3-EXHIBIT B PRICE SCHEDULE revised.xls
XLS spreadsheet 190 KB Posted
- Attached to
- Radon Mitigation System
- Solicitation number
- DOC26GS0008AA
- Issued by
- Hartford County, New Haven County, Connecticut
About this file
This is an Exhibit B Price Schedule for a radon mitigation system procurement by the Connecticut Department of Correction under ITB solicitation DOC26GS0008AA. The project involves design and installation of radon mitigation systems at two correctional facilities: Carl Robinson Correctional Institution in Enfield and Maloney Center for Training and Development in Cheshire. The scope includes mobilization, site preparation, system layout, floor slab scanning, installation of sub-slab depressurization (SSD) suction points, PVC vent piping, radon mitigation fans, roof or wall vent termination assemblies, manometer installation, system start-up and balancing, and final inspection and documentation. Bidders are required to attend mandatory pre-bid walkthroughs at both locations on July 8, 2026 (Maloney at 10:00 a.m., Carl Robinson at 1:00 p.m.), with approved security clearance required prior to attendance. Bids are due July 22, 2026 at 2:00 p.m. EDT. The solicitation opened June 24, 2026 at 7:00 a.m. EDT.
The price schedule requires vendors to provide net unit prices and net totals for nine main line items covering radon mitigation system installation, with additional unit prices for optional change order work including supplemental SSD suction points, additional mitigation fans, extended PVC vent piping, core drilling, roof and wall penetrations, electrical installation, concrete patching, monitoring device installation, and after-hours or weekend labor. Vendors propose their own payment terms, with delivery specified as Free On Board Destination. The contact for the Connecticut Department of Correction is Kelly Godreau (860-692-7672, Kelly.Godreau@ct.gov). No estimated contract value, set-asides, preference programs, incumbent information, or contract term details are disclosed in this pricing document.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Service | |||
| STATE OF CONNECTICUT | |||
| Department of Correction | |||
| Exhibit B | |||
| Price Schedule | |||
| BUYER NAME: Kelly Godreau | |||
| PHONE NUMBER: 860-692-7672 | DAS BID NUMBER: | ||
| DOC26GS0008AA | |||
| VENDOR NAME: | |||
| ITEM# | DESCRIPTION OF COMMODITY AND/OR SERVICES | QUANTITY | NET PRICE |
| Net Total |
Page &P of &N
Sheet1 (2)
| Radon Mitigation System | |||||
| STATE OF CONNECTICUT | |||||
| Department of Correction | |||||
| Exhibit B | |||||
| Price Schedule | |||||
| BUYER NAME: Kelly Godreau | |||||
| PHONE NUMBER: 860-692-7672 | BID NUMBER: | ||||
| DOC26GS0008AA | |||||
| VENDOR NAME: | |||||
| ITEM# | DESCRIPTION OF COMMODITY AND/OR SERVICES | UNIT | QUANTITY | NET PRICE | |
| 1 | Mobilization, site preparation, and system layout | LS | 1 | ||
| 2 | Floor slab x-ray/scanning (If floor slab x-raying is to be subcontracted, provide the name and address of the subcontractor) | ||||
| 3 | Installation of SSD suction point(s) through existing slab | EA | - | ||
| 4 | PVC vent piping, fittings, supports, and penetrations, interior/exterior finishing | LS | 1 | ||
| 5 | Inline radon mitigation fan(s), including mounting and electrical connection | EA | - | ||
| 6 | Exterior roof or wall vent termination assembly and finishing | EA | 1 | ||
| 7 | Manometer installation and system labeling | LS | 1 | ||
| 8 | System start-up, balancing, and activation | LS | 1 | ||
| 9 | Final inspection and documentation | LS | 1 | ||
| The following unit prices shall apply if additional work is authorized by written Change Order. | |||||
| Additional SSD suction point | EA | ||||
| Additional mitigation fan | EA | ||||
| Additional PVC vent piping (2"–6") | LF | ||||
| Core drilling through slab greater than 6 inches thick | EA | ||||
| Roof penetration and flashing | EA | ||||
| Wall penetration and weatherproofing | EA | ||||
| Electrical circuit installation by licensed electrician | EA | ||||
| Concrete patching and slab restoration | SF | ||||
| System monitoring device installation | EA | ||||
| After-hours or weekend work | HR | ||||
| EA | |||||
| NET PRICE TOTAL | |||||
| _______________________________________ | ____________________ | ||||
| BIDDER SIGNATURE | DATE |
Page &P of &N
File details come from the government source that posted it. Updated .