Repair Fire Station Bay Floor Specs.pdf

PDF 379 KB Posted

Attached to
Fire Department Bay Floor Replaced/Repaired Federal contract opportunity
Solicitation number
FA465425Q0006
Issued by
Department of the Air Force Reserve Command

About this file

This is a detailed technical specification document for repairing fire station bay floors at Grissom Air Reserve Base in Indiana. The specifications outline requirements for a fluid-applied flooring system consisting of an epoxy primer, two-component aliphatic urethane topcoat with grit for slip resistance, and additional urethane topcoats.

The document provides comprehensive technical requirements including surface preparation, material specifications, application procedures, and quality control measures. Key requirements include: chemical and wear resistance testing criteria, minimum reflectance values of 85% for white and 65% for light gray surfaces, a 2-year warranty against defects, installer qualifications requiring 5 years experience and 10 successful similar projects, and specific safety protocols for handling materials. The flooring system must meet strict criteria for chemical resistance to hydraulic fluids and Skydrol, have a minimum tensile strength of 32,921 kPa, and include non-ferrous metallic aggregate for a non-slip surface. The contractor must coordinate with facility users for access, maintain proper ventilation, protect adjacent areas, and allow 48 hours curing time before allowing traffic on finished surfaces.

View the file

Other files for this federal contract opportunity

Other files attached to Fire Department Bay Floor Replaced/Repaired, newest first.
File Type Posted
FA465425Q0006 Fire Department Question and Answers As of 6.05.2025.docx DOCX document
Solicitation Amendment - FA465425Q00060002.pdf PDF
WD IN20250002 cao 20250523.pdf PDF
Grissom DBIDS - Requesting Base Access.pdf PDF
Solicitation Amendment FA465425Q00060002 SF 30.pdf PDF
Solicitation Amendment FA465425Q00060001 SF 30.pdf PDF
SOW 251000 Repair Fire Station Bay Floor.pdf PDF
Questions and Answers.docx DOCX document
CTGB 251000 Drawings.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Grissom Air Reserve Base 434 Base Civil Engineering

Repair Fire Station Bay Floor

TECHNICAL SPECIFICATIONS

PROJECT TABLE OF CONTENTS Page 1 10 May 2005 Page 1

Repair Fire Station Bay Floors

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01010 GENERAL PROVISIONS

01320 PROJECT SCHEDULE

01330 SUBMITTAL PROCEDURES

01420 SOURCES FOR REFERENCE PUBLICATIONS

01670 RECYCLED / RECOVERED MATERIALS

01781 OPERATION AND MAINTENANCE DATA

DIVISION 09 - FINISHES

09670 FLUID-APPLIED FLOORING

-- End of Project Table of Contents --

SECTION 01010

GENERAL PROVISIONS

PART 1 GENERAL

1.1 SCOPE OF WORK

The work covered under this contract includes furnishing all labor, materials, supplies, equipment of services required to Repair fire Station Bay Floors, Facilities 474 at Grissom Air Reserve Base, Indiana

1.2 CONTRACT DRAWINGS

The extent, location and general arrangement of the work to be accomplished are shown on the Contract Drawings and listed in the Technical Specifications.

The drawings referred to in the Contract Documents as the "plans", "Plans" or "drawings" are applicable to this Contract and are titled as follows:

PROJECT NO.: CTGB 25*1002

Repair Fire Station Bay Floor

1.3 WORK, MATERIALS, AND EQUIPMENT NOT IN THIS CONTRACT

1.3.1 Government Furnished Materials and Equipment

There is no Government furnished materials or equipment under this contract.

1.3.2 Work By Others

All work shown in the contract drawings shall be accomplished under this contract. There is no work by others.

1.4 SAFETY

Comply with all Base Fire, Safety and Security Regulations. The equipment items furnished shall comply with all governing federal and state laws regarding safety, including all current requirements of the Occupational Safety and Health Act (OSHA). Contractor shall be solely responsible for job safety in accordance with all laws, regulations methods, etc. of Federal, OSHA and State of Indiana.

1.4.1 Hot Work

The Contractor shall obtain permits for work associated with hot work, welding, cutting, and brazing from the Grissom ARB Fire Department prior to any such work.

1.4.2 Building Contamination

Seal occupied areas of building from smell and contamination when cleaning and applying floor finishes.

10 May 2005 Page 2

1.4.3 Signs

Provide signs on doors indicating "Do Not Enter; Work In Progress".

1.5 GOVERNMENT OPERATIONS

Work shall proceed to completion with a minimum of interruption. The Contractor shall minimize any disturbance or inconvenience on or about the Base. The Contractor shall suitably mark all hazards due to this work and shall keep traffic-ways clear and unobstructed.

1.6 DIGGING

1.6.1 Digging Permits

No digging should be required in this project.

1.7 FLIGHTLINE DRIVING

Driving on the flightline is limited to those individuals who/whom require access to this area. Access to the east side of the facility may be required work on the floor.

1.7.1 Flightline Driving Requirements

Flight line driving will not be required in this project. Access to the south side will be thru the east gate escorted by the facility users.

PART 2 PRODUCTS

2.1 MATERIALS

All equipment and materials to be furnished by the Contractor shall be new and the standard products of manufacturers regularly engaged in the production of such materials, and the manufacturer's latest design.

2.2 DELIVERY, STORAGE, AND HANDLING

The Contractor shall be responsible for the delivery, storage and handling of all products in compliance with manufacturer's recommendations. All materials, except bulk deliveries, shall be delivered in the manufacturer's original containers. The container's shall be sealed and display the manufacturer's original label(s). The Contractor shall promptly remove damaged products from the job site and replace damaged products with undamaged products. The Contractor shall have all materials delivered at the job site during his normal working hours. The Contractor shall be responsible for the proper protection of all materials from the weather.

