Attachment 6 Project Technical Specifications.pdf

PDF 11 MB Posted

Attached to
Replace Roof Building 300 Federal contract opportunity
Solicitation number
SP3300-21-Q-0056
Issued by
Defense Logistics Agency Distribution

View the file

Other files for this federal contract opportunity

Other files attached to Replace Roof Building 300, newest first.
File Type Posted
Amendment 0001.pdf PDF
Site Visit Notes and Attendance Sheet.pdf PDF
Appendix 1 site photos.pdf PDF
Attachment 3 SF25A (Payment Bond).pdf PDF
Attachment 8 Submittal Register.pdf PDF
Attachment 5 Project Division 1 Specifications.pdf PDF
Attachment 2 SF25 (Performance Bond).pdf PDF
Attachment 7 Drawings.pdf PDF
Attachment 4 Wage Determination.pdf PDF
Attachment 1 SF24 - Bid Bond.pdf PDF
RFQ SP3300-21-Q-0056.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Specifications Defense Distribution Center, Susquehanna New Cumberland. PA

Section 02 41 00 – Demolition Page 1 of 10

SECTION 02 41 00

DEMOLITION

05/10

TABLE OF CONTENTS

GENERAL

1.1 REFERENCES

1.2 PROJECT DESCRIPTION

Definitions Demolition/Deconstruction Plan General Requirements

1.3 ITEMS TO REMAIN IN PLACE

Existing Construction Limits and Protection Weather Protection Trees Utility Service Facilities

1.4 BURNING

1.5 SUBMITTALS

1.6 QUALITY ASSURANCE

Dust and Debris Control

1.7 RELOCATIONS

1.8 EXISTING CONDITIONS

PRODUCTS

NOT USED

EXECUTION

3.1 EXISTING FACILITIES TO BE REMOVED

Roofing Carpentry

3.2 DISPOSITION OF MATERIAL

Title to Materials Reuse of Materials and Equipment Salvaged Materials and Equipment Unsalvageable and Non-Recyclable Material

Section 02 41 00 – Demolition Page 2 of 10

3.3 CLEANUP

3.4 DISPOSAL OF REMOVED MATERIALS

Regulation of Removed Materials Burning on Government Property Removal from Government Property

3.5 REUSE OF SALVAGED ITEMS

Section 02 41 00 – Demolition Page 3 of 10

SECTION 02 41 00

DEMOLITION

05/10

GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AIR-CONDITIONING, HEATING AND REFRIGERATION INSTITUTE (AHRI)

AHRI Guideline K (2009) Guideline for Containers for Recovered Non-Flammable

Fluorocarbon Refrigerants

AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION

OFFICIALS (AASHTO)

AASHTO M 145 (1991; R 2012) Standard Specification for Classification of Soils and Soil- Aggregate Mixtures for Highway Construction Purposes

AASHTO T 180 (2017) Standard Method of Test for Moisture-Density Relations of Soils Using a 4.54-kg (10-lb) Rammer and a 457-mm (18-in.) Drop

AMERICAN SOCIETY OF SAFETY PROFESSIONALS (ASSP)

ASSP A10.6 (2006) Safety & Health Program Requirements for Demolition Operations -

American National Standard for Construction and Demolition Operations

CARPET AND RUG INSTITUTE (CRI)

CRI 104 (2015) Carpet Installation Standard for Comnmercial Carpet

CRI 105 (2015) Carpet Installation Standard for Residential Carpet

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2014) Safety and Health Requirements Manual

U.S. DEFENSE LOGISTICS AGENCY (DLA)

DLA 4145.25 (Jun 2000; Reaffirmed Oct 2010) Storage and Handling of Liquefied and Gaseous

Compressed Gases and Their Full and Empty Cylinders http://www.aviation.dla.mil/UserWeb/aviationengineerin

U.S. DEPARTMENT OF DEFENSE (DOD)

DOD 4000.25-1-M (2006) MILSTRIP - Military Standard Requisitioning and Issue Procedures http://www.aviation.dla.mil/UserWeb/aviationengineerin

Section 02 41 00 – Demolition Page 4 of 10

MIL-STD-129 (2014; Rev R) Military Marking for Shipment and Storage

U.S. FEDERAL AVIATION ADMINISTRATION (FAA)

FAA AC 70/7460-1 (2015; Rev L) Obstruction Marking and Lighting

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

40 CFR 61 National Emission Standards for Hazardous Air Pollutants

40 CFR 82 Protection of Stratospheric Ozone

49 CFR 173.301 Shipment of Compressed Gases in Cylinders and Spherical Pressure Vessels

1.2 PROJECT DESCRIPTION

Definitions

Demolition

Demolition is the process of wrecking or taking out any load-supporting structural member of a facility together with any related handling and disposal operations.

Deconstruction

Deconstruction is the process of taking apart a facility with the primary goal of preserving the value of all useful building materials.

Demolition Plan

Demolition Plan is the planned steps and processes for managing demolition activities and identifying the required sequencing activities and disposal mechanisms.

Deconstruction Plan

Deconstruction Plan is the planned steps and processes for dismantling all or portions of a structure or assembly, to include managing sequencing activities, storage, re-installation activities, salvage and disposal mechanisms.

Demolition/Deconstruction Plan

Prepare a Demolition Plan and submit proposed salvage, demolition, deconstruction, and removal procedures for approval before work is started. Include in the plan procedures for careful removal and disposition of materials specified to be salvaged, coordination with other work in progress, a disconnection schedule of utility services, a detailed description of methods and equipment to be used for each operation and of the sequence of operations.

