36C24221B0018 0004.docx

DOCX document 47 KB Posted

Attached to
J041--528A8-19-807 REPLACE COOLING TOWERS 1 & 2 Federal contract opportunity
Solicitation number
36C24221B0018
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2

About this file

This document is an amendment to a federal solicitation for replacing cooling towers 1 and 2. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2 is seeking to replace two existing cooling towers at their facility located at 2875 Union Road in Cheektowaga, New York. This amendment provides responses to offeror questions to clarify the scope of work. It specifies that existing condenser water lines are to be cut and plugged just inside the exterior wall and at existing butterfly valves. It also clarifies that condenser water lines running to the new cooling towers are to remain 10 inches in diameter as shown on the plans, disregarding any reference to an alternate. Additionally, it states that fittings for new piping exposed outdoors are to have aluminum jackets to match the piping, rather than PVC as seen on existing fittings. Finally, it attaches the missing HVAC water treatment specification that was referenced but not provided with the initial solicitation documents.

View the file

Other files for this federal contract opportunity

Other files attached to J041--528A8-19-807 REPLACE COOLING TOWERS 1 & 2, newest first.
File Type Posted
36C24221B0018 0008.docx DOCX document
36C24221B0018 0007.docx DOCX document
36C24221B0018 0006.docx DOCX document
36C24221B0018 0005.docx DOCX document
232500 HVAC Water Treatment.pdf PDF
36C24221B0018 0003.docx DOCX document
36C24221B0018 0002.docx DOCX document
Cooling Towers Walk Thru Sign in sheet signed.pdf PDF
SOW Replace Cooling Towers 1-21-21.pdf PDF
36C24221B0018_1.docx DOCX document
P07-WAGE RATE ALBANY COUNTY.pdf PDF
Replace Cooling Towers Specifications - Issue for Bid June 2020.pdf PDF
Replace Cooling Towers Drawings Issue for Bid - June 2020.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7.

ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF

PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE

OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:

Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERE

D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED

STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF

CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF

SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 03-03-2021 528A8-19-807 Department of Veterans Affairs Network Contracting Office (NCO) 2 2875 Union Road Suite 3500 Cheektowaga NY 14227 Department of Veterans Affairs Network Contracting Office (NCO) 2 2875 Union Road Suite 3500 Cheektowaga NY 14227 To all Offerors/Bidders

36C24221B0018 02-08-2021

X

X

RFI QUESTIONS AND ANSWERS

Nicholas Winne Answers to latest RFI as follows:

1. With regard to Alternate #2- please clarify intent and scope (ref: section 1, drawing MP-401 and drawings MD-101, MP-101). Is the demo from the valves up and through the chiller plant or from the valves down and through the trench?

RESPONSE: These existing lines are out of service. The intent of the drawings is to cut the existing pipe lines to just inside the exterior wall where they currently exit the chiller plant and then again at the butterfly valves in the vertical piping. Both ends are then to be plugged with rubber seal plugs.

1. Condenser Water schematic on drawing MP-702 shows (2) lines off the 18” CWTT header labeled “12” CWTT (10” CWFT for alternate)” going to the new cooling towers. After this label they are tagged 10” CWTT. Plan drawings MP-101 and MP-103 show these lines as 10”.

Do they need to be 12” if the alternate is not accepted? At what point would they become 10” if the alternate is not accepted? Please modify the plans and schematic to reflect the correct pipe sizing.

RESPONSE: On drawing MI-702, “Condenser Water Schematic…”, where the main CWTT risers up to each tower tap off the 18” CWTT main header; the tower risers should remain 10” the whole way up to the tee for the 8” fill feed line connections at the top of each tower . Ignore the reference to Deduct Alternate – It does not apply to these 10” lines.

QUESTION RFI 3

Specification section 230711-3.1.P states that all outdoor pipe exposed to outdoor weather is to receive a metal jacket (see below)

P. Provide metal jackets over insulation as follows:

1. All piping exposed to outdoor weather.

2. Piping exposed in building, within 1800 mm (6 feet) of the floor, that connects to sterilizers, kitchen and laundry equipment. Jackets may be applied with pop rivets. Provide aluminum angle ring escutcheons at wall, ceiling or floor penetrations.

3. A 50 mm (2 inch) overlap is required at longitudinal and circumferential joints.

Photos from the job walk show existing fittings being finished in PVC Jacket. Are the fittings in the new work to be finished with PVC or Aluminum to match the piping.

ANSWERS

Specification section 230711, Article 3.1.P.1 should read:

“1. All piping required by this specification to be insulated and that is exposed to outdoor weather.”

Delete specification section 230711, Article 3.1.P.2 as it is not applicable to this project

QUESTION RFI 4

1. Spec 23 21 13, page 18, item 3.5- mentions spec “23 25 00 – HVAC Water Treatment”. This spec was not included with the bid package. Please review and clarify.

ANSWER

SPEC ATTACHED

See attached document: 232500 HVAC Water Treatment.