Containers parking shall be on the facilities north side.

2.3 WARRANTIES

Provide warranty documents for any standard manufacturer warranties on equipment to the Contracting Officer prior to completion of the contract.

PART 3 EXECUTION

3.1 WORKMANSHIP

10 May 2005 Page 3

Materials and equipment shall be installed in accordance with the approved recommendations of the manufacturer to conform with the Contract. The installation shall be accomplished in a skillful and workmanlike manner.

Adequate precautions shall be taken by the Contractor to protect Government property from damage resulting from work on the contract. Damage to

Government property resulting from work on this contract shall be repaired by the Contractor to the satisfaction of the Contracting Officer and at no additional cost to the Government.

3.1.1 Cleanup

The construction area shall be always kept clan and free of debris.

Contractor is to control all FOD items, special concern should be taken of possible windblown items.

3.2 SUPERVISION

The Contractor shall have a site superintendent at the site at all times when there are workers on site or when deliveries to be received. Under no circumstances shall a subcontractor be authorized to be a site superintendent for the prime contractor. The Superintendent shall be designated as such to the Contracting Officer in writing with the signatures of the Contractor and the designated Superintendent. The Contractor shall outline in the designation letter the extent of the Superintendent's authority.

3.3 CODE COMPLIANCE

Work shall comply with applicable Federal, State, and Local Codes.

3.4 RECORD AS-BUILT DRAWINGS

The Contractor shall maintain on the job an accurate and clear set of as-built drawings, drawn to scale, indicating as-built changes and corrections to the contract drawings. Drawings shall be updated daily and shall be available for inspection by the Contracting Officer. Submit final as-built drawings to the Contracting Officer upon completion of work.

-- End of Section --

SECTION 01320

Coat Fire Station Bay Floor

PROJECT SCHEDULE

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. The following shall be submitted in accordance with Section 01330 SUBMITTAL

PROCEDURES:

SD-01 Preconstruction Submittals

Project Schedule, Electronic and Hard Copy; G

Contractor to provide electronic and hard copy. Acceptable electronic formats are pdf, doc, and tiff files. Contractor to provide schedule updates as required. Microsoft Project is an acceptable format.

PART 2 PRODUCTS (Not Applicable)

PART 3 EXECUTION

3.1 GENERAL REQUIREMENTS

A Project Schedule as described below shall be prepared. The scheduling of construction shall be the responsibility of the Contractor. Contractor management personnel shall actively participate in its development.

Subcontractors and suppliers working on the project shall also contribute in developing and maintaining an accurate Project Schedule. Contractor to provide information to track work, lead times, and submittals.

3.2 COORDINATION

The Project Schedule shall be coordinated with the Progress Schedule.

Coordinate with the project's submittal register.

3.3 PROJECT SCHEDULE

3.3.1 Use of the Critical Path Method

The Critical Path Method (CPM) of network calculation shall be used to generate the Project Schedule. The Contractor shall provide the Project Schedule in the Precedence Diagram Method (PDM).

3.3.2 Level of Detail Required

The Project Schedule shall include an appropriate level of detail. The following conditions determine the appropriate level of detail to be used in the Project Schedule:

3.3.2.1 Activity Durations

Reasonable durations are those that allow the progress of activities to be accurately determined. (Usually less than 2 percent of all non-procurement activities' Original Durations are greater than 20 days).

3.3.2.2 Procurement Activities

Tasks related to the procurement of long lead materials or equipment shall be included as separate activities in the project schedule. Long lead materials and equipment are those materials that have a procurement cycle of over 40 days. Examples of procurement process activities include, but are not limited to: submittals, approvals, procurement, fabrication, and delivery.

3.3.2.3 Critical Activities

The following activities shall be listed as separate line activities on the Contractor's project schedule:

a. Submission and approval of submittals.

b. Submission and approval of O & M manuals.

c. Submission and approval of work plans, safety, environmental.

d. Submission and approval of project phasing.

e. Prefinal inspection.

f. Correction of punchlist from prefinal inspection.

g. Final inspection.

3.3.2.4 Government Activities

Government and other agency activities that could impact progress shall be shown. These activities include, but are not limited to approvals, inspections, and utility tie-ins.

3.3.2.5 Responsibility

All activities shall be identified in the project schedule by the party responsible to perform the work. Responsibility includes, but is not limited to, the subcontracting firm or the contractor work force.

Activities shall not belong to more than one responsible party.

3.3.2.6 Work Areas

All activities shall be identified in the project schedule by the work area in which the activity occurs. Activities shall not be allowed to cover more than one work area.

3.3.2.7 Modification or Claim Number

The modification or claim number of each activity shall be identified by the Mod or Claim Number. Whenever possible, changes shall be added to the schedule by adding new activities. Existing activities shall not normally be changed to reflect modifications.

3.3.2.8 Category of Work

All Activities shall be identified in the project schedule according to the category of work which best describes the activity. Category of work refers, but is not limited, to the procurement chain of activities including such items as submittals, approvals, procurement, fabrication, delivery, installation, start-up, and testing.

3.3.2.9 Feature of Work

All activities shall be identified in the project schedule according to the feature of work to which the activity belongs. Feature of work refers, but is not limited to, a work breakdown structure for the project.

3.3.3 Scheduled Project Completion

The schedule interval shall extend from NTP to the contract completion date.

3.3.3.1 Project Start Date

The schedule shall start no earlier than the date on which the NTP was acknowledged. The Contractor shall include as the first activity in the project schedule an activity called "Start Project". The "Start Project" activity shall have a constraint date equal to the date that the NTP was acknowledged, and a zero day duration.

