Radon Mitigation System
Solicitation number
DOC26GS0008AA
Issued by
Hartford County, New Haven County, Connecticut

About this file

This is a Scope of Work exhibit for the Connecticut Department of Correction detailing the installation and activation of sub-slab depressurization (SSD) radon mitigation systems at two correctional facilities: Maloney Center (275 Jarvis Street, Cheshire) and Carl Robinson Correctional Institution (285 Shaker Road, Enfield). The scope requires contractors to install complete radon mitigation systems inclusive of sealing, slab suction pits, vent piping, fans, and exhaust components in accordance with ASTM E2121, ASTM E1465, EPA Radon Mitigation Standards, and applicable Connecticut building codes. Two mandatory pre-bid walkthroughs are scheduled for July 8, 2026, with Maloney Center at 10:00 a.m. and Carl Robinson at 1:00 p.m.; all attendees must obtain approved security clearance prior to attending. Bids are due July 22, 2026, at 2:00 p.m. EDT. At Maloney Center, the system will be installed in offices 111 and 113 on the main level, while at Carl Robinson, the system will be installed in the Creamery Building basement storage area. The installed systems must maintain indoor radon levels below 2.0 pCi/L and include a minimum 10-year warranty. Services shall be performed Monday through Friday during normal business hours (8:00 a.m. to 4:00 p.m.), excluding state holidays, with exact timing to be determined during a preconstruction meeting.

Contractors must be registered as Home Improvement Contractors with the Connecticut Department of Consumer Protection and possess valid Residential/Commercial Radon Mitigation Provider certificates from either the National Radon Proficiency Program (NRPP) or National Radon Safety Board (NRSB). All technicians require background clearance and security clearance at least 10 business days in advance of site access. All bid prices shall be firm, net, and include delivery and transportation charges, F.O.B. Destination, with 48-hour advance notice required prior to delivery. Equipment furnished must be new and of current production; used, refurbished, or discontinued models are not acceptable. Contractors must provide a 2-year workmanship guarantee covering defects in material and workmanship. Invoicing must include the purchase order number, date of service, location, detailed work description, itemized labor and parts, and a signed service report; failure to comply will delay payment. State payment terms are Net 45 following delivery and service completion. No contract value, estimated award date, or contract term renewal options are specified in this scope of work document.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT A

DESCRIPTION OF GOODS AND SERVICES

PLEASE NOTE THAT THERE ARE TWO MANDATORY WALKTHROUGHS SCHEDULED ON JULY 8TH – 10AM AT MALONEY CENTER, 275 JARVIS ST, CHESHIRE AND 1PM AT CARLROBINSON CI, 285 SHAKER RD, ENFIELD. PLEASE MAKE SURE ALL SECURITY CLEARANCE FORMS HAVE BEEN SUBMITTED FOR EVERYONE PLANNING TO ATTEND AS SOON AS POSSIBLE. YOU WILL NOT BE ABLE TO ATTEND THE WALKTHROUGHS WITHOUT PRIOR SECURITY CLEARANCE.

SCOPE OF WORK:

The Department of Correction (DOC) is requesting bid proposals for a vendor to do the following:

A. Work under this item shall include the installation and activation of a sub-slab depressurization (SSD) radon mitigation system(s) in an existing building and associated work by people who are knowledgeable, qualified, trained and licensed in the performance of such work. The Contractor performing this work shall possess a valid Residential/Commercial Radon Mitigation Provider certificate issued by either the National Radon Proficiency Program (NRPP) or the National Radon Safety Board (NRSB). Contractors performing this work must be registered as Home Improvement Contractors with the Connecticut Department of Consumer Protection. Radon mitigation companies must utilize licensed electricians, plumbers, salespeople, and other professionals for all applicable components of the work rendered. The Contractor shall also provide the owner a guarantee/warranty that the system installed shall maintain indoor radon levels below 2.0 pCi/L for a minimum of 10 years.

B. These Specifications govern all work activities related to radon mitigation. All activities shall be performed in accordance with, but not limited to, the current revision of the American Society of Testing and Materials (ASTM) Standard Practice for Installing Radon Mitigation Systems in Existing Low-Rise Residential Buildings (ASTM E2121), the EPA Radon Mitigation Standards (RMS) (EPA 402-R-18-003), the ASTM Standard Practice for Radon Control Options for the Design and Construction of New Low-Rise Residential Buildings (ASTM E1465), the EPA Radon Prevention in the Design and Construction of Schools and Other Large Buildings (EPA 625-R-92-016), the American National Standards Institute/American Association of Radon Scientists and Technologists (ANSI/AARST CC-1000, ANSI/AARST RMS-LB) and all applicable federal, state and local building codes.

