RFB936300-01 - Drawings.pdf
PDF 11 MB Posted
- Attached to
- DOE ISD Infirmary Roof Replacement
- Solicitation number
- 005-RFBCON-0985-2024
- Issued by
- Polk County, Milton City, Iowa
About this file
The document is a set of architectural drawings for the DOE ISD Infirmary Roof Replacement project, prepared by Modern Design Architects for the State of Iowa, Department of Administrative Services (DAS). The project involves a complete roof replacement for the Iowa School for the Deaf's Infirmary Building located at 3501 Harry Langdon Blvd. in Council Bluffs, Iowa. The project scope includes removing the existing roof system down to the concrete deck, installing a new fully-adhered 60 mil EPDM membrane with R30 polyisocyanurate insulation, replacing sheet metal, installing new retrofit drains, and addressing parapet wall and flashing details. The project is identified as DAS Project #9363.00 and RFB #936300-01.
The construction will be managed by Samuels Group, with Confidence Group as the design team. The project involves specific technical requirements, including removing ballast gravel, addressing potential asbestos material at the parapet wall base (to be abated by others), installing tapered crickets between drains for proper drainage, and raising curbs and vents to meet minimum flashing height requirements. The contractor will be responsible for coordinating with the owner, protecting the facility and surrounding areas, and maintaining a professional work environment. Special considerations include working in a secure facility, using appropriate access methods, and coordinating daily activities with the owner's representative.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1222508-event.pdf | ||
| RFB936300-01 - Addendum 1.pdf | ||
| RFB936300-01 - Notice to Bidders.pdf | ||
| RFB936300-01 - Bid Form.pdf | ||
| RFB936300-01 - Project Manual.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHEET NO.
SHEET TITLE:
Project Title:
REVISIONS
Date
Architect:
RFB #
936300-01
COVER
PAGE
AA
DOE ISD INFIRMARY ROOF REPLACEMENT
3501 Harry Langdon Blvd.
Council Bluffs, IA 51503
DAS Project #9363.00
RFB #936300-01
CONTACT INFORMATION:
Owner:
State of Iowa, Department of Administrative Services 109 SE 13th Street Des Moines, IA 50319 Contact: Jennie Elliot 515.745.3244.
Client:
Iowa School for the Deaf 3501 Harry Langdon Blvd.
Council Bluffs, IA 51503 Contact: Scott Mauch – Facility Manager 402.677.4534
Construction Manager:
Samuels Group 2929 Westown Parkway, Suite 200 West Des Moines, IA 50266 Contact: Jerry Dehnke 515.661.7142
Design Team:
Confidence Group Modern Design Architects 645 Daybreak Dr. 202 Main St.
Waukee, IA 50263 Janesville, IA 50647 Contact: Garrett Brown Contact: Kevin McConnell
515.979.5173 319.987.2101
DRAWING INDEX:
AA COVER PAGE
A1.0 OVERVIEW& STAGING
A2.0 PLANS
A2.1 DETAILS
AB
C
D
I HEREBY CERTIFY THAT THIS PLAN OR TECHNICAL SUBMISSION WAS
PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND RESPONSIBLE
CHARGE. I AM A DULY REGISTERED ARCHITECT UNDER THE LAWS OF THE
STATE OF IOWA.
ROBERT J. STENSLAND,A.I.A.
MY REGISTRATION RENEWAL DATE IS: 6/30/25
PAGES OR SHEETS COVERED BY THIS SEAL:
DATE: 3-1-24 IOWA REG: 5656
AA, A1.0, A2.0, A2.1 ONLY
Project Title:
REVISIONS
Date
Architect:
RFB #
936300-01
MATERIAL
AND
EQUIPMENT
STORAGE
OVERVIEW,
STAGING, &
CORES
A1.0
INFIRMARY BUILDING
EXPOSED MEMBRANE AREA BALLASTED AREAS GENERAL NOTES
CONTRACTOR RESPONSIBLE FOR
VERIFICATION OF EXISTING ROOF SYSTEM.
CONTRACTOR RESPONSIBLE FOR REMOVAL
OF BALLAST.
CONTRACTOR RESPONSIBLE FOR REMOVAL
OF EXISTING TIRES ANDS TORING IN
PARKING LOT SOUTH OF BUILDING. OWNER
WILL DISPOSE OF TIRES.
