Repair B-888 Vol 2 B-3 Submittal FBO.pdf
PDF 28 MB Posted
- Attached to
- W50S8P-20-B-0003 NLZG142008 Repair Bldg 888 Federal contract opportunity
- Solicitation number
- NLZG142008
- Issued by
- Department of the Army National Guard
View the file
Other files for this federal contract opportunity
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 2 3 4 5
A
B
C
D
3500 Parkway Lane, Suite 500 Peachtree Corners, GA 30092 Phone (678) 336-7740 Fax (678) 336-7744
SHEET ID
P a rk w a y L a n e
S u it e
P e a c h tr e e C o rn e rs
G
A
P h o n e
-7
F a x
(6
-7
S
IZ
E
A N
S I D
F
IL
E N
A M
E
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
IS
S
U E
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
F
IL
E N
U M
B E
R
D A
T E
D E
S C
R
IP
T
IO
N M
A R
K
P a rk w a y L a n e
S u it e
P e a c h tr e e C o rn e rs
G
A
P h o n e
-7
F a x
(6
-7
/9
/2
:0
:2
A
M B
IM
/1
O H
A N
G R e p a ir H a n g a r B ld g
/1
O
H A
N G
B L
D G
A R
C H
R
.r v t
G-001.
B-3 SUBMITTAL
AIRPORT (ANG), OHIO
NLZG142008 REPAIR BUILDING 888
RICKENBACKER INTERNATIONAL
W9133L-15-D-0001-9M01
B-3 SUBMITTAL
12 APR 2019
C O
V E
R S
H E
E T
V
O L
U M
E
N L Z
G R
E P
A
IR
B U
IL
D
IN
G
R
IC
K E
N B
A C
K E
R I N
T E
R N
A T
IO
N
A L
A
IR
P O
R T
A
N G
O
H
IO
S
T A
IR
R
E F
U E
L
IN
G W
IN
G
R
IC
K E
N B
A C
K E
R A
N G
B
M
IN
U T
E M
A N
W A
Y C
O L
U M
B U
S O
H
-1
J O
B N
O
L T
H
M T
R
L D
P
M L K
A
P R
W
L
-1
-D -0
-9
M
N
REGIONAL MAP
SCALE: N.T.S.
LOCATION MAP
SCALE: N.T.S.
RICKENBACKER
ANGB
N
BUILDING 888
N
SITE MAP
SCALE: N.T.S.
MAIN
ENTRANCE
GATE HOUSE
VOLUME 2
1 2 3 4 5
B
C
D
SHEET ID
P a rk w a y L a n e
S u it e
P e a c h tr e e C o rn e rs
G
A
P h o n e
-7
F a x
(6
-7
S
IZ
E
A N
S I D
F
IL
E N
A M
E
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
IS
S
U E
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
F
IL
E N
U M
B E
R
D A
T E
D E
S C
R
IP
T
IO
N M
A R
K
P a rk w a y L a n e
S u it e
P e a c h tr e e C o rn e rs
G
A
P h o n e
-7
F a x
(6
-7
/9
/2
:5
:3
P M
B
IM
/1
O H
A N
G R e p a ir H a n g a r B ld g
/1
O
H A
N G
B L
D G
A R
C H
R
.r v t
G-002.
B-3 SUBMITTAL
S H
E E
T I N
D E
X
V O
L U
M E
N L Z
G R
E P
A
IR
B U
IL
D
IN
G
R
IC
K E
N B
A C
K E
R I N
T E
R N
A T
IO
N
A L
A
IR
P O
R T
A
N G
O
H
IO
S
T A
IR
R
E F
U E
L
IN
G W
IN
G
R
IC
K E
N B
A C
K E
R A
N G
B
M
IN
U T
E M
A N
W A
Y C
O L
U M
B U
S O
H
-1
J O
B N
O
L T
H
M T
R
L D
P
M L K
A
P R
W
L
-1
-D -0
-9
M
SHEET INDEX - VOLUME 2
SHEET
NUMBER SHEET NAME
M-802 MECHANICAL SCHEMATICS
ELECTRICAL
E-001 ELECTRICAL GENERAL NOTES AND ABBREVIATIONS
E-002 ELECTRICAL SYMBOLS
ES101 ELECTRICAL SITE PLAN
ED101 FIRST FLOOR ELECTRICAL DEMOLITION PLAN
ED102 SECOND FLOOR ELECTRICAL DEMOLITION PLAN - AREA F
EL101A FIRST FLOOR ELECTRICAL LIGHTING PLAN - AREA A
EL101B FIRST FLOOR ELECTRICAL LIGHTING PLAN - AREA B
EL101C FIRST FLOOR ELECTRICAL LIGHTING PLAN - AREA C
EL101D FIRST FLOOR ELECTRICAL LIGHTING PLAN - AREA D
EL101E FIRST FLOOR ELECTRICAL LIGHTING PLAN - AREA E
EL101F FIRST FLOOR ELECTRICAL LIGHTING PLAN - AREA F
EL102F SECOND FLOOR ELECTRICAL LIGHTING PLAN - AREA F
EL103 ROOF LIGHTING PLAN
EL104 PHOTOMETRIC RESULTS
EP101A FIRST FLOOR ELECTRICAL POWER PLAN - AREA A
EP101B FIRST FLOOR ELECTRICAL POWER PLAN - AREA B
EP101C FIRST FLOOR ELECTRICAL POWER PLAN - AREA C
EP101D FIRST FLOOR ELECTRICAL POWER PLAN - AREA D
EP101E FIRST FLOOR ELECTRICAL POWER PLAN - AREA E
EP101F FIRST FLOOR ELECTRICAL POWER PLAN - AREA F
EP102F SECOND FLOOR ELECTRICAL POWER PLAN - AREA F
EP151A FIRST FLOOR MECHANICAL POWER PLAN - AREA A
EP151B FIRST FLOOR MECHANICAL POWER PLAN - AREA B
EP151C FIRST FLOOR MECHANICAL POWER PLAN - AREA C
EP151D FIRST FLOOR MECHANICAL POWER PLAN - AREA D
EP151E FIRST FLOOR MECHANICAL POWER PLAN - AREA E
EP151F FIRST FLOOR MECHANICAL POWER PLAN - AREA F
EP152F SECOND FLOOR MECHANICAL POWER PLAN - AREA F
EP158 BLOCKHOUSE MECHANICAL POWER PLANS
