rfb_13118_bid_schedule.xlsx

XLSX spreadsheet 34 KB Posted

Attached to
RFB - TIJUANA RIVER VALLEY SMUGGLER'S GULCH DREDGING
Solicitation number
BPM013118
Issued by
California

About this file

This is a bid schedule document for the Tijuana River Valley Smuggler's Gulch Dredging project (RFB 13118) issued by the California Department of Parks and Recreation. The project encompasses sediment removal and channel restoration work at Smuggler's Gulch, with multiple bid components structured across two main templates. The base bid includes excavation of approximately 1,400 linear feet (10,000 cubic yards) south of Monument Road, with work specifications including temporary facilities, surveys, mobilization/demobilization, water pollution control plan (WPCP) preparation and implementation, clearing and grubbing, earthwork excavation with 2:1 slope requirements, trash boom relocation, and removal of sediment, debris, tires (approximately 1,500 units), and other materials to designated staging areas and landfills or recycling facilities. The project includes seven additive alternates ranging from 400 to 1,800 linear feet of additional excavation work, covering sections such as Disney Crossing to Tijuana River Pilot Channel Connection and Monument Road to Disney Crossing, each with estimated quantities of 10,000 cubic yards of sediment removal and 500 to 1,500 tires for disposal.

All bid items are priced on a lump-sum basis with unit prices and total figures to be completed by bidders. The bid schedule indicates placeholder values of $0 pending contractor submissions. The project requirements include material testing, environmental permits for certain additive alternates, and designation of a qualified biologist for biological resources conditions, with specific duties outlined in the special provisions. Bidders are responsible for verifying acceptance of waste materials at designated landfills and recycling plants. The document does not provide explicit response deadlines, award dates, or contract term information within the bid schedule itself, as these details would typically be contained in the broader request for bid documents.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Part 1 Template Smugglers Gulch Sediment Removal

BID SCHEDULE (Includes Materials AND Installation unless otherwise noted)

BASE BID:
ITEM
NO.ITEM CODEITEM DESCRIPTIONESTIMATED QUANTITYUNIT OF MEASUREUNIT PRICE
(IN FIGURES)TOTAL

(IN FIGURES)

1Temporary Facilities and Controls1LS
2Complete survey in BASE BID to verify depths and slopes to be marked out via staking to provide a fully functional drainage system.1LS
3Mobilization & Demobilization1LS
4WPCP Preparation1LS
5WPCP Implementation1LS
6Clearing & Grubbing1LS
7Earthwork – Excavation (1,400 LF)

APPROX. depth 15’ APPROX. width 20’ at bottom of channel Slopes of all trench sides to be 2 to 1

(2 feet of horizontal run for every 1 foot of vertical run).1LS
8Disconnect and relocate trash booms to allow work to occur.1LS
9Relocate, reconnect, and reinstall trash booms once work has been completed at Base Bid scope.
Trash Boom anchors are existing concrete footings measuring ~30"x30"x60".1LS
10Removal and relocation of all dirt, debris, trash, and tires from BASE BID to “Staging Area.”1LS
11Clean all dirt, trash, sediment, debris, and tires from the culvert located at "Monument Road". The culvert must be cleared in full allowing for unobstructed flow of the water once completed.
12Disposal of tires from BASE BID APPROX. QTY: 1,5001LS
13Removal of all dirt, debris, trash and tires accumulated from BASE BID to “Staging Area” and exported to the designated landfill and/or recycling plant. Contractor to verify the landfill and/or recycling plant that will accept the various materials.1LS
ADDITIVE ALTERNATE #1:
ITEMDESCRIPTIONESTIMATED QUANTITYUNIT OF MEASUREUNIT PRICE
(IN FIGURES)TOTAL

(IN FIGURES)

14Temporary Facilities and Controls1LS
15Complete survey in ADD/ALT 1 to verify depths and slopes to be marked out via staking to provide a fully functional drainage system.1LS
16Mobilization & Demobilization1LS
17WPCP Preparation1LS
18WPCP Implementation1LS
19Clearing & Grubbing1LS
20Earthwork – Excavation (1,500 LF)

