Attachment 8 Submittal Register.pdf

PDF 294 KB Posted

Attached to
Replace Roof Building 300 Federal contract opportunity
Solicitation number
SP3300-21-Q-0056
Issued by
Defense Logistics Agency Distribution

View the file

Other files for this federal contract opportunity

Other files attached to Replace Roof Building 300, newest first.
File Type Posted
Amendment 0001.pdf PDF
Site Visit Notes and Attendance Sheet.pdf PDF
Appendix 1 site photos.pdf PDF
Attachment 3 SF25A (Payment Bond).pdf PDF
Attachment 7 Drawings.pdf PDF
Attachment 4 Wage Determination.pdf PDF
Attachment 1 SF24 - Bid Bond.pdf PDF
RFQ SP3300-21-Q-0056.pdf PDF
Attachment 5 Project Division 1 Specifications.pdf PDF
Attachment 6 Project Technical Specifications.pdf PDF
Attachment 2 SF25 (Performance Bond).pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DESCRIPTION OF ITEM SUBMITTED

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l1) (l2) (m) (n) (o) (p) (q1) (q2) (r)

01 PS Construction Sequence 1.7 G

01 PS List of Contact Personnel 1.4.1.1 G

01 PS Project Schedule 3.5 G

01 PS Submittal Register 1.3 G 01 PS Schedule of Values 1.3 G 01 PS Preliminary Construction Schedule 1.3 G 01 PS Health and Safety Plan 1.3 G 01 PS Quality Control (QC) Plan 1.3 G 01 PS Environmental Plan 1.3 G

01 PS Accident Prevention Plan (APP) 1.6 G 01 PS Activity Hazard Analysis (AHA) 1.8 G

01 PS Fall Protection and Prevention Plan (FP&P) 1.6.1 d G

01 PS Demoltion Plan 1.6.1 f G 07 C License Certificates 1.3

07 C Contractor Safety Self-Evaluation Checklist 1.3

07 C Quality Control Report 1.3

07 C Machinery & Mechanized Equip.

Certification Form 1.3

01 PS QC Plan 1.5 G

01 11 00, Summary of Work

01 14 00, Work Restrictions

01 78 00, Close-Out Submittals

01 32 01.00 10, Project Schedule

01 33 00, Submittal Procedures

01 35 26, Government Safety Requirements

01 45 00.00 10, Quality Control for Minor Construction

REMARKSSUBMIT

APPROVAL

NEEDED BY:

MATERIAL

NEEDED

BY:

A C T I O N

C O D E

DATE OF

ACTION

D A T E

F O R W A R D E D

T O

R E V I E W E R

D A T E

R E C E I V E D

F R O M

R E V I E W E R

A C T I O N

C O D E

DATE OF

ACTION

D A T E

R E C E I V E D

F R O M

C O N T R A C T O R

D A T E

F O R W A R D E D

T O

A P P R O V I N G

A U T H O R I T Y

APPROVING AUTHORITY

D A T E

R E C E I V E D

F R O M

A P P R O V I N G

A U T H O R I T Y

D A T E

M A I L E D

T O

C O N T R A C T O R

PS - PRECONSTRUCTION SUBMITTALS

SD - SHOP DRAWING

PD - PRODUCT DATA

S - SAMPLES

DD - DESIGN DATA

TR - TEST REPORTS

C - CERTIFICATES

MI - MANUFACTURER'S INSTRUCTIONS

MFR - MANUFACTURER'S FIELD

REPORTS

O&M - OPERATING AND MAINTENANCE

CS - CLOSE-OUT SUBMITTALS

P A R A G R A P H

N U M B E R

C L A S S I F I C A T I O N

G O V E R N M E N T

O R

A E

R E V I E W E R

CONTRACTOR

SCHEDULE DATES

CONTRACTOR

ACTION

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E F I C I A T I O N

S E C T I O N

S U B M I T T A L

D O C U M E

T

Y P E

S U B M I T T A L

D O C U M E

D

S C R I P T I O N

SUBMITTAL REGISTER

Division 1 - General Requirements

CONTRACT NO:

TITLE: Construction Services CONTRACTOR:LOCATION: Defense Distribution Center, Susquehanna

JOB NAME: Re-Roof Building 300

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l1) (l2) (m) (n) (o) (p) (q1) (q2) (r)

REMARKSSUBMIT

APPROVAL

NEEDED BY:

MATERIAL

NEEDED

BY:

A C T I O N

C O D E

DATE OF

ACTION

D A T E

F O R W A R D E D

T O

R E V I E W E R

D A T E

R E C E I V E D

F R O M

R E V I E W E R

A C T I O N

C O D E

DATE OF

ACTION

D A T E

R E C E I V E D

F R O M

C O N T R A C T O R

D A T E

F O R W A R D E D

T O

A P P R O V I N G

A U T H O R I T Y

APPROVING AUTHORITY

D A T E

R E C E I V E D

F R O M

A P P R O V I N G

A U T H O R I T Y

D A T E

M A I L E D

T O

C O N T R A C T O R

PS - PRECONSTRUCTION SUBMITTALS

SD - SHOP DRAWING

PD - PRODUCT DATA

S - SAMPLES

DD - DESIGN DATA

TR - TEST REPORTS

C - CERTIFICATES

MI - MANUFACTURER'S INSTRUCTIONS

MFR - MANUFACTURER'S FIELD

REPORTS

O&M - OPERATING AND MAINTENANCE

CS - CLOSE-OUT SUBMITTALS

P A R A G R A P H

N U M B E R

C L A S S I F I C A T I O N

G O V E R N M E N T

O R

A E

R E V I E W E R

CONTRACTOR

SCHEDULE DATES

CONTRACTOR

ACTION

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E F I C I A T I

C T I O N

S U B M I T T A L

D O C U M E

P E

S U B M I T T A L

D O C U M E

S C R I P T I O N

SUBMITTAL REGISTER

Division 1 - General Requirements

CONTRACT NO:

TITLE: Construction Services CONTRACTOR:LOCATION: Defense Distribution Center, Susquehanna

JOB NAME: Re-Roof Building 300

03 PD As-Built Record of Equipment and Materials 1.3.5 G

03 PD Final Approved Shop Drawings 1.2 G

03 PD Warranty Management Plan 1.4.1 G 08 MI Manufacturer's Instructions 1.2 10 O&M Operation and Maintenance Manuals 1.5 G 11 CS Record Drawings (CAD Drawings) 1.3.2.1 G 11 CS Record Drawings (Full Size Prints) 1.3.2.2 G

1/11/2021 Page 1 of 1

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l1) (l2) (m) (n) (o) (p) (q1) (q2) (r)

01 PS Existing Conditions 1.8 07 C Demolition Plan 1.2.2 G 11 CS Receipts 3.2

02 SD Detailed Drawings 1.3 G 03 PD Asbestos Waste Shipment Records 3.10.3.1 G 03 PD Encapsulants 2.1 G 03 PD Respiratory Protection Program 1.8.1 G 03 PD Cleanup and Disposal 3.10 G 03 PD Qualifications 1.5.1 G 03 PD Training Program 1.10 03 PD Licenses, Permits and Notifications 1.7.1 G 03 PD Asbestos Management Plan 3.10.3.2 G 07 C Encapsulants 2.1 G 07 C Medical Surveillance Requirements 1.8

02 82 14.00 10, Asbestos Hazard Control Activities

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E F I C I A T I

C T I O N

S U B M I T T A L

D O C U M E

P E

S U B M I T T A L

D O C U M E

S C R I P T I O N

SUBMITTAL REGISTER

Division 2 - Existing Conditions

TITLE: Construction Services CONTRACTOR:LOCATION: Defense Distribution Center, Susquehanna

JOB NAME: Re-Roof Building 300

CONTRACT NO:

D A T E

F O R W A R D E D

T O

A P P R O V I N G

A U T H O R I T Y

D A T E

M A I L E D

T O

C O N T R A C T O

R REMARKS

D A T E

F O R W A R D E D

T O

R E V I E W E R

02 41 00, Demolition

PS - PRECONSTRUCTION SUBMITTALS

SD - SHOP DRAWING

PD - PRODUCT DATA

S - SAMPLES

DD - DESIGN DATA

TR - TEST REPORTS

C - CERTIFICATES

MI - MANUFACTURER'S INSTRUCTIONS

MFR - MANUFACTURER'S FIELD

REPORTS

O&M - OPERATING AND MAINTENANCE

CS - CLOSE-OUT SUBMITTALS

DATE OF

ACTION

APPROVING AUTHORITY

D A T E

R E C E I V E D

F R O M

A P P R O V I N G

A U T H O R I T Y

D A T E

R E C E I V E D

F R O M

R E V I E W E R

A C T I O N

C O D

ESUBMIT

APPROVAL

NEEDED BY:

MATERIAL

NEEDED

BY:

A C T I O N

C O D E

DAT

E OF

ACTI

ON

C L A S S I F I C A T I O N

G O V E R N M E N T

O R

A E

R E V I E W E R

CONTRACTOR

SCHEDULE DATES

CONTRA

CTOR

D A T E

R E C E I V E D

F R O M

C O N T R A C T O R

P A R A G R A P H

N U M B

R

1/5/2021 Page 1 of 1

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l1) (l2) (m) (n) (o) (p) (q1) (q2) (r)

02 SD Nailing Strips 3.2 G

06 TR Preservative-treated Lumber and Plywood 1.4.3

07 C Certificates of Grade 1.9.1

SUBMITTAL REGISTER

Division 6 - Wood, Plastics, and Composites

TITLE: Construction Services CONTRACTOR:LOCATION: Defense Distribution Center, Susquehanna

JOB NAME: Re-Roof Building 300

CONTRACT NO:

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E F I C I A T I

C T I O N

S U B M I T T A L

D O C U M E

P E

S U B M I T T A L

D O C U M E

S C R I P T I O

N REMARKSSUBMIT

APPROVAL

NEEDED BY:

MATERIAL

NEEDED

BY:

A C T I O N

C O D E

DAT

E OF

ACTI

ON

D A T E

F O R W A R D E D

T O

R E V I E W E R

CONTRACTOR

SCHEDULE DATES

CONTRA

CTOR

D A T E

R E C E I V E D

F R O M

C O N T R A C T O R

D A T E

F O R W A R D E D

T O

A P P R O V I N G

A U T H O R I T Y

A C T I O N

C O D E

DATE OF

ACTION

APPROVING AUTHORITY

D A T E

R E C E I V E D

F R O M

A P P R O V I N G

A U T H O R I T Y

D A T E

M A I L E D

T O

C O N T R A C T O R

06 10 00, Rough Carpentry

D A T E

R E C E I V E D

F R O M

R E V I E W E R

P A R A G R A P H

N U M B E R

C L A S S I F I C A T I O N

G O V E R N M E N T

O R

A E

R E V I E W E R

PS - PRECONSTRUCTION SUBMITTALS

SD - SHOP DRAWING

PD - PRODUCT DATA

S - SAMPLES

DD - DESIGN DATA

TR - TEST REPORTS

C - CERTIFICATES

MI - MANUFACTURER'S INSTRUCTIONS

MFR - MANUFACTURER'S FIELD

REPORTS

O&M - OPERATING AND MAINTENANCE

CS - CLOSE-OUT SUBMITTALS

1/5/2021 Page 1 of 3

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l1) (l2) (m) (n) (o) (p) (q1) (q2) (r)

02 SD Insulation Board, Tapered Insulation Layout and Attachment 2.1 & 2.1.6 G

02 SD Verification of Existing Conditions 1.2 G 03 PD Insulation 2.1 G 03 PD Cover Board 2.2 G 03 PD Fasteners 2.3 G 03 PD Recycled Content for Insulation 2.1.2