3.3.3.2 Last Activity

Completion of the last activity in the schedule shall be constrained by the contract completion date. The Contractor shall include as the last activity in the project schedule an activity called "End Project". The "End Project" activity shall have a constraint date equal to the completion date for the project, and a zero day duration.

3.4 PROJECT SCHEDULE SUBMISSIONS

The Contractor shall provide the submissions as described below..

3.4.1 Project Schedule Submission

The Project Schedule shall be submitted for approval within 20 calendar days after NTP. The schedule shall provide a reasonable sequence of activities which represent work through the entire project and shall be at a reasonable level of detail.

3.4.2 Schedule Updates

Based on the result of progress meetings, specified in "Periodic Progress Meetings," the Contractor shall submit periodic schedule updates. These submissions shall enable the Contracting Officer to assess Contractor's progress.

3.5 SUBMISSION REQUIREMENTS

The following items shall be submitted by the Contractor:

3.5.1 Network Diagram

3.5.1.1 Project Milestone Dates

Dates shall be shown on the diagram for start of project, any contract required interim completion dates, and contract completion dates.

3.5.1.2 Critical Path

10 May 2005 Page 4

The critical path shall be clearly shown.

3.6 DIRECTED CHANGES

Proposed revisions to the schedule will be approved by the Contracting Officer prior to inclusion of those changes within the project schedule.

SECTION 01330

SUBMITTAL PROCEDURES

PART 1 GENERAL

1.1 SUBMITTAL IDENTIFICATION (SD)

Submittals required are identified by SD numbers and titles as follow:

SD-01 Preconstruction Submittals

SD-02 Shop Drawings

SD-03 Product Data

SD-04 Samples

SD-05 Design Data

SD-06 Test Reports

SD-07 Certificates

SD-08 Manufacturer's Instructions

SD-09 Manufacturer's Field Reports

SD-10 Operation and Maintenance Data

SD-11 Closeout Submittals

1.2 SUBMITTAL CLASSIFICATION

Submittals are classified as follows:

1.2.1 Government Approved

Government approval is required for extensions of design, critical materials, deviations, equipment whose compatibility with the entire system must be checked. Within the terms of the Contract Clause entitled "Specifications and Drawings for Construction," they are considered to be "shop drawings." Government approval requirement is indicated by a "G" in the classification column of the submittal register.

1.2.2 Information Only

All submittals not requiring Government approval will be for information only (FIO). Contractor shall not submit FIO's to the Government. The Contractor's Quality Control Manager shall maintain a FIO file, on site, subject to Government's review. FIO's are not considered to be "shop drawings".

1.3 SUBMITTALS Government approval is required for submittals with a "G" designtion;

submittals not having a "G" designation are for information only. The following shall be submitted in accordance with this section (01330), SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Submittal Register; G

1.4 APPROVED SUBMITTALS

The Contracting Officer's approval of submittals shall not be construed as a complete check, but will indicate only that the general method of construction, materials, detailing and other information are satisfactory.

Approval will not relieve the Contractor of the responsibility for any error which may exist. After submittals have been approved by the Contracting Officer, no resubmittal for the purpose of substituting materials or equipment will be considered unless accompanied by an explanation of why a substitution is necessary.

1.5 DISAPPROVED SUBMITTALS

The Contractor shall make all corrections required by the Contracting Officer and promptly furnish a corrected submittal in the form and number of copies specified for the initial submittal. If the Contractor considers any correction indicated on the submittals to constitute a change to the contract, a notice shall be given promptly to the Contracting Officer.

1.6 GENERAL

The Contractor shall make submittals as required by the specifications.

The Contracting Officer may request submittals in addition to those specified when deemed necessary to adequately describe the work covered in the respective sections. Units of weights and measures used on all submittals shall be the same as those used in the contract drawings. Each submittal shall be complete and in sufficient detail to allow ready determination of compliance with contract requirements. Prior to submittal, all items shall be checked and approved by the Contractor's Quality Control (CQC) System Manager and each item shall be stamped, signed, and dated by the CQC System Manager. Proposed deviations from the contract requirements shall be clearly identified. Submittals shall include items such as: Contractor's, manufacturer's, or fabricator's drawings; descriptive literature including (but not limited to) catalog cuts, diagrams, operating charts or curves; test reports; test cylinders;

samples; O&M manuals (including parts list); certifications; warranties;

and other such required submittals. Submittals requiring Government approval shall be scheduled and made prior to the acquisition of the material or equipment covered thereby. Samples remaining upon completion of the work shall be picked up and disposed of in accordance with manufacturer's Material Safety Data Sheets (MSDS) and in compliance with existing laws and regulations.

1.7 SUBMITTAL REGISTER

At the end of this section is a submittal register showing items of equipment and materials for which submittals are required by the specifications. Columns "c" through "f" have been completed by the

Government; the Contractor shall complete columns "a", "b", and "g" through "i" and submit the forms to the Contracting Officer for approval within 7 calendar days after Notice to Proceed. The approved submittal register will become the scheduling document and will be used to control submittals throughout the life of the contract. The submittal register and the progress schedules shall be coordinated.

1.8 SCHEDULING

Schedule submittals of related systems, such as wall coverings, finishes, and color related items, concurrently. Submit certifications with the appropriate drawings, where required. Allow a minimum of 7 calendar days for Government Approval after receipt.