Identify components and materials to be salvaged for reuse or recycling with reference to paragraph Existing Facilities to be removed. Append tracking forms for all removed materials indicating type, quantities, condition, destination, and end use. Coordinate with Waste Management Plan in accordance with Section 01 74 19 CONSTRUCTION WASTE

Section 02 41 00 – Demolition Page 5 of 10

MANAGEMENT AND DISPOSAL. Include statements affirming Contractor inspection of the existing roof deck and its suitability to perform as a safe working platform or if inspection reveals a safety hazard to workers, state provisions for securing the safety of the workers throughout the performance of the work. Provide procedures for safe conduct of the work in accordance with EM 385-1-1. Plan shall be approved by Contracting Officer prior to work beginning.

General Requirements

Do not begin demolition or deconstruction until authorization is received from the Contracting Officer. The work of this section is to be performed in a manner that maximizes the value derived from the salvage and recycling of materials. Remove rubbish and debris from the project site; do not allow accumulations inside or outside the building. The work includes demolition, deconstruction, salvage of identified items and materials, and removal of resulting rubbish and debris. Remove rubbish and debris from Government property daily, unless otherwise directed. Store materials that cannot be removed daily in areas specified by the Contracting Officer. In the interest of occupational safety and health, perform the work in accordance with EM 385-1-1, Section 23, Demolition, and other applicable Sections.

1.3 ITEMS TO REMAIN IN PLACE

Take necessary precautions to avoid damage to existing items to remain in place, to be reused, or to remain the property of the Government. Repair or replace damaged items as approved by the Contracting Officer. Coordinate the work of this section with all other work indicated. Construct and maintain shoring, bracing, and supports as required. Ensure that structural elements are not overloaded. Increase structural supports or add new supports as may be required as a result of any cutting, removal, deconstruction, or demolition work performed under this contract. Provide new supports and reinforcement for existing construction weakened by demolition, deconstruction, or removal work. Repairs, reinforcement, or structural replacement require approval by the Contracting Officer prior to performing such work.

Existing Construction Limits and Protection

Do not disturb existing construction beyond the extent indicated or necessary for installation of new construction. Provide temporary shoring and bracing for support of building components to prevent settlement or other movement. Provide protective measures to control accumulation and migration of dust and dirt in all work areas. Remove dust, dirt, and debris from work areas daily.

Weather Protection

For portions of the building to remain, protect building interior and materials and equipment from the weather at all times. Where removal of existing roofing is necessary to accomplish work, have materials and workmen ready to provide adequate and temporary covering of exposed areas.

Trees

Section 02 41 00 – Demolition Page 6 of 10

Protect trees within the project site which might be damaged during demolition or deconstruction, and which are indicated to be left in place, by a 6 foot high fence. Erect and secure fence a minimum of 5 feet from the trunk of individual trees or follow the outer perimeter of branches or clumps of trees. Replace any tree designated to remain that is damaged during the work under this contract with like-kind or as approved by the Contracting Officer.

Utility Service

Maintain existing utilities indicated to stay in service and protect against damage during demolition and deconstruction operations. Prior to start of work, utilities serving each area of alteration or removal will be shut off by the Government and disconnected and sealed by the Contractor.

Facilities

Protect electrical and mechanical services and utilities. Where removal of existing utilities and pavement is specified or indicated, provide approved barricades, temporary covering of exposed areas, and temporary services or connections for electrical and mechanical utilities.

Floors, roofs, walls, columns, pilasters, and other structural components that are designed and constructed to stand without lateral support or shoring, and are determined to be in stable condition, must remain standing without additional bracing, shoring, or lateral support until demolished or deconstructed, unless directed otherwise by the Contracting Officer.

Ensure that no elements determined to be unstable are left unsupported and place and secure bracing, shoring, or lateral supports as may be required as a result of any cutting, removal, deconstruction, or demolition work performed under this contract.

1.4 BURNING

The use of burning at the project site for the disposal of refuse and debris will not be permitted.

1.5 SUBMITTALS

Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for Contractor Quality Control approval. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00

SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals Existing Conditions

SD-07 Certificates Demolition Plan, G Notification; G

Section 02 41 00 – Demolition Page 7 of 10

Notification of Demolition and Renovation Form SD-11 Closeout Submittals

Receipts

1.6 QUALITY ASSURANCE

Submit timely notification of demolition projects to Federal, State, regional, and local authorities in accordance with 40 CFR 61, Subpart M. Notify the Regional Office of the United States Environmental Protection Agency (USEPA), State's environmental protection agency, local air pollution control district/agency and the Contracting Officer in writing 10 working days prior to the commencement of work in accordance with 40 CFR 61, Subpart M. Comply with federal, state, and local hauling and disposal regulations. In addition to the requirements of the "Contract Clauses," conform to the safety requirements contained in ASSP A10.6. Comply with the Environmental Protection Agency requirements specified.

Use of explosives will not be permitted.

Dust and Debris Control

Prevent the spread of dust and debris to occupied portions of the building and avoid the creation of a nuisance or hazard in the surrounding area. Do not use water if it results in hazardous or objectionable conditions such as, but not limited to, ice, flooding, or pollution.

1.7 RELOCATIONS

Perform the removal and reinstallation of relocated items as indicated with workmen skilled in the trades involved. Repair or replace items to be relocated which are damaged by the Contractor with new undamaged items as approved by the Contracting Officer.

1.8 EXISTING CONDITIONS

Before beginning any demolition or deconstruction work, survey the site and examine the drawings and specifications to determine the extent of the work. Record existing conditions in the presence of the Contracting Officer showing the condition of structures and other facilities adjacent to areas of alteration or removal. Photographs sized 100 mm 4 inch will be acceptable as a record of existing conditions. Include in the record the elevation of the top of foundation walls, finish floor elevations, possible conflicting electrical conduits, plumbing lines, alarms systems, the location and extent of existing cracks and other damage and description of surface conditions that exist prior to before starting work. It is the Contractor's responsibility to verify and document all required outages which will be required during the course of work, and to note these outages on the record document. Submit survey results.

