Replace Cooling Towers Drawings Issue for Bid - June 2020.pdf
PDF 8 MB Posted
- Attached to
- J041--528A8-19-807 REPLACE COOLING TOWERS 1 & 2 Federal contract opportunity
- Solicitation number
- 36C24221B0018
About this file
This is a set of construction drawings for replacing two cooling towers at the Albany Stratton VA Medical Center in Albany, New York. The project involves demolishing the existing cooling towers and associated piping and controls, and installing new 750-ton cooling towers, along with related mechanical, electrical, and control systems work. New condenser water piping will connect the cooling towers to existing headers in the chiller plant. Associated work includes installing seismic supports, flexible joints, and vibration isolation for the cooling towers and piping. The contractor must provide design and calculations for all seismic components.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24221B0018 0008.docx | DOCX document | |
| 36C24221B0018 0007.docx | DOCX document | |
| 36C24221B0018 0006.docx | DOCX document | |
| 36C24221B0018 0005.docx | DOCX document | |
| 36C24221B0018 0004.docx | DOCX document | |
| 232500 HVAC Water Treatment.pdf | ||
| 36C24221B0018 0003.docx | DOCX document | |
| 36C24221B0018 0002.docx | DOCX document | |
| Cooling Towers Walk Thru Sign in sheet signed.pdf | ||
| P07-WAGE RATE ALBANY COUNTY.pdf | ||
| Replace Cooling Towers Specifications - Issue for Bid June 2020.pdf | ||
| SOW Replace Cooling Towers 1-21-21.pdf | ||
| 36C24221B0018_1.docx | DOCX document |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P
T R
I O
T S
T
IL
L S
E R
V
IN
G
D E
S I G
N
C O
N S
U L
T I N
G
T
IT
U S
A V
E N
U
O
C H
E S
T E
R N
Y
(5
(5
F
A X
D A
T E
B Y
A P
P R
O V
E D
C H
E C
K E
D B
Y
D R
A W
N B
Y
S C
A L E
P R
O J E
C T
I D
E N
T
IF
IC
A
T
IO
N N
O
D A
T E
N U
M B
E R
S H
E E
T
S H
E E
T T
IT
L E
R E
V
IS
IO
N
IT IS A VIOLATION OF THE LAW FOR ANY PERSON, EXCEPT A LICENSED PROFESSIONAL ENGINEER OR LAND SURVEYOR, TO ALTER THIS DRAWING IN ANY WAY. IF A LICENSED PROFESSIONAL ENGINEER OR LAND SURVEYOR ALTERS THIS DRAWING THEY MUST ATTACH THEIR SEAL AND NOTATION "ALTERED BY" FOLLOWED BY A SIGNATURE AND THE DATE AND A SPECIFIC DESCRIPTION OF THE ALTERATION.
A S
N O
T E
D
R E
P L
A C
E C
O O
L
IN
G T
O W
E R
S
A l b a n y
S t r a t t o n
V A
M e d ic a l
C e n t e r
H o l l a n d
A v e n u e
A l b a n y
N
Y
C O V E R S H E E T
G I-
B F W
A N G K W
B F W
A -1 -8
REPLACE COOLING TOWERS, 1 & 2
V.A. UPSTATE NEW YORK
LIST OF DRAWINGS:
SITE LOCATION SITE PLAN
GI-001 COVERSHEET
GC-001 SITE LOGISTICS PLAN
AF-101 ROOF ARCHITECTURAL PLAN
S-001 STRUCTURAL LEGEND & GENERAL NOTES
SD-201 STRUCTURAL ROOF & DUNNAGE DEMOLITION PLAN
SF-201 EXISTING ROOF FRAMING & DUNNAGE PLAN
MP-001 MECHANICAL LEGEND & SCHEDULES
MD-101 FIRST FLOOR DEMOLITION PLAN – CONDENSER PIPING
MD-102 FIRST FLOOR DEMOLITION PLAN - STEAM PIPING
MD-103 ROOF MECHANICAL DEMOLITION PLAN
MD-110 ROOF HEAT TRACE DEMOLITION PLAN
MP-101 FIRST FLOOR MECHANICAL PLAN – CONDENSER PIPING
MP-102 FIRST FLOOR MECHANICAL PLAN - STEAM PIPING
MP-103 ROOF MECHANICAL PLAN
MP-110 ROOF HEAT TRACE PLAN
MP-401 CHILLER PLANT SECTION VIEWS
MP-402 COOLING TOWER SECTION VIEW
MP-410 CHILLER PLANT ISOMETRIC VIEW
MP-501 MECHANICAL DETAILS
MP-502 MECHANICAL DETAILS
MI-101 FIRST FLOOR PLAN - HVAC CONTROLS
MI-102 ROOF PLAN - HVAC CONTROLS
MI-701 CONDENSER WATER - SCHEMATIC CONTROLS DIAGRAM - DEMOLITION
MI-702 CONDENSER WATER - SCHEMATIC CONTROLS DIAGRAM - NEW WORK
MI-703 CONDENSER WATER SYSTEM - CONTROL POINTS SCHEDULE
MI-704 CONDENSER WATER SYSTEM -SEQUENCE OF OPERATIONS
PD-101 FIRST FLOOR DEMOLITION PLUMBING PLAN
PD-102 ROOF DEMOLITION PLUMBING PLAN
PP-201 FIRST FLOOR PLUMBING PLAN
PP-202 ROOF PLUMBING PLAN
ED-101 FIRST FLOOR - ELECTRICAL DEMOLITION PLAN
ED-102 ROOF PLAN - ELECTRICAL DEMOLITION PLAN
EP-101 CHILLER PLANT - ELECTRICAL POWER PLAN
EP-102 ROOF PLAN - ELECTRICAL POWER PLAN
EP-501 ELECTRICAL RISER DIAGRAMS & DETAILS
EP-502 ELECTRICAL SCHEDULES
PROJECT NO. 528A8-19-807
ISSUE FOR BID
(UNLESS OTHERWISE NOTED OR SHOWN ON PLAN, THE FOLLOWING SHALL APPLY)
SHORING AND BRACING NOTES
1. CONTRACTOR SHALL PROVIDE SHORING AND BRACING AND SHALL COMPLY WITH THE LOCAL BUILDING
CODE AND ORDINANCES OF THE LOCAL GOVERNING AUTHORITIES.
2. BRACING SHALL BE LOCATED TO CLEAR NEW CONSTRUCTION AND OTHER PERMANENT WORK.
3. MAINTAIN SHORING AND BRACING UNTIL STRUCTURAL ELEMENTS ARE REBRACED BY OTHER BRACING
OR UNTIL PERMANENT CONSTRUCTION IS IN PLACE.
(UNLESS OTHERWISE NOTED OR SHOWN ON PLAN, THE FOLLOWING SHALL APPLY)
GENERAL NOTES (EXISTING CONDITIONS)
1. DIMENSIONS AND ELEVATIONS OF EXISTING CONDITIONS GIVEN ON STRUCTURAL DRAWINGS ARE BASED ON INFORMATION CONTAINED IN VARIOUS ORIGINAL DESIGN AND CONSTRUCTION DOCUMENTS
PROVIDED BY THE OWNER, AND LIMITED FIELD OBSERVATIONS AND MEASUREMENTS.
2. CONTRACTOR SHALL VERIFY ALL EXISTING DIMENSIONS AND CONDITIONS BY ACTUAL MEASUREMENT PRIOR TO BEGINNING WORK, AND WHEN FEASIBLE, PRIOR TO SHOP DRAWINGS SUBMITTALS. ANY DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECTS. IT SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO COORDINATE SAID DISCREPANCIES WITH ALL SUB-
CONTRACTORS AND MATERIAL SUPPLIERS.
3. CONTRACTOR SHALL PROVIDE TEMPORARY SHORING AND BRACING TO MAKE SAFE ALL FLOORS AND/OR ADJACENT PROPERTY AS PROJECT CONDITIONS REQUIRE. DESIGN SHALL BE CERTIFIED BY A
LICENSED ENGINEER EMPLOYED BY THE CONTRACTOR.
(UNLESS OTHERWISE NOTED OR SHOWN ON PLAN, THE FOLLOWING SHALL APPLY)
GENERAL INFORMATION
1. "LOADS INDICATED ON THIS DRAWING ARE THOSE FOR THE DESIGN OF THE BUILDING SUPERSTRUCTURE.
2. ALL DETAILS MARKED "TYPICAL" IN THE SET OF STRUCTURAL DRAWINGS SHALL BE APPLIED THROUGHOUT THE PROJECT AS REQUIRED TO SATISFY THE REQUIREMENTS OF THE CONSTRUCTION DOCUMENTS THE CONTRACTOR SHALL COORDINATE REQUIREMENTS FOR QUANTITY AND LOCATION WHERE THE "TYPICAL"
DETAILS APPLY.
3. FAILURE ON THE PART OF THE CONTRACTOR TO REVIEW THE DRAWINGS OF THE OTHER DISCIPLINES (I.E.
ARCHITECTURAL, MECHANICAL, ELECTRICAL,PLUMBING, ETC.) TOGETHER WITH THE FULL EXTENT OF THE PROJECT SPECIFICATIONS DOES NOTRELIEVE THEM OF THE RESPONSIBILITY TO FURNISH AND INSTALL ITEMS THAT ARE PART OF THEIR WORK AS INDICATED BY THE DRAWINGS AND SPECIFICATIONS OF OTHER TRADES. THE CONTRACTOR IS PROHIBITED FROM EXCLUDING STRUCTURAL WORK FORM THEIR CONTRACT
NOT SHWON IN THE STRUCTURAL DRAWINGS.
SECTION SHEET LOCATION
SECTION NUMBER
MOMENT CONNECTION
EXISTING COLUMN LINE
NEW COLUMN LINE
INDICATES SPAN OF METAL DECK.
DECK SPANS PERPENDICULAR TO
FRAMING UNLESS OTHERWISE
NOTED.
DROP-IN FRAME
FOR
ROOF DRAIN AND
OVERFLOW DRAIN
SYMBOLS KEY/LEGEND
1. METAL DECK UNITS AND ACCESSORY ITEMS SHALL BE FORMED FROM STEEL SHEETS
CONFORMING TO ASTM SPECIFICATION A611 WITH A MINIMUM YIELD STRENGTH OF 33,000 PSI.
BEFORE FORMING, THE STEEL SHEET SHALL RECEIVE A PROTECTIVE METAL COATING OR ZINC
CONFORMING TO ASTM SPECIFICATION A653.
2. UNFRAMED OPENINGS IN ROOF DECK SHALL BE REINFORCED AS FOLLOWS:
A. HOLES LESS THAN 8": PROVIDE AN 18 GAUGE FLAT SHEET EXTENDING 8" MINIMUM BEYOND
HOLE IN ALL DIRECTIONS.
B. HOLES 8" -13": PROVIDE A 16 GAUGE FLAT SHEET EXTENDING 8" MIN. BEYOND HOLE IN ALL
DIRECTIONS.
3. THERE SHALL BE NO HANGING OF ANY ITEMS SUCH AS CEILINGS, CONDUIT, PIPING, DUCTWORK
ETC. FROM THE STEEL ROOF DECK.
(UNLESS OTHERWISE NOTED OR SHOWN ON PLAN, THE FOLLOWING SHALL APPLY)
GENERAL NOTES (STEEL DECK)
1. STRUCTURAL STEEL SHALL CONFORM TO THE LATEST EDITION OF THE "STEEL CONSTRUCTION
MANUAL" BY THE AMERICAN INSTITUTE OF STEEL CONSTRUCTION (A.I.S.C.).
2. UNLESS OTHERWISE NOTED, ALL MATERIALS SHALL BE IN ACCORDANCE WITH THE FOLLOWING
SPECIFICATIONS:
MEMBER A.S.T.M. MIN. STRENGTH
ROLLED SHAPES A992 50 KSI
STRUCTURAL TUBING A500 (GRADE B) 46 KSI
STEEL PIPE A500 (GRADE B) 42 KSI
OTHER ROLLED PLATES A36 36 KSI
CONNECTION BOLTS A325 92 KSI
ANCHOR BOLTS F1554 ---
THREADED BOLTS A36 36 KSI
NON-SHRINK GROUT C1107 8,000 PSI
3. CONNECTIONS SHALL BE SHEAR TYPE CONNECTIONS AND DESIGNED BY THE FABRICATOR FOR
THE FACTORED SHEAR FORCES INDICATED ON PLAN IN ACCORDANCE WITH THE A.I.S.C.