C. The work shall include the installation and activation of sub-slab depressurization systems as identified on the Contract Plans and Specifications. The Building Owner will retain the services of an independent third-party specialist to provide oversight of the installation, conduct post-mitigation radon in air testing and to protect its interests and those using the building.

D. Deviations from these specifications require the written approval of the Department of Correction Engineer and third-party specialist.

TECHNICAL SPECIFICATION:

Main Level- Offices 111 & 113 – Location: Maloney Center, 275 Jarvis St, Cheshire CT:

Installation of a Sub-slab depressurization (SSD) radon mitigation system

Inclusive of all required components including sealing, slab suction pit, vent piping, fan and exhaust in accordance with applicable standards including ANSI/AARST RMS-LB, ASTM E2121 (as applicable), EPA 402-R-18-003 and EPA 625-R-92-016. Projected areas for potential suction pit and vent piping location include the lower mechanical and/or upper storage basement areas, as depicted on the attached site sketches. Contractor shall perform sub-slab pressure field extension communication tests to ensure pit location(s) will achieve system performance goals throughout the entire slab area.

Where work involves post-tensioned slabs, Contractor shall x-ray and/or scan floor slab in all areas where slab penetrations are to be made to locate post-tension cables, rebar, conduit, pipe, etc. and ensure items are not hit/damaged during drilling/penetration of slab. Intent of mitigation system is to reduce indoor radon levels to below a maximum of 2.0 pCi/L. Contractor shall install the SSD system as an active set-up and shall supply the fan and all related materials. Fan location is to be exterior or within unoccupied/unconditioned attic spaces with vent piping exhausted through the roof, as directly above the suction pit as feasible, minimizing any bends in and total length of vent pipe runs from pit to exhaust.

Additional Notes: Any exhaust piping that is visible within interior areas shall be boxed-in using sheetrock, then taped/prepped and painted to finish. An access door shall be provided for the air flow/pressure monitor and shall be labeled to properly identify the location of the system performance monitor.

CREAMERY BUILDING- Basement Storage Area: - Location: Robinson Correctional Institution, 285 Shaker Rd, Enfield CT:

Installation of a Sub-slab depressurization (SSD) radon mitigation system

Inclusive of all required components including sealing, slab suction pit, vent piping, fan and exhaust in accordance with applicable standards including ANSI/AARST RMS-LB, ASTM E2121 (as applicable), EPA 402-R-18-003 and 625-R-92-016. Projected areas for potential suction pit and vent piping location include the lower mechanical and/or upper storage basement areas, as depicted on the attached site sketches. Contractor shall perform subslab pressure field extension communication tests to ensure pit location(s) will achieve system performance goals throughout the entire slab area.

Where work involves post-tensioned slabs, Contractor shall x-ray and/or scan floor slab in all areas where slab penetrations are to be made to locate post-tension cables, rebar, conduit, pipe, etc. and ensure items are not hit/damaged during drilling/penetration of slab. Intent of mitigation system is to reduce indoor radon levels to below a maximum of 2.0 pCi/L. Contractor shall install the SSD system as an active set-up and shall supply the fan and all related materials. Fan location is to be exterior or within unoccupied/unconditioned attic spaces with vent piping exhausted through the roof, as directly above the suction pit as feasible, minimizing any bends in and total length of vent pipe runs from pit to exhaust.

Additional Notes: Any exhaust piping that is visible within interior areas shall be boxed-in using sheetrock, then taped/prepped and painted to finish. An access door shall be provided for the air flow/pressure monitor and shall be labeled to properly identify the location of the system performance monitor.

Due to the historical significance of the Robinson Correctional Creamery Building, any exhaust piping that is visible on the exterior shall also be boxed-in using exterior grade materials that either match or are prepped/painted to match the exterior of the building.

EXPERIENCE:

Contractors performing this work must be registered as Home Improvement Contractors with the Connecticut Department of Consumer Protection. Radon mitigation companies must utilize licensed electricians, plumbers, salespeople, and other professionals for all applicable components of the work rendered.

Contractors are responsible for providing certified warranty and non-warranty repairs/service if required.