PRODUCTS

NOT USED

EXECUTION

Section 02 41 00 – Demolition Page 8 of 10

3.1 EXISTING FACILITIES TO BE REMOVED

Inspect and evaluate existing structures onsite for reuse. Existing construction scheduled to be removed for reuse shall be disassembled. Dismantled and removed materials are to be separated, set aside, and prepared as specified, and stored or delivered to a collection point for reuse, remanufacture, recycling, or other disposal, as specified.

Roofing

Remove existing roof system and associated components in their entirety down to existing roof deck. Remove single-ply roofing to effect the connections with new flashing or roofing. Cut existing membrane and insulation along straight lines. Remove roofing system and insulation without damaging the roof deck. Sequence work to minimize building exposure between demolition or deconstruction and new roof materials installation.

Temporary Roofing

Install temporary roofing and flashing as necessary to maintain a watertight condition throughout the course of the work. Remove temporary work prior to installation of permanent roof system materials unless approved otherwise by the Contracting Officer. If it is determined after removing roofing the existing deck and support structure is deteriorated, such that ability to support foot traffic and construction loads is unknown. Make provisions for worker safety during demolition, deconstruction, and installation of new materials as described in paragraphs entitled "Statements" and "Regulatory and Safety Requirements."

Reroofing

When removing the existing roofing system from the roof deck, remove only as much roofing as can be recovered by the end of the work day, unless approved otherwise by the Contracting Officer. Do not attempt to open the roof covering system in threatening weather.

Reseal all openings prior to suspension of work the same day.

Carpentry

Salvage for reuse lumber and sort by type and size. Recycle salvaged wood unfit for reuse, except stained, painted, or treated wood.

3.2 DISPOSITION OF MATERIAL

Title to Materials

Except for salvaged items specified in related Sections, and for materials or equipment scheduled for salvage, all materials and equipment removed and not reused or salvaged, shall become the property of the Contractor and shall be removed from Government property. Title to materials resulting from demolition and deconstruction, and materials and equipment to be removed, is vested in the Contractor upon approval by the Contracting Officer of the Contractor's demolition, deconstruction, and removal procedures, and authorization by the Contracting Officer to begin demolition and deconstruction. The

Section 02 41 00 – Demolition Page 9 of 10

Government will not be responsible for the condition or loss of, or damage to, such property after contract award. Showing for sale or selling materials and equipment on site is prohibited.

Reuse of Materials and Equipment

Remove and store materials and equipment indicated to be reused or relocated to prevent damage, and reinstall as the work progresses.

Salvaged Materials and Equipment

Remove materials and equipment that are indicated to be removed by the Contractor and that are to remain the property of the Government, and deliver to a storage site, as directed.

Salvage items and material to the maximum extent possible.

Store all materials salvaged for the Contractor as approved by the Contracting Officer and remove from Government property before completion of the contract.

Remove salvaged items to remain the property of the Government in a manner to prevent damage, and packed or crated to protect the items from damage while in storage or during shipment. Items damaged during removal or storage must be repaired or replaced to match existing items. Properly identify the contents of containers.

No items are to be salvaged and turned over to the government on this project.

Unsalvageable and Non-Recyclable Material

Dispose of unsalvageable and non-recyclable combustible material off the site.

3.3 CLEANUP

Remove debris and rubbish from the Installation. Remove and transport the debris in a manner that prevents spillage on streets or adjacent areas. Apply local regulations regarding hauling and disposal.

3.4 DISPOSAL OF REMOVED MATERIALS

Regulation of Removed Materials

Dispose of debris, rubbish, scrap, and other non-salvageable materials resulting from removal operations with all applicable federal, state and local regulations as contractually specified off the Installation. Storage of removed materials on the project site is prohibited.

Burning on Government Property

Burning of materials removed from demolished and deconstructed structures will not be permitted on Government property.

Section 02 41 00 – Demolition Page 10 of 10

Removal from Government Property

Transport waste materials removed from demolished and deconstructed structures from Government property for legal disposal.

3.5 REUSE OF SALVAGED ITEMS

Recondition salvaged materials and equipment designated for reuse before installation.

Replace items damaged during removal and salvage operations or restore them as necessary to usable condition.