SPECIFICATIONS FOR LOAD RESISTANCE FACTOR DESIGN. MINIMUM BOLT DIAMETER SHALL BE 3/4" UNLESS OTHERWISE NOTED. BOLTS SHALL BE SHEAR/BEARING TYPE BOLTS AND BE "SNUG-TIGHT".
STEEL BEAM CONNECTIONS SHALL BE DESIGNED TO SUPPORT A MINIMUM OF ONE HALF THE
MAXIMUM TOTAL UNIFORM LOAD FOR PARTICULAR BEAM AND SPAN CONDITION AS DEFINED BY THE
A.I.S.C. MANUAL OF STEEL CONSTRUCTION (FOR COMPOSITE BEAMS, MULTIPLY BY 1.33).
4. WELDING SHALL BE IN ACCORDANCE WITH A.W.S. D1.1 USING E7OXX ELECTRODES. UNLESS OTHERWISE NOTED, PROVIDE CONTINUOUS MINIMUM SIZED FILLET WELDS PER A.I.S.C. REQUIREMENTS.
FILLER MATERIAL SHALL HAVE A MINIMUM YIELD STRENGTH OF 58 K.S.I.
5. HOLES IN STEEL BEAMS SHALL BE DRILLED OR PUNCHED. ALL SLOTTED HOLES SHALL BE
PROVIDED WITH SMOOTH EDGES. BURNING OF HOLES AND TORCH CUTTING AT THE SITE IS NOT
PERMITTED.
6. THE STRUCTURAL STEEL ERECTOR SHALL PROVIDE TEMPORARY GUYING AND BRACING AS REQUIRED.
COLUMNS, ANCHOR BOLTS, BASE PLATES, ETC. HAVE BEEN DESIGNED FOR THE FINAL COMPLETE CONDITION, AND HAVE NOT BEEN INVESTIGATED FOR POTENTIAL LOADINGS ENCOUNTERED DURING
STEEL ERECTION AND CONSTRUCTION. ANY INVESTIGATION OF THE COLUMNS, ANCHOR BOLTS,
FRAMING, ETC. FOR ADEQUACY DURING THE STEEL ERECTION AND CONSTRUCTION PROCESS IS THE
SOLE RESPONSIBILITY OF THE CONTRACTOR.
7. STEEL FABRICATORS SHALL BE AN A.I.S.C. CERTIFIED SHOP FOR CATEGORY I STEEL STRUCTURES AND MAINTAIN DETAILED QUALITY CONTROL PROCEDURES AS REQUIRED TO SATISFY THE SPECIAL
INSPECTION REQUIREMENTS OF THE LATEST BUILDING CODE HAVING JURISDICTION.
8. UNLESS OTHERWISE NOTED, STRUCTURAL STEEL PERMANENTLY EXPOSED TO THE WEATHER,
SHALL BE HOT-DIP GALVANIZED IN ACCORDANCE WITH ASTM A123. PROTECTIVE COATING DAMAGED DURING THE TRANSPORT, ERECTING AND FIELD WELDING PROCESS SHALL BE REPAIRED IN THE
FIELD TO MATCH THE SHOP APPLIED COATING.
9. THE OWNER WILL HIRE AN INDEPENDENT TESTING AGENCY TO PROVIDE SPECIAL INSPECTIONS OF
THE BOLTING, WELDING, AND OTHER ITEMS IN ACCORDANCE WITH IBC 2015 AND ASCE 7-10.
10. REINFORCING SHALL BE PROVIDED AT CONNECTIONS WHERE CUTS HAVE REDUCED THE SHEAR OR MOMENT CAPACITY BELOW THAT REQUIRED TO SUSTAIN THE REACTION. FLANGES AND WEB ARE TO
BE REINFORCED WHERE THE LOCAL CAPACITY TO SUSTAIN LOAD IS INADEQUATE.
11. STEEL FABRICATOR TO SUPPLY 16 GAGE CLOSURE ANGLES AROUND ALL FLOOR OPENINGS AND PERIMETER OF BUILDING. FOR SLAB OVERHANG GREATER THAN 6" REFER TO TYPICAL SLAB EDGE
DETAIL.
12. SEE ARCHITECTURAL DETAILS ON ROOF DRAINS AND MISCELLANEOUS ROOF OPENINGS FOR CURBS
AND MISCELLANEOUS ANGLE IRON.
13. MISCELLANEOUS IRON CONTRACTOR TO PROVIDE MISCELLANEOUS STEEL SHOWN ON ARCHITECTURAL
DRAWINGS THAT IS NOT SHOWN ON STRUCTURAL DRAWINGS.
14. ALL STEEL USED IN THE FABRICATION OF EXPOSED STRUCTURAL STEEL, INCLUDING CONNECTIONS, SHALL BE CONSIDERED ARCHITECTURALLY EXPOSED STRUCTURAL STEEL AND WILL BE SUBJECT TO THE REQUIREMENTS OF SECTION 10 OF THE AISC CODE OF STANDARD PRACTICE FOR ALL STEEL BUILDINGS AND BRIDGES, MARCH 18, 2005. APPLY GALVANIZING REPAIR PAINT TO GALVANIZED COATINGS
15. AT LOCATIONS ON THE ARCHITECTURAL DRAWINGS OR OTHER TRADES WHERE A STEEL ANGLE OR PLATE IS SHOWN DIAGRAMMATICALLY AND REFERENCE IS MADE TO THE STRUCTURAL DRAWINGS FOR SIZE, PROVIDE MINIMUM THICKNESS OF 3/8" MATERIAL AND PLATE WIDTH OR ANGLE SIZE AS
SCALED FROM THE DRAWINGS. INSTALL THE PLATE OR ANGLE TO THE EXTENT REQUIRED TO
ACCOMPLISH A COMPLETE JOB.
16. WHEN NO MEMBER SIZE IS GIVEN IN PLAN AND/OR SECTION, AND THE SIZE CANNOT BE
DETERMINED GRAPHICALLY, THE MINIMUM SIZE ASSUMED FOR BIDDING SHALL BE AS FOLLOWS:
CHANNELS C12x35 W-SHAPES W16x50 ANGLES L6x6x1/2 TUBES HSS6x6x1/2
PIPES 6"∅ X-STRONG
WT (TEE'S) WT8x25
UNLESS OTHERWISE NOTED ALL MEMBERS INDICATED ON PLAN ARE W-SHAPES. FINAL SIZES SHALL BE CONFIRMED BY ENGINEER VIA A REQUEST FOR INFORMATION (RFI) DURING THE BID PERIOD OR
DURING THE SHOP DRAWING PHASE. CONTRACTOR SHALL NOT BE ENTITLED TO COSTS FOR
REVISIONS TO THE MEMBER SIZE IF AN RFI IS NOT SUBMITTED IN A TIMELY MANNER.
(UNLESS OTHERWISE NOTED OR SHOWN ON PLAN, THE FOLLOWING SHALL APPLY)
GENERAL NOTES (STRUCTURAL STEEL)
DAMAGED BY CONSTRUCTION OPERATIONS.
ABBREVIATIONS
ADJ. ADJUSTMENT H.S.B. HIGH STRENGTH BOLTS
ALT. ALTERNATE I.D. INSIDE DIAMETER
A.B. ANCHOR BOLT I.E. INVERT ELEVATION
ATTACH. ATTACHMENT IN. INCHES
BOT. BOTTOM INSUL. INSULATION
BLDG. BUILDING JT. JOINT
BM. BEAM L.L.V. LONG LEG VERTICAL
B.R. BRIDGING LP. LOW POINT
CANT. CANTILEVER LOC'NS. LOCATIONS
CL. CENTER LINE MAX. MAXIMUM
CLR. CLEARANCE / CLEAR M.C. MOMENT CONNECTION
CA COLUMN ABOVE MID. MIDDLE
CB COLUMN BELOW MIN. MINIMUM
COL. COLUMN NO., # NUMBER
CONC. CONCRETE N.T.S. NOT TO SCALE
CONN. CONNECTION O.C. ON CENTER
CONT. CONTINUOUS / CONTINUATION PL. PLATE
DIA. DIAMETER P.S.F. POUNDS PER SQUARE FOOT
DWG. DRAWING P.S.I. POUNDS PER SQUARE INCH
EA. EACH R.D. ROOF DRAIN
E.F. EACH FACE REINF. REINFORCING / REINFORCED
EL., ELEV. ELEVATION REQ'D. REQUIRED
E.O.D. EDGE OF DECK SCHED. SCHEDULE
E.O.S. EDGE OF SLAB S.C. SLIP CONNECTION
EQ. EQUALLY SPL. SPLICE
E.W. EACH WAY SP. SPACING
EXIST. EXISTING SQ. SQUARE
EXP. EXPANSION SYM. SYMBOL
E.J. EXPANSION JOINT T & B TOP AND BOTTOM
EXT. EXTENSION THK. THICKNESS
FIN. FINISHED T.O.S. TOP OF STEEL
FT. FOOT / FEET T.O.W. TOP OF WALL
FTG. FOOTING TYP. TYPICAL
H. HANGER U.O.N. UNLESS OTHERWISE NOTED
H.P. HIGH POINT VERT. VERTICAL
HOR., HORIZ. HORIZONTAL W.W.F. WELDED WIRE FABRIC
SNOW, WIND, & EARTHQUAKE LOADS (IBC 2015)
LIVE LOADSDEAD LOADS
OCCUPANCY PSFMAIN ROOF
IBC SECTION 1608
IBC SECTION 1609
IBC SECTIONS 1613-1618 EARTHQUAKE DESIGN
WIND LOAD
SNOW LOAD
CLASSROOMS
CONFERENCE ROOMS
STAIRS
LOBBIES & CORRIDORS
RESTROOMS
STORAGE
OFFICES
FLAT ROOF SNOW LOAD
2 PSF
10 PSF
7 PSF
5 PSF
- MEMBRANE
- MECHANICAL & ELECTRICAL
- DECK & INSULATION
- MISC.
24 PSF - TOTAL (NOT INCLUDING STEEL)
SEISMIC IMPORTANCE FACTOR:
E
= 1.50
0.2 SPECTRAL RESPONSE ACCELERATION:
1.0 SPECTRAL RESPONSE ACCELERATION:
DAMPED DESIGN SPECTRAL RESPONSE:
ACCELERATION (SHORT PERIODS)
DAMPED DESIGN SPECTRAL RESPONSE:
ACCELERATION (1-second PERIOD)
SEISMIC DESIGN CATEGORY:
SITE CLASSIFICATION:
BASIC WIND SPEED (3-Second GUST):
3S
WIND LOAD IMPORTANCE FACTOR:
WIND EXPOSURE:
GUST EFFECTIVE FACTOR:
INTERNAL PRESSURE COEFFICIENT:
GROUND SNOW LOAD:
FLAT ROOF SNOW LOAD:
SNOW EXPOSURE FACTOR:
SNOW LOAD IMPORTANCE FACTOR:
SNOW THERMAL FACTOR:
Pg
Pf
Ce
Is
Ct
= 40 PSF
= 34 PSF
= 1.00
= 1.20
= 1.00
V
Iw
CATEGORY "B"
G
Gcpi
= 120 MPH
= 1.00
= 0.85
= ±0.18
= 0.181
= 0.069
= 0.193S
S
S
I
= 0.111S
CATEGORY "C"
SITE CLASS D
DOES NOT INCLUDE DRIFT
INCLUDES 20 PSF PARTITION LOAD
**70
*34
S
DS
D1
RISK CATEGORY IV
I O
T S
T
IL
L S
E R
V
S I G
N
C O
N S
U L
T I N
G
T
IT
U S
A V
E N
C H
E S
T E
R N
Y
(5
(5
F
A X
D A
T E
B Y
A P
P R
O V
E D
C H
E C
K E
D B
Y
D R
A W
N B
Y
S C
A L E
P R
O J E
C T
I D
E N
T
IF
IC
A
T
IO
N N
O
D A
T E
N U
M B
E R
S H
E E
T
S H
E E
T T
IT
L E
R E
V
IS
IO
N
IT IS A VIOLATION OF THE LAW FOR ANY PERSON, EXCEPT A LICENSED PROFESSIONAL ENGINEER OR LAND SURVEYOR, TO ALTER THIS DRAWING IN ANY WAY. IF A LICENSED PROFESSIONAL ENGINEER OR LAND SURVEYOR ALTERS THIS DRAWING THEY MUST ATTACH THEIR SEAL AND NOTATION "ALTERED BY" FOLLOWED BY A SIGNATURE AND THE DATE AND A SPECIFIC DESCRIPTION OF THE ALTERATION.
