owned weapons are not authorized on Defense Distribution Center, Susquehanna.
Force Protection Condition advisory signs can be seen at the access control points and exterior building door entrances. The current FPCON is BRAVO. Any changes will be communicated from your COR. Construction activities may be curtailed or suspended with little or no notice based upon national emergencies or local contingency operations.
The DDSP Weather Alert Hotline (717) 770-2866 is for information regarding installation closures.
Radiation Permit: Possession and/or use of equipment that contains an ionizing radiation source on the installation requires permit authorization by the Installation Commander. Such use or possession of ionizing radiation must be in connection with an activity of the DoD or with a service to be performed on the installation for the benefit of the DoD, in accordance with 10 U.S.C. 2692(b)(1). Contractors will coordinate the permit application process through the Contracting Officer Representative and allow thirty days from the date of submission for approval.
Motor Vehicle Operations: Defense Distribution Center, Susquehanna follows Pennsylvania Vehicle Law for operation of motor vehicles. Drivers are required to be properly licensed for the type
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: Page 13 of 35
CONTINUED ON NEXT PAGE
or class of vehicle being driven. All vehicles being operated are required to be legally registered, with current proof of financial responsibility. If the vehicle is registered in Pennsylvania then a current certificate of inspection will be required.
The Mass Notification System is used to deliver public safety and protective measure information in the event of an emergency. Follow the instructions of the notification system which may include shelter-in-place and/or evacuation.
No security seals will be removed without the approval from the Security Management Branch or the Building Supervisor.
ELECTRONIC SECURITY REQUIREMENTS:
Any changes, modification or troubleshooting to any alarms, CCTV (Cameras) or duress buttons must be coordinated through the Security Management Branch prior to any work. In addition, any requests for shutting of power for any contract work must be vetted prior to any electric shutoff.
(End of Text)
(END OF SECTION H)
SECTION I – CONTRACT CLAUSES
FAR 52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS (JUN 2020)
FAR 52.204-2 ALT II SECURITY REQUIREMENTS (APR 1984)
FAR 52.204-9 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL (JAN 2011)
FAR 52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2016)
FAR 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEC 2014)
FAR 52.204-24 PROHIBITION OF CONTRACTING FOR CERTAIN TELECOMUNICATIONS AND VIDEO SURVEILLANCE
SERVICES OR EQUIPMENT (AUG 2020)
FAR 52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS (NOV 2015)
FAR 52.211-18 VARIATION IN ESTIMATED QUANTITY (APR 1984)
FAR 52.219-6 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (DEVIATION 2020-O0008)
FAR 52.219-28 POST AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (NOV 2020)
FAR 52.222-1 NOTICE TO THE GOVERNMENT OF LABOR DISPUTES (FEB 1997)
FAR 52.222-4 CONTRACT WORK HOURS AND SAFETY STANDARDS ACT – OVERTIME COMPRENSATION (MAY 2018)
FAR 52.222-6 CONSTRUCTION WAGE RATE REQUIREMENTS (AUG 2018)
FAR 52.222-7 WITHHOLDING OF FUNDS (MAY 2014)
FAR 52.222-8 PAYROLLS AND BASIC RECORDS (FEB 2021)
FAR 52.222-9 APPRENTICES AND TRAINEES (JUL 2005)
FAR 52.222-10 COMPLIANCE WITH COPELAND ACT REQUIREMENTS (FEB 1988)
FAR 52.222-11 SUBCONTRACTS (LABOR STANDARDS) (MAY 2014)
FAR 52.222-12 CONTRACT TERMINATION-DEBARMENT (MAY 2014)
FAR 52.222-13 COMPLIANCE WITH CONSTRUCTION WAGE RATE REQUIREMENTS AND RELATED REGULATIONS (MAY
2014)
FAR 52.222-14 DISPUTES CONCERNING LABOR STANDARDS (FEB 1988)