06 TR Flame Spread Rating 1.7 G

07 C Installer Qualifications 1.6 G

07 C Indoor Air Quality for Insulation 2.1.3 08 MI Nails and Fasteners 2.3 G 08 MI Roof Insulation 2.1 & 2.1.6 G

02 SD Roof Plan Drawing 1.3.1 02 SD Wind Load Calculations 1.4.4 02 SD Boundaries of Enhanced Perimeter 1.3.1

02 SD Corner Attachments of Roof System Components 1.3.1

02 SD Location of Perimeter Half-Sheets 1.3.1

02 SD Spacing of Perimeter, Corner, and Infield Fasteners 1.3.1

02 SD Slopes and Drain Locations 3.3.3 03 PD Cement 2.2 03 PD EPDM Sheet 2.1.1 G 03 PD Seam Tape 2.1.2 03 PD Bonding Adhesive 2.1.4 03 PD Lap Splice Adhesive 2.1.3 03 PD Water Cutoff Mastic/Water Block 2.1.6

03 PD Lap Cleaner, Lap Sealant, and Edge Treatment 2.1.5

SUBMITTAL REGISTER

Division 7 - Thermal and Moisture Protection

CONTRACT NO:

TITLE: Construction Services CONTRACTOR:LOCATION: Defense Distribution Center, Susquehanna

JOB NAME: Re-Roof Building 300

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E F I C I A T I

C T I O N

S U B M I T T A L

D O C U M E

P E

S U B M I T T A L

D O C U M E

S C R I P T I O N

D A T E

R E C E I V E D

F R O M

A P P R O V I N G

A U T H O R I T Y

D A T E

M A I L E D

T O

C O N T R A C T O

R REMARKSSUBMIT

APPROVAL

NEEDED BY:

MATERIAL

NEEDED

BY:

A C T I O N

C O D E

DAT

E OF

ACTI

ON

D A T E

F O R W A R D E D

T O

R E V I E W E R

CONTRACTOR

SCHEDULE DATES

CONTRA

CTOR

D A T E

R E C E I V E D

F R O M

C O N T R A C T O R

D A T E

F O R W A R D E D

T O

A P P R O V I N G

A U T H O R I T Y

D A T E

R E C E I V E D

F R O M

R E V I E W E R

A C T I O N

C O D E

DATE OF

ACTION

07 22 00, Roof and Deck Insulation

APPROVING AUTHORITY

07 53 23, Ethylene-Propylene-Diene-Monomer (EPDM) Roofing

P A R A G R A P H

N U M B E R

C L A S S I F I C A T I O N

G O V E R N M E N T

O R

A E

R E V I E W E R

PS - PRECONSTRUCTION SUBMITTALS

SD - SHOP DRAWING

PD - PRODUCT DATA

S - SAMPLES

DD - DESIGN DATA

TR - TEST REPORTS

C - CERTIFICATES

MI - MANUFACTURER'S INSTRUCTIONS

MFR - MANUFACTURER'S FIELD

REPORTS

O&M - OPERATING AND MAINTENANCE

CS - CLOSE-OUT SUBMITTALS

1/5/2021 Page 2 of 3

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l1) (l2) (m) (n) (o) (p) (q1) (q2) (r)

SUBMITTAL REGISTER

Division 7 - Thermal and Moisture Protection

CONTRACT NO:

TITLE: Construction Services CONTRACTOR:LOCATION: Defense Distribution Center, Susquehanna

JOB NAME: Re-Roof Building 300

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E F I C I A T I

C T I O N

S U B M I T T A L

D O C U M E

P E

S U B M I T T A L

D O C U M E

S C R I P T I O N

D A T E

R E C E I V E D

F R O M

A P P R O V I N G

A U T H O R I T Y

D A T E

M A I L E D

T O

C O N T R A C T O

R REMARKSSUBMIT

APPROVAL

NEEDED BY:

MATERIAL

NEEDED

BY:

A C T I O N

C O D E

DAT

E OF

ACTI

ON

D A T E

F O R W A R D E D

T O

R E V I E W E R

CONTRACTOR

SCHEDULE DATES

CONTRA

CTOR

D A T E

R E C E I V E D

F R O M

C O N T R A C T O R

D A T E

F O R W A R D E D

T O

A P P R O V I N G

A U T H O R I T Y

D A T E

R E C E I V E D

F R O M

R E V I E W E R

A C T I O N

C O D E

DATE OF

ACTION

APPROVING AUTHORITY

P A R A G R A P H

N U M B E R

C L A S S I F I C A T I O N

G O V E R N M E N T

O R

A E

R E V I E W E R

PS - PRECONSTRUCTION SUBMITTALS

SD - SHOP DRAWING

PD - PRODUCT DATA

S - SAMPLES

DD - DESIGN DATA

TR - TEST REPORTS

C - CERTIFICATES

MI - MANUFACTURER'S INSTRUCTIONS

MFR - MANUFACTURER'S FIELD

REPORTS

O&M - OPERATING AND MAINTENANCE

CS - CLOSE-OUT SUBMITTALS

03 PD Flashings 2.1.7

03 PD Flashing Accessories 2.1.7 03 PD Flashing Tape 2.1.7.1 03 PD Fasteners and Plates 2.1.8 03 PD Roof Insulation 2.1.11 03 PD Pre-Manufactured Accessories 2.1.9 03 PD Sample Warranty Certificate 1.8 G 05 DD Wind Uplift Calculations 1.4.4 G 07 C Qualification of Manufacturer 1.4.1 07 C Qualification of Applicator 1.4.2 07 C Wind Uplift Resistance Classification 1.4.4 G 07 C Fire Resistance Classification 1.4.3 G 08 MI Application 3.2 G 08 MI Membrane Flashing 3.3.2 G 08 MI Seam Tape 2.1.2 08 MI Tape Seams / Lap Splices 3.2.4 08 MI Perimeter Attachment 3.2.5 08 MI Fasteners 2.1.8 08 MI Pre-Manufactured Accessories 3.3.4 08 MI Cold Weather Installation 1.6 G 11 CS Warranty Information Card 3.10 11 CS Instructions To Government Personnel 3.9 11 CS Safety Data Sheets 1.3

02 SD Expsosed Sheet Metal Coverings 2.2.1 G 02 SD Gutters 3.1.15 G 02 SD Downspouts 3.1.16 G 02 SD Gravel Stops and Fascia 3.1.14 G 02 SD Flashing for Roof Drains 3.1.17 G 02 SD Base Flashing 3.1.10 G

07 60 00, Flashing and Sheet Metal

1/5/2021 Page 3 of 3

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l1) (l2) (m) (n) (o) (p) (q1) (q2) (r)

SUBMITTAL REGISTER

Division 7 - Thermal and Moisture Protection

CONTRACT NO:

TITLE: Construction Services CONTRACTOR:LOCATION: Defense Distribution Center, Susquehanna

JOB NAME: Re-Roof Building 300

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E F I C I A T I

C T I O N

S U B M I T T A L

D O C U M E

P E

S U B M I T T A L

D O C U M E

S C R I P T I O N

D A T E

R E C E I V E D

F R O M

A P P R O V I N G

A U T H O R I T Y

D A T E

M A I L E D

T O

C O N T R A C T O

R REMARKSSUBMIT

APPROVAL

NEEDED BY:

MATERIAL

NEEDED

BY:

A C T I O N

C O D E

DAT

E OF

ACTI

ON

D A T E

F O R W A R D E D

T O

R E V I E W E R

CONTRACTOR

SCHEDULE DATES

CONTRA

CTOR

D A T E

R E C E I V E D

F R O M

C O N T R A C T O R

D A T E

F O R W A R D E D

T O

A P P R O V I N G

A U T H O R I T Y

D A T E

R E C E I V E D

F R O M

R E V I E W E R

A C T I O N

C O D E

DATE OF

APPROVING AUTHORITY

P A R A G R A P H

N U M B E R

C L A S S I F I C A T I O N

G O V E R N M E N T

O R

A E

R E V I E W E R

PS - PRECONSTRUCTION SUBMITTALS

SD - SHOP DRAWING

PD - PRODUCT DATA

S - SAMPLES

DD - DESIGN DATA

TR - TEST REPORTS

C - CERTIFICATES

MI - MANUFACTURER'S INSTRUCTIONS

MFR - MANUFACTURER'S FIELD

REPORTS

O&M - OPERATING AND MAINTENANCE

CS - CLOSE-OUT SUBMITTALS

02 SD Counterflashing 3.1.11 G

02 SD Flashing at Roof Penetrations and Equipment Supoports 3.1.19 G

02 SD Caulked Reglets 2.2.8.2 a G 04 S Finish Samples 1.4.2 G 08 MI Instructions for Installation 1.4.3 G 08 MI Quality Control Plan 1.4.3 G 10 O&M Cleaning and Maintenance 1.4.3 G

03 PD Sealants 2.1.1 G 03 PD Primers 2.2 G 03 PD Bond Breaker 2.3 G 03 PD Backstops 2.4 G 06 TR Field Adhesion 3.1 G

07 92 00, Joint Sealant

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l1) (l2) (m) (n) (o) (p) (q1) (q2) (r)

02 SD Duct Insulation Systems 2.4 03 PD Certification 1.4.2 03 PD Duct Insulation Systems 2.4 G 08 MI Duct Insulation Systems 3.3 G

S U B M I T T A L

D O C U M E N T

T Y P E

S U B M I T T A L

D O C U M E N T

D E S C R I P T I O N

P A R A G R A P H

N U M B E R

C L A S S I F I C A T I O N

G O V E R N M E N T

O R

A E

R E V I E W E R

PS - PRECONSTRUCTION SUBMITTALS

SD - SHOP DRAWING

PD - PRODUCT DATA

S - SAMPLES

DD - DESIGN DATA

TR - TEST REPORTS

C - CERTIFICATES

MI - MANUFACTURER'S INSTRUCTIONS

MFR - MANUFACTURER'S FIELD

REPORTS

O&M - OPERATING AND MAEINTENANCE

CS - CLOSE-OUT SUBMITTALS

SUBMITTAL REGISTER

DIVISION 23 - Heating, Ventilation, and Air-Conditioning

CONTRACT NO:

JOB NAME:

TITLE: Construction Services LOCATION: Defense Distribution Center, Susquehanna CONTRACTOR:

CONTRACTOR

SCHEDULE DATES

CONTRACTOR

ACTION APPROVING AUTHORITY

D A T E

R E C E I V E D

F R O M

C O N T R A C T O R

D A T E

F O R W A R D E D

T O

A P P R O V I N G

A U T H O R I T Y

23 07 00, Thermal Insulation for Mechanical Systems

D A T E

R E C E I V E D

F R O M

A P P R O V I N G

A U T H O R I T Y

D A T E

M A I L E D

T O

C O N T R A C T O

R REMARKS

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E F I C I A T I O N

S E C T I O

N SUBMIT

APPROVAL

NEEDED BY:

MATERIAL

NEEDED

BY:

A C T I O N

C O D E

DATE OF

ACTION

D A T E

F O R W A R D E D

T O

R E V I E W E R

D A T E

R E C E I V E D

F R O M

R E V I E W E R

A C T I O N

C O D E

DATE OF

1/7/2021 Page 1 of 1 Submittal Register, Div 23

Submittal Register Div 1
Submittal Register
Submittal Register Div 2
Submittal Register
Submittal Register Div 6
Submittal Register
Submittal Register Div 7
Submittal Register
Submittal Register Div 2.pdf
Submittal Register

File details come from the government source that posted it. Updated .