ELP101 LIGHTNING PROTECTION PLAN
E-401 ENLARGED BLOCKHOUSE POWER PLANS
E-402 ENLARGED BLOCKHOUSE POWER PLAN
E-501 ELECTRICAL DETAILS
E-502 ELECTRICAL DETAILS
E-503 ELECTRICAL DETAILS
E-504 ELECTRICAL DETAILS
E-505 ELECTRICAL DETAILS
E-506 ELECTRICAL DETAILS
E-600 ELECTRICAL FEEDER SCHEDULES
E-601 ELECTRICAL ONE-LINE DIAGRAMS
E-602 LIGHT FIXTURE SCHEDULE
E-603 MECHANICAL EQUIPMENT SCHEDULES
E-604 MECHANICAL EQUIPMENT SCHEDULES
E-605 PANEL SCHEDULES
E-606 PANEL SCHEDULES
E-607 PANEL SCHEDULES
E-608 PANEL SCHEDULES
TELECOMMUNICATIONS
T-001 TELECOMMUNICATIONS GENERAL NOTES, ABBREVIATIONS & SYMBOLS
T-101A FIRST FLOOR TELECOMMUNICATIONS PLAN - AREA A
T-101B FIRST FLOOR TELECOMMUNICATIONS PLAN - AREA B
T-101C FIRST FLOOR TELECOMMUNICATIONS PLAN - AREA C
T-101D FIRST FLOOR TELECOMMUNICATIONS PLAN - AREA D
T-101E FIRST FLOOR TELECOMMUNICATIONS PLAN - AREA E
T-101F FIRST FLOOR TELECOMMUNICATIONS PLAN - AREA F
T-102F SECOND FLOOR TELECOMMUNICATIONS PLAN - AREA F
T-401 ENLARGED TELECOM ROOMS
T-501 TELECOM DETAILS
T-502 TELECOM DETAILS
T-601 TELECOM RISER DIAGRAM
SHEET INDEX - VOLUME 2
SHEET
NUMBER SHEET NAME
MECHANICAL
M-001 MECHANICAL GENERAL NOTES AND ABBREVIATIONS
M-002 MECHANICAL LEGENDS AND HVAC DESIGN CRITERIA
MD100 FIRST FLOOR MECHANICAL DEMOLITION PLAN
MD101A FIRST FLOOR MECHANICAL DEMOLITION PLAN - AREA A
MD101B FIRST FLOOR MECHANICAL DEMOLITION PLAN - AREA B
MD101C FIRST FLOOR MECHANICAL DEMOLITION PLAN - AREA C
MD101D FIRST FLOOR MECHANICAL DEMOLITION PLAN - AREA D
MD101E FIRST FLOOR MECHANICAL DEMOLITION PLAN - AREA E
MD101F FIRST FLOOR MECHANICAL DEMOLITION PLAN - AREA F
MD401 MECHANICAL DEMOLITION PLAN - EAST BLOCKHOUSE
MD402 MECHANICAL DEMOLITION PLAN - WEST BLOCKHOUSE
MH100 FIRST FLOOR MECHANICAL HVAC PLAN
MH101A FIRST FLOOR MECHANICAL PLAN - AREA A
MH101B FIRST FLOOR MECHANICAL PLAN - AREA B
MH101C FIRST FLOOR MECHANICAL PLAN - AREA C
MH101D FIRST FLOOR MECHANICAL PLAN - AREA D
MH101E FIRST FLOOR MECHANICAL PLAN - AREA E
MH101F FIRST FLOOR MECHANICAL PLAN - AREA F
MH102F SECOND FLOOR MECHANICAL HVAC PLAN
MP100 FIRST FLOOR MECHANICAL PIPING PLAN
MP101A FIRST FLOOR MECHANICAL PIPING PLAN - AREA A
MP101B FIRST FLOOR MECHANICAL PIPING PLAN - AREA B
MP101C FIRST FLOOR MECHANICAL PIPING PLAN - AREA C
MP101D FIRST FLOOR MECHANICAL PIPING PLAN - AREA D
MP101E FIRST FLOOR MECHANICAL PIPING PLAN - AREA E
MP101F FIRST FLOOR MECHANICAL PIPING PLAN - AREA F
MP102F SECOND FLOOR MECHANICAL PIPING PLAN
M-301 MECHANICAL SECTION VIEWS
M-302 MECHANICAL SECTION VIEWS
M-303 MECHANICAL SECTION VIEWS
M-304 MECHANICAL SECTION VIEWS
M-305 MECHANICAL SECTION VIEWS
M-401 MEZZANINE DUCTWORK PLAN - EAST BLOCKHOUSE
M-402 MEZZANINE DUCTWORK PLAN - WEST BLOCKHOUSE
M-403 MEZZANINE MECHANICAL PIPING PLAN - EAST BLOCKHOUSE
M-404 MEZZANINE MECHANICAL PIPING PLAN - WEST BLOCKHOUSE
M-405 MECHANICAL ENLARGED PLAN - MECHANICAL ROOM
M-501 MECHANICAL DETAILS
M-502 MECHANICAL DETAILS
M-503 MECHANICAL DETAILS
M-504 MECHANICAL DETAILS
M-601 MECHANICAL SCHEDULES
M-602 MECHANICAL SCHEDULES
M-603 MECHANICAL SCHEDULES
M-701 MECHANICAL CONTROLS
M-702 MECHANICAL CONTROLS
M-703 MECHANICAL CONTROLS
M-704 MECHANICAL CONTROLS
M-705 MECHANICAL CONTROLS
M-706 MECHANICAL CONTROLS
M-707 MECHANICAL CONTROLS
M-708 MECHANICAL CONTROLS
M-709 MECHANICAL CONTROLS
M-710 MECHANICAL CONTROLS
M-711 MECHANICAL CONTROLS
M-712 MECHANICAL CONTROLS
M-713 MECHANICAL CONTROLS
M-714 MECHANICAL CONTROLS
M-715 MECHANICAL CONTROLS
M-716 MECHANICAL CONTROLS
M-717 MECHANICAL CONTROLS
M-801 MECHANICAL SCHEMATICS
SHEET INDEX - VOLUME 2
SHEET
NUMBER SHEET NAME
GENERAL
G-001. COVER SHEET - VOLUME 2
G-002. SHEET INDEX - VOLUME 2
FIRE PROTECTION
F-001 FIRE PROTECTION GENERAL NOTES AND LEGEND
FD100 FIRST FLOOR FIRE PROTECTION DEMOLITION PLAN
FD101A FIRST FLOOR FIRE PROTECTION DEMOLITION PLAN - AREA A
FD101B FIRST FLOOR FIRE PROTECTION DEMOLITION PLAN - AREA B