APPROX. depth 15’ APPROX. width 20’ at bottom of channel Slopes of all trench sides to be 2 to 1

(2 feet of horizontal run for every 1 foot of vertical run).1LS
21Removal and relocation of all dirt, debris, trash, and tires from ADD/ALT 1 to “Staging Area”1LS
22Clean all dirt, trash, sediment, debris, and tires from the culvert located at "Disney Crossing". The culvert must be cleared in full allowing for unobstructed flow of the water once completed.
23Disposal of tires from ADD/ALT 1 APPROX. QTY: 1,5001LS
24Removal of all dirt, debris, trash and tires from “Staging Area” to designated landfill and/or recycling plant. Contractor to verify the landfill and/or recycling plant that will accept the various materials.1LS
ADDITIVE ALTERNATE #2:
ITEMDESCRIPTIONESTIMATED QUANTITYUNIT OF MEASUREUNIT PRICE
(IN FIGURES)TOTAL

(IN FIGURES)

25Temporary Facilities and Controls1LS
26Complete Survey in ADD/ALT 2 to verify depths and slopes to be marked out via staking to provide a fully functional drainage system.1LS
27Mobilization & Demobilization1LS
28WPCP Preparation1LS
29WPCP Implementation1LS
30Clearing & Grubbing1LS
31Earthwork – Excavation (1,600 LF)

APPROX. depth 15’ APPROX. width 20’ at bottom of channel Slopes of all trench sides to be 2 to 1.

(2 feet of horizontal run for every 1 foot of vertical run).1LS
32Removal and relocation of all dirt, debris, trash, and tires from ADD/ALT 2 to “Staging Area”1LS
33Disposal of tires from ADD/ALT 2 APPROX. QTY: 1,5001LS
34Removal of all dirt, debris, trash and tires accumulated from ADD/ALT 2 to “Staging Area” and exported to designated landfill and/or recycling plant. Contractor to verify the landfill and/or recycling plant that will accept the various materials.1LS

Part 2 Template Smugglers Gulch Sediment Removal

BID SCHEDULE (Includes Materials AND Installation unless otherwise noted)

BASE BID:
ITEMDESCRIPTIONESTIMATED QUANTITYUNIT OF MEASUREUNIT PRICE
(IN FIGURES)TOTAL

(IN FIGURES)

1Temporary Facilities and Controls1LS
2Complete survey in BASE BID to verify depths and slopes to be marked out via staking to provide a fully functional drainage system.1LS
3Mobilization & Demobilization1LS
4WPCP Preparation1LS
5WPCP Implementation1LS
6Clearing & Grubbing1LS
7Earthwork – Excavation (400 LF)

APPROX. depth 15’ APPROX. width 20’ at bottom of channel Slopes of all trench sides to be 2 to 1

(2 feet of horizontal run for every 1 foot of vertical run).1LS
8Disconnect and relocate trash booms to allow work to occur.1LS
9Reconnect and reinstall trash booms once work has been completed at Base Bid & Add/Alt 1 scope.1LS
10Removal and relocation of all dirt, debris, trash, and tires from BASE BID to “Staging Area”1LS
11Disposal of tires from BASE BID APPROX. QTY: 5001LS
12Removal of all dirt, debris, trash and tires accumulated from BASE BID to “Staging Area” and exported to the designated landfill and/or recycling plant. Contractor to verify the landfill and/or recycling plant that will accept the waste materials.1LS
Total Base Bid
ADDITIVE ALTERNATE #1:
ITEMDESCRIPTIONESTIMATED QUANTITYUNIT OF MEASUREUNIT PRICE
(IN FIGURES)TOTAL

(IN FIGURES)

13Temporary Facilities and Controls1LS
14Complete survey in ADD/ALT 1 to verify depths and slopes to be marked out via staking to provide a fully functional drainage system.1LS
14Mobilization & Demobilization1LS
15WPCP Preparation1LS
16WPCP Implementation1LS
17Clearing & Grubbing1LS
18Earthwork – Excavation (1,000 LF)