MATERIAL AND EQUIPMENT STORAGE WILL
BE DESIGNATED LOCATION WITH AGREED
UPON NUMBER OF PARKING SPOTS.
LOADING AND UNLOADING OF MATERIALS
SHOULD BE PERFORMED FROM WEST SIDE
OF BUILDING
CRANE LOCATION
EPDM
Coverboard
Wood Fiber Board
BUR
Concrete Deck
Ballast EPDM Perlite
EPS
BUR
Concrete Deck
A
B
C D
Project Title:
REVISIONS
Date
Architect:
RFB #
936300-01
21'-1" 59'-10" 21'-1" 12'-0"
'-0
8'-3"
9' -0
'-0
3'-9"
SL
O
PE
SL
O
PE
SL
O
PE
SL
O
PE
P
P P
P
P
A2.0
ROOF PLAN
A2.1
A2.1
A2.1
A2.1
A2.1
A2.1
1. ROOF PLAN LAYOUT, LOCATION, AND SECTIONS WERE TAKEN FROM EXISTING BUILDING PLANS AND FIELD CONDITIONS. THE CONTRACTOR IS RESPONSIBLE TO CORE THE ROOF. THE CONTRACTOR SHOULD VERIFY ALL CONDITIONS OF THE EXISTING ROOF SYSTEM, INCLUDING INSULATION TYPE(S) AND THICKNESS. FAILURE TO VERIFY CONDITIONS WILL BE AT THE CONTRACTORS EXPENSE.
2. NEW ROOFING ASSEMBLY:
FULLY-ADHERED 60 MIL EPDM MEMBRANE
FULLY-ADHERED ½” COVER BOARD
FULLY-ADHERED R30 POLYISOCYANURATE INSULATION(2 LAYERS)
CONCRETE DECK
3. REMOVE EXISTING ROOF SYSTEM TO THE CONCRETE DECK.
4. REMOVE ANY EXISTING SHEET METAL, AND REPLACE WITH NEW.
5. REMOVE BALLAST GRAVEL AND DISPOSE; OWNER DOES NOT WANT. CONTRACTOR RESPONSIBLE FOR REMOVAL OF EXISTING TIRES
AND STORING IN PARKING LOT SOUTH OF THE BUILDING. OWNER WILL DISPOSE OF TIRES.
6. ASBESTOS MATERIAL WAS IDENTIFIED AT THE PARAPET WALL BASE MATERIAL(BLACK). REFERENCE ASBESTOS INSPECTION REPORT FOR ADDITIONAL INFORMATION. ABATEMENT BY OTHERS. CONTRACTOR WILL COORDINATE WITH ABATEMENT CONTRACTOR DURING TIME OF REMOVAL AND INSTALL. INSTALL NEW SEALANT ALONG COPING STONE AND FILL ANY VOIDS IN COPING STONE.
7. ALL PARAPET/EXISTING FLASHINGS WILL RECEIVE NEW PLYWOOD TO EXISTING BRICK FOR A CLEAN WORKING SURFACE FOR EPDM.
NO LEAD PINS ARE TO BE USED FOR ATTACHMENT INTO BRICK.
8. ARROWS ON PLANS INDICATE DIRECTION OF THE SLOPED CONCRETE DECK. TAPERED CRICKETS WILL BE INSTALLED BETWEEN DRAINS FOR ADEQUATE DRAINAGE. CONTRACTOR SHOULD FIELD VERIFY ALL DIMENSIONS OF THE BUILDING AND DRAIN LOCATIONS FOR
ACCURATE LAYOUT.
9. EXISTING METAL VENTS(2) SHALL BE REMOVED AND STORED FOR THE OWNER AND NEW PREFAB CURB VENT(S) TO BE INSTALLED
DURING CONSTRUCTION AND PROPERLY REFASTENED TO PROVIDE WATERTIGHT CONDITIONS.
10. RAISE ALL CURBS AND VENTS WHICH DO NOT MEET THE 8" MINIMUM FLASHING HEIGHT REQUIREMENT. INSTALL TAPERED CRICKET ON ABOVE CURBS 24" OR MORE WIDE. CRICKETS SHALL HAVE ½” PER FOOT MINIMIMUM FINSHED SLOPE AWAY FROM CURB AND
VALLEYS DIRECTING WATER TO THE SIDES.