1.9 SUBMITTAL FORM (AF FORM 3000)

The AF Form 3000, Material Approval Submittal, shall be used for submitting both Government approved and information only submittals in accordance with the instructions on the reverse side of the form. These forms will be the instructions on the reverse side of the form. These forms will be furnished to the Contractor. This form shall be properly completed by filling out all the heading blank spaces and identifying each item submitted. Special care shall be exercised to ensure proper listing of the specification paragraph and/or sheet number of the contract drawings pertinent to the data submitted for each item.

1.10 SUBMITTAL PROCEDURES

Submittals shall be made as follows:

1.10.1 Procedures

Provide electronic copies of the submittals and submittal registers are to be provided to the Contracting Office at 448 Mustang Ave., Grissom ARB, IN 46971.

1.10.2 Deviations

For submittals which include proposed deviations requested by the Contractor, the Contractor shall set forth in writing the reason for any deviations and annotate such deviations on the submittal. The Government reserves the right to rescind inadvertent approval of submittals containing unnoted deviations.

1.11 CONTROL OF SUBMITTALS

The Contractor shall carefully control his procurement operations to ensure that each individual submittal is made on or before the Contractor scheduled submittal date shown on the approved "Submittal Register."

1.12 GOVERNMENT APPROVED SUBMITTALS

Upon completion of review of submittals requiring Government approval, three (3) copies of the submittal will be retained by the Contracting Officer and one (1) copy of the submittal will be returned to the Contractor.

10 May 2005 Page 4

Coat Fire Station Bay Floor

1.13 INFORMATION ONLY SUBMITTALS

Normally submittals for information only will not be returned. Approval of the Contracting Officer is not required on information only submittals.

The Government reserves the right to require the Contractor to resubmit any item found not to comply with the contract. This does not relieve the Contractor from the obligation to furnish material conforming to the plans and specifications; will not prevent the Contracting Officer from requiring removal and replacement of nonconforming material incorporated in the work;

and does not relieve the Contractor of the requirement to furnish samples for testing by the Government laboratory or for check testing by the Government in those instances where the technical specifications so prescribe.

1.14 OWNERSHIP

Samples, color boards, color chips, or similar items submitted will become Government property and shall not be returned to the Contractor.

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION

Coat Maintenance Bay Floors

CONTRACTOR

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G # R A P H

G O V

C T L A O S R S I A F / I E C A R T E I V O W N R

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

01320 SD-01 Preconstruction Submittals Project Schedule 3.1 G

01330 SD-01 Preconstruction Submittals Submittal Register 1.7 G

09670 SD-03 Product Data Aggregate Cleaning Compounds Sealer and Resin 2.4 G Floor Surfacing 3.6.2 G Conductive Flooring G Mixing 3.5 Joints, backrods, admixture, curing compounds, and fillers

SD-04 Samples Flooring Systems 2.3 G On floor panel G

SD-06 Test Reports Test(s) G

SD-07 Certificates Qualifications of Installer 1.8 G

SD-08 Manufacturer’s Instructions Application 3.6 G

SD-10 Operation and Maintenance Data Flooring Systems 2.3 G

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 1 PAGES

CTGB 25-1000

SECTION 01670

10 May 2005 Page 6

SECTION 01670

RECYCLED / RECOVERED MATERIALS

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

40 CFR 247 Comprehensive Procurement Guideline for Products Containing Recovered Materials

1.2 OBJECTIVES

Government procurement policy is to acquire, in a cost effective manner, items containing the highest percentage of recycled and recovered materials practicable consistent with maintaining a satisfactory level of competition without adversely affecting performance requirements or exposing suppliers' employees to undue hazards from the recovered materials. The Environmental Protection Agency (EPA) has designated certain items which must contain a specified percent range of recovered or recycled materials. EPA designated products specified in this contract comply with the stated policy and with the EPA guidelines. The Contractor shall make all reasonable efforts to use recycled and recovered materials in providing the EPA designated products and in otherwise utilizing recycled and recovered materials in the execution of the work.

1.3 EPA DESIGNATED ITEMS INCORPORATED IN THE WORK

Various sections of the specifications contain requirements for materials that have been designated by EPA as being products which are or can be made with recovered or recycled materials. These items, when incorporated into the work under this contract, shall contain at least the specified percentage of recycled or recovered materials unless adequate justification (non-availability) for non-use is provided. When a designated item is specified as an option to a non-designated item, the designated item requirements apply only if the designated item is used in the work.

1.4 EPA PROPOSED ITEMS INCORPORATED IN THE WORK

Products other than those designated by EPA are still being researched and are being considered for future Comprehensive Procurement Guideline (CPG) designation. It is recommended that these items, when incorporated in the work under this contract, contain the highest practicable percentage of recycled or recovered materials, provided specified requirements are also met.

1.5 EPA LISTED ITEMS USED IN CONDUCT OF THE WORK BUT NOT INCORPORATED IN

THE WORK

There are many products listed in 40 CFR 247 which have been designated or proposed by EPA to include recycled or recovered materials that may be used by the Contractor in performing the work but will not be incorporated into

SECTION 01670

10 May 2005 Page 7 the work. These products include office products, temporary traffic control products, and pallets. It is recommended that these non-construction products, when used in the conduct of the work, contain the highest practicable percentage of recycled or recovered materials and that these products be recycled when no longer needed.

SECTION 01781

10 May 2005 Page 8

SECTION 01781

OPERATION AND MAINTENANCE DATA

PART 1 GENERAL

1.1 SUBMISSION OF OPERATION AND MAINTENANCE DATA

Submit Operation and Maintenance (O&M) Data specifically applicable to this contract and a complete and concise depiction of the provided equipment, product, or system. Organize and present information in sufficient detail to clearly explain O&M requirements at the system, equipment, component, and subassembly level. Include an index preceding each submittal. Submit in accordance with this section and Section 01330, "Submittal Procedures."