APPROX. depth 15’ APPROX. width 20’ at bottom of channel Slopes of all trench sides to be 2 to 1

(2 feet of horizontal run for every 1 foot of vertical run).1LS
19Removal and relocation of all dirt, debris, trash, and tires from ADD/ALT 1 to “Staging Area”1LS
20Disposal of tires from ADD/ALT 1 APPROX. QTY: 1,0001LS
21Removal of all dirt, debris, trash and tires from “Staging Area” to designated landfill and/or recycling plant. Contractor to verify the landfill and/or recycling plant that will accept the waste materials.1LS
22Reconnect trash booms to anchors1LS
Total Additive Alternate #1
ADDITIVE ALTERNATE #2:
ITEMDESCRIPTIONESTIMATED QUANTITYUNIT OF MEASUREUNIT PRICE
(IN FIGURES)TOTAL

(IN FIGURES)

22Temporary Facilities and Controls1LS
23Complete Survey in ADD/ALT 2 to verify depths and slopes to be marked out via staking to provide a fully functional drainage system.1LS
24Mobilization & Demobilization1LS
25WPCP Preparation1LS
26WPCP Implementation1LS
27Clearing & Grubbing1LS
28Earthwork – Excavation (1,600 LF)

APPROX. depth 15’ APPROX. width 20’ at bottom of channel Slopes of all trench sides to be 2 to 1.

(2 feet of horizontal run for every 1 foot of vertical run).1LS
29Removal and relocation of all dirt, debris, trash, and tires from ADD/ALT 2 to “Staging Area”1LS
30Disposal of tires from ADD/ALT 2 APPROX. QTY: 1,5001LS
31Removal of all dirt, debris, trash and tires accumulated from ADD/ALT 2 to “Staging Area” and exported to designated landfill and/or recycling plant. Contractor to verify the landfill and/or recycling plant that will accept the waste materials.1LS
Total Additive Alternate #2
ADDITIVE ALTERNATE #3:
ITEMDESCRIPTIONESTIMATED QUANTITYUNIT OF MEASUREUNIT PRICE
(IN FIGURES)TOTAL

(IN FIGURES)

32Temporary Facilities and Controls1LS
33Complete Survey in ADD/ALT 3 to verify depths and slopes to be marked out via staking to provide a fully functional drainage system.1LS
34Mobilization & Demobilization1LS
35WPCP Preparation1LS
36WPCP Implementation1LS
37Clearing & Grubbing1LS
38Earthwork – Excavation (1,500 LF)

APPROX. depth 15’ APPROX. width 20’ at bottom of channel Slopes of all trench sides to be 2 to 1.

(2 feet of horizontal run for every 1 foot of vertical run).1LS
39Removal and relocation of all dirt, debris, trash, and tires from ADD/ALT 3 to “Staging Area”1LS
40Disposal of tires from ADD/ALT 3 APPROX. QTY: 1,5001LS
41Removal of all dirt, debris, trash and tires accumulated from ADD/ALT 3 to “Staging Area” and exported to designated landfill and/or recycling plant. Contractor to verify the landfill and/or recycling plant that will accept the waste materials.1LS
Total Additive Alternate #3
ADDITIVE ALTERNATE #4:
ITEMDESCRIPTIONESTIMATED QUANTITYUNIT OF MEASUREUNIT PRICE
(IN FIGURES)TOTAL

(IN FIGURES)

42Temporary Facilities and Controls1LS
43Complete Survey in ADD/ALT 4 to verify depths and slopes to be marked out via staking to provide a fully functional drainage system.1LS
43Mobilization & Demobilization1LS
44WPCP Preparation1LS
45WPCP Implementation1LS
46Clearing & Grubbing1LS
47Earthwork – Excavation (1,800 LF)

APPROX. depth 15’ APPROX. width 15’ at bottom of channel Slopes of all trench sides to be 2 to 1.