FD101C FIRST FLOOR FIRE PROTECTION DEMOLITION PLAN - AREA C
FD101D FIRST FLOOR FIRE PROTECTION DEMOLITION PLAN - AREA D
FD101E FIRST FLOOR FIRE PROTECTION DEMOLITION PLAN - AREA E
FD101F FIRST FLOOR FIRE PROTECTION DEMOLITION PLAN - AREA F
FD102F SECOND FLOOR FIRE PROTECTION DEMOLITION PLAN - AREA F
FD103 HANGAR CEILING LEVEL FIRE PROTECTION DEMOLITION PLAN
F-100 FIRST FLOOR FIRE SUPPRESSION PLAN - OVERALL
F-101A FIRST FLOOR FIRE SUPPRESSION PLAN - AREA A
F-101B FIRST FLOOR FIRE SUPPRESSION PLAN - AREA B
F-101C FIRST FLOOR FIRE SUPPRESSION PLAN - AREA C
F-101D FIRST FLOOR FIRE SUPPRESSION PLAN - AREA D
F-101E FIRST FLOOR FIRE SUPPRESSION PLAN - AREA E
F-101F FIRST FLOOR FIRE SUPPRESSION PLAN - AREA F
F-102F SECOND FLOOR FIRE SUPPRESSION PLAN - AREA F
F-103 HANGAR CEILING LEVEL FIRE SUPPRESSION PLAN
F-501 WATER SUPPLY ISOMETRIC
FA100 FIRST FLOOR FIRE ALARM PLAN
FA101A FIRST FLOOR FIRE ALARM PLAN - AREA A
FA101B FIRST FLOOR FIRE ALARM PLAN - AREA B
FA101C FIRST FLOOR FIRE ALARM PLAN - AREA C
FA101D FIRST FLOOR FIRE ALARM PLAN - AREA D
FA101E FIRST FLOOR FIRE ALARM PLAN - AREA E
FA101F FIRST FLOOR FIRE ALARM PLAN - AREA F
FA102F SECOND FLOOR FIRE ALARM PLAN - AREA F
FA104 BLOCKHOUSE FIRE ALARM PLANS
FA501 FIRE ALARM OPERATIONAL MATRIX AND RISER DIAGRAM
FA502 EXISTING FIRE ALARM OPERATIONAL MATRIX AND RISER DIAGRAM
PLUMBING
P-001 PLUMBING GENERAL NOTES, SYMBOLS AND ABBREVIATIONS
PD100 FIRST FLOOR PLUMBING DEMOLITION PLAN
PD101A FIRST FLOOR PLUMBING DEMOLITION - AREA A
PD101B FIRST FLOOR PLUMBING DEMOLITION - AREA B
PD101C FIRST FLOOR PLUMBING DEMOLITION - AREA C
PD101D FIRST FLOOR PLUMBING DEMOLITION - AREA D
PD101E FIRST FLOOR PLUMBING DEMOLITION - AREA E
PD101F FIRST FLOOR PLUMBING DEMOLITION - AREA F
P-100 FIRST FLOOR PLUMBING DRAINAGE PLAN
P-101A FIRST FLOOR PLUMBING DRAINAGE - AREA A
P-101B FIRST FLOOR PLUMBING DRAINAGE - AREA B
P-101C FIRST FLOOR PLUMBING DRAINAGE - AREA C
P-101D FIRST FLOOR PLUMBING DRAINAGE - AREA D
P-101E FIRST FLOOR PLUMBING DRAINAGE - AREA E
P-101F FIRST FLOOR PLUMBING DRAINAGE - AREA F
PP100 FIRST FLOOR PLUMBING SUPPLY PLAN
PP101A FIRST FLOOR PLUMBING SUPPLY - AREA A
PP101B FIRST FLOOR PLUMBING SUPPLY - AREA B
PP101C FIRST FLOOR PLUMBING SUPPLY - AREA C
PP101D FIRST FLOOR PLUMBING SUPPLY - AREA D
PP101E FIRST FLOOR PLUMBING SUPPLY - AREA E
PP101F FIRST FLOOR PLUMBING SUPPLY - AREA F
P-401 PLUMBING ENLARGED PLANS
P-402 PLUMBING ENLARGED PLANS
P-501 PLUMBING DETAILS
P-601 PLUMBING SCHEDULES
P-901 WEST SIDE SANITARY RISER DIAGRAM
P-902 EAST SIDE SANITARY RISER DIAGRAM
P-903 WEST SIDE DOMESTIC WATER RISER DIAGRAM
P-904 EAST SIDE DOMESTIC WATER RISER DIAGRAM
DESIGN AND INSTALLATION SHALL BE IN ACCORDANCE WITH UFC 1-200-01, "GENERAL BUILDING REQUIREMENTS", 2018 EDITION; UFC 3-600-01, "FIRE PROTECTION ENGINEERING FOR FACILITIES", 2016 EDITION WITH CHANGE 2; UFC 3-600-02, "OPERATIONS AND MAINTENANCE: INSPECTION, TESTING, AND MAINTENANCE OF FIRE PROTECTION SYSTEMS", 2010 EDITION;
UFC 4-010-01, "DOD MINIMUM ANTITERRORISM STANDARDS FOR BUILDINGS", 2012 EDITION WITH CHANGE 1; UFC 4-021-01 "DESIGN AND O&M: MASS NOTIFICATION SYSTEMS", ECM 2018-17 NEW REQUIREMENTS FOR VISUAL NOTIFICATION FOR MASS NOTIFICATION SYSTEMS. MOST RECENT DRAFT; EM-385-1-1, "ARMY CORPS OF ENGINEERING MANUAL (EM)", 2014 EDITION;
INTERNATIONAL BUILDING CODE (IBC) 2015 EDITION; NFPA 1, "FIRE CODE", 2018 EDITION; NFPA 13, "STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS", 2016 EDITION; NFPA 24, "STANDARD FOR THE INSTALLATION OF PRIVATE FIRE SERVICE MAINS AND THEIR APPURTENANCES", 2016 EDITION; NFPA 70, "NATIONAL ELECTRICAL CODE", 2017 EDITION; NFPA 72, "NATIONAL FIRE ALARM AND SIGNALING CODE", 2016 EDITION; NFPA 101, "LIFE SAFETY CODE" 2018 EDITION; NFPA 241, "SAFEGUARDING CONSTRUCTION, ALTERATION, AND DEMOLITION OPERATIONS" 2013 EDITION. UFC SHALL TAKE
PRECEDENCE OVER NFPA REQUIREMENTS.