1.1.1 Package Quality

Documents must be fully legible. Poor quality copies and material with hole punches obliterating the text or drawings will not be accepted.

1.1.2 Changes to Submittals

Manufacturer-originated changes or revisions to submitted data shall be furnished by the Contractor if a component of an item is so affected subsequent to acceptance of the O&M Data.

1.2 TYPES OF INFORMATION REQUIRED IN O&M DATA PACKAGES

1.2.1 Operating Instructions

Include specific instructions, procedures, and illustrations for the following phases of operation:

1.2.1.1 Safety Precautions

List personnel hazards and equipment or product safety precautions for all operating conditions.

1.2.1.2 Environmental Conditions

Include a list of Environmental Conditions (temperature, humidity, and other relevant data) that are best suited for the operation of each product, component or system. Describe conditions under which the item/equipment should not be allowed to run.

1.2.2 Preventive Maintenance

Include the information for preventive and scheduled maintenance to minimize corrective maintenance and repair.

1.2.2.1 Preventive Maintenance Plan and Schedule

Include manufacturer's schedule for routine preventive maintenance, inspections, tests and adjustments required to ensure proper and economical operation and to minimize corrective maintenance. Provide manufacturer's projection of preventive maintenance work-hours on a daily, weekly, monthly, and annual basis including craft requirements by type of craft.

For periodic calibrations, provide manufacturer's specified frequency and

SECTION 01781

10 May 2005 Page 9 procedures for each separate operation.

1.2.3 Corrective Maintenance (Repair)

Include manufacturer's recommended procedures and instructions for correcting problems and making repairs.

1.2.3.1 Maintenance and Repair Procedures

Include instructions and a list of tools required to repair or restore the product or equipment to proper condition or operating standards.

1.2.4 Appendices

Provide information required below and information not specified in the preceding paragraphs but pertinent to the maintenance or operation of the product or equipment. Include the following:

1.2.4.1 Warranty Information

List and explain the various warranties and include the servicing and technical precautions prescribed by the manufacturers or contract documents in order to keep warranties in force. Include warranty information for primary components such as the compressor of air conditioning system.

1.2.4.2 Contractor Information

Provide a list that includes the name, address, and telephone number of the General Contractor and each Subcontractor who installed the product or equipment, or system. For each item, also provide the name address and telephone number of the manufacturer's representative and service organization most convenient to the project site. Provide the name, address, and telephone number of the product, equipment, and system manufacturers.

1.3 SCHEDULE OF OPERATION AND MAINTENANCE DATA PACKAGES

Furnish the O&M data packages specified in individual technical sections.

The required information for each O&M data package is as follows:

1.3.1 Data Package 1

a. Safety precautions

b. Maintenance and repair procedures

c. Warranty information

d. Contractor information

e. Spare parts and supply list

PART 2 PRODUCTS

Not used

PART 3 EXECUTION

Not used

SECTION 09670

10 May 2005 Page 1

SECTION 09670

FLUID-APPLIED FLOORING

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM D 1308 (2002e1) Effect of Household Chemicals on Clear and Pigmented Organic Finishes

.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

29 CFR 1910-SUBPART Z Toxic and Hazardous Substances

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. The following shall be submitted in accordance with Section 01330 SUBMITTAL

PROCEDURES:

SD-03 Product Data

Aggregate Cleaning Compounds Sealer and Resin; G Floor Surfacing; G Conductive Flooring; G Mixing Joints, backrods, admixture, curing compounds, and fillers

Flooring manufacturer's descriptive data, mixing, proportioning, and installation instructions. Maintenance literature for resinous flooring shall be included.

SD-04 Samples

Flooring Systems; G

Cured samples of each floor finish or color combination.

Samples of grit gradations.

SD-06 Test Reports

10 May 2005 Page 2

SD-07 Certificates

Qualifications of Installer; G

A written statement from the floor manufacturer that the installer is acceptable.

SD-08 Manufacturer's Instructions

Application; G

Complete instructions for application of flooring system including any precautions or special handling instructions required to comply with OSHA 29 CFR 1910-SUBPART Z.

Complete instructions for preparation of base, slab, mixing, place flooring layer, curing of floor finish and testing.

SD-10 Operation and Maintenance Data

Flooring Systems; G

Data Package 1 in accordance with Section 01781 OPERATION AND

MAINTENANCE DATA.

1.3 DEFINITIONS

1.3.1 Reflective Chemically Resistant Coating

A coating system that reflects light and increases illumination and is resistant to chemicals used in bays.

1.3.2 Chemically Resistant Urethane (CRU)

A generic type of reflective chemically resistance coating.

1.3.3 Non-ferrous Metallic Aggregate Dry-Shake Aggregate

A dry aggregate mixture applied to wet mixture during construction and troweled into the surface to form a light reflective non-oxidizing surface.

1.4 DELIVERY AND STORAGE

Deliver the materials to the project site in unopened bags and containers clearly labeled with the name of the manufacturer, type of material, batch number, and date of manufacture. Store materials, other than aggregates, away from fire, sparks, or smoking areas. Maintain the storage area between 50 and 90 degrees F.

1.5 ENVIRONMENTAL CONDITIONS

Maintain the interior ambient room and floor temperatures at 60 degrees F, or above, for a period extending from 48 hours before installation until one week after installation. If coating must be applied at temperatures outside this range, the coating manufacturer must submit a statement certifying an alternative temperature range. Concrete to receive surfacing shall have cured for at least 28 days and shall have been free of water for at least 7 days. Wood substrates shall have a measured moisture content of between 8 and 10 percent prior to application.