(2 feet of horizontal run for every 1 foot of vertical run).1LS
48Removal and relocation of all dirt, debris, trash, and tires from ADD/ALT 4 to “Staging Area”1LS
49Disposal of tires from ADD/ALT 4 APPROX. QTY: 1,5001LS
50Removal of all dirt, debris, trash and tires accumulated from ADD/ALT 4 to “Staging Area” and exported to designated landfill and/or recycling plant. Contractor to verify the landfill and/or recycling plant that will accept the waste materials.1LS
Total Additive Alternate #4
ADDITIVE ALTERNATE #5:
ITEMDESCRIPTIONESTIMATED QUANTITYUNIT OF MEASUREUNIT PRICE
(IN FIGURES)TOTAL

(IN FIGURES)

51Temporary Facilities and Controls1LS
52Complete Survey in ADD/ALT 5 to verify depths and slopes to be marked out via staking to provide a fully functional drainage system.1LS
52Mobilization & Demobilization1LS
53WPCP Preparation1LS
54WPCP Implementation1LS
55Clearing & Grubbing1LS
56Earthwork – Excavation (1,300 LF)

APPROX. depth 15’ APPROX. width 15’ at bottom of channel Slopes of all trench sides to be 2 to 1.

(2 feet of horizontal run for every 1 foot of vertical run).1LS
57Removal and relocation of all dirt, debris, trash, and tires from ADD/ALT 5 to “Staging Area”1LS
58Disposal of tires from ADD/ALT 5 APPROX. QTY: 1,0001LS
59Removal of all dirt, debris, trash and tires from ADD/ALT 5 to “Staging Area” and exported to designated landfill and/or recycling plant. Contractor to verify the landfill and/or recycling plant that will accept the waste materials.1LS
Total Additive Alternate #5
ADDITIVE ALTERNATE #6:
ITEMDESCRIPTIONESTIMATED QUANTITYUNIT OF MEASUREUNIT PRICE
(IN FIGURES)TOTAL

(IN FIGURES)

60Temporary Facilities and Controls1LS
61Complete Survey in ADD/ALT 6 to verify depths and slopes to be marked out via staking to provide a fully functional drainage system.1LS
62Mobilization & Demobilization1LS
63WPCP Preparation1LS
64WPCP Implementation1LS
65Clearing & Grubbing1LS
66Earthwork – Excavation (600 LF)

APPROX. depth 15’ APPROX. width 15’

Slopes of all trench sides to be 2 to 1.1LS
67Removal and relocation of all dirt, debris, trash, and tires from ADD/ALT 6 to “Staging Area”1LS
68Disposal of tires from ADD/ALT 6 APPROX. QTY: 5001LS
69Removal of all dirt, debris, trash and tires from ADD/ALT 6 to “Staging Area” and expored to designated landfill and/or recycling plant. Contractor to verify the landfill and/or recycling plant that will accept the waste materials.1LS
Total Additive Alternate #6
ADDITIVE ALTERNATE #7:
ITEMDESCRIPTIONESTIMATED QUANTITYUNIT OF MEASUREUNIT PRICE
(IN FIGURES)TOTAL

(IN FIGURES)

70Temporary Facilities and Controls1LS
71Complete Survey in ADD/ALT 7 to verify depths and slopes to be marked out via staking to provide a fully functional drainage system.1LS
72Mobilization & Demobilization1LS
73WPCP Preparation1LS
74WPCP Implementation1LS
75Clearing & Grubbing1LS
76Earthwork – Excavation (1,500 LF)

APPROX. depth 15’ APPROX. width 15’ at bottom of channel Slopes of all trench sides to be 2 to 1.