THE INTENT, AND EXTENT OF THE FIRE PROTECTION SYSTEM DESIGN IS PERFORMANCE-BASED IN NATURE, AND IS DIAGRAMMATIC ONLY. IT IS NOT INTENDED TO SHOW EVERY PIPE, FITTING, DEVICE, APPLIANCE, COMPONENT, ETC. FIRE ALARM FLOOR PLANS AND RISER DIAGRAM ARE DIAGRAMMATIC AND NOT INTENDED TO SHOW EACH AND EVERY COMPONENT, DEVICE, APPLIANCE, ETC. CONDUIT PATHWAYS AND INTERCONNECTIONS SHALL BE DETERMINED BY THE BUILDING FEATURES, NFPA 70, NFPA 72, SYSTEM MANUFACTURER REQUIREMENTS AND RECOMMENDATIONS.
CONTRACTOR SHALL VISIT JOB SITE PRIOR TO BID WITH THE PROJECT DOCUMENTS AND SPECIFICATIONS TO BECOME FAMILIAR WITH THE SITE AND SCOPE OF WORK. NOTIFY ENGINEER OF RECORD WITH ANY DISCREPANCIES OUTSIDE THIS DESIGN INTENT. ANY CHANGE ORDER REQUEST AS A RESULT OF COORDINATION BETWEEN TRADES SHALL BE DENIED.
ADHERE TO AND OBTAIN ALL PERMITS, LICENSES, AND FEDERAL GOVERNMENT REQUIREMENTS.
DO NOT SCALE PLANS FOR THE PURPOSE OF ESTABLISHING DIMENSIONS. FIELD DIMENSION GOVERN.
FIRE STOP ALL PENETRATIONS OF SMOKE/FIRE PARTITIONS. FIRE STOPPING SHALL BE OF UL LISTED ASSEMBLY.
ASBESTOS-CONTAINING MATERIALS (ACM) AND LEAD PAINT HAVE BEEN IDENTIFIED; PLEASE SEE SPECIFICATION SECTIONS 02 82 16.00 20 (ENGINEERING CONTROLS OF ASBESTOS-CONTAINING MATERIALS) AND 02 83 13.00 20 (LEAD IN CONSTRUCTION). THESE SECTIONS MUST BE REVIEWED PRIOR TO START OF WORK AND SUCH MATERIALS PLANNED FOR
AND ADDRESSED PRIOR TO OTHER WORK ACCORDINGLY IF IMPACTED BY THE PROJECT.
1.
2.
3.
4.
5.
6.
7.
GENERAL NOTESFIRE PROTECTION LEGEND
SPRINKLER RISER
FIRE ALARM DUCT MOUNTED SMOKE DETECTOR
R = RETURN
S= SUPPLY
MANUAL FIRE ALARM PULL STATION, MOUNT
42" - 48" AFF TO TOP OF HANDLE
VALVE SUPERVISORY SWITCH
WATER FLOW DETECTOR/SWITCH
FIRE ALARM MONITORING MODULE
FIRE ALARM AND MASS NOTIFICATION CONTROL PANEL
FIRE ALARM ANNUNCIATOR
FIRE ALARM CONTROL MODULE
SMOKE DETECTOR-PHOTOELECTRIC
ER=ELEVATOR RECALL
DOOR HOLDER
FMCP
ANN
F
MM
CM
S
S
FIRE ALARM BATTERY CABINETBATT
CARBON MONOXIDE DETECTOR (MIN. 48" AFF)
CO
CONTRACTOR SHALL SUBMIT COMPLETE BATTERY CALCULATIONS, VOLTAGE DROP CALCULATIONS, MATERIAL DATA SHEETS, AND SHOP DRAWINGS TO OWNER'S TECHNICAL REPRESENTATIVE FOR REVIEW PRIOR TO COMMENCING FABRICATION AND INSTALLATION. FAILURE TO COMPLY IS AT THE RISK OF THE CONTRACTOR.
REFER TO PLAN DRAWINGS AND PROJECT DOCUMENTS FOR APPROXIMATE FIRE ALARM SYSTEM QUANTITIES AND LOCATIONS, NOT ALL SITE CONDITIONS ARE SHOWN. FIRE ALARM CONTRACTOR SHALL VISIT JOB SITE WITH ALL PROJECT DOCUMENTS PRIOR TO BID TO BECOME FAMILIAR WITH PROJECT DESIGN, INSTALLATION, TESTING AND COMMISSIONING REQUIREMENTS, SITE CONDITIONS FOR NEW SYSTEM INSTALLATION, TO PROVIDE A COMPREHENSIVE AND COMPLETE BID, CODE COMPLIANT SYSTEM DESIGN, INSTALLATION, TESTING, COMMISSIONING AND APPROVAL REQUIREMENTS.
CONTRACTOR SHALL PROVIDE A MINIMUM CIS SCORE OF 0.8 IN ACCORDANCE WITH UFC 4-021-01.
FIRE ALARM SIGNALS AND EMERGENCY COMMUNICATIONS SHALL TAKE PRECEDENCE OVER ALL OTHER SIGNALS, SUCH AS BUT NOT LIMITED TO PUBLIC ADDRESS SYSTEMS.
ALL NOTIFICATION APPLIANCES CIRCUITS (NAC) SHALL PERFORM TO CLASS "B" AS DEFINED BY NFPA 70 AND NFPA 72.
ALL SIGNALING LINE CIRCUITS (SLC) SHALL PERFORM TO CLASS "B" AS DEFINED BY NFPA 70 AND NFPA 72.