FAR 52.222-15 CERTIFICATION OF ELIGIBILITY (MAY 2014)
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: Page 14 of 35
CONTINUED ON NEXT PAGE
FAR 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT
OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
FAR 52.222-27 AFFIRMATIVE ACTION COMPLIANCE REQUIREMENTS FOR CONSTRUCTION (APR 2015)
FAR 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts (SEP 2013)
FAR 52.223-3 HAZARDOUS MATERIAL IDENITIFICATION AND MATERIAL SAFETY DATA (JAN 1997)
FAR 52.223-6 DRUG-FREE WORKPLACE (MAY 2001)
FAR 52.223-17 AFFIRMATIVE PROCUREMENT OF EPA-DESIGNATED ITEMS IN SERVICE AND CONSTRUCTION
CONTRACTS (MAY 2008)
FAR 52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE DRIVING (JUN 2020)
FAR 52.224-1 PRIVACY ACT NOTIFICATION (APR 1984)
FAR 52.224-2 PRIVACY ACT (APR 1984)
FAR 52.225-9 BUY AMERICAN ACT—CONSTRUCTION MATERIALS (FEB 2021)
FAR 52.227-4 PATENT INDEMNITY—CONSTRUCTION CONTRACTS (DEC 2007)
FAR 52.228-2 ADDITIONAL BOND SECURITY (OCT 1997)
FAR 52.228-5 INSURANCE – WORK ON A GOVERNMENT INSTALLATION (JAN 1997)
FAR 52.228-11 INDIVIDUAL SURETY-PLEDGES OF ASSETS (DEVIATION 2020-O0016)
FAR 52.228-12 PROSPECTIVE SUBCONTRACTOR REQUESTS FOR BONDS (MAY 2014)
FAR 52.228-14 IRREVOCABLE LETTER OF CREDIT (NOV 2014)
FAR 52.228-15 PERFORMANCE AND PAYMENT BONDS – CONSTRUCTION (DEVIATION 2020-O0016)
FAR 52.232-5 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (MAY 2014)
FAR 52.232-23 Alt I ASSIGNMENT OF CLAIMS (MAY 2014) ALTERNATE I (APR 1984)
FAR 52.232.27 PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS (MAY 2017)
FAR 52.236-2 DIFFERING SITE CONDITIONS (APR 1984)
FAR 52.236-3 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (APR 1984)
FAR 52.236-5 MATERIAL AND WORKMANSHIP (APR 1984)
FAR 52.236-6 SUPERINTENDENCE BY THE CONTRACTOR (APR 1984)
FAR 52.236-7 PERMITS AND RESPONSIBILITIES (NOV 1991)
FAR 52.236-8 OTHER CONTRACTS (APR 1984)
FAR 52.236-9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND
IMPROVEMENTS (APR 1984)
FAR 52.236-10 OPERATIONS AND STORAGE AREAS (APR 1984)
FAR 52.236-11 USE AND POSSESSION PRIOR TO COMPLETION (APR 1984)
FAR 52.236-12 CLEANING UP (APR 1984)
FAR 52.236-13 ACCIDENT PREVENTION (NOV 1991)
FAR 52.236-14 AVAILABILITY AND USE OF UTILITY SERVICES (APR 1984)
FAR 52.236-15 SCHEDULES FOR CONSTRUCTION CONTRACTS (APR 1984)
FAR 52.236-17 LAYOUT OF WORK (APR 1984)
FAR 52.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (FEB 1997)
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: Page 15 of 35
CONTINUED ON NEXT PAGE
ALTERNATE I (APR 1984)
FAR 52.236-26 PRECONSTRUCTION CONFERENCE (FEB 1995)
FAR 52.243-5 CHANGES AND CHANGED CONDITIONS (APR 1984)
FAR 52.249-10 DEFAULT (FIXED-PRICE CONSTRUCTION) (APR 1984)
DFARS 252.203-7000 REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALS (SEP 2011)
DFARS 252.203-7002 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS
(SEP 2013)
DFARS 252.204-7000 DISCLOSURE OF INFORMATION (OCT 2016)
DFARS 252.204-7003 CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCT (APR 1992)
DFARS 252.204-7004 ANTITERRORISM AWARENESS TRAINING FOR CONTRACTORS (FEB 2019)
DFARS 252.204-7012 SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER INCIDENT REPORTING (OCT 2016)
DFARS 252.204-7015 NOTICE OF AUTHORIZED DISCLOSURE OF INFORMATION FOR LITIGATION SUPPORT (MAY 2016)
DFARS 252.204-7018 PROHIBITION ON THE ACQUISITION OF COVERED DEFENSE TELECOMMUNICATIONS
EQUIPMENT OR SERVICES (JAN 2021)
DFARS 252.204-7020 NIST SP 800-171 DoD Assessment Requirements (NOV 2020)
DFARS 252.223-7006 PROHIBITION ON STORAGE AND DISPOSAL OF TOXIC AND HAZARDOUS MATERIALS (SEP
2014)
DFARS 252.223-7008 PROHIBITION OF HEXAVALENT CHROMIUM (JUN 2013)
DFARS 252.225-7012 PREFERENCE FOR CERTAIN DOMESTIC COMMODITIES (DEC 2017)
DFARS 252.225-7048 EXPORT-CONTROLLED ITEMS (JUNE 2013)
