Appendix 1 site photos.pdf
PDF 43 MB Posted
- Attached to
- Replace Roof Building 300 Federal contract opportunity
- Solicitation number
- SP3300-21-Q-0056
- Issued by
- Defense Logistics Agency Distribution
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 0001.pdf | ||
| Site Visit Notes and Attendance Sheet.pdf | ||
| Attachment 3 SF25A (Payment Bond).pdf | ||
| Attachment 8 Submittal Register.pdf | ||
| Attachment 5 Project Division 1 Specifications.pdf | ||
| Attachment 6 Project Technical Specifications.pdf | ||
| Attachment 2 SF25 (Performance Bond).pdf | ||
| Attachment 7 Drawings.pdf | ||
| Attachment 4 Wage Determination.pdf | ||
| Attachment 1 SF24 - Bid Bond.pdf | ||
| RFQ SP3300-21-Q-0056.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
Picture 1
Picture 2
Picture 3
Picture 4
Picture 5
Picture 6
Picture 7
Picture 8
Picture 9
Picture 10
Picture 11
Picture 12
Picture 13
Picture 14
Picture 15
Picture 16
Picture 17
Picture 18
Picture 19
Picture 20
Picture 21
Picture 22
Picture 23
Picture 24
Picture 25
Picture 26
Picture 27
Picture 28
Picture 29
Picture 30
Picture 31
Picture 32
Picture 33
Picture 34
Picture 35
Picture 36 (Fascia)
Picture 36A (Fascia)
Picture 37
Picture 38
Picture 38A
Picture 39
Picture 40
Picture 41
Picture 42
Picture 43
Picture 43A
Picture 43B
Picture 43C (Fascia)
Picture 44
Picture 45
Picture 46
Picture 47
Picture 48
Picture 48
Picture 49
Picture 49A - (Ponding Water)
Picture 50 – (Gas Line)
Picture 50A – (Gas Line Support)
Picture 51
Picture 51A
Picture 51B
Picture 51C
Picture 52
Picture 53
Picture 53A
Picture 53B
Picture 54
Picture 55
Picture 56
Picture 57
Picture 58
Picture 59
Picture 60
Picture 61
Picture 62
Picture 62A
Picture 63
Picture 64
Picture 65
Picture 66
Picture 67
Picture 68
Picture 69
Picture 70
Picture 71
Picture 72
Picture 73
Picture 74
Picture 75
Picture 76
Picture 77
Appendix 1
Existing Conditions Photos Taken on June 02, 2020
(Refer to drawing G-002 for locations where picture were taken)
Appendix includes the following attached pdf files:
1. Pictures 1 to 14.pdf
2. Pictures 15 to 30.pdf
3. Pictures 31 to 45.pdf
4. Pictures 46 to 51B.pdf
5. Pictures 51C to 60.pdf
6. Pictures 61 to 69.pdf
7. Pictures 70 to 77.pdf
File details come from the government source that posted it. Updated .