RFP 50011_Exhibit B - Pricing.xlsx
XLSX spreadsheet 17 KB Posted
- Attached to
- On-Call Environmental Abatement Services
- Solicitation number
- 50011
- Issued by
- Colorado
About this file
The document is a Pricing Exhibit (RFP 50011_Exhibit B) for an On-Call Environmental Abatement Services contract with the City and County of Denver, Colorado. The contract covers environmental abatement services for a five-year term, including abatement, remediation, and management of building materials and contaminated soils containing asbestos, lead-based paint, and mold, with potential limited building demolition associated with response actions. The pricing exhibit is structured in two tables: one for non-prevailing wage labor rates and another for prevailing wage labor rates, detailing hourly rates for standard and non-standard work hours across contract years 1-5.
The pricing tables list multiple labor categories with specific roles critical to environmental abatement, including Project Managers, Superintendents, Asbestos Project Designers, Certified Lead Supervisors, Laborers, Expert Witnesses, and various specialized workers such as Truck Drivers, Power Equipment Operators, Electricians, and Plumbers. Rates are differentiated by standard hours (8 a.m. - 5 p.m., Monday-Friday) and non-standard hours (5 p.m. - 8 a.m., weekends, and city holidays), with separate pricing for contract years 1-3, 4, and 5. The document indicates that prevailing wage rates for certain labor categories can be found in a separate Exhibit C - Prevailing Wage Schedule.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1-Non-Prevailing Wage
| RFP 50011_Exhibit B - Pricing | Instructions: Only complete cells with a $ symbol. |
| Table 1 - Non-Prevailing Wage |
| CONTRACT YEARS 1-3 | CONTRACT YEARS 1-3 | CONTRACT YEAR 4 | CONTRACT YEAR 4 | CONTRACT YEAR 5 | CONTRACT YEAR 5 | |||
| Labor Title (or equivalent) | Labor Description | Total hourly rate STANDARD HOURS | ||||||
| (8 a.m. – 5 p.m., M-F) | Total hourly rate |
NON- STANDARD HOURS
| (5 p.m. – 8 a.m., M-F, weekends & City holidays) | Total hourly rate STANDARD HOURS |
| (8 a.m. – 5 p.m., M-F) | Total hourly rate |
NON- STANDARD HOURS
| (5 p.m. – 8 a.m., M-F, weekends & City holidays) | Total hourly rate STANDARD HOURS |
| (8 a.m. – 5 p.m., M-F) | Total hourly rate |
NON- STANDARD HOURS
(5 p.m. – 8 a.m., M-F, weekends & City holidays)
| Project Manager | Main contact for contract, cost proposals, billing and project coordination | $ | $ | $ | $ | $ | $ |
| Superintendent | Projects contact and oversight | $ | $ | $ | $ | $ | $ |
| Asbestos Project Designer | Development of Abatement Design | $ | $ | $ | $ | $ | $ |
| Asbestos Supervisor (non-laborer) | State certified on-site supervisor for asbestos laborers | $ | $ | $ | $ | $ | $ |
| CDPHE Reg. 19 Certified Lead Supervisor | State certified lead supervisor | $ | $ | $ | $ | $ | $ |
| CDPHE Reg. 19 Certified Lead Project Designer | State certified lead project designer | $ | $ | $ | $ | $ | $ |
| Common Laborer Field Supervisor | On-site supervisor for common laborers | $ | $ | $ | $ | $ | $ |
| Expert Witness | Litigation and preparation | $ | $ | $ | $ | $ | $ |
| Administrative Support | As-needed non-field laborer | $ | $ | $ | $ | $ | $ |
Table 2-Prevailing Wage
| RFP 50011_Exhibit B - Pricing | Instructions: Only complete cells with a $ symbol. |
| Table 2 - Prevailing Wage | For rates, see Exhibit C - Prevailing Wage Schedule |
| CONTRACT YEARS 1-3 | CONTRACT YEARS 1-3 | CONTRACT YEAR 4 | CONTRACT YEAR 4 | CONTRACT YEAR 5 | CONTRACT YEAR 5 | |||
| Labor Title (or equivalent) | Labor Description | Total hourly rate STANDARD HOURS | ||||||
| (8 a.m. – 5 p.m., M-F) | Total hourly rate |
NON- STANDARD HOURS
| (5 p.m. – 8 a.m., M-F, weekends & City holidays) | Total hourly rate STANDARD HOURS |
| (8 a.m. – 5 p.m., M-F) | Total hourly rate |
NON- STANDARD HOURS
| (5 p.m. – 8 a.m., M-F, weekends & City holidays) | Total hourly rate STANDARD HOURS |
| (8 a.m. – 5 p.m., M-F) | Total hourly rate |
NON- STANDARD HOURS
(5 p.m. – 8 a.m., M-F, weekends & City holidays)
| Asbestos Laborer | State certified asbestos laborer performing asbestos abatement or remediation inside or outside of a building. | $ | $ | $ | $ | $ | $ |
| Common Laborer, Yardman | Non-asbestos & non-regulated material/demolition & cleanup laborer | $ | $ | $ | $ | $ | $ |
| CDPHE Reg. 19 Certified Lead Worker | State certified lead hazzard worker | $ | $ | $ | $ | $ | $ |
| Truck Driver | Pick-up | $ | $ | $ | $ | $ | $ |
| Truck Driver | Tandem/Semi-truck & water | $ | $ | $ | $ | $ | $ |
| Power Equipment Operator | Backhoe | $ | $ | $ | $ | $ | $ |
| Power Equipment Operator | Trackhoe | $ | $ | $ | $ | $ | $ |
| Power Equipment Operator | Front end loader | $ | $ | $ | $ | $ | $ |
| Power Equipment Operator | Skid loader | $ | $ | $ | $ | $ | $ |
| Power Equipment Operator | Wheel excavator | $ | $ | $ | $ | $ | $ |
| Power Equipment Operator | Bulldozer | $ | $ | $ | $ | $ | $ |
| Electrician | Licensed operator capable of meeting CDPHE PPE requirements for asbestos containment entry | $ | $ | $ | $ | $ | $ |
| Plumber | Licensed operator capable of meeting CDPHE PPE requirements for asbestos containment entry | $ | $ | $ | $ | $ | $ |
File details come from the government source that posted it. Updated .