ALL INDICATING DEVICE CIRCUITS SHALL PERFORM TO CLASS "B" AS DEFINED BY NFPA 70 AND NFPA 72.
THE INSTALLATION OF WIRING BETWEEN THE FMCP AND RELAY MODULES OR APPLIANCES SHALL PERFORM TO
CLASS "B" AS DEFINED BY NFPA 72.
CONDUCTORS FOR THE FIRE ALARM SYSTEM SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70. THE CONDUCTORS SHALL NOT BE INSTALLED WITH CONDUCTORS OF LIGHTING OR POWER SYSTEMS. THE SUM OF THE CROSS-AREA OF INDIVIDUAL CONDUCTORS SHALL NOT EXCEED 40% OF THE INTERIOR CROSS SECTION OF THE CONDUIT. ALL FIRE ALARM SYSTEM CONDUIT SHALL NOT BE LESS THAN 3/4". EXPOSED WIRING IS ACCEPTABLE AT
CEILING LEVEL WITHIN PLENUM. EXPOSED WIRING SHALL BE PLENUM RATED.
WALL MOUNTED FIRE ALARM DEVICES IN UNFINISHED AREAS MAY BE SURFACED MOUNTED, THE CONDUIT MAY BE
INSTALLED EXPOSED ON WALLS AND ON CEILINGS.
IN FINISHED AREAS, WALL MOUNTED DEVICES SHALL BE FLUSH MOUNTED. THE CONDUIT SHALL BE INSTALLED
CONCEALED IN THE WALLS AND CEILINGS UNLESS REFERENCED AS CEILING MOUNTED.
ELECTRICAL CONTRACTORS SHALL COORDINATE WITH FIRE ALARM VENDOR FOR SYSTEM OPERATING
INSTRUCTIONS AND WIRING DIAGRAMS.
ALL DUCT DETECTORS SHALL BE PROVIDED WITH REMOTE STATUS INDICATION. PROVIDE INDICATING LAMP FOR ALL
CONCEALED DETECTORS.
DUCT SMOKE SENSORS SHALL BE IN ACCORDANCE WITH NFPA 72, 90A, AND AS INDICATED ON THE CONTRACT
DOCUMENTS.
DUCT DETECTORS SHALL BE PROVIDED IN SUPPLY AIR SYSTEMS WITH A DESIGN CAPACITY GREATER THAN 2,000- CFM. ACCESS TO DETECTORS SHALL BE PROVIDED FOR INSPECTION AND MAINTENANCE PURPOSES. ACTUATION OF THE DUCT DETECTOR SYSTEM SHALL SHUT DOWN ALL OPERATIONAL CAPABILITIES OF THE AFFECTED UNIT.
FIRE ALARM MANUAL PULL STATIONS AT DOOR OPENINGS SHALL BE WITHIN 5' - 0" HORIZONTALLY OF THE DOOR
OPENING.
PROVIDE SYNCHRONIZATION FOR ALL NEW VISIBLE (STROBE) NOTIFICATION APPLIANCES WHERE THERE ARE MORE THAN TWO DEVICES IN THE SAME ROOM OR IN AN ADJACENT SPACE WITHIN THE FIELD OF VIEW TO COMPLY WITH
THE REQUIREMENTS OF NFPA 72.
PROVIDE SYNCHRONIZATION FOR ALL NEW AUDIBLE (SPEAKER) NOTIFICATION APPLIANCES WITHIN A NOTIFICATION
ZONE TO COMPLY WITH THE REQUIREMENTS OF NFPA 72.
PROVIDE TRANSIENT VOLT SURGE SUPPRESSION DEVICE WHERE CIRCUITS PENETRATE THE BUILDING ENVELOPE AND, FIRE ALARM EQUIPMENT SUPPLIED FROM THE BUILDING ELECTRICAL SYSTEM, (I.E DOOR HOLDERS, NAC
BOOSTER PANELS, ETC), IN ACCORDANCE WITH NFPA 70 AND NFPA 72 REQUIREMENTS.
STROBE FOR VISUAL APPLIANCES SHALL HAVE WHITE/ CLEAR LENS AND BE LABELED "ALERT".
INSTALL SMOKE DETECTORS NO CLOSER THAN 3' - 0" TO HVAC AIR SUPPLY DIFFUSERS
ALL FIRE ALARM PANELS AND EQUIPMENT SHALL BE GROUNDED IN ACCORDANCE WITH NFPA 70 ARTICLE 250 AND
800 WITH A MAXIMUM OF 25 OHMS RESISTANCE.
CONTRACTOR SHALL PROVIDE A DOCUMENTATION CABINET AT THE SYSTEM CONTROL UNIT IN THE BUILDING WITH ALL REQUIRED DOCUMENTATION AND SOFTWARE REQUIRED BY NFPA 72 SECTIONS 7.7.2 AND 23.2.2.
REFER TO FIRE ALARM SYSTEM SPECIFICATION 28 31 76 FOR ADDITIONAL REQUIREMENTS AND INFORMATION.
CONTRACTOR SHALL PROVIDE PATHWAY SURVIVABILITY OF LEVEL 1 IN ACCORDANCE WITH NFPA 72.
DEMOLISH EXISTING FIRE ALARM SYSTEM IN ITS ENTIRETY AFTER THE NEW SYSTEM HAS BEEN INSTALLED AND
ACCEPTED BY THE COR.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
FIRE ALARM AND MASS NOTIFICATION CLEAR
VISUAL STROBE AND SPEAKER. WALL MOUNT
AT 80" AFF TO BOTTOM OF LENS OR 6" BELOW
CEILING, WHICHEVER IS LOWER AND NOT
GREATER THAN 96".
C = CEILING MOUNTED DEVICE.
WP = WEATHER PROOF.
30 = CANDELA RATING, RATINGS VARY.
REMOTE ALARM INDICATION AND TESTING SWITCH
SURGE SUPPRESSOR
DH
CONTRACTOR SHALL SUBMIT COMPLETE SHOP DRAWINGS WITH HYDRAULIC CALCULATIONS, MATERIAL SPECIFICATION BROCHURE TO CONTRACTING OFFICER'S TECHNICAL REPRESENTATIVE FOR REVIEW PRIOR TO COMMENCING FABRICATION AND INSTALLATION. OBTAIN CURRENT FIRE PUMP TEST REPORT FOR USE IN HYDRAULIC CALCULATIONS.