1.5.1 Exterior temperature shall be above 50 degrees during the demolition and installation to allow operation of relocated fire vehicles and equipment. Contractor is to schedule accordingly.

1.6 PROTECTION

Protect adjacent surfaces not scheduled to receive the flooring by masking, or by other means, to maintain these surfaces free of the flooring material.

1.6.1 Protection and Cleanup

The contractor will protect areas adjacent to surface preparation and coating operations, and will protect the work area with barricades, warning tape, and signs. When work is complete, the contractor will remove these items (including masking tape); and will remove accumulated debris.

1.6.2 Nonpainted Areas

Areas, devices, or items not to be coated must be masked off. The contractor will provide proper masking material, masking tape, polyethylene sheet, or other materials as required to protect areas from overspray, splatter, foot tracking, and spills.

1.7 INSTALLATION

1.7.1 Test of Floor for Hydrostatic Water Pressure and Water Content

Remove any existing coating. Use a Delmhorst moisture meter with a probe and scale for wood, test the water content of the floor. If a reading of more than 20 is obtained, test the floor using ASTM D 4263-83, Standard Test Method, Indicating Moisture In Concrete by the Plastic Sheet Method.

If moisture is present, contact the Contracting Officer immediately and do not proceed until authorized by the Contracting Officer.

1.7.2 Test Application

The selected coating system should be tested in accordance with the following:

1.7.2.1 Test Area

Before the final acceptance of the system, the contractor will apply the coating on an area of the bay floor, designated by the Contracting Officer, representative of all existing floor conditions. The test area will measure at least 15 feet by 15 feet, and include at least 10 linear feet of expansion seam and a grounding point in the center.

1.7.2.2 Testing Procedure

A test application will be accomplished in accordance with the contract specifications, including temperature, humidity, and dryness of the concrete. The test will include all phases of coating system application:

surface preparation (cleaning, scarification); seam repair; and application of each coat. Each coat will be cured for the recommended time and evaluated for application properties, curing, and film properties. The total system will be cured 10 days prior to evaluation. After 10 day's curing, the final coat will be evaluated for:

adhesion between coats and to the substrate surface film properties color

10 May 2005 Page 4 reflectance chemical resistance spot test grit concentration (particles/square year)

If the coated area fails any one of the criteria, the coating system should be rejected. The contracting officer should evaluate the test results, then accept, requiring retesting, or reject the system. The results and contractor's decision shall be submitted to the Government.

1.8 QUALIFICATIONS OF INSTALLER

Installation shall be performed by an applicator approved by the manufacturer of the floor surfacing materials. The Contractor shall furnish a written statement from the manufacturer that the installer is acceptable.

1.8.1 Installer and Representatives

The coating applicator must have a minimum of five years' experience applying the specified coating system. Work experience should include at least ten jobs or 250,000 square feet of successful applications.

1.8.2 Technical Representative

A technical representative furnished by the manufacturer will assist the CO in ensuring the coating system is properly installed in accordance with manufacturers’ recommendations. The technical representative will provide a written statement that the floor is ready for installation of the coating system. After coating installation, the technical representative will provide a signed letter stating installation was performed according to manufacturer’s instructions.

1.8.3 Contractor

The contractor will be responsible for the presence of the technical representative during all floor preparations and coating operations. The contractor will be responsible for expenses of the technical representative.

10 May 2005 Page 5

1.9 SAFETY

The contractor will provide health and fire safety precautions for contractor personnel and will conduct operations in coordination with station operations so that no station personnel are exposed to hazardous amounts of airborne dust particles and solvent vapors. During coating application, the following paragraphs will apply, unless in conflict with a manufacturer's recommendations or other requirements of a recognized legal authority, in which case those requirements take precedence. Volatile organic compound (VOC) content must be equal to or less than all applicable Federal, state, and local regulations.

1.9.1 Protection Against Vapors

Personnel must wear canister-type respirators or fresh air supply masks when applying coatings, working with chemical strippers in a confined location, or handling hazardous liquid, materials. Respiratory protective devices must conform to OSHA 1910.134 and be approved by the Mining Enforcement and Safety Administration or be acceptable to the U.S.

Department of Labor for the specific contaminant personnel will encounter.

Personnel wearing respiratory protective cartridges for respirators;

regularly inspect and maintain all respiratory protective devices.

1.9.2 Protection Against Liquids

Wear protective clothing, gloves, and eye and face protection when applying coatings or when handling liquid materials. Face protective equipment must meet the requirements of ANSI 287.1.

1.9.3 Ventilation

The work area must be ventilated properly at all times to prevent accumulation of hazardous fumes.

1.10 WASTE REMOVAL

1.10.1 Liquid Waste

The contractor will remove, from the base, liquid waste material from cleaning operations that cannot be safely flushed into the sewer systems, and coating or solvent residue and containers. The contractor will analyze a sample of the residue by Toxicity Characteristic Leaching Procedure (TCLP) - Metals. If the material is hazardous, the contractor will coordinate with the Base Environmental Coordinator and dispose of the material as hazardous waste in accordance with all Federal, state, and local regulations.

1.10.2 Bay Floors

During removal of paint and coatings from Bay floors, the contractor will collect and store, in drums, all paint and abrasive residue.

1.10.3 No Hazardous Materials Present

Remove all areas of the existing coating with poor adhesion, peeling, blistering, or other film defects, including poor resistance to Skydrol and chemicals. Scarification or bead blasting procedures may be used to remove old coatings. Retained coatings should be abraded to remove any gloss or shininess with sand paper, steel wool, or mechanical brushes. When

10 May 2005 Page 6 existing coatings are to be completely removed, retain only tightly bonded areas less than one inch in diameter. Remove all oily residues from newly exposed concrete using solvents and detergents as appropriate.

