RFP Note to Include_EMG Demo_8618 Warwick.docx

DOCX document 31 KB Posted

Attached to
Emergency Residential Demolition: 8618 Warwick
Solicitation number
300000149322436
Issued by
Michigan

About this file

This is an RFP note for emergency residential demolition prepared by the City of Detroit, Michigan. The project concerns the demolition of a one-family, 11/2-story brick dwelling located at 8618 Warwick that has been deemed unsafe and requires immediate removal. The structure is vacant, open to trespass and weather exposure, and has sustained severe fire and structural damage since a fire occurrence on October 25, 2020. Specific deficiencies include a roof damaged beyond repair with imminent collapse risk, brick siding stripped by vandals, interior damage throughout the dwelling, and surrounding premises littered with debris. Both adjacent dwellings are similarly vacant and damaged. An Emergency Demolition Order has been issued by the City of Detroit, and the project must proceed on an emergency timeline regardless of frost law restrictions.

The awarded vendor must source all backfill material from a Category 2 source approved on the City of Detroit Backfill platform, with vendors required to reference the platform for current approved sources. No pricing terms, set-aside information, incumbent contractors, or specific funding amounts are detailed in this RFP note. The emergency nature of the project requires strict adherence to accelerated timelines for completion.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Notes to Include in the RFP

BSEED Inspector Description: Regarding a re-inspect of 8618 Warwick found:

-RE-INSPECT

1 family 11/2 story brick Dwelling with garage.

Vacant and open to trespass and elements.

Severe fire and structural damages to dwlg throughout.

Roof damaged and brick siding stripped by vandals.

Damage to roof from fire has severely damaged the structure of roof and collapse appears eminent.

Premises littered with trash and debris.

Vac>180, posted EMG-DEMO Order demolition by CC on 2023 Dwelling on each side vacant and open and damaged as well.

Rec: Emergency-DEMO

DFD Fire Occurrence Date: 10/25/2020

*Emergency timelines must be met regardless of if Frost Laws are in effect.

Backfill:

· The awarded vendor must use backfill material from a Category 2 source approved on the City of Detroit Backfill platform. Please refer to the backfill platform for a current list of approved sources.

File details come from the government source that posted it. Updated .