DFARS 252.225-7972 PROHIBITION ON THE PROCUREMENT OF FOREIGN-MADE UNMANNED AIRCRAFT SYSTEMS
(DEVIATION 2020-O0015) MAY 2020
DFARS 252.227-7033 RIGHTS IN SHOP DRAWINGS (APR 1966)
DFARS 252.232-7010 LEVIES ON CONTRACT PAYMENTS (DEC 2006)
DFARS 252.232-7017 ACCELERATING PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS--PROHIBITION ON
FEES AND CONSIDERATION (APR 2020)
DFARS 252.236-7000 MODIFICATION PROPOSALS-PRICE BREAKDOWN (DEC 1991)
DFARS 252.243-7001 PRICING OF CONTRACT MODIFICATIONS (DEC 1991)
DFARS 252.244-7000 SUBCONTRACTS FOR COMMERCIAL ITEMS (JAN 2021)
DFARS 252.247-7023 TRANSPORTATION OF SUPPLIES BY SEA (FEB 2019)
FAR 52.213-4 TERMS AND CONDITIONS—SIMPLIFIED ACQUISITIONS (OTHER THAN COMMERCIAL ITEMS) (FEB
2021) (MODIFIED)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses that are incorporated by reference:
(1) The clauses listed below implement provisions of law or Executive order:
(i) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: Page 16 of 35
CONTINUED ON NEXT PAGE
(ii) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (JUL 2018) (Section 1634 of Pub. L. 115-91).
(iii) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (AUG 2020) (Section 889(a)(1)(A) of Pub. L. 115-232).
(iv) 52.222-3, Convict Labor (JUN 2003) (E.O. 11755).
(v) 52.222-21, Prohibition of Segregated Facilities (APR 2015).
(vi) 52.222-26, Equal Opportunity (SEP 2016) (E.O. 11246).
(vii) 52.225-13, Restrictions on Certain Foreign Purchases (JUN 2008) (E.O.s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).
(viii) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).
(ix) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Pub. L. 108-77, 108- 78 (19 U.S.C. 3805 note).
(2) Listed below are additional clauses that apply:
(i) 52.232-1, Payments (APR 1984).
(ii) 52.232-8, Discounts for Prompt Payment (FEB 2002).
(iii) 52.232-11, Extras (APR 1984).
(iv) 52.232-25, Prompt Payment (JAN 2017).
(v) 52.232-39, Unenforceability of Unauthorized Obligations (JUN 2013).
(vi) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (DEC 2013).
(vii) 52.233-1, Disputes (MAY 2014).
(viii) 52.244-6, Subcontracts for Commercial Items (NOV 2020)
(ix) 52.253-1, Computer Generated Forms (JAN 1991).
(b) The Contractor shall comply with the following FAR clauses, incorporated by reference, unless the circumstances do not apply:
(1) The clauses listed below implement provisions of law or Executive order:
(i) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (JUN 2020) (Pub. L. 109-282) (31 U.S.C. 6101 note) (Applies to contracts valued at or above the threshold specified in FAR 4.1403(a) on the date of award of this contract).
(ii) 52.222-19, Child Labor—Cooperation with Authorities and Remedies (JAN 2020) (E.O.
13126) (Applies to contracts for supplies exceeding the micro-purchase threshold, as defined in FAR 2.101 on the date of award of this contract).
(iii) 52.222-20, Contracts for Materials, Supplies, Articles, and Equipment (JUN 2020) (41 U.S.C. chapter 65) (Applies to supply contracts over the threshold specified in FAR 22.602 on the date of award of this contract, in the United States, Puerto Rico, or the U.S. Virgin Islands).
(iv) 52.222-35, Equal Opportunity for Veterans (JUN 2020) (38 U.S.C. 4212) (Applies to contracts valued at or above the threshold specified in FAR 22.1303(a) on the date of award of this contract).
(v) 52.222-36, Equal Employment for Workers with Disabilities (JUN 2020) (29 U.S.C. 793) (Applies to contracts over the threshold specified in FAR 22.1408(a) on the date of award of this contract, unless the work is to be performed outside the United States by employees recruited outside the United States). (For purposes of this clause, “United States” includes the 50 States, the District of Columbia, Puerto Rico, the Northern Mariana Islands, American Samoa, Guam, the U.S. Virgin Islands, and Wake Island.)