Containments or vacuum pick-ups should be used to confine and collect dust and debris during these operations.

1.10.4 Hazardous Materials Present

All materials must be contained and disposed of as hazardous waste. Sweep the floor and remove all debris, dust, and dirt from the concrete surface.

Remove old paint, sealers, and hardeners with a nonflammable paint remover using manufacturer's recommended procedures. If required, paint remover should be applied at the rate of 10 gallons per 1,000 square feet. Collect all solid and liquid materials and test by Toxicity Characteristic Leaching Procedure (TCLP) for metals; dispose as directed by the Bioenvironmental Engineer.

1.11 WARRANTY

The contractor will warrant the applied floor coating system with a safety non-slip surface for a period of not less than two years against defects such as: peeling: loss of adhesion; loss of static dissipative properties;

film softening; or failure from chemicals or fluids used in bay operations. The contractor will warrant the coating materials free of formulation or manufacturing defects.

PART 2 PRODUCTS

2.1 REQUIREMENTS

Chemical resistant coating systems for bay floors typically consist of an epoxy primer, a two component aliphatic urethane topcoat that incorporates grit to provide slip resistance, and one or two additional urethane topcoats. They must meet or exceed the criteria listed in Table A1 to provide equivalent service on bay floors. Abrasion resistance may be compared to assess relative durability of coating systems. Coating systems with the highest wear index (wear cycles per million with 1000-gram load) should be selected to ensure maximum durability.

2.2 MATERIALS

Materials (except aggregate) used in the flooring shall be the products of a single manufacturer. Materials shall meet the following requirements:

2.2.1 Primer

Type recommended by the manufacturer to penetrate the pores of the substrate and bond with the floor surfacing matrix to form a permanent monolithic bond between substrate and surfacing matrix.

2.2.2 Fillers

Fillers, if required, shall be inert silica, quartz or other hard aggregate material as recommended by the flooring manufacturer. Fillers shall be furnished in the quantity necessary to impart the required color and physical characteristics. The filler shall contain sufficient fines to provide an even-textured, non-slip type of surface on the finished topping.

10 May 2005 Page 7

2.2.3 Top Coating

Furnish color coating of type as indicated on the drawings.

2.3 FLOORING SYSTEMS

The complete systems, after curing, shall have the following properties when tested in accordance with the test methods listed for each property.

2.3.1 Reflective Floor Coating Criteria

Table A-1: Reflective Floor Coating Criteria

Property Value Test Method Solids Content: % by Volume 65 ASTM D 2657 Volatile Organic Compounds (VOC) 400g/L EPA Protocol Drying Properties: 70 degrees F @ 50% RH Dry-to-Touch Time, HR (Maximum) 4 ASTM D 1640 Dry-to-Recoat Time, HR (Maximum) 8 ASTM D 1640 Dry for Foot Traffic, HR (Maximum) 24 Dry to Full Chemical & Traffic Resistance (Days)

Reflectance, % (Minimum)

White 85 ASTM E 1347 Light Gray 65 ASTM E 1347

Tensile Strength, kPa (psi) (Minimum) 32,921 (5500) ASTM D 2370 Elongation, % (Minimum) 6 ASTM D 2370 Abrasion Resistance CS17 wheel 1500 ASTM D 4060(B) 1,000-gram load, wear cycles per mil (min)

Chemical Resistance 24 hr spot test ASTM D 1308 Hydraulic Fluid, MIL-H-83282 No visible effects Skydrol 500B4 No visible effects

Change in pencil hardness (max) ASTM D 3363 Hydraulic Fluid, MIL-H-83282 2 Skydrol 500B4 3

Metals Content of Dry Film Total metals and soluble metals Metals content of dry film will not exceed requirements of 55FR 55 111798, 19 Mar 1990, of hazardous waste defined by (TCLP) CFR 261.7

Grit Content (paragraph 5.7.1.3) Slip Resistance (paragraph 5.8.2.2)

Application Properties No film defects, i.e., ASTM D 823 blisters, orange peel, FED STD 141 or wrinkling Method 4331.1

ENVIRONMENTAL REQUIREMENTS: Coating system including thinners shall not contain materials that do not meet local, state and Federal laws and regulations. Cured coating film must meet requirements for disposal as a nontoxic waste in accordance with Federal Register (FR), volume 55, paragraph 11798, March, 1990.

TOXICITY: The manufacturer shall certify that the coating system, thinners, cleaners and materials used in surface preparation and application of the CRU coating system does not contain lead in excess of 0.06% by weight of the dry paint film, asbestos or asbestos-form pigments, benzene, toluene, chlorinated solvents, any ACGIH carcinogenic or AACGIH suspected carcinogenic compounds.

10 May 2005 Page 8

The coating shall have no adverse effect on the health of personnel when used for its intended purpose.

2.4 SEALER AND RESIN

Sealer shall be a product recommended by the industrial resin-based flooring manufacturer; when applied to the resin topping and dry, it shall be non-slip and resistant to staining. Resin shall be suitable for the type application indicated.

2.5 COLOR

Color and striping shall be as indicated on the drawings.

2.6 REFLECTIVE CHEMICALLY RESISTANT COATING SYSTEMS

The reflective chemically resistant floor coating system will consist of primer, midcoat, and topcoats, and appropriate grit. System components, including grit, will be applied in the quantities and sequence specified by the coating manufacturer in the submittals, and as further described in this section.

2.6.1 Coating System Components

The coating system must, without considering the grit, meet requirements of the Reflective Floor Coating Criteria Table. All components of the reflective floor coating system, including coatings and grit, must be supplied by the same manufacturer.