A S
N O
T E
D
R E
P L
A C
E C
O O
L
IN
G T
O W
E R
S
A L
B A
N Y
S T
R A
T T
O N
V A
M E
D
IC
A L
C E
N T
E R
H
O L
L A
N D
A V
E N
U E
A L
B A
N Y
N
Y
S T R
U C
T U
R A
L L
E G
E N
D
G E
N E
R A
L
N O
T E
S
S
- 0
N A S
T W H
D W J
W
E D C B A
EXIST. 5"Ø
PO
ST
EXIS
T. 5
"Ø
PO
ST
EXIST
W12x30
EXIST
W12x30
E X
IS
W x
E X
IS
T
W x
EXIST.
L3x2 1/2"x1/4"
(TYP.)
EXIS
T. 5
"Ø
PO
ST
EXIS
T. 5
"Ø
PO
ST EXIST.
W12x30
EXIST.
W12x30
E X
IS
T
W x
E X
IS
T
W x
E X
IS
T
W x
EXIST. 5"Ø
PO
ST
EXIS
T. 5
"Ø
PO
ST
(V.I.F.)
24' - 8"
(V.I.F.)
24' - 8"
(V.I.F.)
24' - 8"
(V.I.F.)
24' - 8"
(V .I
.F
(V .I
.F
(V .I
.F
CL.
POST
CL.
POST
CL.
POST
CL.
POST
EXISTING
COOLING
TOWER
EXISTING DUNNAGE
FRAMING AND POSTS
TO BE DEMOLISHED
E X
IS
x
/4
EXISTING COOLING
TOWER
EXIS
T. 5
"Ø
PO
ST
6' - 3 5/8" 15' - 6 3/8"
EXIS
T. 5
"Ø
PO
ST
DEMOLISH EXIST.
DUNNAGE POST
(TYP. FOR 4 LOCATIONS)
SCALE: 1/8" = 1'-0"
STRUCTURAL ROOF & DUNNAGE DEMOLITION PLAN
1. DUNNAGE ELEVATION 28'-4 3/8" ABOVE EXISTING FINISHED FLOOR UNLESS OTHERWISE
NOTED. VERIFY IN THE FIELD
2. ALL EXISTING CONDITIONS ARE TO BE VERIFIED IN FIELD.
I O
T S
T
IL
L S
E R
V
S I G
N
C O
N S
U L
T I N
G
T
IT
U S
A V
E N
C H
E S
T E
R N
Y
(5
(5
F
A X
D A
T E
B Y
A P
P R
O V
E D
C H
E C
K E
D B
Y
D R
A W
N B
Y
S C
A L E
P R
O J E
C T
I D
E N
T
IF
IC
A
T
IO
N N
O
D A
T E
N U
M B
E R
S H
E E
T
S H
E E
T T
IT
L E
R E
V
IS
IO
N
IT IS A VIOLATION OF THE LAW FOR ANY PERSON, EXCEPT A LICENSED PROFESSIONAL ENGINEER OR LAND SURVEYOR, TO ALTER THIS DRAWING IN ANY WAY. IF A LICENSED PROFESSIONAL ENGINEER OR LAND SURVEYOR ALTERS THIS DRAWING THEY MUST ATTACH THEIR SEAL AND NOTATION "ALTERED BY" FOLLOWED BY A SIGNATURE AND THE DATE AND A SPECIFIC DESCRIPTION OF THE ALTERATION.
A S
N O
T E
D
R E
P L
A C
E C
O O
L
IN
G T
O W
E R
S
A L
B A
N Y
S T
R A
T T
O N
V A
M E
D
IC
A L
C E
N T
E R
H
O L
L A
N D
A V
E N
U E
A L
B A
N Y
N
Y
S T R
U C
T U
A L
R O
O F
D
U N
N A
G E
D E
M O
L
IT
IO
N
P L
A N
S D
- 2
N A S
T W H
D W J
W
(V.I.F.)
24' - 8"
(V.I.F.)
24' - 8"
(V.I.F.)
24' - 8"
(V.I.F.)
24' - 8"
(V .I
.F
(V .I
.F
(V .I
.F
EXIST. W14x22
EXIST. W14x22
EXIST. W14x22
EXIST. W14x22
EXIST. W14x26
EXIST. W14x30
EXIST. W18x40
EXIST. W18x40
EXIST. W14x26
EXIST. W14x22
EXIST. W14x22
EXIST. W14x22
EXIST. W14x22
EXIST. W14x22
EXIST. W14x22
EXIST. W14x30
EXIST. W18x40
EXIST. W18x40
EXIST. W14x26
EXIST. W14x22
EXIST. W14x22
EXIST. W14x22
EXIST. W14x22
EXIST. W14x22
EXIST. W14x22
EXIST. W14x30
EXIST. W18x40
EXIST. W14x26
EXIST. W14x22
EXIST. W14x22
EXIST. W14x22
EXIST. W14x22
EXIST. W14x22
EXIST. W14x26
EXIST. W14x30
EXIST. W18x40
EXIST. W14x30
EXIST. W14x30
EXIST. W14x30
EXIST. W14x26
EXIST. W14x22
EXIST. W14x30
EXIST. W14x30
EXIST. W14x30
EXIST. W14x30
EXIST. W14x30
EXIST. W14x30
EXIST. W18x40 EXIST. W18x40
EXIST. W14x30EXIST. W14x30EXIST. W14x30
E X
IS
T
W x
E X
IS
T
W x
E X
IS
T
W x
E X
IS
T
W x
E X
IS
T
W x
E X
IS
T
W x
E X
IS
T
W x
E X
IS
T
W x
E X
IS
T
W x
EXIS
T. 5
"Ø
PO
ST U
P
EXIS
T. 5
"Ø
PO
ST U
P
EXIS
T. 5
"Ø
PO
ST U
P
EXIS
T. 5
"Ø
PO
ST U
P
EXIS
T. 5
"Ø
PO
ST U
P
EXIS
T. 5
"Ø
PO
ST U
P
EXIS
T. 5
"Ø
PO
ST U
P
EXIS
T. 5
"Ø
PO
ST U
P
7' - 1" 14' - 9"
CL. BEAM
POST
CL. BEAM
POST
DEMOLISH EXISTING POST
REFER TO SD-201
(TYP. FOR 4 LOCATIONS)
SCALE: 1/8" = 1'-0"
EXISTING ROOF FRAMING PLAN
1. TOP OF EXISTING STEEL AT ELEVATION 23'-0" ABOVE EXISTING FINISHED FLOOR UNLESS OTHERWISE
NOTED.
2. EXISTING ROOF DECK - 1 1/2", 22 GA. COMPOSITE METAL DECK w/ 2 1/2" CONCRETE OVER DECK REINFORCED WITH ONE LAYER OF 6x6 - W2.9xW2.9 WWF. VERIFY IN THE FIELD.
3. ALL EXISTING CONDITIONS ARE TO BE VERIFIED IN FIELD, PRIOR TO SUBMISSION OF SHOP
DRAWINGS.
SEE PLAN FOR
FRAMING SIZE
(TYP.)
SF-201
1 DUNNAGE FRAMING SECTION
SCALE: 3/4" = 1'-0"
1' - 1 1/2"
2' - 6"
CL.
POST
CL.
BEAM
SPRING VIBRATOR
INSOLATOR (SEE
MECH. DWGS.)
COOLING TOWER
(SEE MECH. DWGS.)
T.O. SPRING ISOLATOR
EL. +5'-3" ABOVE FINISH ROOF
(REFER TO MECH DWGS.)
POST , SEE PLAN
FOR SIZE
6 1/2" x 1/2" x 1'-0"
PLATE SHOP WELDED
TO HSS POST
(4) 3/4"⌀ A325 BOLTS
(TYP.)
EXISTING FRAMING
SEE PLAN
T.O. STEEL DUNNAGE
EL. (SEE PLAN)
/8
NOTE:
ELEVATION OF DUNNAGE ABOVE ROOF STEEL SHALL BE
ADJUSTED AS NECESSARY TO ENSURE COOLING TOWER
OVERLFOW HEIGHT IS WITHIN 0.5" OF COOLINIG TOWER-3
HEIGHT.
3/8" THK. STIFFENER
PLATE
3/8" THK. STIFFENER
PLATE
EXISTING ROOF SLAB AnD
ROOF CONSTRUCTION.
(V.I.F.)
V .I
.F
E D C B A
EXIST.
L3x2 1/2"x1/4"
(TYP.)
EXIS
T. 5
"Ø
PO
ST EXIST.
W12x30
EXIST.
W12x30
E X
IS
T
W x
E X
IS
T
W x
E X
IS
T
W x
EXIST. 5"Ø
PO
ST
EXIS
T. 5
"Ø
PO
ST
(V.I.F.)
24' - 8"
(V.I.F.)
24' - 8"
(V.I.F.)
24' - 8"
(V.I.F.)
24' - 8"
(V .I
.F
(V .I
.F
(V .I
.F
CL.
POST
CL.
POST
CL.
POST
CL.
POST
EXISTING
COOLING
TOWER
SF-201
L3x2 1/2"x1/4"
KICKER, SEE
TYPICAL DETAIL
(TYP. FOR 8)
/4
H SS6x0.375
PO
ST
H SS6x
0.
PO
ST
H SS6x
0.
PO
ST
W12x45
W12x45
W x
W x
W x
W x
/8
W x
/8
W x
/8
W x
COOLING
TOWER OP WT.
37,215 LBS, EACH1' - 0 3/8"
4' - 11 1/4"
/4
(TYP.)
1' - 1 1/2"
6' - 3 5/8" 15' - 6 3/8"
CL.
POST
4' - 7 3/8"
4' - 3 1/2"H SS6x0.375
PO
ST
EXIS
T. 5
"Ø
PO
ST
H SS6x
0.
PO
ST
H SS6x
0.
PO
ST
SCALE: 1/8" = 1'-0"
EXISTING DUNNAGE FRAMING PLAN
1. TOP OF NEW DUNNAGE STEEL AT ELEVATION 28'-11" ABOVE EXISTING FINISHED FLOOR
UNLESS OTHERWISE NOTED. VERIFY IN THE FIELD.
2. ALL EXISTING CONDITIONS ARE TO BE VERIFIED IN FIELD.
3. BOTTOM OF NEW COOLING TOWER ELEVATIONS SHALL BE 5'-3" ABOVE TOP OF FINISH
ROOF, REFER TO MECHANICAL DWGS.
BEAM SEE PLAN
POST
TYPICAL KNEE BRACE DETAIL
1/4"
TYP.
SCALE: N.T.S.
W.P.
W.P.
L3x2 1/2"x1/4"
KNEE BRACE.
PL. 6x6x3/8 w/ (2) 3/4"∅ A325
BOLT.
TOP OF DUNNAGE STEEL
EL - SEE PLAN
CL.
BEAM1
"1
I O
T S
T
IL
L S
E R
V
S I G
N
C O
N S
U L
T I N
G
T
IT
U S
A V
E N
C H
E S
T E
R N
Y
(5
(5
F
A X
D A
T E
B Y
A P
P R
O V
E D
C H
E C
K E
D B
Y
D R
A W
N B
Y
S C
A L E
P R
O J E
C T
I D
E N
T
IF
IC
A
T
IO
N N
O
D A
T E
N U
M B
E R
S H
E E
T
S H
E E
T T
IT
L E
R E
V
IS
IO
N
IT IS A VIOLATION OF THE LAW FOR ANY PERSON, EXCEPT A LICENSED PROFESSIONAL ENGINEER OR LAND SURVEYOR, TO ALTER THIS DRAWING IN ANY WAY. IF A LICENSED PROFESSIONAL ENGINEER OR LAND SURVEYOR ALTERS THIS DRAWING THEY MUST ATTACH THEIR SEAL AND NOTATION "ALTERED BY" FOLLOWED BY A SIGNATURE AND THE DATE AND A SPECIFIC DESCRIPTION OF THE ALTERATION.