-- End of Section --

Section 02 82 14.00 10 – Asbestos Hazard Control Activities Page 1 of 36

SECTION 02 82 14.00 10

ASBESTOS HAZARD CONTROL ACTIVITIES

2/10

TABLE OF CONTENTS

PART 1 GENERAL

1.1 REFERENCES

1.2 DEFINITIONS

1.2.1 Amended Water

1.2.2 Asbestos-Containing Material (ACM)

1.2.3 Authorized Person

1.2.4 Building Inspector

1.2.5 Class I Asbestos Work

1.2.6 Class II Asbestos Work

1.2.7 Class III Asbestos Work

1.2.8 Class IV Asbestos Work

1.2.9 Clean Room

1.2.10 Competent Person

1.2.11 Contractor/Supervisor

1.2.12 Critical Barrier

1.2.13 Decontamination Area

1.2.14 Demolition

1.2.15 Disposal Bag

1.2.16 Disturbance

1.2.17 Equipment Room or Area

1.2.18 Fiber

1.2.19 Friable ACM

1.2.20 Glovebag

1.2.21 High-Efficiency Particulate Air (HEPA) Filter

1.2.22 Intact

1.2.23 Model Accreditation Plan (MAP)

1.2.24 Negative Initial Exposure Assessment

1.2.25 NESHAP

1.2.26 Nonfriable ACM

1.2.27 Nonfriable ACM (Category I)

1.2.28 Nonfriable ACM (Category II)

1.2.29 Permissible Exposure Limits (PELs)

1.2.30 Regulated Area

Section 02 82 14.00 10 – Asbestos Hazard Control Activities Page 2 of 36

1.2.31 Removal

1.2.32 Repair

1.2.33 Surfacing ACM

1.2.34 Thermal System Insulation (TSI) ACM

1.2.35 Transite

1.2.36 Worker

1.3 SYSTEM DESCRIPTION

1.3.1 Abatement Work Tasks

1.3.2 Unexpected Discovery of Asbestos

1.4 SUBMITTALS

1.5 QUALITY ASSURANCE

1.5.1 Written Qualifications and Organization Report

1.5.2 Specific Requirements

1.5.3 Federal, State or Local Citations on Previous Projects

1.5.4 Preconstruction Conference

1.6 SAFETY

1.6.1 Asbestos Hazard Abatement Plan Appendix

1.6.2 Activity Hazard Analyses Appendix

1.6.3 Local Exhaust System

1.7 SECURITY

1.7.1 Licenses, Permits and Notifications

1.7.2 Regulated Areas

1.7.3 Warning Signs and Tape

1.7.4 Warning Labels

1.8 MEDICAL SURVEILLANCE REQUIREMENTS

1.8.1 Respiratory Protection Program

1.8.2 Respiratory Fit Testing

1.8.3 Respirator Selection and Use Requirements

1.8.4 Personal Protective Equipment

1.8.5 Whole Body Protection

1.9 HYGIENE

1.9.1 Single Stage Decontamination Area

1.9.2 Decontamination Area Exit Procedures

1.9.3 Smoking

1.10 TRAINING PROGRAM

PART 2 PRODUCTS

2.1 ENCAPSULANTS

2.2 ENCASEMENT PRODUCTS

2.3 EXPENDABLE SUPPLIES

2.3.1 Glovebag

Section 02 82 14.00 10 – Asbestos Hazard Control Activities Page 3 of 36

2.3.2 Duct Tape

2.3.3 Disposal Containers

2.3.4 Sheet Plastic

2.3.5 Mastic Removing Solvent

2.3.6 Leak-Tight Wrapping

2.3.7 Viewing Inspection Window

2.3.8 Wetting Agents

2.3.9 Strippable Coating

PART 3 EXECUTION

3.1 GENERAL REQUIREMENTS

3.2 PROTECTION OF ADJACENT WORK OR AREAS TO REMAIN

3.3 OBJECTS

3.3.1 Stationary Objects

3.4 BUILDING VENTILATION SYSTEM AND CRITICAL BARRIERS

3.5 PRECLEANING

3.6 METHODS OF COMPLIANCE

3.6.1 Mandated Practices

3.6.2 Control Methods

3.6.3 Unacceptable Practices

3.6.4 Class II Work

3.6.5 Specific Control Methods for Class II Work

3.6.6 Class II Asbestos Work Response Action Detail Sheets

3.6.7 Sealing Contaminated Items Designated for Disposal

3.7 FINAL CLEANING AND VISUAL INSPECTION

3.8 EXPOSURE ASSESSMENT AND AIR MONITORING

3.8.1 General Requirements

3.8.2 Initial Exposure Assessment

3.8.3 Environmental Air Monitoring During Abatement

3.8.4 Air-Monitoring Results and Documentation

3.9 CLEARANCE CERTIFICATION

3.10 CLEANUP AND DISPOSAL

3.10.1 Title to ACM Materials

3.10.2 Collection and Disposal of Asbestos

3.10.3 ACM Waste

Section 02 82 14.00 10 – Asbestos Hazard Control Activities Page 4 of 36

SECTION 02 82 14.00 10

ASBESTOS HAZARD CONTROL ACTIVITIES

2/10

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN SOCIETY OF SANITARY ENGINEERING (ASSE)

ASSE Z9.2 (2012) Fundamentals Governing the Design and Operation of

Local Exhaust Ventilation Systems

ASTM INTERNATIONAL (ASTM)

ASTM D4397 (2010) Standard Specification for Polyethylene Sheeting for

Construction, Industrial, and Agricultural Applications

ASTM E1368 (2011) Visual Inspection of Asbestos Abatement Projects

COMPRESSED GAS ASSOCIATION (CGA)

CGA G-7 (2008) Compressed Air for Human Respiration; 6th Edition

INTERNATIONAL SAFETY EQUIPMENT ASSOCIATION (ISEA)

ANSI/ISEA Z87.1 (2010) Occupational and Educational Personal Eye and Face

Protection Devices

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 701 (2010) Standard Methods of Fire Tests for Flame Propagation of

Textiles and Films

NATIONAL INSTITUTE FOR OCCUPATIONAL SAFETY AND HEALTH (NIOSH)

NIOSH 2003-154 (2003; 4th Ed; Supple 3) NIOSH Manual of Analytical Methods

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2008; Errata 1-2010; Changes 1-3 2010; Changes 4-6 2011;

Change 7 2012) Safety and Health Requirements Manual

EP 1110-1-11 (1992; Change 1 1997) Engineering and Design -- Asbestos Abatement Guideline Detail Sheets

U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA)

Section 02 82 14.00 10 – Asbestos Hazard Control Activities Page 5 of 36

EPA 340/1-90/018 (1990) Asbestos/NESHAP Regulated Asbestos Containing Materials Guidance

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

29 CFR 1910.134 Respiratory Protection

29 CFR 1910.141 Sanitation

29 CFR 1910.147 Control of Hazardous Energy (Lock Out/Tag Out)

29 CFR 1926.1101 Asbestos

29 CFR 1926.32 Safety and Health Regulations for Construction - Definition

40 CFR 61 National Emission Standards for Hazardous Air Pollutants

40 CFR 763 Asbestos

42 CFR 84 Approval of Respiratory Protective Devices

49 CFR 107 Hazardous Materials Program Procedures

49 CFR 171 General Information, Regulations, and Definitions

49 CFR 172 Hazardous Materials Table, Special Provisions, Hazardous Materials Communications, Emergency Response Information, and Training Requirements

49 CFR 173 Shippers - General Requirements for Shipments and Packagings

UNDERWRITERS LABORATORIES (UL)

UL 586 (2009) Standard for High-Efficiency Particulate, Air Filter Units

1.2 DEFINITIONS

Water containing a wetting agent or surfactant with a surface tension of at least 29 dynes per square centimeter.