FIRE SPRINKLER CONTRACTOR SHALL INSTALL SYSTEM PIPING AND COMPONENTS IN A WORKMANSHIP LIKE MANNER.
CHANGES IN INSTALLATION AS A RESULT OF POOR CRAFTSMANSHIP SHALL BE AS DIRECTED BY CONTRACTING OFFICER'S
TECHNICAL REPRESENTATIVE AND SHALL BE AT NO ADDITIONAL COST TO THE OWNER.
ANY ADDITIONAL OFFSETS OR FITTINGS REQUIRED FOR PROPER INSTALLATION, COORDINATION WITH OTHER TRADES, AND/OR TO MAINTAIN PROPER CLEARANCES SHALL BE PROVIDED FOR A COMPLETE AND WORKING SYSTEM.
NOT ALL PIPING, VALVES AND APPURTENANCES ARE SHOWN ON THE PLANS. REFER TO SPECIFICATIONS AND DETAILS
FOR ADDITIONAL INFORMATION.
ALL CONTROL VALVES ON THE FIRE PROTECTION SYSTEM SHALL BE ELECTRICALLY SUPERVISED PER NFPA 13.
COORDINATE THE TYPE AND EXACT LOCATION OF FLOW AND SUPERVISORY SWITCHES BETWEEN FIRE PROTECTION AND FIRE ALARM CONTRACTORS. FIRE ALARM SYSTEM, SUPERVISION AND WIRING SHALL BE PROVIDED UNDER THE
ELECTRONIC SAFETY AND SECURITY DIVISION.
SPRINKLER SYSTEM(S) SHALL BE DESIGNED FOR A MAXIMUM WORKING PRESSURE OF 175 PSI IN ACCORDANCE WITH
NFPA 13.
SPRINKLER SYSTEM(S) SHALL BE HYDROSTATICALLY TESTED IN ACCORDANCE WITH NFPA 13.
ALL VALVES SHALL HAVE A PERMANENTLY AFFIXED SIGN PER NFPA 13 INDICATING ITS FUNCTION AND SECURED TO THE
VALVE WITH SUITABLE CHAIN.
HANGER MATERIAL, SPACING AND METHOD OF ATTACHMENT SHALL BE IN ACCORDANCE WITH NFPA 13 AND
MANUFACTURER'S REQUIREMENTS.
MAINTAIN A MINIMUM OF 18" CLEARANCE BELOW SPRINKLER DEFLECTOR(S) AND ANY PERMANENT OR TEMPORARY
OBSTRUCTION(S) PER NFPA 13.
ONLY LISTED AND APPROVED DEVICES AND MATERIALS AS SPECIFIED IN NFPA 13 SHALL BE INSTALLED THROUGHOUT THE
SYSTEM.
ALL SPRINKLERS SHALL BE INSTALLED ACCORDING TO THEIR LISTED SPACING AND OBSTRUCTION REQUIREMENTS.
CONTRACTOR SHALL COORDINATE INSTALLATION OF ALL FIRE PROTECTION DEVICES WITH ALL OTHER TRADES.
PROVIDE SYSTEM(S) WITH FLUSHING CONNECTIONS PER NFPA 13.
PROVIDE A PERMANENTLY ATTACHED AND STENCILED PLACARD TO THE RISER STATING THE REQUIRED DESIGN CRITERIA
FOR EACH DESIGNED SYSTEM PER NFPA 13. THE USE OF INDELIBLE MARKER IS PROHIBITED.
AT LEAST SIX (6) SPARE SPRINKLERS OF EACH TYPE, TEMPERATURE, AND ORIFICE SIZE USED IN THE SYSTEM INCLUDING A SPECIAL WRENCH FOR EACH FIRE SPRINKLER SHALL BE KEPT IN A CABINET WHERE AMBIENT TEMPERATURE WILL AT
NO TIME EXCEED 100°F PER NFPA 13.
PIPE, FITTING, SPRINKLERS, HANGERS, AND COMPONENTS INSTALLED IN CORROSIVE ATMOSPHERES (I.E COMPARTMENTS CONTAINING CORROSIVE MATERIALS AND/OR FUMES, OR EXTERIOR WEATHER CONDITIONS, ETC.) SUCH AS DRAIN PIPES, HANGER ALL-THREAD ROD, ETC., SHALL BE AN APPROVED CORROSION RESISTANT MATERIAL.
THE SITE IS CLASSIFIED AS SEISMIC DESIGN CATEGORY B THEREFORE SEISMIC BRACING OF THE SPRINKLER SYSTEM IS
NOT REQUIRED.
QUICK RESPONSE SPRINKLER REDUCTIONS ARE NOT PERMITTED.
PROVIDE AIR VENTING OF THE SPRINKLER SYSTEM PER NFPA 13 SECTION 7.1.5 AT A LOCATION NEAR THE HIGH POINT OF
THE SYSTEM.
SPRINKLER PIPING MUST BE A MINIMUM OF SCH. 40 BLACK STEEL PIPE. PIPING WITH A WALL THICKNESS LESS THAN SCH.
40 MUST NOT BE THREADED.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
FIRE SUPPRESSION NOTES
FIRE ALARM NOTES
RELAY MODULERM
R/S
FIRE ALARM LEGEND
LOCAL OPERATING CONSOLE LOC
EXISTING MONACO RADIO TRANSMITTERFATR
RTS
VS
WF
SS
C
REFER TO WET-PIPE SPRINKLER SYSTEM SPECIFICATION 21 13 13.00 10 AND 21 13 17.00 10 DRY PIPE SPRINKLER
SYSTEM SPECIFICATION FOR ADDITIONAL REQUIREMENTS AND INFORMATION.
SPRINKLER PROTECTION IS NOT REQUIRED IN THE NONCOMBUSTABLE CONCEALED SPACE ABOVE THE CEILING PER
NFPA 13.
FITTING AND COUPLING HOUSINGS SHALL BE MALLEABLE IRON CONFORMING TO ASTM A47/A47M.
DEMOLISH EXISTING FIRE SPRINKLER SYSTEMS INCLUDED IN THE SCOPE TO THE FLOOR FLANGE IN THE RISER
ROOMS. EXCEPTIONS: WST SIMULATOR, BOSS SIMULATOR, AND BLOCKHOUSE #2.