A S
N O
T E
D
R E
P L
A C
E C
O O
L
IN
G T
O W
E R
S
A L
B A
N Y
S T
R A
T T
O N
V A
M E
D
IC
A L
C E
N T
E R
H
O L
L A
N D
A V
E N
U E
A L
B A
N Y
N
Y
E X
IS
T
IN
G R
O O
F F
R A
M
IN
G
D U
N N
A G
E P
L A
N
S F
- 2
N A S
T W H
D W J
W
HEAT TRACE SCHEDULE
CIRCUIT POWER
LENGTH
(FT)
PIPING SYSTEM
OUTPUT
(W/FT)
VOLTAGE PHASE
NOMINAL
CURRENT (AMP)
BREAKER
CURRENT (AMP)
TRANSFORMER
LOAD (W)
MODEL NOTES
C1 P1 64 CT-1 STEAM 3.78 208 1 1.2 1.5 314.8 HLT25-JT 2,3
C2 P2 42 CT-1 SIDESTREAM SUP 2.16 208 1 0.4 0.8 136.1 CLT25-JT 1,3
C3 P3 42 CT-1 SIDESTREAM RET 2.16 208 1 0.4 0.8 136.1 CLT25-JT 1,3
C4 P4 52 CT-2 STEAM 3.78 208 1 0.9 1.2 255.8 HLT25-J 2,3
C5 P5 42 CT-2 SIDESTREAM SUP 2.16 208 1 0.4 0.8 136.1 CLT25-JT 1,3
C6 P6 42 CT-2 SIDESTREAM RET 2.16 208 1 0.4 0.8 136.1 CLT25-JT 1,3
NOTES:
1. SELF-REGULATING 5 WATT HEATER CABLE
2. HIGH TEMPERATURE SELF-REGULATING HEATER CABLE
3. PROVIDE POWER CONNECTION KIT TO ALL CIRCUITS
PIPE SUPPORT SCHEDULE
TAG NO. EQUIPMENT
BASE
DIMENSIONS
PIPING SYSTEM
BRACING
LENGTH (FT.)
SIDE POST
HEIGHT
INTERIOR
WIDTH POST
TO POST
DISTANCE
TO BOTTOM
OF PIPE
BASIS OF DESIGN MODEL NOTES
A PSL SUPPORT 18" x 18" x 3" CONDENSER WATER - 37 1/2" 24 3/8" 18 5/8" PHP SYSTEM/DESIGN PSL-2-2 1,3,5,6
B PSL SUPPORT 18" x 18" x 3" EQUALIZER - 78 3/4" 30" 65 1/8" PHP SYSTEM/DESIGN PSL-5-2 1,4,5,6
C PSL BRACING - - 4 - - - PHP SYSTEM/DESIGN PSE BRACING 1,5
D PSL BRACING - - 8 - - - PHP SYSTEM/DESIGN PSE BRACING 1,5
E PSL BRACING - - 10 - - - PHP SYSTEM/DESIGN PSE BRACING 1,5
NOTES:
1. PIPE SUPPORT SYSTEM IS CONSTRUCTED OF HOT DIPPED GALVANIZED CARBON STEEL (PER ASTM A 123) AND 304 STAINLESS STEEL (MILLED FINISHED).
ROLL-FORMED 3-SIDED TUBULAR SHAPE, PERFORATED WITH 9/16" HOLES AT 1-7/8" CENTERS ON THREE SIDES. 12 GAUGE THICKNESS. NUTS AND
WASHERS ARE HOT DIP GALVANIZED CARBON STEEL OR 304 STAINLESS STEEL.
2. BASE MATERIAL IS INJECTION MOLDED HIGH DENSITY/HIGH IMPACT POLYPROPYLENE WITH UV-INHIBITORS AND ANTIOXIDANTS, BLACK.
3. PSL-2-2 SUPPORTS TO BE USED ON ALL NEW CWTT PIPING ON ROOF. CENTER OF PIPE AT 2"-0" ABOVE ROOF SURFACE. SEE MP-402 FOR PIPE ELEVATIONS.
4. PSL-5-2 SUPPORTS TO BE USED ON ALL EQUALIZER PIPING ON ROOF. CENTER OF PIPE AT 6" - 0 1/8" ABOVE ROOF SURFACE. SEE MP-402 FOR PIPE
ELEVATIONS.
5. ALL PIPE SUPPORT AND SEISMIC SYSTEMS ARE DELEGATED DESIGN. BASIS OF DESIGN IS PHP DESIGN/SYSTEMS OR EQUIVALENT. ALL CALCULATIONS
AND DESIGN SHALL BE PERFORMED BY PROFESSIONAL ENGINEER LICENSED IN THE STATE OF NEW YORK. DIFFERENT BRACING LENGTHS AND THEIR
REQUIRED POSITION TO BE DETERMINE BY PROFESSIONAL ENGINEER AS PART OF THE DELEGATED DESIGN. BRACING LENGTHS ARE FOR SEISMIC
BRACING.
6. STEEL TIE-DOWN CABLES WITH EYEBOLTS TO BE PROVIDED FOR SEISMIC PROTECTION AS PART OF THE DELEGATED DESIGN. LOCATION AND NUMBER
OF STEEL TIE-DOWN CABLES WITH EYEBOLTS TO BE DETERMINED AS PART OF THE DELEGATED DESIGN BY ENGINEER.
CWTT CONDENSER WATER TO TOWER
CWFT CONDENSER WATER FROM TOWER
CHWS CHILLED WATER SUPPLY
CHWR CHILLED WATER RETURN
LPS LOW PRESSURE STEAM
LPC LOW PRESSURE CONDENSATE
MPS MEDIUM PRESSURE STEAM
HWS HOT WATER SUPPLY
HWR HOT WATER RETURN
DN DOWN
KW KILOWATTS
RPM REVOLUTIONS PER MINUTE
HP HORSEPOWER
(E) EXISTING TO REMAIN
CT COOLING TOWER
CH CHILLER
COND P CONDENSER PUMP
CH-P CHILLER PUMP
UH UNIT HEATER
PRV PRESSURE REDUCING VALVE
HX HEAT EXCHANGER
CW DOMESTIC COLD WATER
FD FLOOR DRAIN
RD ROOF DRAIN
VFD VARIABLE FREQUENCY DRIVE
FM FLOW METER
SYMBOLS & ABBREVIATIONS
POINT OF DISCONNECTION
POINT OF CONNECTION
BALL VALVE (SINGLE-LINE)
GATE VALVE (SINGLE-LINE)
PRESSURE REDUCING VALVE
(SINGLE-LINE)
ELBOW UP (SINGLE-LINE)
ELBOW DOWN (SINGLE-LINE)
PIPE SECTION UP (DOUBLE-LINE)
PIPE SECTION DOWN (DOUBLE-LINE)
PIPE CAP (SINGLE-LINE)
PIPE ELBOW (SINGLE-LINE)
DEMOLITION
DIRECTION OF FLOW
DOUBLE-LINE CONTIUATION
SINGLE-LINE CONTIUATION
PIPE REDUCER (SINGLE-LINE)
CHECK VALVE (SINGLE-LINE)
STRAINER (SINGLE-LINE)
SOLENOID VALVE (SINGLE-LINE)
OR
SS SIDE STREAM FILTER
X
X
DEMOLITION KEYNOTE
NEW WORK KEYNOTE
STEAM TRAP (ONE-LINE)
OS&Y GATE VALVE (ONE-LINE)
RH ROOF HYDRANT
MOTORIZED CONTROL VALVE1(1/2" - 2")
MOTORIZED CONTROL VALVE (8" - 18")
DCW DOMESTIC COLD WATER
IDW INDIRECT WASTE WATER
RPZ (ONE-LINE)
RPZ (TWO-LINE)
PRESSURE GAUGE
MOTORIZED CONTROL VALVE (ONE-LINE)V MOTORIZED CONTROL VALVE
M
TEMPERATURE TRANSMITTER
LT LEVEL TRANSMITTER
MANUAL ISOLATION
BUTTERFLY VALVE (2-LINE)
MANUAL ISOLATION
BUTTERFLY VALVE (ONE-LINE)
S
PT PRESSURE TRANSMITTER
FLOW METER
PUMP (ONE-LINE)
TRIPLE-DUTY VALVE (ONE-LINE)
OR TT
P/T PORT
M
M
I O
T S
T
IL
L S
E R
V
S I G
N
C O
N S
U L
T I N
G
T
IT
U S
A V
E N
C H
E S
T E
R N
Y
(5
(5
F
A X
D A
T E
B Y
A P
P R
O V
E D
C H
E C
K E
D B
Y
D R
A W
N B
Y
S C
A L E
P R
O J E
C T
I D
E N
T
IF
IC
A
T
IO
N N
O
D A
T E
N U
M B
E R
S H
E E
T
S H
E E
T T
IT
L E
R E
V
IS
IO
N
IT IS A VIOLATION OF THE LAW FOR ANY PERSON, EXCEPT A LICENSED PROFESSIONAL ENGINEER OR LAND SURVEYOR, TO ALTER THIS DRAWING IN ANY WAY. IF A LICENSED PROFESSIONAL ENGINEER OR LAND SURVEYOR ALTERS THIS DRAWING THEY MUST ATTACH THEIR SEAL AND NOTATION "ALTERED BY" FOLLOWED BY A SIGNATURE AND THE DATE AND A SPECIFIC DESCRIPTION OF THE ALTERATION.
A S
N O
T E
D
R E
P L
A C
E C
O O
L
IN
G T
O W
E R
S
A l b a n y
S t r a t t o n
V A
M e d ic a l
C e n t e r
H o l l a n d
A v e n u e
A l b a n y
N
Y
M E
C H
A N
IC
A
L L
E G
E N
D
S C
H E
D U
L E
S
M P
-0
B F W
A N G K M W
B F W
A -1 -8
NOTES/ACCESSORIES:
1. PROVIDE SEISMIC ISOLATOR (SPRING RAIL) WITH SNUBBER AND LIMIT STOPS TO SUPPORT EACH UNIT ON TOP OF DUNNAGE (26'-8 1/8" AFF OFF PLANT FLOOR). SPRING RAIL HEIGHT FROM ROOF SURFACE SHALL BE COORDINATED TO MATCH EXISTING CT-3's OVERFLOW HEIGHT.
2. PROVIDE VARIABLE SPEED DRIVE FOR FAN MOTORS. INSTALL INSIDE CHILLER PLANT. INSTALL IN ACCORDANCE WITH
MANUFACTURER'S INSTALLATION MANUAL. REFER TO VFD SCHEDULE ON THIS SHEET.
3. PROVIDE STEAM SUMP HEATER (SPARGE TUBE).
4. PROVIDE BASIN SWEEPING SYSTEM WITH FLANGED CONNECTION AT EXTERIOR OF UNIT FOR CONNECTION TO EXISTING
SIDE STREAM FILTER SKID.
5. PROVIDE 12" EXTERIOR FLANGED CONNECTION SIDE-TAPPED INTO THE BASIN OF EACH TOWER FOR CONNECTION OF
EQUALIZER.
6. PROVIDE MECHANICAL VIBRATION CUTOFF SWITCH FOR FAN MOTOR ON FAN SUPPORT FRAMEWORK. CONNECT
VIBRATION CUTOFF SWITCH TO FAN VARIABLE SPEED DRIVE.
7. PROVIDE ONE (1) MOVABLE DAVIT ARM AND MOUNTING BRACKET FOR FAN REMOVAL AND MAINTENANCE.
8. PROVIDE HEAVY GAUGE, TYPE 304 STAINLESS STEEL HOT WATER DISTRIBUTION BASINS. PROVIDE POLYPROPYLENE
METERING ORIFICES TO ASSURE EVEN DISTRIBUTION OF WATER OVER WET DECK SURFACE. PROVIDE TYPE 304 STAINLESS STEEL COVERS TO PREVENT ACCUMULATION OF DEBRIS AND ALGAE IN THE HOT WATER DISTRIBUTION
BASINS.