Any materials containing more than one percent asbestos.

Any person authorized by the Contractor and required by work duties to be present in the regulated areas.

Section 02 82 14.00 10 – Asbestos Hazard Control Activities Page 6 of 36

Individual who inspects buildings for asbestos and has EPA Model Accreditation Plan (MAP) "Building Inspector" training; accreditation required by 40 CFR 763, Subpart E, Appendix C, has EPA/State certification/license as a "Building Inspector".

Activities defined by OSHA involving the removal of thermal system insulation (TSI) and surfacing ACM.

Activities defined by OSHA involving the removal of ACM which is not thermal system insulation or surfacing material. This includes, but is not limited to, the removal of asbestos containing wallboard, floor tile and sheeting, roofing and siding shingles, and construction mastic. Certain "incidental" roofing materials such as mastic, flashing and cements when they are still intact are excluded from Class II asbestos work. Removal of small amounts of these materials which would fit into a glovebag may be classified as a Class III job.

Activities defined by OSHA that involve repair and maintenance operations, where ACM, including TSI and surfacing ACM, is likely to be disturbed. Operations may include drilling, abrading, cutting a hole, cable pulling, crawling through tunnels or attics and spaces above the ceiling, where asbestos is actively disturbed or asbestos-containing debris is actively disturbed.

Maintenance and custodial construction activities during which employees contact but do not disturb ACM and activities to clean-up dust, waste and debris resulting from Class I, II, and III activities. This may include dusting surfaces where ACM waste and debris and accompanying dust exists and cleaning up loose ACM debris from TSI or surfacing ACM following construction

An uncontaminated room having facilities for the storage of employees' street clothing and uncontaminated materials and equipment.

In addition to the definition in 29 CFR 1926.32(f), a person who is capable of identifying existing asbestos hazards as defined in 29 CFR 1926.1101, selecting the appropriate control strategy, has the authority to take prompt corrective measures to eliminate them and has EPA Model Accreditation Plan (MAP) "Contractor/Supervisor" training; has EPA/State certification/license as a "Contractor/Supervisor".

Section 02 82 14.00 10 – Asbestos Hazard Control Activities Page 7 of 36

Individual who supervises asbestos abatement work and has EPA Model Accreditation Plan "Contractor/Supervisor" training; has EPA/State certification as a "Contractor/Supervisor".

One or more layers of plastic sealed over all openings into a regulated area or any other similarly placed physical barrier sufficient to prevent airborne asbestos in a regulated area from migrating to an adjacent area.

An enclosed area adjacent and connected to the regulated area and consisting of an equipment room, shower area, and clean room, which is used for the decontamination of workers, materials, and equipment that are contaminated with asbestos.

The wrecking or taking out of any load-supporting structural member and any related razing, removing, or stripping of asbestos products.

A 6 mil thick, leak-tight plastic bag, pre-labeled in accordance with 29 CFR 1926.1101, used for transporting asbestos waste from containment to disposal site.

Activities that disrupt the matrix of ACM, crumble or pulverize ACM, or generate visible debris from ACM. Disturbance includes cutting away small amounts of ACM, no greater than the amount which can be contained in 1 standard sized glovebag or waste bag, not larger than 60 inches in length and width in order to access a building component.

An area adjacent to the regulated area used for the decontamination of employees and their equipment.

A fibrous particulate, 5 micrometers or longer, with a length to width ratio of at least 3 to 1.

A term defined in 40 CFR 61, Subpart M and EPA 340/1-90/018 meaning any material which contains more than 1 percent asbestos, as determined using the method specified in 40 CFR 763, Polarized Light Microscopy (PLM), that when dry, can be crumbled, pulverized, or reduced to powder by hand pressure.

Section 02 82 14.00 10 – Asbestos Hazard Control Activities Page 8 of 36

Not more than a 60 by 60 inch impervious plastic bag-like enclosure affixed around an asbestos-containing material, with glove-like appendages through which material and tools may be handled.

A filter capable of trapping and retaining at least 99.97 percent of all mono-dispersed particles of 0.3 micrometers in diameter.

ACM which has not crumbled, been pulverized, or otherwise deteriorated so that the asbestos is no longer likely to be bound with its matrix. Removal of "intact" asphaltic, resinous, cementitious products does not render the ACM non-intact simply by being separated into smaller pieces.

USEPA training accreditation requirements for persons who work with asbestos as specified in 40 CFR 763.

A demonstration by the Contractor to show that employee exposure during an operation is expected to be consistently below the OSHA Permissible Exposure Limits (PELs).

National Emission Standards for Hazardous Air Pollutants. The USEPA NESHAP regulation for asbestos is at 40 CFR 61, Subpart M.

A NESHAP term defined in 40 CFR 61, Subpart M and EPA 340/1-90/018 meaning any material containing more than 1 percent asbestos that, when dry, cannot be crumbled, pulverized or reduced to powder by hand pressure.

A NESHAP term defined in 40 CFR 61, Subpart E and EPA 340/1-90/018 meaning asbestos-containing packings, gaskets, resilient floor covering, and asphalt roofing products containing more than 1 percent asbestos.

A NESHAP term defined in 40 CFR 61, Subpart E and EPA 340/1-90/018 meaning any material, excluding Category I nonfriable ACM, containing more than 1 percent asbestos.

Section 02 82 14.00 10 – Asbestos Hazard Control Activities Page 9 of 36

Concentration of asbestos not in excess of 0.1 fibers per cubic centimeter of air (f/cc) as an 8 hour time weighted average (TWA).

An airborne concentration of asbestos not in excess of 1.0 f/cc of air as averaged over a sampling period of 30 minutes.