22.
23.
24.
25.
FIRE SUPPRESSION NOTES CONTINUED
WP
NS NON-SPRINKLERED SPACE
V
F ELECTRIC BELL PROVIDED AND INSTALLED BY FIRE
SPRINKLER CONTRACTOR AND WIRED AND CONNECTED
TO FIRE ALARM SYSTEM BY FIRE ALARM CONTRACTOR.
MASS NOTIFICATION SPEAKER. WALL MOUNT AT
80" AFF TO BOTTOM OF APPLIANCE OR 6" BELOW
CEILING, WHICHEVER IS LOWER AND NOT
GREATER THAN 96".
C = CEILING MOUNTED DEVICE.
WP = WEATHER PROOF.
30 = CANDELA RATING, RATINGS VARY.
M
WP
EXISTING HEF GENERATOR
C
2-1/2" HOSE VALVE WITH PRESSURE REDUCING
VALVE SET TO 100 PSI. (NO CABINET OR HOSE REQ.)
PRESSURE DETECTOR/SWITCHPS
NITROGEN GENERATORN
1 2 3 4 5
A
B
C
D
SHEET ID
P a rk w a y L a n e
S u it e
P e a c h tr e e C o rn e rs
G
A
P h o n e
-7
F a x
(6
-7
S
IZ
E
A N
S I D
F
IL
E N
A M
E
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
IS
S
U E
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
F
IL
E N
U M
B E
R
D A
T E
D E
S C
R
IP
T
IO
N M
A R
K
P a rk w a y L a n e
S u it e
P e a c h tr e e C o rn e rs
G
A
P h o n e
-7
F a x
(6
-7
/8
/2
:0
:2
P M
B
IM
/1
O
H A
N G
R e p a ir
H a n g a r B ld g
/1
O H
A N
G B
L D
G
M
E P
R
.r v t
F-001
B-3 SUBMITTAL
F
IR
E P
R O
T E
C T
IO
N
G E
N E
R A
L N
O T
E S
A N
D L
E G
E N
D
N L Z
G R
E P
A
IR
B U
IL
D
IN
G
R
IC
K E
N B
A C
K E
R I N
T E
R N
A T
IO
N
A L
A
IR
P O
R T
A
N G
O
H
IO
S
T A
IR
R
E F
U E
L
IN
G W
IN
G
R
IC
K E
N B
A C
K E
R A
N G
B
M
IN
U T
E M
A N
W A
Y C
O L
U M
B U
S O
H
-1
J O
B N
O
N D
S
D B
B T
H
A P
R
IL
N /A
W
L
-1
-D -0
-9
M shewfeltn Snapshot
F
C P
F A
C P
F A
C P
1d 1c 57 4 3 1 1a10 9 8 1b2
M
L
H
G
F
E
D
C
A
B
K
J
M6.8 M6.2M7.1M7.3M7.6M7.8M8.1
MJ.3
MH.9
MH.5
4.7 4.5 4.4 4.2
K.7
L.2
FD101D
FD101E
FD101E
FD101F
FD101B
FD101C
FD101A
FD101B
F D
A
F D
D
F D
C
F D
F
AREA A
AREA B
AREA C
AREA D
AREA E
AREA F
WST
SIMULATOR
BOSS
SIMULATOR
4 4
10"
8"8"
4"
4"
4"
4"4"
4"
DEMO AREA
LEGEND DEMO FIRE ALARM SYSTEM ONLY.
REPLACE WITH COMBINATION FIRE
ALARM/ MASS NOTIFICATION SYSTEM.
FIRE SPRINKLER PROTECTION AT
HANGAR ROOF DECK TO BE
DEMOLISHED.
FIRE SPRINKLER PROTECTION
INSIDE SIMULATOR TO REMAIN.
FIRE SPRINKLER PROTECTION
AT HANGAR ROOF DECK TO BE
DEMOLISHED.
CONTRACTOR SHALL DEMOLISH THE EXISTING FIRE SPRINKLER AND HEF SYSTEMS TO THE FULLEST EXTENT POSSIBLE WITH THE EXCEPTION OF SPRINKLER PROTECTION IN THE TWO EXISTING SIMULATORS AND BLOCKHOUSE #2.
CONTRACTOR TO DISPOSE OF ALL DEMOLISHED COMPONENTS AND MATERIALS OFF SITE IN ACCORDANCE WITH ALL
FEDERAL REGULATIONS.
REMOVE ANY EXISTING SMOKE OR HEAT DETECTION IN RENOVATED AREAS.
REMOVE DRAFT CURTAINS THROUGHOUT THE HANGAR WITHOUT REPLACEMENT.
DEMOLITION NOTES:
1.
2.
3.
4.
KEY NOTES:
EXISTING HIGH EXPANSION FOAM CONCENTRATE
STORAGE TANK TO BE REMOVED (275 GAL.).
EXISTING RISER ROOM TO BE RELOCATED.
EXISTING FIRE ALARM CONTROL PANEL TO BE REMOVED.
EXISTING FIRE ALARM CONTROL PANEL TO REMAIN.
EXISTING RISER ROOM TO REMAIN.
EXISTING MONACO TRANSMITTER TO BE RELOCATED.
EXISTING RADIO ANTENNA TO REMAIN.
1 2 3 4 5
A
B
C
D
SHEET ID
P a rk w a y L a n e
S u it e
P e a c h tr e e C o rn e rs
G
A
P h o n e
-7
F a x
(6
-7
S
IZ
E
A N
S I D
F
IL
E N
A M
E
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
IS
S
U E
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
F
IL
E N
U M
B E
R
D A
T E
D E
S C
R
IP
T
IO
N M
A R
K
P a rk w a y L a n e
S u it e
P e a c h tr e e C o rn e rs
G
A
P h o n e
-7
F a x
(6
-7
/8
/2
:1
:2
P M
B
IM
/1
O
H A
N G
R e p a ir
H a n g a r B ld g
/1
O H
A N
G B
L D
G
M
E P
R
.r v t
FD100
B-3 SUBMITTAL
F
IR
S T
F L
O O
R F
IR
E
P R
O T
E C
T
IO
N D
E M
O L
IT
IO
N
P L A
N
N L Z
G R
E P
A
IR
B U
IL
D
IN
G
R
IC
K E
N B
A C
K E
R I N
T E
R N
A T
IO
N
A L
A
IR
P O
R T
A
N G
O
H
IO
S
T A
IR
R
E F
U E
L
IN
G W
IN
G
R
IC
K E
N B
A C
K E
R A
N G
B
M
IN
U T
E M
A N
W A
Y C
O L
U M
B U
S O
H
-1
J O
B N
O
N D
S
D B
B T
H
A P
R
IL
N /A
W
L
-1
-D -0
-9
M
SCALE: 1/16" = 1'-0"A1
FIRST FLOOR FIRE PROTECTION DEMOLITION PLAN
N
SCALE: = 1'-0"
0 16 3216
1/16"
1d 1c 710 9 8
M
L
K
J
M6.8 M6.2M7.1M7.3M7.6M7.8M8.1
MJ.3
MH.9
MH.5
K.7
L.2
FD101A
FD101B
F D
A
F D
D
F D
A
F D
D
EXISTING FIRE ALARM AND FIRE SPRINKLER SYSTEMS TO REMAIN.