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: Page 17 of 35
CONTINUED ON NEXT PAGE
(vi) 52.222-37, Employment Reports on Veterans (JUN 2020)(38 U.S.C. 4212) (Applies to contracts valued at or above the threshold specified in FAR 22.1303(a) on the date of award of this contract).
(vii) 52.222-41, Service Contract Labor Standards (AUG 2018) (41 U.S.C. chapter 67) (Applies to service contracts over $2,500 that are subject to the Service Contract Labor Standards statute and will be performed in the United States, District of Columbia, Puerto Rico, the Northern Mariana Islands, American Samoa, Guam, the U.S. Virgin Islands, Johnston Island, Wake Island, or the outer Continental Shelf).
(viii)(A) 52.222-50, Combating Trafficking in Persons (OCT 2020) (22 U.S.C. chapter 78 and E.O. 13627) (Applies to all solicitations and contracts).
(B) Alternate I (MAR 2015) (Applies if the Contracting Officer has filled in the following information with regard to applicable directives or notices: Document title(s), source for obtaining document(s), and contract performance location outside the United States to which the document applies).
(ix) 52.222-55, Minimum Wages Under Executive Order 13658 (NOV 2020) (Applies when 52.222-6 or 52.222-41 are in the contract and performance in whole or in part is in the United States (the 50 States and the District of Columbia)).
(x) 52.222-62, Paid Sick Leave Under Executive Order 13706 (JAN 2017) (E.O. 13706) (Applies when 52.222-6 or 52.222-41 are in the contract and performance in whole or in part is in the United States (the 50 States and the District of Columbia.))
(xi) 52.223-5, Pollution Prevention and Right-to-Know Information (MAY 2011) (E.O. 13423) (Applies to services performed on Federal facilities).
(xii) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (JUN 2016) (E.O. 13693)(applies to contracts for products as prescribed at FAR 23.804(a)(1)).
(xiii) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (JUN 2016) (E.O. 13693) (Applies to maintenance, service, repair, or disposal of refrigeration equipment and air conditioners).
(xiv) 52.223-15, Energy Efficiency in Energy-Consuming Products (MAY 2020) (42 U.S.C. 8259b) (Unless exempt pursuant to 23.204, applies to contracts when energy-consuming products listed in the ENERGY STAR® Program or Federal Energy Management Program (FEMP) will be—
(A) Delivered;
(B) Acquired by the Contractor for use in performing services at a Federally-controlled facility;
(C) Furnished by the Contractor for use by the Government; or
(D) Specified in the design of a building or work, or incorporated during its construction, renovation, or maintenance).
(xv) 52.223-20, Aerosols (JUN 2016) (E.O. 13693) (Applies to contracts for products that may contain high global warming potential hydrofluorocarbons as a propellant or as a solvent; or contracts for maintenance or repair of electronic or mechanical devices).
(xvi) 52.223-21, Foams (JUN 2016) (E.O. 13693) (Applies to contracts for products that may contain high global warming potential hydrofluorocarbons or refrigerant blends containing hydrofluorocarbons as a foam blowing agent; or contracts for construction of buildings or facilities.
(xvii) (DELETED)
(xviii) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (JUN 2020) (42 U.S.C. 1792) (Applies to contracts greater than the threshold specified in FAR 26.404 on the date of award of this contract, that provide for the provision, the service, or the sale of food in the United States).
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: Page 18 of 35
CONTINUED ON NEXT PAGE
(xix) 52.232-33, Payment by Electronic Funds Transfer—System for Award Management (OCT 2018) (Applies when the payment will be made by electronic funds transfer (EFT) and the payment office uses the System for Award Management (SAM) as its source of EFT information).
(xx) 52.232-34, Payment by Electronic Funds Transfer—Other than System for Award Management (JUL 2013) (Applies when the payment will be made by EFT and the payment office does not use the SAM database as its source of EFT information.)
(xxi) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (FEB 2006) (46 U.S.C. App. 1241) (Applies to supplies transported by ocean vessels (except for the types of subcontracts listed at 47.504(d).)
(2) Listed below are additional clauses that may apply:
(i) 52.204-21, Basic Safeguarding of Covered Contractor Information Systems (JUN 2016) (Applies to contracts when the contractor or a subcontractor at any tier may have Federal contract information residing in or transiting through its information system.
(ii) 52.209-6, Protecting the Government's…
This is the start of the file's text. The full file is on GovTribe.