9. PROVIDE A HEAVY GAUGE, HOT-DIPPED GALVINIZED STEEL WIRE FAN GUARD.
10. PROVIDE HOT WATER BASIN DAMS IN EACH HOT WATER BASIN TO ACCOMMODATE WATER FLOW RATES DOWN TO 50%
OF THE DESIGN FLOW
11. ALL WETTED PARTS/SURFACES SHALL BE STAINLESS STEEL CONSTRUCTION.
12. LOW SOUND FAN SHALL BE PROVIDED AND ARE DRIVEN BY A ONE-PEICE MULTI-GROOVE, NEOPRENE/POLYESTER BELT.
MOTOR IS MOUNTED ON AN ADJUSTABLE MOTOR BASE. FAN AND MOTOR SHEAVES ARE NON-CORROSIVE CAST ALUMINUM. THE POWER TRAIN FAN DRIVE SYSTEM, INCLUDING FAN MOTORS, IS WARRANTED AGAINST DEFECTS IN MATERIALS AND WORKMANSHIP FOR FIVE (5) YEARS FROM DATE OF SHIPMENT. REFER TO VFD SCHEDULE ON THIS
SHEET.
13. 10" WATER OUTLET SHALL BE LOCATED AT THE DEPRESSED AREA OF THE COLD WATER BASIN. SEE SUBMITTAL DRAWING
FOR EXACT LOCATION.
14. THE MAXIMUM FLOW RATE FOR CT-1/2 IS 2250 GPM. THE TOWER'S CONDENSER PUMPS (COND-P-4/5) HAVE A FLOW RATE
OF 2100 GPM AT AN AVERAGE OF 55.2 HZ FOR THEIR RESPECTIVE VFD.
15. PROVIDE CONDUCTANCE PROBE STYLE LEVEL CONTROL SENSOR WITH LOW LEVEL/HIGH LEVEL ALARM, HEATER CUTOUT, ADJ. PROBE TO BE CONNECTED TO ALC BMS. INSTALL IN ACCORDANCE WITH MANUFACTURER INSTALLATION
MANUAL.
EXISTING PUMP SCHEDULE
NO. LOCATION TYPE SERVICE WORK REQUIRED
LOW FLOW
RATE (GPM)
HIGH FLOW
RATE(GPM)
DESIGN
HEAD IN
FEET
ACTUAL HEAD
IN FEET
ACTUAL PRESSURE
DIFF. (PSIG)
MOTOR CHARACTERISTICS
IMPELLER SIZE
(DIA. in.)
MANUFACTURER MODEL NOTES
RPM HP VOLTS PHASE BHP
CH P-1 CHILLER ROOM BASE MOUNTED CHILLER WATER REFERENCE ONLY - 1800 39 33.5 14.5 1180 30 460 3 26.8 11.2 ARMSTRONG FTV-FS N/A
CH P-2 CHILLER ROOM BASE MOUNTED CHILLER WATER REFERENCE ONLY - 1800 39 32.8 14.2 1180 30 460 3 27.0 11.2 ARMSTRONG FTV-FS N/A
CH P-3 CHILLER ROOM BASE MOUNTED CHILLER WATER REFERENCE ONLY - 1800 39 33.3 14.4 1180 30 460 3 27.0 11.2 ARMSTRONG FTV-FS N/A
CH P-9 CHILLER ROOM BASE MOUNTED CHILLER WATER REFERENCE ONLY - 1800 39 32.8 14.2 1180 30 460 3 27.0 11.2 ARMSTRONG FTV-FS N/A
CH P-9X CHILLER ROOM BASE MOUNTED CHILLER WATER REFERENCE ONLY - 1800 39 32.8 14.2 1180 30 460 3 27.0 11.2 ARMSTRONG FTV-FS N/A
CH P-10 CHILLER ROOM BASE MOUNTED CHILLER WATER REFERENCE ONLY - 1800 39 32.8 14.2 1180 30 460 3 27.0 11.2 ARMSTRONG FTV-FS N/A
CH P-12 CHILLER ROOM BASE MOUNTED CHILLER WATER REFERENCE ONLY - 2400 64 52.4 22.7 1185 50 460 3 37.0 12.83 PACO 1903EE N/A
CH P-13 CHILLER ROOM BASE MOUNTED CHILLER WATER REFERENCE ONLY - 2400 64 50.8 22.0 1185 50 460 3 37.8 12.83 PACO 1903EE 1
COND P-4 CHILLER ROOM BASE MOUNTED CONDENSER WATER ONLY BALANCE - 2100 80 67.0 29.0 1186 60 460 3 47.5 14.44 ARMSTRONG FTV-FS 1
COND P-5 CHILLER ROOM BASE MOUNTED CONDENSER WATER ONLY BALANCE - 2100 70 63.5 27.5 1185 60 460 3 52.26 14.44 ARMSTRONG FTV-FS 1
COND P-6 CHILLER ROOM BASE MOUNTED CONDENSER WATER ONLY BALANCE - 2100 80 69.8 30.2 1185 60 460 3 48.4 14.44 ARMSTRONG FTV-FS 1
COND P-14 CHILLER ROOM BASE MOUNTED CONDENSER WATER ONLY BALANCE 2250 3000 80 82.0 35.6 1780 75 460 3 70.6 10.48 PACO 1922EE 1,2
COND P-15 CHILLER ROOM BASE MOUNTED CONDENSER WATER ONLY BALANCE 2250 3000 80 81.3 35.2 1780 75 460 3 70.84 10.48 PACO 1922EE 1,2
SS-3/P-18 CHILLER ROOM BASE MOUNTED SIDE STREAM FILTER BALANCE 300 600 1765 15 460 3 1,3
VARIABLE FREQUENCY DRIVE SCHEDULE
NO. ASSOCIATION. VOLTAGE (V) AMPERAGE (A) PHASE WEIGHT (LB.) BASIS OF DESIGN BASIS OF DESIGN NOTES
VFD-1 CT-1 FAN MOTOR 480 32.6 3 25.68 SCHNEIDER ELECTRIC ATV212HD22N4S 1
VFD-2 CT-2 FAN MOTOR 480 32.6 3 25.68 SCHNEIDER ELECTRIC ATV212HD22N4S 1
VFD-14 COND P - 14 480 101 3 97 SCHNEIDER ELECTRIC ATV61HD55N4 N/A
VFD-15 COND P -15 480 101 3 97 SCHNEIDER ELECTRIC ATV61HD55N4 N/A
VFD-SS-3/P-18 SIDE STREAM - 3 480 101 3 97 SCHNEIDER ELECTRIC ATV61HD55N4 N/A
COOLING TOWER SCHEDULE
NO. LOCATION UNIT TYPE
NOMINAL
CAPACITY (TONS)
WATER FLOW
(GPM)
AMBIENT AIR
TEMP. (°F wb)
EWT
(°F)
LWT
(°F)
DRIFT LOSS
(GPM)
FAN MOTOR
BASIS OF DESIGN MODEL NOTES
NO. RPM HP VOLTAGE (V) PHASE
CT-1 CHILLER PLANT ROOF CROSSFLOW 700 2100 78 95 85 22.5 1 VARIABLE 30 460 3 BALTIMORE AIRCOIL COMPANY XES3E-1222-13O ALL ACCESSORIES REQUIRED BELOW
CT-2 CHILLER PLANT ROOF CROSSFLOW 700 2100 78 95 85 22.5 1 VARIABLE 30 460 3 BALTIMORE AIRCOIL COMPANY XES3E-1222-13O ALL ACCESSORIES REQUIRED BELOW
FLOW METER SCHEDULE
NO. SERVICE / LOCATION
PROCESS
CONNECTION
SIZE (in.)
ACCURACY
FLOW RANGE
(GPM)
VELOCITY
RANGE (ft/sec)
MAX.
PRESSURE
(PSI)
AMBIENT
TEMPERATURE (°F)
WATER
TEMPERATURE
RANGE (°F)
COMMUNICATIONS VOLTAGE
INGRESS
PROTECTION
BASIS OF DESIGN MODEL NOTES
(E)FM-5
(E) CT-3 MAKEUP
WATER
- - - - - - - - - - - - N/A
(E)FM-6
(E) CT-3 CONDENSER
WATER
- - - - - - - - - - - - N/A
FM-2
CT-1/2 MAKEUP WATER
/ CHILLER ROOM
3/4
+/- 0.5% from 5 to 100% Qs, +/- 1% from 1 to 5% Qs
5.2 TO 52 0.328 to 32.81 145 23 to 131 32 to 122 RS485 24 VAC IP67 OMEGA FMG602-VAC N/A
FM-3
CT-1 CONDENSER
WATER
6"
+/- 0.5% from 5 to 100% Qs, +/- 1% from 1 to 5% Qs
286.2 TO 2,862 0.328 to 32.81 145 23 to 131 32 to 122 RS485 24 VAC IP67 OMEGA FMG611 N/A
FM-4
CT-2 CONDENSER
WATER
6"
+/- 0.5% from 5 to 100% Qs, +/- 1% from 1 to 5% Qs
286.2 TO 2,862 0.328 to 32.81 145 23 to 131 32 to 122 RS485 24 VAC IP67 OMEGA FMG611 N/A
FM-7
BLOWDOWN / CHILLER
ROOM
3/4
+/- 0.7% from 5 to 100% Qs, +/- 1% from 1 to 5% Qs
0.66 TO 13.2 - 145 41 to 140 32 to 122 RS485
12 to 24
VDC
IP65 OMEGA FMG915B-SS-IO-NPT N/A
ALT. NO. DEDUCT ALTERNATE DESCRIPTION DISCIPLINES INVOLVED
CROSS-CONNECTION BETWEEN TOWERS, CT-1/2 AND CT-3.
INCLUDES EQUALIZER LINE ON ROOF.
MECH. & CONTROLS
DEMOLITION OF OLD CHW / HW MAINS IN CORNER OF CHILLER
PLANT
MECHANICAL ONLY
3 RE-FEEDING LOW-PRESSURE STEAM HEADER MECHANICAL ONLY
MOTORIZED CONTROL VALVE SCHEDULE
NO. LOCATION EXISTING/NEW PIPE SIZE (in.) TYPE SERVICE
MOTOR
VOLTAGE (VAC)
MODULATING
OR 2-WAY
BASIS OF DESIGN MODEL NOTES
V-1 CHILLER 1 CWTT BRANCH TO HEADER EXISTING 10 BUTTERFLY CWFT - 2-POSITION - - N/A
V-3 CHILLER 2 CWTT BRANCH TO HEADER EXISTING 10 BUTTERFLY CWFT - 2-POSITION - - N/A
V-7 BRANCH TO CT-1 INLETS NEW 10 BUTTERFLY CWTT 120 2-POSITION N/A
V-7A CT-1 CW SUMP LINE ON ROOF NEW 10 BUTTERFLY BYPASS 120 MODULATING N/A
V-8 SIDE STREAM RETURN FROM CT-1 NEW 4 BUTTERFLY SIDE STREAM FILTER RETURN 120 2-POSITION N/A
V-9 BRANCH TO CT-2 INLETS NEW 10 BUTTERFLY CWTT 120 2-POSITION N/A
V-9A CT-2 CW SUMP LINE ON ROOF NEW 10 BUTTERFLY BYPASS 120 MODULATING N/A
V-10 SIDE STREAM RETURN FROM CT-2 NEW 4 BUTTERFLY SIDE STREAM FILTER RETURN 120 2-POSITION N/A
V-11 SIDE STREAM SUPPLY TO CT-2 NEW 4 BUTTERFLY SIDE STREAM FILTER SUPPLY 120 2-POSITION N/A
V-12 WATER-SIDE ECONOMIZER EXISTING 8 BUTTERFLY CWFT - 2-POSITION - - N/A
V-13 BYPASS TO WATER-SIDE ECONOMIZER EXISTING 8 BUTTERFLY CWFT - 2-POSITION - - N/A
V-17 SIDE STREAM SUPPLY TO CT-1 NEW 4 BUTTERFLY SIDE STREAM FILTER SUPPLY 120 2-POSITION N/A
V-19 BRANCH TO COOLING TOWER 1 NEW 10 BUTTERFLY CWFT 120 2-POSITION N/A
V-20 BRANCH TO COOLING TOWER 2 NEW 10 BUTTERFLY CWFT 120 2-POSITION N/A
V-27 MAKE-UP WATER BRANCH TO CWTT MAIN NEW 2 2-PIECE, BALL DCW (MAKE-UP WATER) 120 MODULATING N/A
V-29 AT CWFT HEADER NEW 3/4 2-PIECE, BALL BLOWDOWN 24 2-POSITION N/A
NOTES:
1. WHEN BALANCING, ALL EXISTING TD VALVES SHALL REMAIN 100% OPEN WITH FLOW RATE SET WITH PUMP SPEED. THE BALANCED PUMP SPEED SHALL BE PROGRAMMED INTO THE BMS OR VFD.