An OSHA term defined in 29 CFR 1926.1101 meaning an area established by the Contractor to demarcate areas where Class I, II, and III asbestos work is conducted; also any adjoining area where debris and waste from such asbestos work accumulate; and an area within which airborne concentrations of asbestos exceed, or there is a reasonable possibility they may exceed, the permissible exposure limit.

All operations where ACM is taken out or stripped from structures or substrates, and includes demolition operations.

Overhauling, rebuilding, reconstructing, or reconditioning of structures or substrates, including encapsulation or other repair of ACM attached to structures or substrates.

Asbestos-containing material which contains more than 1 percent asbestos and is sprayed-on, troweled-on, or otherwise applied to surfaces, such as acoustical plaster on ceilings and fireproofing materials on structural members, or other materials on surfaces for acoustical, fireproofing, or other purposes.

ACM which contains more than 1 percent asbestos and is applied to pipes, fittings, boilers, breeching, tanks, ducts, or other interior structural components to prevent heat loss or gain or water condensation.

A generic name for asbestos cement wallboard and pipe.

Individual (not designated as the Competent Person or a supervisor) who performs asbestos work and has completed asbestos worker training required by 29 CFR 1926.1101, to include

Section 02 82 14.00 10 – Asbestos Hazard Control Activities Page 10 of 36

EPA Model Accreditation Plan (MAP) "Worker" training; accreditation if required by the OSHA Class of work to be performed or by the state where the work is to be performed.

1.3 SYSTEM DESCRIPTION

This section covers all operations in which asbestos-containing materials (ACM) are encountered. These procedures and equipment are required to protect workers and building occupants from airborne asbestos fibers and ACM dust and debris. Activities include OSHA Class I, Class II, Class III, and Class IV work operations. This section also includes containment, storage, transportation and disposal of the generated ACM wastes. Submit Detailed Drawings in accordance with EP 1110-1-11 and containing descriptions, and site layout to include worksite containment area(s), local exhaust systems locations, decontamination units and load-out units, other temporary waste storage facility, access tunnels, location of temporary utilities (electrical, water, sewer) and boundaries of each regulated area. When the detail sheets are not attached to this specification, the Contractor can get them from the web at: http://140.194.76.129/publications/eng-pamphlets/ep1110-1- 11/toc.htm

The specific ACM to be abated is identified on the detailed plans and project drawings. A summary for each work task including the appropriate RESPONSE ACTION DETAIL SHEET (item to be abated and methods to be used) and SET-UP DETAIL SHEETS (containment techniques to include safety precautions and methods) is included in Table 1, "Individual Work Task Data Elements" at the end of this section.

For any previously untested building components suspected to contain asbestos and located in areas impacted by the work, notify the Contracting Officer who will have the option of ordering up to four (4) bulk samples to be obtained at the Contractor's expense and delivered to a laboratory accredited under the National Institute of Standards and Technology (NIST) "National Voluntary Laboratory Accreditation Program (NVLAP)" and analyzed by PLM.

If the asbestos content is less than 10 percent, as determined by a method other than point counting, the asbestos content shall be verified by point counting. Any additional components identified as ACM that have been approved by the Contracting Officer for removal shall be removed and will be paid for by an equitable adjustment to the contract price under the CONTRACT CLAUSE titled "changes". Sampling shall be conducted by personnel who have successfully completed the EPA Model Accreditation Plan (MAP) "Building Inspector" training course and is EPA/State certified/licensed as a "Building Inspector".

1.4 SUBMITTALS

Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-02 Shop Drawings

Section 02 82 14.00 10 – Asbestos Hazard Control Activities Page 11 of 36

Detailed Drawings; G

SD-03 Product Data Asbestos Waste Shipment Records; G Encapsulants; G Respiratory Protection Program; G Cleanup and Disposal; G Qualifications; G Training Program Licenses, Permits and Notifications; G Asbestos Management Plan; G

SD-06 Test Reports Exposure Assessment and Air Monitoring; G Local Exhaust System

SD-07 Certificates Local Exhaust System Encapsulants; G Medical Surveillance Requirements

1.5 QUALITY ASSURANCE

In addition to detailed requirements of this specification, work performed under this contract shall comply with EM 385-1-1, applicable federal, state, and local laws, ordinances, criteria, rules and regulations regarding handling, storing, transporting, and disposing of asbestos waste materials. Matters of interpretation of standards shall be submitted to the appropriate administrative agency for resolution before starting work. Where the requirements of this specification, applicable laws, criteria, ordinances, regulations, and referenced documents vary, the most stringent requirements shall apply. Follow all state and local laws, rules and regulations regarding demolition, removal, encapsulation, construction alteration, repair, maintenance, renovation, spill/emergency cleanup, housekeeping, handling, storing, transporting and disposing of asbestos material that apply:

Submit a written qualifications and organization report providing evidence of qualifications of the Contractor, Contractor's Project Supervisor, Designated Competent Person, supervisors and workers; Designated IH; independent testing laboratory; all subcontractors to be used including disposal transportation and disposal facility firms, subcontractor supervisors, subcontractor workers; and any others assigned to perform asbestos abatement and support activities. Include in the report an organization chart showing the Contractor's staff organization chain of command and reporting relationship with all subcontractors. The report shall be signed by the Contractor, the Contractor's onsite project manager, Designated Competent Person, Designated IH, designated testing laboratory and the principals of all subcontractors to be used. Include the following statement in the report: "By signing this report I certify that the personnel I am responsible for during the course of this project fully

Section 02 82 14.00 10 – Asbestos Hazard Control Activities Page 12 of 36 understand the contents of 29 CFR 1926.1101, 40 CFR 61, Subpart M, and the federal, state and local requirements for those asbestos abatement activities that they will be involved in."