EQUIPMENT:

The equipment furnished will be the latest model in current production and be of quality workmanship and material. The Contractor will represent all equipment offered is new. Used, shopworn, demonstrator, prototype, discontinued models, refurbished/remanufactured, are not acceptable. All parts not specifically mentioned which are necessary for the unit to be complete and ready for operation or which are normally furnished as standard equipment shall be furnished by the Contractor. All parts shall conform in strength and workmanship to the accepted standards of the industry.

WORKMANSHIP GUARANTEE:

Bidders shall guarantee the goods and services against defects resulting from defective material or workmanship, and to repair any damage at no cost to the agency for a period of 2 years following successful startup of equipment.

BID PRICES:

All rates shall be firm and prices shall be net including all delivery and transportation charges fully prepaid by the contractor, F.O.B. Destination.

DELIVERY:

Bidders shall provide an estimated time of delivery in the section provided on Exhibit B, labeled “Delivery”. Forty-eight (48) hour advance notice of delivery must be provided prior to date of delivery.

The Contractor shall provide the Department with signed background check release form(s) for each employee at least 10 business days in advance of delivery, in order to provide time for a background check to confirm eligibility to be admitted on site.

Due to the location and nature of the work, the contractors shall be required to issue identification badges to each of their employees. These badges shall be worn in plain sight at all times within the confines of the Correctional Facility.

HOURS OF OPERATION

The Department of Corrections facilities operate on a continual 24 hour basis, 365 days per year. Services shall take place Monday through Friday, during DOC normal business hours of 8:00 a.m. to 4:00 p.m, excluding state holidays. Exact time with be discussed during preconstruction meeting.

SECURITY REGULATIONS

All persons entering a correctional facility are required to comply with the Department’s Security Regulation Requirements. (See Attachment entitled “Security Regulations”).

SECURITY CLEARANCE

Upon award of contract, Contractor(s) are required to provide a completed “Collect Background Report” form for all technicians to be assigned to and/or request admittance to any of the agency’s facilities.

DOC will provide a written security clearance confirmation list for individuals that have been security cleared. No technician will be granted admittance to any facility without proper clearance. Technicians are advised to carry a copy of their authorized security clearance confirmation with them at all times. Any changes in personnel must be security cleared at least 10 business days in advance of requested admittance.

Questions relating to the Collect Background Report Form should be directed to the DOC Collect Mailbox at DOC.Collect1@ct.gov. Completed and signed forms should be emailed to this email address or faxed to secure fax number 860-920-3081.

PURCHASE ORDER & BILLING REQUIREMENTS

SERVICE TECHNICIAN REPORTS:

The contractor shall be required to provide a completed, signed service report for each service visit.

In addition, the service reports must be legible and contain:

1) Date of service.

2) Location of service.

3) Make and Model number of equipment being serviced.

4) Manufacturer and Manufacturer Part No of parts being installed.

5) Accurate and Complete Description of work performed.

6) Technician name.

7) Arrival time and Departure time (Site Labor Only).

8) Agency Purchase Order Number.

9) Agency signature.

10) A new service report shall be completed for each service visit.

BILLING REQUIREMENTS: All contractor invoicing must contain:

1) Purchase Order Number

2) Date of Service

3) Location of Service

4) Description of Work performed

5) Be Itemized by Service Rate, Labor Hours and/or Labor Rate (as applicable)

6) Be Itemized by Part Number and Part Unit pricing (if applicable)

7) A legible copy of the signed service report must accompany invoicing.

Failure to comply with any of the above will delay timely vendor payment.

PAYMENT TERMS

The State payment terms are Net 45 following delivery and/or service completion.

DEPARTMENT OF CORRECTION PURCHASING AND PAYMENT ADDRESS:

Questions regarding purchase orders from the Department of Correction should be directed to at telephone number (860) 692-7672.

State of CT - Department of Correction Attn: Purchasing Dept – Kelly Godreau 24 Wolcott Hill Road Wethersfield, CT 06109 e-mail: Kelly.godreau@ct.gov

Payment and invoicing questions relating to DOC should be sent to the Accounts Payable Unit at DOC.Payables@ct.gov .

Invoices should be sent to the following address:

State of CT - Department of Correction Attn: Accounts Payable P.O. Box 290891 Wethersfield, CT 06129-0891

ADDRESS AND BUSINESS CHANGES

In the event that the awarded contractor moves, changes telephone number, or changes business name, it is the contractor’s responsibility to advise the Department of Correction of such changes in writing. The State will not be held responsible for payments or purchase orders which are delayed due to additional routing caused by the lack of notification on the contractor’s part.