2. PUMP FLOW RATE SHALL BE 3000 GPM WHEN SERVING CT-3 AND 2250 GPM WHEN SERVING CT-1 OR CT-2.
3. PUMP FLOW RATE SHALL BE 600 GPM WHEN SERVING BOTH CT-1 AND CT-2 SIMULTANEOUSLY, AND 300 GPM WHEN SERVING EITHER CT-1 OR CT-2.
NOTES:
1. REMOTE VFD INSIDE CHILLER PLANT
E D C B A
MP-401
(E)18" CWTT
(E)10" CWFT
(E)18" CWFT
(E )1
C W
T T
(E)18" CWTT
(E )1
C W
T T
(E )1
C W
F T
(E)10" CWFT
(E)8" CWFT (E)8" CWFT
(E)8" CWTT
(E)8" CWFT
(E )8
C
W T
T
(E)10" CWFT
(E )1
C W
F T
(E)12" CWFT
(E )1
C H
W R
(E )1
C H
W R
(E)12" CWTT
(E)6" SF
10" HWR
10" HWS
14" CHWR
14" CHWS
TO FACILITY
10" CWTT
UP TO CT-1
10" CWTT
UP TO CT-2
(E)10" CHWS
(E)10" CHWR
(E)10"
CWFT
BYPASS
FROM CT-3
(E)12" CWTT
UP TO CT-3
(E)12" CWFT
FROM CT-3
COND
P-15
COND
P-14
(E )1
C W
F T
CH-3
CH-2
CH-1
(E )1
C W
F T
(E )1
C W
F T
(E )1
C W
F T
(E )1
C W
F T
(E )1
C W
F T
(E)HX-1
SS-3/P-18
BASKET
FILTER
SIDE
STREAM
FILTER
SS-2
COND
P-4 CH P-1
COND
P-5
CH P-2 CH P-3
COND
P-6
CH P-13
CH P-12
(E)10" CHWR
(E)10" CHWR
(E)10" CWFT
UP TO CT-1
(E)10" CWFT
UP TO CT-2
(E)6" SF
(E)10" CHWS
(E)10" CHWR
2 2
(E)6" SF
(E)6" SF
(E)6" SF
(E)6" SF
(E)6" SF
(E)10" CWTT
(E )1
C W
(E )1
C W
CH P-9
CH P-10
CH P-9X
(E)10" HWS
(E)10" HWR
(E)3" HWR
(E)3" HWS
(E)3" HWR
(E)3" HWS
M
M
M
M
M
M
M M
MP-401
(E)FD
(E)FD
(E)FD
(E)FD
(E)FD
(E)FD (E)FD
(E)FD(E)FD
(E)FD
(E)FD
DEMOLTION KEYNOTES:
1. REMOVE EXISTING HWS/R AND CHWS/R PIPING TO EXISTING SHUTOFF VALVES. REFER TO DRAWING MP-401, PLAN NO. 1 FOR LOCATION.
2. REMOVE CONDENSER PIPING BETWEEN COOLING TOWER, CT-1 AND CT-2, AND EXISTING HEADERS LOCATED IN CHILLER PLANT AS SHOWN. SEE MD-103 FOR CONTINUATION. REMOVE MOTORIZED 3-WAY VALVE.
3. REMOVE WATER METER AND 3/4" BLOW DOWN PIPE UP TO EXISTING HEADER.
4. DISCONNECT AND CAP WATER TREATMENT LINE FROM CONDENSER WATER PIPING. WATER TREATMENT
PIPING EXISTING TO REMAIN.
5. REMOVE EXISTING 6" SIDE STREAM FILTER PIPING. REFER TO INSTALLATION PLANS FOR RECONNECTION TO
NEW SUMP BASIN SWEEPING SYSTEM. PROVIDE WELD CAP AT DISONNECTED TEES.
6. REMOVE EXISTING CAP ON CWTT/CWFT HEADER AND PREPARE FOR NEW CROSS-CONNECTION. THIS WORK IS
PART OF DEDUCT ALTERNATE NO. 1.
X
MP-401
(E)3/4" BLOW DOWN
(E)3/4" BLOW DOWN
(E )1
)1
W
T
(E )1
(E)1" WT
S
I O
T S
T
IL
L S
E R
V
S I G
N
C O
N S
U L
T I N
G
T
IT
U S
A V
E N
C H
E S
T E
R N
Y
(5
(5
F
A X
D A
T E
B Y
A P
P R
O V
E D
C H
E C
K E
D B
Y
D R
A W
N B
Y
S C
A L E
P R
O J E
C T
I D
E N
T
IF
IC
A
T
IO
N N
O
D A
T E
N U
M B
E R
S H
E E
T
S H
E E
T T
IT
L E
R E
V
IS
IO
N
IT IS A VIOLATION OF THE LAW FOR ANY PERSON, EXCEPT A LICENSED PROFESSIONAL ENGINEER OR LAND SURVEYOR, TO ALTER THIS DRAWING IN ANY WAY. IF A LICENSED PROFESSIONAL ENGINEER OR LAND SURVEYOR ALTERS THIS DRAWING THEY MUST ATTACH THEIR SEAL AND NOTATION "ALTERED BY" FOLLOWED BY A SIGNATURE AND THE DATE AND A SPECIFIC DESCRIPTION OF THE ALTERATION.
A S
N O
T E
D
R E
P L
A C
E C
O O
L
IN
G T
O W
E R
S
A l b a n y
S t r a t t o n
V A
M e d ic a l
C e n t e r
H o l l a n d
A v e n u e
A l b a n y
N
Y
F
IR
S T F
L O
O R
D E
M O
L
IT
IO
N
P L
A N
C O
N D
E N
S E
R P
IP
IN
G
M D
-1
B F W
A N G K M W
B F W
A -1 -8
1/4" = 1'-0"
FIRST FLOOR DEMOLITION PLAN - CONDENSER PIPING
E D C B A
MP-401
(E)2" LPC
(E )1
L P
C
(E )3
L P
C
UH-1
UH-2
COND
P-14
(E)HX-1
CH-1 CH-2
SS-3/P-18
COND
P-15
CH-3
UP TO CT-1
UP TO
CT-2
(E)2" LPS UP
TO CT-3
TO UNIT HEATERS
IN CHILLER ROOM
TO LPC
MAIN
(E)PRV BELOW
STEAM
TRAP
STEAM
TRAP
STEAM
TRAP
CH P-13
CH P-12
SIDE
STREAM
FILTER
SS-2
CH P-2
COND
P-5
CH P-1
COND
P-4
CH P-3
COND
P-6
PRV
PRV
RELIEF VALVE
FOR STEAM
HEADER
(E )2
L P
S
(E)2" LPC
(E )2
L P
S
(E )2
L P
C
DEMOLTION KEYNOTES:
1. DISCONNECT LPS AND LPC PIPING BETWEEN EXISTING COOLING TOWERS, AND
STEAM AND CONDENSATE MAIN. REFER TO MD-103 FOR CONTINUATION.
2. PLUG ALL UNUSED OPENINGS.
X
(E)8" HPS(110 PSIG)
(E )8
H
P S
(1 P
S
IG
(E)CONV-1
(E)CONV-2
UNDER
(E)CONV-4
(E)CONV-3
PRV
PRV
(E )8
H
P S
(1 P
S
IG
(E)8" LPS(15 PSIG)
(E)8" LPS(15 PSIG)(E)3" LPS(15 PSIG)
(E)4" LPS(15 PSIG)
(E)4" LPS(15 PSIG)
(E)8" LPS(15 PSIG)
(E)2" LPS(15 PSIG)
(E)2" LPS(110 PSIG)
(E )3
L P
S (1
P
S
IG
(E )2
L P
S (1
P
S
IG
(E)2" LPS(15 PSIG)
(E)8" HPS(110 PSIG)
(E)4" LPS(15 PSIG)
(E)1" GRAVITY COND. RET.
(E)3" PC
(E )3
P
C
(E)HWS
(E)HWS
(E)3" LPS(15 PSIG)
CH P-9X
CH P-10
CH P-9
I O
T S
T
IL
L S
E R
V
S I G
N
C O
N S
U L
T I N
G
T
IT
U S
A V
E N
C H
E S
T E
R N
Y
(5
(5
F
A X
D A
T E
B Y
A P
P R
O V
E D
C H
E C
K E
D B
Y
D R
A W
N B
Y
S C
A L E
P R
O J E
C T
I D
E N
T
IF
IC
A
T
IO
N N
O
D A
T E
N U
M B
E R
S H
E E
T
S H
E E
T T
IT
L E
R E
V
IS
IO
N
IT IS A VIOLATION OF THE LAW FOR ANY PERSON, EXCEPT A LICENSED PROFESSIONAL ENGINEER OR LAND SURVEYOR, TO ALTER THIS DRAWING IN ANY WAY. IF A LICENSED PROFESSIONAL ENGINEER OR LAND SURVEYOR ALTERS THIS DRAWING THEY MUST ATTACH THEIR SEAL AND NOTATION "ALTERED BY" FOLLOWED BY A SIGNATURE AND THE DATE AND A SPECIFIC DESCRIPTION OF THE ALTERATION.
A S
N O
T E
D
R E
P L
A C
E C
O O
L
IN
G T
O W
E R
S
A l b a n y
S t r a t t o n
V A
M e d ic a l
C e n t e r
H o l l a n d
A v e n u e
A l b a n y
N
Y
F
IR
S T F
L O
O R
D E
M O
L
IT
IO
N
P L
A N
T E
A M
P
IP
IN
G
M D
-1
B F W
A N G K M W
B F W
A -1 -8
1/4" = 1'-0"
FIRST FLOOR DEMOLITION PLAN - STEAM PIPING
E D C B A
(E )1
C W
F T
(E )1
C W
F T
(E)10" CWTT(E)10" CWTT
(E )1
C W
F T
(E)12" CWFT DN TO
CHILLER ROOM
(E)8" CWFT
BYPASS
FROM CT-3
(E)10" CWFT DN TO
CHILLER ROOM
(E)10" CWTT FROM
CHILLER ROOM (E)10" CWTT FROM
CHILLER ROOM
(E)2" LPC CAPPED
ABOVE ROOF
(E)2" LPS FROM
CHILLER ROOM
(E)2" LPS
FROM CHILLER
ROOM
CAPPED (E)2" LPS
FROM CHILLER
ROOM TO BE
REMOVED
(E )1
(E )1
(E)10" (E)10"
(E)10" (E)10"
(E )1
C W
T T
(E )1
C W
T T
(E)10" CWTT
(E)10" CWTT
(E)10" CWTT
(E)10" CWTT
(E)2" LPS TO
CT-1 BASIN
(E)2" LPS TO
CT-2 BASIN
CT-3
(E)CT-1 (E)CT-2
(E)12" CWTT FROM
CHILLER ROOM
(E)10" CWFT BYPASS
DN TO CHILLER ROOM
(E)10" CWFT
FROM CT-3
(E)10" CWFT
FROM CT-3
2 2
2 2
2 2
2 2
DEMOLTION KEYNOTES:
1. REMOVE AND DISPOSE OF COOLING TOWERS, CT-1 AND CT-2, AND ASSOCIATED APPURTENANCES, INCLUDING BUT NOT LIMITED TO LADDERS, PLATFORMS, SAFTEY RAILS, AND OTHER RELATED ITEMS.
2. REMOVE EXISTING CONDENSER PIPING BETWEEN COOLING TOWER, CT-1 AND CT-2, AND EXISTING
CONDENSER WATER HEADERS LOCATED IN CHILLER PLANT AS SHOWN. SEE MD-101 FOR
CONTINUATION.
