This is a price schedule exhibit (Exhibit B) for a radon mitigation system bid issued by the Connecticut Department of Correction for two correctional facilities: Carl Robinson Correctional Institution in Enfield and Maloney Center for Training and Development in Cheshire. The solicitation (ITB DOC26GS0008AA) requests design and installation of radon mitigation systems to bring radon levels into compliance at both facilities. A mandatory pre-bid walkthrough is required on July 8, 2026, with Maloney Center scheduled for 10:00 a.m. and Carl Robinson scheduled for 1:00 p.m.; all attendees must obtain approved security clearance prior to the walkthrough date. Bids are due July 22, 2026, at 2:00 p.m. EDT. The solicitation opened June 24, 2026, at 7:00 a.m. EDT.
No specific contract value, line-item component details, or technical specifications are disclosed in the available solicitation materials. Delivery terms are specified as Free On Board Destination with vendors proposing their own payment terms. The solicitation is open to vendors of any type with no identified set-asides or preference programs. Vendors should direct inquiries to Kelly Godreau at the Connecticut Department of Correction (860-692-7672, Kelly.Godreau@ct.gov). Supporting solicitation documents include the Bid Vendor Form Package, Instructions to Bidders, and DAS Standard Terms and Conditions.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Service | |||
| STATE OF CONNECTICUT | |||
| Department of Correction | |||
| Exhibit B | |||
| Price Schedule | |||
| BUYER NAME: Kelly Godreau | |||
| PHONE NUMBER: 860-692-7672 | DAS BID NUMBER: | ||
| DOC26GS0008AA | |||
| VENDOR NAME: | |||
| ITEM# | DESCRIPTION OF COMMODITY AND/OR SERVICES | QUANTITY | NET PRICE |
| Net Total |
Page &P of &N
Maloney
| Radon Mitigation System | |||||
| STATE OF CONNECTICUT | |||||
| Department of Correction | |||||
| Exhibit B | |||||
| Price Schedule | |||||
| BUYER NAME: Kelly Godreau | |||||
| PHONE NUMBER: 860-692-7672 | BID NUMBER: | ||||
| DOC26GS0008AA | |||||
| Maloney Center for Training and Staff Development, 275 Jarvis Street, Cheshire, CT 06410 | VENDOR NAME: | ||||
| Per our discussion during the pre-bid walkthrough on July 8, 2026, the mitigation system item 4-9 Quantities listed below have been changed from 1 to 2. Net Price should | |||||
| now include the installation of 2 exterior systems to cover the entire 5,000 sq. ft. building. | |||||
| ITEM# | DESCRIPTION OF COMMODITY AND/OR SERVICES | UNIT | QUANTITY | NET PRICE | |
| 1 | Mobilization, site preparation, and system layout | LS | 1 | ||
| 2 | Diagnostic Testing | LS | 1 | ||
| 3 | Floor slab x-ray/scanning (If floor slab x-raying is to be subcontracted, provide the name and address of the subcontractor) | LS | 1 | ||
| 4 | Installation of SSD suction point(s) through existing slab | EA | 2 | ||
| 5 | PVC vent piping, fittings, supports, and penetrations | LS | 2 | ||
| 6 | Inline radon mitigation fan(s), including mounting and electrical connection | EA | 2 | ||
| 7 | Exterior roof or wall vent termination assembly and finishing | EA | 2 | ||
| 8 | Manometer installation and system labeling | LS | 2 | ||
| 9 | System start-up, balancing, and activation | LS | 2 | ||
| 10 | Final inspection and documentation | LS | 1 | ||
| The following unit prices shall apply if additional work is authorized by written Change Order. | |||||
| Additional SSD suction point | EA | ||||
| Additional mitigation fan | EA | ||||
| Additional PVC vent piping (2"–6") | LF | ||||
| Core drilling through slab greater than 6 inches thick | EA | ||||
| Roof penetration and flashing | EA | ||||
| Wall penetration and weatherproofing | EA | ||||
| Electrical circuit installation by licensed electrician | EA | ||||
| Concrete patching and slab restoration | SF | ||||
| System monitoring device installation | EA | ||||
| After-hours or weekend work | HR | ||||
| EA | |||||
| NET PRICE TOTAL | |||||
| _______________________________________ | ____________________ | ||||
| BIDDER SIGNATURE | DATE |
Page &P of &N
CRCI
| Radon Mitigation System | |||||
| STATE OF CONNECTICUT | |||||
| Department of Correction | |||||
| Exhibit B | |||||
| Price Schedule | |||||
| BUYER NAME: Kelly Godreau | |||||
| PHONE NUMBER: 860-692-7672 | BID NUMBER: | ||||
| DOC26GS0008AA | |||||
| VENDOR NAME: | |||||
| ITEM# | DESCRIPTION OF COMMODITY AND/OR SERVICES | UNIT | QUANTITY | NET PRICE | |
| 1 | Mobilization, site preparation, and system layout | LS | 1 | ||
| 2 | Floor slab x-ray/scanning (If floor slab x-raying is to be subcontracted, provide the name and address of the subcontractor) | ||||
| 3 | Installation of SSD suction point(s) through existing slab | EA | - | ||
| 4 | PVC vent piping, fittings, supports, and penetrations, interior finishing | LS | 1 | ||
| 5 | Inline radon mitigation fan(s), including mounting and electrical connection | EA | - | ||
| 6 | Exterior roof or wall vent termination assembly and finishing | EA | 1 | ||
| 7 | Manometer installation and system labeling | LS | 1 | ||
| 8 | System start-up, balancing, and activation | LS | 1 | ||
| 9 | Final inspection and documentation | LS | 1 | ||
| The following unit prices shall apply if additional work is authorized by written Change Order. | |||||
| Additional SSD suction point | EA | ||||
| Additional mitigation fan | EA | ||||
| Additional PVC vent piping (2"–6") | LF | ||||
| Core drilling through slab greater than 6 inches thick | EA | ||||
| Roof penetration and flashing | EA | ||||
| Wall penetration and weatherproofing | EA | ||||
| Electrical circuit installation by licensed electrician | EA | ||||
| Concrete patching and slab restoration | SF | ||||
| System monitoring device installation | EA | ||||
| After-hours or weekend work | HR | ||||
| EA | |||||
| NET PRICE TOTAL | |||||
| _______________________________________ | ____________________ | ||||
| BIDDER SIGNATURE | DATE |