(2 feet of horizontal run for every 1 foot of vertical run).1LS
77Removal and relocation of all dirt, debris, trash, and tires from ADD/ALT 7 to “Staging Area”1LS
78Disposal of tires from ADD/ALT 7 APPROX. QTY: 1,0001LS
79Removal of all dirt, debris, trash and tires from ADD/ALT 7 to “Staging Area” and exported to designated landfill and/or recycling plant. Contractor to verify the landfill and/or recycling plant that will accept the waste materials.1LS
Total Additive Alternate #7

RFB 13118 - BID SCHEDULE

DEPARTMENT OF PARKS AND RECREATION - TIJUANA RIVER VALLEY SMUGGLERS GULCH DREDGING

RFB 13118 - ORACLE PROJECT NO. 1028476 - BID SCHEDULE

BASE BID: Smugglers Gulch Channel South of Monument Road

ITEM
NO.ITEM CODEITEM DESCRIPTIONESTIMATED QUANTITYUNIT OF MEASUREUNIT PRICE
TOTAL
1Temporary Facilities and Controls1Lump Sum (LS)$ - 0
2Mobilization & Demobilization1LS$ - 0
3WPCP Preparation1LS$ - 0
4WPCP Implementation – Includes BMPs at “Staging Area/s”1LS$ - 0
5Disconnect and relocate trash booms to allow work to occur1LS$ - 0
6Earthwork – Excavation (1,400 LF)10,000CY$ - 0
7Removal and Relocation of Sediment10,000CY$ - 0
8Material Testing1LS$ - 0
9Removal of material from “Base Bid – Staging Area”10,000CY$ - 0
10Disposal of Tires – Base Bid – QTY: 1,5001,500EA$ - 0
11Relocate and Reconnect Trash Booms1LS$ - 0
Total Base Bid$ - 0
*Refer to Part 4. Special Provisions Subsection 22. Biological Resources Condition A. Base Bid Qualified Biologist’s Duties for details regarding the qualified biologist duties and biological services.
ADDITIVE ALTERNATE #1: Disney Crossing to Tijuana River Pilot Channel Connection
ITEMDESCRIPTIONESTIMATED QUANTITYUNIT OF MEASUREUNIT PRICE
TOTAL
1Temporary Facilities and Controls1LS$ - 0
2Mobilization & Demobilization1LS$ - 0
3WPCP Preparation1LS$ - 0
4WPCP Implementation – Includes BMPs at “Staging Area/s”1LS$ - 0
5Earthwork – Excavation (1,500 LF)10,000CY$ - 0
6Removal and Relocation of Sediment10,000CY$ - 0
7Material Testing1LS$ - 0
8Removal of material from “Add/Alt 1 – Staging Area”10,000CY$ - 0
9Disposal of Tires – Add/Alt #1 – QTY: 1,5001,500EA$ - 0
10Environmental Permits*1LS$ - 0
Total Add/Alt 1$ - 0
*Refer to Part 4. Special Provisions Subsection 22. Biological Resources Condition B. Additive Alternate 1 and Additive Alternate 2 Qualified Biologists Duties for details regarding the qualified biologist duties and biological services pertaining to this Additive Alternate.
ADDITIVE ALTERNATE #2: Monument Road to Disney Crossing
ITEMDESCRIPTIONESTIMATED QUANTITYUNIT OF MEASUREUNIT PRICE
TOTAL
1Temporary Facilities and Controls1LS$ - 0
2Mobilization and Demobilization1LS$ - 0
3WPCP Preparation1LS$ - 0
4WPCP Implementation – Includes BMPs at “Staging Area/s”1LS$ - 0
5Earthwork – Excavation (1,600 LF)10,000CY$ - 0
6Removal and Relocation of Sediment10,000CY$ - 0
7Material Testing1LS$ - 0
8Removal of material from “Add/Alt 2 – Staging Area”10,000CY$ - 0
9Disposal of Tires – Add/Alt #2 – QTY: 1,5001,500EA$ - 0
10Environmental Permits*1LS$ - 0
Total Add/Alt 2$ - 0
*Refer to Part 4. Special Provisions Subsection 22. Biological Resources Condition B. Additive Alternate 1 and Additive Alternate 2 Qualified Biologists’ Duties for details regarding the qualified biologist duties and biological services pertaining to this specific Additive Alternate.
BASE BID TOTAL$ - 0
BASE BID + ADD ALT 1 TOTAL$ - 0
BASE BID + ADD ALT 1 + ADD ALT 2 TOTAL$ - 0

File details come from the government source that posted it. Updated .