3. DISCONNECT AND REMOVE EXISTING LPS STEAM CONNECTION. SEE MD-102 FOR CONTINUATION.
X
(E)RV-14
I O
T S
T
IL
L S
E R
V
S I G
N
C O
N S
U L
T I N
G
T
IT
U S
A V
E N
C H
E S
T E
R N
Y
(5
(5
F
A X
D A
T E
B Y
A P
P R
O V
E D
C H
E C
K E
D B
Y
D R
A W
N B
Y
S C
A L E
P R
O J E
C T
I D
E N
T
IF
IC
A
T
IO
N N
O
D A
T E
N U
M B
E R
S H
E E
T
S H
E E
T T
IT
L E
R E
V
IS
IO
N
IT IS A VIOLATION OF THE LAW FOR ANY PERSON, EXCEPT A LICENSED PROFESSIONAL ENGINEER OR LAND SURVEYOR, TO ALTER THIS DRAWING IN ANY WAY. IF A LICENSED PROFESSIONAL ENGINEER OR LAND SURVEYOR ALTERS THIS DRAWING THEY MUST ATTACH THEIR SEAL AND NOTATION "ALTERED BY" FOLLOWED BY A SIGNATURE AND THE DATE AND A SPECIFIC DESCRIPTION OF THE ALTERATION.
A S
N O
T E
D
R E
P L
A C
E C
O O
L
IN
G T
O W
E R
S
A l b a n y
S t r a t t o n
V A
M e d ic a l
C e n t e r
H o l l a n d
A v e n u e
A l b a n y
N
Y
R O
O F
M E
C H
A N
IC
A
L D
E M
O L
IT
IO
N
P L
A N
M D
-1
B F W
A N G K M W
B F W
A -1 -8
1/4" = 1'-0"
ROOF MECHANICAL DEMOLITION PIPING PLAN
E D C B A
(E )1
C W
F T
(E )1
C W
F T
(E)10" CWTT(E)10" CWTT
(E )1
C W
F T
12" CWFT DN
TO CHILLER
PLANT
12" CWTT FROM
CHILLER PLANT
10" CWFT BYPASS DN
TO CHILLER PLANT
10" CWTT FROM
CHILLER PLANT
10" CWTT FROM
CHILLER PLANT
2" LPC CAPPED
ABOVE ROOF
2" LPS FROM
CHILLER PLANT
(E)2" LPS
FROM
CHILLER
PLANT
CAPPED (E)2" LPS
FROM CHILLER
PLANT TO BE
REMOVED
10" 10"
10" 10"
(E )1
C W
T T
(E )1
C W
T T
(E)10" CWTT(E)10" CWTT
HEAT TRACE HEAT TRACE
(E)HEAT TRACE
(E)HEAT TRACE
1. REMOVE EXISTING HEAT TRACE CABLE, SENDING UNIT, WIRING, AND ACCESSORIES.
KEYNOTES: X
(E)CT-1 (E)CT-2
CT-3
(E)RV-14
2" DCW FROM
CHILLER PLANT
2" DCW
2" DCW FROM
CHILLER PLANT
2" DRAIN
2" DRAIN
10" CWFT FROM
CHILLER PLANT
10" CWFT FROM
CHILLER PLANT
(E)2" DCW
RD
RD
RD
I O
T S
T
IL
L S
E R
V
S I G
N
C O
N S
U L
T I N
G
T
IT
U S
A V
E N
C H
E S
T E
R N
Y
(5
(5
F
A X
D A
T E
B Y
A P
P R
O V
E D
C H
E C
K E
D B
Y
D R
A W
N B
Y
S C
A L E
P R
O J E
C T
I D
E N
T
IF
IC
A
T
IO
N N
O
D A
T E
N U
M B
E R
S H
E E
T
S H
E E
T T
IT
L E
R E
V
IS
IO
N
IT IS A VIOLATION OF THE LAW FOR ANY PERSON, EXCEPT A LICENSED PROFESSIONAL ENGINEER OR LAND SURVEYOR, TO ALTER THIS DRAWING IN ANY WAY. IF A LICENSED PROFESSIONAL ENGINEER OR LAND SURVEYOR ALTERS THIS DRAWING THEY MUST ATTACH THEIR SEAL AND NOTATION "ALTERED BY" FOLLOWED BY A SIGNATURE AND THE DATE AND A SPECIFIC DESCRIPTION OF THE ALTERATION.
A S
N O
T E
D
R E
P L
A C
E C
O O
L
IN
G T
O W
E R
S
A l b a n y
S t r a t t o n
V A
M e d ic a l
C e n t e r
H o l l a n d
A v e n u e
A l b a n y
N
Y
R O
O F
H E
A T T
R A
C E
D E
M O
L
IT
IO
N
P L
A N
M D
-1
B F W
A N G K M W
B F W
A -1 -8
1/4" = 1'-0"
ROOF HEAT TRACE DEMOLITION PLAN
E D C B A
(E)18" CWTT
(E)10" CWFT
(E)18" CWFT
(E )1
C W
T T
(E)18" CWTT
(E )1
C W
T T
(E )1
C W
F T
(E )1
C W
F T
(E)8" CWFT (E)8" CWFT
(E)8" CWTT
(E)8" CWFT
(E )8
C
W T
T
(E )1
C W
F T
(E )1
C W
F T
(E)12" CWFT
(E )1
C H
W R
(E )1
C H
W R
(E)12" CWTT
10" HWR
10" HWS
14" CHWR
14" CHWS
TO FACILITY
10" CWTT
UP TO CT-1
10" CWTT
UP TO CT-2
10" CHWS
10" CHWR
10" CHWS
10" CHWR
(E)10" CWFT
BYPASS
FROM CT-3
(E)12" CWTT
UP TO CT-3
(E)12" CWFT
FROM CT-3
COND
P-15
COND
P-14
(E )1
C W
F T
CH-3
CH-2
CH-1
(E)10" CWFT
(E)10" CWFT
(E )1
C W
F T
(E )1
C W
F T
(E)10" CWFT
(E)HX-1
SS-3/P-18
BASKET
FILTER
SIDE
STREAM
FILTER
SS-2
COND
P-4
CH P-1 COND
P-5
CH P-2
CH P-3
COND
P-6
CH P-13
CH P-12
10" CHWR
10" CHWR
(E)6" STF
10" CWFT
UP TO CT-1
1. ADD INSULATION TO ALL CONDENSER PIPING ASSOCIATED WITH CT-1 AND
CT-2 THROUGHOUT ENTIRE CHILLER PLANT INCLUDING ALL VALVES AND
TRIM; BOTH NEW AND EXISTING CONDENSER PIPING TO BE INSULATED .
GENERAL PLAN NOTES: 1. PROVIDE 10" PIPING BETWEEN COOLING TOWER (CT-1 AND CT-2) AND HEADERS
LOCATED IN CHILLER PLANT AS SHOWN. PROVIDE NEW MOTORIZED CONTROL
VALVES AS SHOWN. SEE MP-103 FOR CONTINUATION.
2. CAP EXISTING HWS/R AND CHWS/R PIPING TO EXISTING BUTTERFLY VALVES.
RUBBER CONSTRUCTION PLUGS SHALL BE ADDED TO SEAL. CAP BOTH ENDS OF
PIPE. THIS WORK IS PART OF DEDUCT ALTERNATE NO. 2.
3. CONNECT WATER TREATMENT PIPING TO CONDENSER WATER PIPING.
4. NEW PIPING TO BE RUN THROUGH CONGESTED AREA. REROUTE PIPING AS
NECESSARY TO AVOID EXISTING PIPING, VALVES, AND ACCESSORIES.
KEYNOTES: X
1 1
1 1
(E)6" SF
(E)6" SF
6" SF
6" SF
4" SF
4" SF FROM
CT-2 BASIN
SCRUBBER
4" SF
4" SF UP TO CT-2
BASIN SCRUBBER
4" SF FROM CT-1
BASIN SCRUBBER
10" CWFT UP TO CT-2
4" SF UP TO CT-1
BASIN SCRUBBER
4" SF
C W
F T
C W
F T
C W
F T
18" CWTT
1 1/2"
DCW
5. CONNECT 2" INDIRECT WASTE DRAIN TO EXISTING 18" CWFT HEADER. PROVIDE
MANUAL ISOLATION BALL VALVE NEAR CONNECTION TO HEADER.
6. CONNECT 12" CWFT PIPING TO EXISTING 12" CFWT RISER. THIS WORK IS PART
OF DEDUCT ALTERNATE NO. 1.
7. CONNECT 2" MAKEUP WATER TO EXISTING CWFT HEADER AS SHOWN. REFER
TO PP-201 FOR PIPE CONTINUATION.
8. CONNECT 1 1/4" INDIRECT WASTE DRAIN TO BOTTOM OF CWTT RISER AT
BOTTOM OF ELBOW AS SHOWN.
9. CONNECT 2" IWD PIPING TO BOTTOM OF EXISTING 12" CWFT PIPING.
10. ALL NEW CONDENSER WATER PIPING TO BE INSULATED AND PAINTED. REFER
TO SPECIFICATION DIVISION 23 SECTION 230711 "HVAC Insulation." REFER TO
DIVISION 09 FOR PAINTING.
11. PROVIDE 1 1/4" MANUAL BALL VALVE IN DROP 3'-0" A.F.F. PROVIDE FUNNEL
GRATE TO EXISTING FLOOR DRAIN.
12. PROVIDE 2" BALL VALVE IN DROP 3'-0" A.F.F. PROVIDE FUNNEL GRATE TO
EXISTING FLOOR DRAIN.
13. BLOWDOWN WATER METER IN DROP.
14. TOUCH UP PAINT AND LABELS ON ALL CONDENSER PIPING
ASSOCIATED WITH CT-3. REFER TO DIVISION 09.
10 10
VFD-14
VFD-15
VFD-SS-3/P-18
(E)FD
2" IWD
FM-7
4" SF
(E)10" HWR
(E)10" HWS
(E)3" HWR
(E)3" HWS
2" IWD
(E)FD
(E)FD
(E)3" HWR
(E)3" HWS
CH P-9
CH P-10
CH P-9X
1 1/4" IWD
(E)FD
(E)FD
1 1/4"
IWD
(E)FD
2" IWD
2" DCW
MP-401
PART OF DEDUCT ALTERNATE NO. 1
FM-4FM-3
VFD-1 VFD-2
DEDUCT ALTERNATE NO. 2
M
M
M
M
M
M
M M
V-8
V-17
V-10
V-11
V-27
V-29
WATER
TREATMENT
SYSTEM
3/4" BLOW DOWN
3/4" BLOW DOWN
M
(E )3
/4
B L O
W D
O W
N
(E )3
/4
B L O
W D
O W
N
S
(E)FD
(E)FD
2" IWD
(E)FD
I O
T S
T
IL
L S
E R
V
S I G
N
C O
N S
U L
T I N
G
T
IT
U S
A V
E N
C H
E S
T E
R N
Y
(5
(5
F
A X
D A
T E
B Y
A P
P R
O V
E D
C H
E C
K E
D B
Y
D R
A W
N B
Y
S C
A L E
P R
O J E
C T
I D
E N
T
IF
IC
A
T
IO
N N
O
D A
T E
N U
M B
E R
S H
E E
T
S H
E E
T T
IT
L E
R E
V
IS
IO
N
IT IS A VIOLATION OF THE LAW FOR ANY PERSON, EXCEPT A LICENSED PROFESSIONAL ENGINEER OR LAND SURVEYOR, TO ALTER THIS DRAWING IN ANY WAY. IF A LICENSED PROFESSIONAL ENGINEER OR LAND SURVEYOR ALTERS THIS DRAWING THEY MUST ATTACH THEIR SEAL AND NOTATION "ALTERED BY" FOLLOWED BY A SIGNATURE AND THE DATE AND A SPECIFIC DESCRIPTION OF THE ALTERATION.