Designate in writing, personnel meeting the following qualifications:

Section 02 82 14.00 10 – Asbestos Hazard Control Activities Page 13 of 36

Section 02 82 14.00 10 – Asbestos Hazard Control Activities Page 14 of 36

The Contractor and all subcontractors shall submit a statement, signed by an officer of the company, containing a record of any citations issued by Federal, State or local regulatory agencies relating to asbestos activities (including projects, dates, and resolutions); a list of penalties incurred through non-compliance with asbestos project specifications, including liquidated damages, overruns in scheduled time limitations and resolutions; and situations in which an asbestos-related contract has been terminated (including projects, dates, and reasons for terminations). If there are none, a negative declaration signed by an officer of the company shall be provided.

The Contractor and the Contractor's Designated Competent Person, Project Supervisor, and Designated IH shall meet with the Contracting Officer prior to beginning work at a safety preconstruction conference to discuss the details of the Contractor's submitted APP to include the AHAP and AHAs appendices. Deficiencies in the APP will be discussed.

Onsite work shall not begin until the APP has been accepted.

1.6 SAFETY

Section 02 82 14.00 10 – Asbestos Hazard Control Activities Page 15 of 36

Prepare a written comprehensive site-specific Accident Prevention Plan (APP) at least 15 days prior to the preconstruction conference. The APP shall be in accordance with the format and requirements in Appendix A of EM 385-1-1. The APP shall incorporate an Asbestos Hazard Abatement Plan (AHAP), and Activity Hazard Analyses (AHAs) as separate appendices into one site-specific document. The APP shall take into consideration all the individual asbestos abatement work tasks identified in Table 1. See Section 01 35 26 GOVERNMENT SAFETY REQUIREMENTS for additional requirements.

The AHAP shall include, but not be limited to, the following:

Section 02 82 14.00 10 – Asbestos Hazard Control Activities Page 16 of 36

AHAs for each major phase of work, shall be submitted and updated during the project. The AHAs format shall be in accordance with Figure 1-1 of EM 385-1-1. The analysis shall define the activities to be performed for a major phase of work, identify the sequence of work, the specific hazards anticipated, and the control measures to be implemented to eliminate or reduce each hazard to an acceptable level. Work shall not proceed on that phase until the AHA has been accepted and a preparatory meeting has been conducted by the Contractor to discuss its contents with everyone engaged in the activities, including the onsite Government representatives. The AHAs shall be continuously reviewed and, when appropriate, modified to address changing site conditions or operations.

Local exhaust units shall conform to ASSE Z9.2 and 29 CFR 1926.1101. Filters on local exhaust system equipment shall conform to ASSE Z9.2 and UL 586. Filter shall be UL labeled. Submit pressure differential recordings and Manufacturer's certifications showing compliance with ASSE Z9.2 for:

1.7 SECURITY

Fenced and locked security area shall be provided for each regulated area. A log book shall be kept documenting entry into and out of the regulated area. Entry into regulated areas shall only be by personnel authorized by the Contractor and the Contracting Officer.

Personnel authorized to enter regulated areas shall be trained, medically evaluated, and wear the required personal protective equipment.

Obtain necessary licenses, permits and notifications in conjunction with the project's asbestos abatement, transportation and disposal actions and timely notification furnished of such actions as required by federal, state, regional, and local authorities. The Contractor shall notify the Pennsylvania Department of Environmental Protection Agency responsible for asbestos air emissions, the State’s OSHA program and the Contracting Officer in writing, at least 10 days prior to the commencement of work, in accordance with 40 CFR 61, Subpart M, and state and local requirements to include the mandatory "Notification of Demolition and Renovation Record" form and other required notification documents.

Notification shall be by Certified Mail, Return Receipt Requested. Furnish copies of the receipts to the Contracting Officer, in writing, prior to the commencement of work. Local fire department shall be notified 3 days before fireproofing material is removed from a building and the notice shall specify whether or not the material contains asbestos. The Contractor is responsible for the associated fees/costs for licenses, permits, and notifications.

Section 02 82 14.00 10 – Asbestos Hazard Control Activities Page 17 of 36

All Class I, II, and III asbestos work shall be conducted within regulated areas. The regulated area shall be demarcated to minimize the number of persons within the area and to protect persons outside the area from exposure to airborne asbestos. Control access to regulated areas, ensure that only authorized personnel enter, and verify that Contractor required medical surveillance, training and respiratory protection program requirements are met prior to allowing entrance.

Warning signs and tape printed in English shall be provided at the regulated boundaries and entrances to regulated areas. Signs shall be located to allow personnel to read the signs and take the necessary protective steps required before entering the area. Warning signs, displaying the following legend in the lower panel:

DANGER

ASBESTOS

CANCER AND LUNG DISEASE HAZARD

AUTHORIZED PERSONNEL ONLY

RESPIRATORS AND PROTECTIVE CLOTHING ARE REQUIRED IN THIS AREA

Warning labels shall be affixed to all asbestos disposal containers, asbestos materials, scrap, waste debris, and other products contaminated with asbestos. Containers with preprinted warning labels conforming to requirements are acceptable. See DETAIL SHEET 14,

1.8 MEDICAL SURVEILLANCE REQUIREMENTS

Medical surveillance requirements shall conform to 29 CFR 1926.1101. Asbestos workers shall be enrolled in a medical surveillance program that meets 29 CFR 1926.1101 (m) requirements and other pertinent state or local requirements. This requirement shall have been satisfied within the last 12 months.

The Contractor's Designated IH shall establish in writing, and implement a respiratory protection program in accordance with 29 CFR 1926.1101 and 29 CFR 1910.134. The Contractor's Designated IH shall establish minimum respiratory protection requirements based on measured or anticipated levels of airborne asbestos fiber concentrations.