ROOF SYMBOLS:
P
CRICKET
PIPE PENETRATION(5)
WALKWAY PAD
DRAIN(4)
SCUPPER(4)
ROOF HATCH(1)
VENT(2)
INFIRMARY BUILDING
Scale: 1"=10'-0"
½” crickets between drains
11. FLASH ALL DRAINS, CURBS, VENTS, AND STACKS AS SHOWN IN PLANS. MANUFACTURER’S STANDARD DETAILS AND
RECOMMENDATIONS FOR ANY MISCELLANEOUS DETAILS NOT SHOWN IN PLANS.
12. INSTALL NEW RETROFIT DRAINS TO ALL FOUR DRAIN LOCATIONS. NEW MATCHING METAL GRATES FOR ALL DRAINS LOCATIONS IS
REQUIRED. PAINTED GRATE COMPONENTS SHOULD MATCH IN COLOR.
13. PIPE FLASHING DETAIL SHOULD BE USED FOR ALL PIPE PENETRATIONS LISTED ON PLANS.
14. INSTALL NEW WALKWAY PADS AROUND ROOF HATCH, CURBS, AND ROOF TRANSITION AREAS .
15. CONTRACT SHALL INCLUDE ANY MODIFICATIONS, MATERIALS, AND/OR IMPROVEMENTS REQUIRED BY THE ROOF SYSTEM
MANUFACTURER TO MEET SPECIFIED WARRANTY.
16. STORED MATERIALS - DO NOT EXPOSE MATERIALS VULNERABLE TO WATER OR UV DEGRADATION IN QUANTITIES GREATER THAN CAN BE APPLIED DURING THE SAME DAY. FLAMMABLE MATERIALS STORED ON ROOF IS NOT ACCEPTABLE. ONLY FLAMMABLE
MATERIALS USED THAT DAY ARE ALLOWED ON ROOF.
17. A PORT-A-JOHN IS REQUIRED ON SITE DURING ALL WORK, AS WELL AS A DUMPSTER. BOTH MUST BE KEPT IN A CLEAN TIDY MANNER AND PLACED IN PREAPPROVED LOCATIONS. ONLY THE FOREMAN IS ALLOWED INSIDE THE BUILDING DURING THE PROJECT DURATION.
18. ACCESS - THIS IS A SECURE FACILITY AND NO ONE SHOULD ENTER THE FACILITY WITHOUT EXPRESS PERMISSION FROM AN OWNER'S REPRESENTATIVE. CONTRACTOR SHOULD USE A LIFT OR SCAFFOLDING FOR ACCESS TO THE ROOFS.
19. PERFORM ALL WORK IN A PROFESSIONAL MANNER AND AS SPECIFIED IN THESE DOCUMENTS. RAIN PRECAUTIONS MUST BE FOLLOWED DAILY. ANY LEAKS ARE THE CONTRACTOR'S RESPONSIBILITY. ANY DAMAGE CAUSED BY LEAKS IS THE CONTRACTOR'S
RESPONSIBILITY. CLEAN WORK AREA AND PROPERLY STORE MATERIALS DAILY.
20. COORDINATE WORK ACTIVITIES DAILY WITH OWNER DURING COURSE OF THE WORK AND PHASING. OWNER REQUIRES 48 HOURS NOTICE PRIOR TO MOVEMENT OF WORK INTO A DIFFERENT LOCATION WITHIN THE PROPERTY. NOTIFICATION OF WORK MUST BE
MADE IN WRITING TO OWNER'S REPRESENTATIVE.
21. PROTECT BUILDINGS, ADJACENT BUILDINGS OR STRUCTURES, WALKWAYS, SITE IMPROVEMENTS, LANDSCAPING, EXTERIOR PLANTINGS, VEHICLES, AND OTHER SURFACES FROM SOILING OF OPERATIONS AND CONSTRUCTION DEBRIS AND DUST.