10 May 2005 Page 9

2.6.2 Grit

Alumina grit number 46 is preferred and must be mechanically broadcast into the wet-applied midcoat.

Polypropylene grit, when selected, must be equivalent to Hercoflat 1200, and premixed into the first coat before application.

2.6.3 Joint Sealants

Joint sealants will be same color as top coat, silicone sealant conforming to ASTM D 5893-96.

2.6.4 Materials for Surface Preparation

Various chemicals are used in surface preparation of concrete prior to coating application, including detergents for cleaning, solvents for oil and grease removal, and acids for etching of the surface.

2.6.5 Striping Coatings

Traffic markings and other striping coatings must be compatible with the reflective coating system or EDS/SDS systems. Traffic marking paints are not acceptable. Markings shall have same grit size and quantity requirement as coating. Striping coatings should be chemical-resistant, but moisture-cured urethane marking coatings are acceptable.

PART 3 EXECUTION

3.1 SURFACE PREPARATION

Comply with the surface preparation instructions of the coating manufacturer. Thoroughly clean all surfaces to be coated. As a minimum, sweep the floor, remove debris, and clean the floor with a mechanical scrubber and a heavy-duty alkaline detergent. Allow the detergent solution to soak for 20 to 30 minutes before final scrubbing. Scrub while rinsing with clear water. Correct all damage which occurs during the surface preparation.

3.1.1 New Concrete

New concrete must age until it meets the moisture content requirements.

Remove any curing membrane, coating overspray, and oil from the concrete using solvents and detergents designed to remove these materials.

3.1.2 Older or Active Bay Floors

Remove oily residues, markings, and other contaminants using solvents and detergents designed for the purpose.

10 May 2005 Page 10

3.1.3 Concrete Surfaces

3.1.3.1 Mechanical Cleaning

Completely remove dirt, wax, paint, and laitance, by grinding with a terrazzo machine, sanding with coarse open grid sandpaper, sand blasting, chipping, bush hammering, or wire brushing.

3.1.3.2 Steam Cleaning

Completely remove all animal fats, grease, oil, and wax using a high pressure steam cleaner equipped with a soap injection system. Scrape the surface to remove any build-up of debris. Then thoroughly saturate the surface with hot caustic solution. Allow the solution to remain on the floor for 15 to 20 minutes. Apply steam, with caustic, over the presoaked area until all contamination is removed. Leach the caustic residue from the surface using one or more applications of steam without caustic. Flush the floor with warm water.

3.1.3.3 Paint Stripping

Brush or spray on a paint stripping material that has been demonstrated to effectively remove the paint. Leave the stripping material on the surface until the paint has softened or blistered. Remove paint by scraping, brushing, or wiping. Rinse the surface in accordance with the stripping material manufacturer's recommendations. Avoid strippers containing toxic methylene chloride.

3.1.3.4 Acid Etching

Apply a 10 percent solution of muriatic acid at a rate of one quart per each 10 square feet of concrete surface. Allow the solution to stand until it stops bubbling but not less than 5 minutes. Remove the acid and wash the surfaces several times, as required, to remove all traces of the acid.

Always dilute acid by pouring into water. Use face shield rubber gloves, and other safety equipment when using acids, alkalies, or solvents.

3.1.3.5 Air Drying

After cleaning, allow concrete surface to air dry thoroughly prior to application of surfacing. Blowers or oil free compressed air may be used.

Do not use flame-drying methods. Prior to application of surfacing, test concrete surface for excessive moisture in at least two locations. Place rubber mats at each location with smooth side against concrete and place weight on top of mat to hold in position and ensure contact with concrete.

Polyethylene with all edges taped may be used in lieu of mats. After 8 hours remove mat or sheeting and examine floor surface for moisture accumulation. If tests indicate accumulation of moisture at either location, additional air drying shall be undertaken until additional tests show no moisture accumulation.

3.1.4 Filling Cracks, Spalls, Joints, and Other Depressions

Fill all cracks, joints, spalls, and other depressions in the substrate with a latex underlayment, as recommended by the manufacturer compatible with the floor surfacing material.

10 May 2005 Page 11

3.2 REMOVAL OF CONTAMINANTS

Check that the concrete is free of contaminants by wetting it with water.

If it is not readily wetted, repeat cleaning with solvents and detergents as often as necessary.

3.3 PREPARATION OF EXPANSION JOINTS

Using suitable hand or power tools, rake all existing joints to a depth (D) of 1 inch, and width (W) at least 1 inch and no more than 1 1/2 inches.

Thoroughly clean the joints and keep them clean by filling with backer rods or other material. After coating work is complete, remove the temporary fillers and fill joints flush with a silicone joint sealant conforming to ASTM D 5893-96. Asphalt-containing sealers tend to bleed into the coating and is prohibited.

3.4 ETCHING CONCRETE

Acid etching should be required for new concrete and may be used for existing concrete if suggested by the coatings manufacturer. Acid etching roughens the surface of smooth concrete but does not remove contaminants.

Remove all contaminants before etching concrete. Etch the clean concrete surface with a dilute solution of acid in accordance with the coating manufacturer's recommendations. Apply the solution uniformly to allow small bubble to form. Where the acid does not properly wet the floor and fails to form bubbles, remove contaminants again in accordance with this section and repeat the procedure until the concrete is clean. Allow the acid to stand on the floor for five minutes to complete the reaction.

Scrub the floor to remove invisible salts, while rinsing with fresh water.

Add detergents or ammonia during this scrubbing process if recommended by the reflective coating manufacturer. From the beginning of the etching process until the final water rinsing, do not allow any portions of the floor to…

This is the start of the file's text. The full file is on GovTribe.