A S
N O
T E
D
R E
P L
A C
E C
O O
L
IN
G T
O W
E R
S
A l b a n y
S t r a t t o n
V A
M e d ic a l
C e n t e r
H o l l a n d
A v e n u e
A l b a n y
N
Y
F
IR
S T F
L O
O R
M E
C H
A N
IC
A
L P
L A
N
C O
N D
E N
S E
R P
IP
IN
G
M P
-1
B F W
A N G K M W
B F W
A -1 -8
1/4" = 1'-0"
FIRST FLOOR MECHANICAL PLAN - CONDENSER PIPING
E D C B A
(E)2" LPC
(E )1
L P
C
(E )3
L P
C
UH-1
UH-2
COND
P-14
(E)HX-1
CH-1 CH-2
SS-3/P-18
COND
P-15
CH-3
UP TO CT-1
UP TO
CT-2
TO UNIT HEATERS
IN CHILLER ROOM
TO LPC
MAIN
STEAM
TRAP
STEAM
TRAP
CH P-13
CH P-12
SIDE
STREAM
FILTER
SS-2
CH P-2
COND
P-5
CH P-1
COND
P-4
CH P-3
COND
P-6
RELIEF VALVE
FOR STEAM
HEADER
(E)DUPLEX PRV BELOW
PRV ASSEMBLY
WITH 2" BYPASS
1. CONNECT 4" LPS(15 PSIG) PIPING TO EXISTING LPS(15 PSIG) PIPING.
REPLACE ELBOW WITH TEE AND TAP INTO TOP OF TEE. THIS WORK IS
PART OF DEDUCT ALTERNATE NO. 3.
2. PROVIDE STEAM TRAP ASSEMBLY PER DETAIL AND SPECIFICATION.
3. PROVIDE DRIP LEG IN DROP.
4. CONNECT 2" LPS(15 PSIG) AND 2" LPC PIPING TO EXISTING LPS(15 PSIG)
AND LPC PIPING, RESPECTIVELY.
5. INSTALL NEW MANUAL ISOLATION VALVE WITH CHAIN OPERATOR.
KEYNOTES: X
(E)8" HPS(110 PSIG)
CH P-9X
CH P-10
CH P-9
(E)CONV-1
(E)CONV-4
(E)CONV-3
(E)CONV-2
UNDER
PRV
PRV
(E )8
H
P S
(1 P
S
IG
(E)8" LPS(15 PSIG)
(E)8" LPS(15 PSIG)
(E)3" LPS(15 PSIG)
(E)4" LPS(15 PSIG)
(E)4" LPS(15 PSIG)
(E)8" LPS(15 PSIG)
(E)2" LPS(15 PSIG)
(E)2" LPS(110 PSIG)
(E )3
L P
S (1
P
S
IG
(E)2" LPS(15 PSIG)
(E)8" HPS(110 PSIG)
(E)6" LPS(15 PSIG)
(E)1" GRAVITY COND. RET.
(E)3" PC
(E )3
P
C
(E)HWS
(E)HWS
2" LPS(15 PSIG)
2" LPS(15 PSIG)
(E )8
H
P S
(1 P
S
IG
4" LPS(15 PSIG)
(E)8" LPS(15 PSIG)
1 1/2" DRAIN
(E)FD
(E)FD(E)FD(E)FD
(E)FD
(E)FD
(E)FD
(E)FD
(E)FD
(E)FD
(E)FD
(E)FD
2" LPC
2" LPC
DEDUCT ALTERNATE NO. 3
I O
T S
T
IL
L S
E R
V
S I G
N
C O
N S
U L
T I N
G
T
IT
U S
A V
E N
C H
E S
T E
R N
Y
(5
(5
F
A X
D A
T E
B Y
A P
P R
O V
E D
C H
E C
K E
D B
Y
D R
A W
N B
Y
S C
A L E
P R
O J E
C T
I D
E N
T
IF
IC
A
T
IO
N N
O
D A
T E
N U
M B
E R
S H
E E
T
S H
E E
T T
IT
L E
R E
V
IS
IO
N
IT IS A VIOLATION OF THE LAW FOR ANY PERSON, EXCEPT A LICENSED PROFESSIONAL ENGINEER OR LAND SURVEYOR, TO ALTER THIS DRAWING IN ANY WAY. IF A LICENSED PROFESSIONAL ENGINEER OR LAND SURVEYOR ALTERS THIS DRAWING THEY MUST ATTACH THEIR SEAL AND NOTATION "ALTERED BY" FOLLOWED BY A SIGNATURE AND THE DATE AND A SPECIFIC DESCRIPTION OF THE ALTERATION.
A S
N O
T E
D
R E
P L
A C
E C
O O
L
IN
G T
O W
E R
S
A l b a n y
S t r a t t o n
V A
M e d ic a l
C e n t e r
H o l l a n d
A v e n u e
A l b a n y
N
Y
F
IR
S T F
L O
O R
M E
C H
A N
IC
A
L P
L A
N
T E
A M
P
IP
IN
G
M P
-1
B F W
A N G K M W
B F W
A -1 -8
1/4" = 1'-0"
FIRST FLOOR MECHANICAL PLAN - STEAM PIPING
E D C B A
(E )1
C W
F T
(E )1
C W
F T
(E)10" CWTT(E)10" CWTT
(E )1
C W
F T
(E)12" CWFT DN TO
CHILLER ROOM
(E)12" CWTT FROM
CHILLER ROOM
(E)10" CWFT
BYPASS DN TO
CHILLER ROOM
(E)10" CWFT
FROM CT-3
(E)8" CWFT
BYPASS
FROM CT-3
(E )1
C W
T T
(E)10" CWTT (E)10" CWTT
(E)10" CWTT(E)10" CWTT
CT-3
14" EQ
10" CWTT DN
TO CHILLER
ROOM
10" CWTT DN TO
CHILLER ROOM
10" CWFT DN TO
CHILLER ROOM
E Q
(E)10" CWFT
FROM CT-3
1. PROVIDE (2) 750 TON COOLING TOWERS, CT-1 AND CT-2, AND ASSOCIATED
APPURTENANCES, INCLUDING BUT NOT LIMITED TO LADDERS, PLATFORMS, SAFETY
RAILS, AND OTHER RELATED ITEMS..
2. ROUTE 10" CWTT AND CWFT PIPING TO HEADERS IN CHILLER PLANT BELOW.
UTILIZE EXISTING ROOF PENETRATIONS IF POSSIBLE. SEE MP-101 FOR
CONTINUATION.
3. CONNECT 2" LPS (15 PSIG) PIPING TO BASIN HEATER.
4. PROVIDE 14" EQUALIZER PIPING.
5. PAINT ALL NEW AND EXISTING CONDENSER PIPING WITH TWO (2) COATS OF EPOXY
IN ACCORDANCE WITH DIVISION 9.
KEYNOTES: X
1 1
2 2
4 4
14" EQ
4" SF RETURN FROM
BASIN SWEEPING
SYSTEM DOWN TO
EXISTING SIDE
STREAM FILTER
4" SF BASIN
SWEEPING SYSTEM
CONNECTION UP
FROM EXISTING
SIDE STREAM
FILTER
4" SF BASIN
SWEEPING SYSTEM
CONNECTION UP
FROM EXISTING
SIDE STREAM
FILTER
2" LPS (15
PSIG)
CT-1 CT-2
(E)RV-14
E Q
/1
B Y
P A
S S
10" BYPASS
4" SF RETURN FROM
BASIN SWEEPING
SYSTEM DOWN TO
EXISTING SIDE
STREAM FILTER
12" EQ
(E)10" CWTT
10" CWTT10" CWTT
8" CWTT 8" CWTT
8" CWTT 8" CWTT
10" BYPASS
E Q
E Q
10" CWTT
6. PROVIDE INSULATION FOR NEW STEAM AND SIDE STREAM FILTER PIPING. REFER TO
SPECIFICATION DIVISION 23 SECTION 230711 "HVAC Insulation."
7. PROVIDE 1" DRAIN VALVE WITH VALVE AT 3'-0" ABOVE ROOF SURFACE.
8. ROUTE 4" SIDE STREAM FILTER PIPING DOWN THROUGH ROOF TO FLOOR BELOW.
REFER TO MP-101 FOR CONTINUATION.
9. ROUTE 2" LPS (15 PSIG) PIPING DOWN THROUGH ROOF TO FLOOR BELOW. REFER
TO MP-101 FOR CONTINUATION. UTILIZE EXISTING ROOF PENETRATIONS IF POSSIBLE.
10. PROVIDE STRUCTURAL PIPE SUPPORT WITH SEISMIC HANGER. BRACE ALL SUPPORTS
TO WITHSTAND SEISMIC FORCES. REFER TO GENERAL NOTE 1 FOR DELEGATED DESIGN
REQUIREMENTS FOR ALL SEISMIC COMPONENTS. REFER TO PIPE SUPPORT SCHEDULE
ON MP-001 FOR DETAILS.
E Q
/1
B Y
P A
S S
2" LPS (15 PSIG)
GENERAL NOTES:
1. THE DESIGN OF ALL SEISMIC SUPPORTS, RESTRAINTS, AND APPURTENANCES SHALL BE DELEGATED TO THE CONTRACTOR. THE CONTRACTOR IS RESPONSIBLE TO PROVIDE ALL DESIGN AND CALCULATIONS THROUGH A PROFESSIONAL ENGINEER REGISTERED IN THE STATE OF NEW YORK. ALL CALCULATIONS AND DESIGN FOR ALL SEISMIC COMPONENTS SHALL BE SEALED AND SIGNED BY PROFESSIONAL ENGINEER AND SUBMITTED FOR REVIEW. BASIS OF DESIGN IS PHP SYSTEMS/DESIGN OR EQUIVALANT. LOCATION AND NUMBER OF TIE-DOWN
CABLES WITH EYEBOLTS TO BE DETERMINED BY PIPE SUPPORT/SEISMIC ENGINEER.
2. ALL NEW COOLING TOWER EQUIPMENT, PIPING, VALVES, AND ACCESSORIES SHALL BE PROVIDED WITH SEISMIC RESTRAINTS, BRACING, AND VIBRATION ISOLATION IN COMPLIANCE WITH ASCE 7, LATEST VERSION.
ALL SEISMIC COMPONENTS SHALL BE DELEGATED DESIGN PER GENERAL NOTE 1.
11. SUPPORT COOLING TOWER WITH SEISMIC RAIL COMPLETE WITH SEISMIC SNUBBER AND
LIMIT STOPS. REFER TO GENERAL NOTE 1 FOR DELEGATED DESIGN REQUIREMENTS FOR
ALL SEISMIC COMPONENTS.
12. PROVIDE FLEXIBLE JOINT AT COOLING TOWER PIPING CONNECTIONS FOR ALL PIPING.
VIBRATION ISOLATORS SHALL BE RATED FOR SEISMIC FORCES AND MOVEMENT. REFER
TO GENERAL NOTE 1 FOR DELEGATED DESIGN REQUIREMENTS FOR ALL SEISMIC
COMPONENTS.
13. PROVIDE FLEXIBLE JOINT ABOVE PIPE PENETRATIONS THROUGH ROOF FOR ALL PIPING.
VIBRATION ISOLATORS SHALL BE RATED FOR SEISMIC FORCES AND MOVEMENT. REFER
TO GENERAL NOTE 1 FOR DELEGATED DESIGN REQUIREMENTS FOR ALL SEISMIC
COMPONENTS.
14. PROVIDE DOUBLE BLOCK AND BLEED VALVE ARRANGEMENT ON EQUALIZER PIPING.
DRAIN PIPING SHALL BE 3/4" WITH DRAIN VALVE AT 3'-0" ABOVE ROOF SURFACE.
1010 1010 1010 1010 10
12 12
8" CWTT
MP-402
BRACING (TYP.)
STEEL TIE-DOWN
CABLE WITH
EYEBOLT (TYP.)
10" CWTT DN
TO CHILLER
ROOM
PART OF DEDUCT ALTERNATE NO. 1
15. PROVIDE STAINLESS STEEL TAPPING AND WELDED FLANGE FOR 10"
EQUALIZER CONNECTION TO STAINLESS STEEL BASIN. WORK PART
OF DEDUCT ALTERNATE NO. 1.
16. PROVIDE 2" MANUAL ISOLATION BALL VALVE WITH THREADED HOSE
CONNECTION FOR COOLING TOWER DRAIN CONNECTION.
17. PROVIDE ULTRASONIC STYLE LEVEL CONTROL SENSOR AT COOLING
TOWER BASIN. CONNECT TO ALC BMS. REFER TO MI-102 AND M1-706
FOR CONTROLS INFORMATION AND LOCATION.
18. PROVIDE CONDUCTANCE PROBE STYLE LEVEL CONTROL SENSOR
AT COOLING TOWER BASIN. CONNECT TO ALC BMS. SEE MP-001 FOR
FURTHER DETAILS ON INSTALLATION. REFER TO MI-102 AND M1-706
FOR CONTROLS INFORMATION AND LOCATION.
19. CONNECT…