22. BEFORE WORKING ON AREAS OF THE WALK WAY THAT CAN PENETRATE TO AREAS BELOW, NOTIFY OWNER A MINIMUM OF 48
HOURS IN ADVANCE IN ORDER TO EVACUATE AREA BENEATH OF SUBSEQUENT OPERATIONS
GENERAL NOTES
½” crickets between drains ½” crickets between drains
½” crickets between drains ½” crickets between drains
'-0
'-0
A2.1
A2.1
A2.1
A2.1
A2.1
P
A2.1
C
DB
A
Project Title:
REVISIONS
Date
Architect:
RFB #
936300-01
DETAILS
A2.1
I
RETROFIT ROOF DRAIN1
A2.1
TYP. THROUGH-WALL SCUPPER2
A2.1
PIPE PENETRATION4
A2.1
A2.1
CURB6
A2.1
TYP. WALKWAY PAD7
A2.1
ALUMINUM DOME
STAINLESS STEEL STUDS, WASHERS AND NUTS
CLAMPING RING
ALUMINUM FLANGE
NEW WOOD NAILER
FASTENER
BONDING ADHESIVE
EPDM MEMBRANE
CONCRETE DECK
INSULATION
CONTINUOUS BEAD OF WATER BLOCK
EXISTING DRAIN BOWL
EXISTING DRAIN PIPE
16" LONG ALUMINUM DRAIN INSERT TUBE
RUBBER SEAL
12"
6" MAX.
1/2"
MIN.
USE APPROPRIATE TERMINATION
CONTINUOUS BEAD OF LAP
SEALANT
PRIMER
5" QUICKSEAM FLASHING
CENTERED OVER EDGE OF
SCUPPER FLANGE
CONTINUOUS BEAD OF
WATER BLOCK
APPROPRIATE FASTENER 4" O.C.
MAX
WELDED METAL SCUPPER
SLEEVE
9" QUICKSEAM FORMFLASH CENTER
OF 5" QUICKSEAM FLASHINGCONTINUOUS
BEAD OF AP
SEALANT
5" QUICKSEAM FLASHING CENTERED
OVER EDGE OF SCUPPER FLANGE
EPDM
MEMBRANE
BONDING
ADHESIVE
USE APPROPRIATE
BASE TIE-IN
STAINLESS STEEL CLAMPING RING
AP SEALANT
CONTINUOUS BEAD OF AP
SEALANT
CLAMPING RING (METAL HOOD
OPTIONAL)
PRE-MOLDED PIPE FLASHING CONTINUOUS BEAD
OF LAP SEALANT
EPDM MEMBRANE
PRIMER
RO
U
N D
PE
N
ET
RA
TI
O
N
12" FORMFLASH
BONDING ADHESIVE
CONITINUOUS BEAD OF
LAP SEALANT
3"3"
CONCRETE DECK
INSULATION
30"
30"
WALKWAY PAD
3" Q
U
IC
KS
EA
M S
PL
IC
E
TA
PE
SL
O
PE
3" Q
U
IC
KS
EA
M S
PL
IC
E
3" Q
U
IC
KS
EA
M S
PL
IC
E
RTU1-1/4" HOT DIPPED
GALVANIZED NAILS 12" O.C.
MAX. WOOD NAILER
CURB
BONDING ADHESIVE
INSULATION
5" QUICKSEAM FLASHING
EPDM MEMBRANE
2" METAL PLATE WITH
FASTENER AT 12" O.C. MAX.
3" SPLICE TAPE
PRIMER
BONDING
ADHESIVE
INSULATION
EPDM MEMBRANE
CONCRETE DECK
2" M
IN
PRIMER
VENT
OVERALL HEIGHT 14"
HEAD WIDTH = 24"
CLEARANCE 8"
FLASHING= 2"
COLLAR
HEIGHT 6"
CMF HEIGHT 2"
OPENING = 12"
CMF WIDTH = 24"
X 24"
REMOVE AND REPLACE SEALANT AT COPING STONE
CONTINUOUS BEAD OF AP SEALANT
CONTINUOUS BEAD OF AP SEALANT
APPROPRIATE FASTENER 12" O.C. MAX.
CONTINOUS BEAD OF AP SEALANT
TERMINATION BAR
APPROPRIATE FASTENER 12" O.C. MAX.
CONTINOUS BEAD OF AP SEALANT
METAL COUNTERFLASHING
EPDM MEMBRANE
MEMBRANE ADHESIVE
1/4" PLYWOOD
WALL
USE APPROPRIATE BASE TIE-IN
PARAPET5
A2.1
8"
| Title� |
| Overview� |
| Plan� |
| DETAILS� |
File details come from the government source that posted it. Updated .