The Contractor's Designated IH shall conduct a qualitative or quantitative fit test conforming to Appendix A of 29 CFR 1910.134 for each worker required to wear a respirator, and any authorized visitors who enter a regulated area where respirators are required to be worn. A respirator fit test shall be performed prior to initially wearing a respirator and every 12 months thereafter. If physical changes develop that will affect the fit, a new fit test shall be

Section 02 82 14.00 10 – Asbestos Hazard Control Activities Page 18 of 36 performed. Functional fit checks shall be performed each time a respirator is put on and in accordance with the manufacturer's recommendation.

Provide respirators, and ensure that they are used as required by 29 CFR 1926.1101 and in accordance with CGA G-7 and the manufacturer's recommendations. Respirators shall be approved by the National Institute for Occupational Safety and Health NIOSH, under the provisions of 42 CFR 84, for use in environments containing airborne asbestos fibers. For air-purifying respirators, the particulate filter shall be high-efficiency particulate air (HEPA)/(N-,R-,P-100). The initial respirator selection and the decisions regarding the upgrading or downgrading of respirator type shall be made by the Contractor's Designated IH based on the measured or anticipated airborne asbestos fiber concentrations to be encountered.

Provide workers with personal protective clothing and equipment and ensure that it is worn properly. The Designated IH and Designated Competent Person shall select and approve all the required personal protective clothing and equipment.

Personnel exposed to or having the potential to be exposed to airborne concentrations of asbestos that exceed the PELs, or for all OSHA Classes of work for which a required negative exposure assessment is not produced, shall be provided with whole body protection and such protection shall be worn properly. Disposable whole body protection shall be disposed of as asbestos contaminated waste upon exiting from the regulated area. Reusable whole body protection worn shall be either disposed of as asbestos contaminated waste upon exiting from the regulated area or be properly laundered in accordance with 29 CFR

1926.1101. The Contractor's Designated Competent Person, in consultation with the Designated IH, has the authority to take immediate action to upgrade or downgrade whole body protection when there is an immediate danger to the health and safety of the wearer.

Disposable-impermeable coveralls with a zipper front shall be provided. Sleeves shall be secured at the wrists, and foot coverings secured at the ankles. See DETAIL SHEET 13.

Gloves shall be provided to protect the hands where there is the potential for hand injuries (i.e., scrapes, punctures, cuts, etc.).

Cloth socks shall be provided and worn next to the skin. Footwear, as required by OSHA and EM 385-1-1, that is appropriate for safety and health hazards in the area shall be worn.

Section 02 82 14.00 10 – Asbestos Hazard Control Activities Page 19 of 36

Reusable footwear removed from the regulated area shall be thoroughly decontaminated or disposed of as ACM waste.

Hood type disposable head covering shall be provided. In addition, protective head gear (hard hats) shall be provided as required. Hard hats shall only be removed from the regulated area after being thoroughly decontaminated.

Eye protection shall be provided, when operations present a potential eye injury hazard, and shall meet the requirements of ANSI/ISEA Z87.1.

1.9 HYGIENE

Establish a decontamination area for the decontamination of employees, material and equipment. Ensure that employees enter and exit the regulated area through the decontamination area.

A decontamination area (equipment room/area) shall be provided for Class I work involving less than 25 feet or 10 square feet of TSI or surfacing ACM, and for Class II and Class III asbestos work operations where exposures exceed the PELs or where there is no negative exposure assessment. The equipment room or area shall be adjacent to the regulated area for the decontamination of employees, material, and their equipment which could be contaminated with asbestos. The area shall be covered by an impermeable drop cloth on the floor or horizontal working surface. The area must be of sufficient size to accommodate cleaning of equipment and removing personal protective equipment without spreading contamination beyond the area.

Ensure that the following procedures are followed:

Section 02 82 14.00 10 – Asbestos Hazard Control Activities Page 20 of 36

Smoking, if allowed by the Contractor, shall only be permitted in designated areas approved by the Contracting Officer.

1.10 TRAINING PROGRAM

Establish and submit a training program as specified by EPA MAP, training requirements at 40 CFR 763, OSHA requirements at 29 CFR 1926.1101 (k)(9). Contractor employees shall complete the required training for the type of work they are to perform and such training shall be documented and provided to the Contracting Officer.

Prior to commencement of work the Contractor's Designated IH and Competent Person shall instruct each worker about:

PART 2 PRODUCTS

2.1 ENCAPSULANTS

Encapsulants shall conform to USEPA requirements, shall contain no toxic or hazardous substances and no solvent. Submit certificates stating that encapsulants meet the applicable specified performance requirements.

2.2 ENCASEMENT PRODUCTS

Encasement shall consist of primary cellular polymer coat, polymer finish coat, and any other finish coat as approved by the Contracting Officer.

2.3 EXPENDABLE SUPPLIES

Section 02 82 14.00 10 – Asbestos Hazard Control Activities Page 21 of 36

Glovebags shall be provided as described in 29 CFR 1926.1101 and SET-UP DETAIL SHEET 10. The glovebag assembly shall be 6 mil thick plastic, prefabricated and seamless at the bottom with preprinted OSHA warning label.

Industrial grade duct tape of appropriate widths suitable for bonding sheet plastic and disposal container.

Leak-tight (defined as solids, liquids, or dust that cannot escape or spill out) disposal containers shall be provided for ACM wastes as required by 29 CFR 1926.1101 and DETAIL SHEETS 9A, 9B, 9C and 14. Disposal containers can be in the form of:

Sheet plastic shall be polyethylene of 6 mil minimum thickness and shall be provided in the largest sheet size necessary to minimize seams. Film shall be clear, frosted, or black and conform to ASTM D4397, except as specified below:

Where a potential for fire exists, flame-resistant sheets shall be provided. Film shall be frosted or black and shall conform to the requirements of NFPA 701.

Reinforced sheets shall be provided where high skin strength is required, such as where it constitutes the only barrier between the regulated area and the outdoor environment.

This is the start of the file's text. The full file is on GovTribe.