FIRE SPRINKLER AT HANGAR ROOF DECK TO BE DEMOLISHED.
LEGEND
CONTRACTOR SHALL DEMOLISH THE EXISTING FIRE SPRINKLER AND HEF SYSTEMS TO
THE FULLEST EXTENT POSSIBLE WITH THE EXCEPTION OF SPRINKLER PROTECTION IN
THE TWO EXISTING SIMULATORS AND BLOCKHOUSE #2.
CONTRACTOR TO DISPOSE OF ALL DEMOLISHED COMPONENTS AND MATERIALS OFF
SITE IN ACCORDANCE WITH ALL FEDERAL REGULATIONS.
REMOVE ANY EXISTING SMOKE OR HEAT DETECTION IN RENOVATED AREAS WITHOUT
REPLACEMENT.
REMOVE DRAFT CURTAINS THROUGHOUT THE HANGAR WITHOUT REPLACEMENT.
DEMOLITION NOTES:
1.
2.
3.
4.
1 2 3 4 5
A
B
C
D
SHEET ID
P a rk w a y L a n e
S u it e
P e a c h tr e e C o rn e rs
G
A
P h o n e
-7
F a x
(6
-7
S
IZ
E
A N
S I D
F
IL
E N
A M
E
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
IS
S
U E
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
F
IL
E N
U M
B E
R
D A
T E
D E
S C
R
IP
T
IO
N M
A R
K
P a rk w a y L a n e
S u it e
P e a c h tr e e C o rn e rs
G
A
P h o n e
-7
F a x
(6
-7
/8
/2
:1
:2
P M
B
IM
/1
O
H A
N G
R e p a ir
H a n g a r B ld g
/1
O H
A N
G B
L D
G
M
E P
R
.r v t
FD101A
B-3 SUBMITTAL
F
IR
S T
F L
O O
R F
IR
E
P R
O T
E C
T
IO
N D
E M
O L
IT
IO
N
P L A
N
A R
E A
A
N L Z
G R
E P
A
IR
B U
IL
D
IN
G
R
IC
K E
N B
A C
K E
R I N
T E
R N
A T
IO
N
A L
A
IR
P O
R T
A
N G
O
H
IO
S
T A
IR
R
E F
U E
L
IN
G W
IN
G
R
IC
K E
N B
A C
K E
R A
N G
B
M
IN
U T
E M
A N
W A
Y C
O L
U M
B U
S O
H
-1
J O
B N
O
N D
S
D B
B T
H
A P
R
IL
N /A
W
L
-1
-D -0
-9
M
SCALE: 1/8" = 1'-0"A1
FIRST FLOOR FIRE PROTECTION DEMOLITION PLAN - AREA A
1ST FLOOR KEY PLAN
AREA "A"
AREA "B"
AREA "C"
AREA "D"
AREA "E"
AREA "F"
E N
T R
A N
C E
S
ID
E
A
IR
S
ID
E
SCALE: = 1'-0"
0 8 168
1/8"
N
C P
1d 1c 710 9 8
H
G
F
E
M6.8 M6.2M7.1M7.3M7.6M7.8M8.1
FD101B
FD101C
FD101A
FD101B
F D
B
F D
E
F D
B
F D
E
4 4
DEMO FIRE ALARM SYSTEM ONLY. REPLACE WITH
COMBINATION FIRE ALARM/MASS NOTIFICATION SYSTEM.
FIRE SPRINKLER PROTECTION AT HANGAR ROOF DECK TO
BE DEMOLISHED.
LEGEND
CONTRACTOR SHALL DEMOLISH THE EXISTING FIRE SPRINKLER AND HEF SYSTEMS TO
THE FULLEST EXTENT POSSIBLE WITH THE EXCEPTION OF SPRINKLER PROTECTION IN
THE TWO EXISTING SIMULATORS AND BLOCKHOUSE #2.
CONTRACTOR TO DISPOSE OF ALL DEMOLISHED COMPONENTS AND MATERIALS OFF
SITE IN ACCORDANCE WITH ALL FEDERAL REGULATIONS.
REMOVE ANY EXISTING SMOKE OR HEAT DETECTION IN RENOVATED AREAS WITHOUT
REPLACEMENT.
REMOVE DRAFT CURTAINS THROUGHOUT THE HANGAR WITHOUT REPLACEMENT.
EXISTING UNDERGROUND PIPING BENEATH THE HANGAR FLOOR TO BE ABANDONED IN
PLACE. PIPING TO BE FILLED WITH FLOWABLE FILL AND CAPPED AT THE FLOOR LEVEL.
PIPING SHALL BE CAPPED AND FINISHED LEVEL WITH THE EXISTING FLOOR LEVEL AND
MADE SUITABLE TO BE FINISHED TO MATCH ADJACENT SURFACES.
DEMOLITION NOTES:
1.
2.
3.
4.
5.
KEY NOTES:
EXISTING FIRE ALARM CONTROL PANEL TO BE DEMOLISHED.
EXISTING RISER ROOM TO BE RELOCATED. REVISE PIPING
AS SHOWN IN F-SERIES DRAWINGS.
EXISTING RISER ROOM TO REMAIN. REVISE PIPING AS
SHOWN IN F-SERIES DRAWINGS.
FILL ABANDONED UNDERGROUND PIPING WITH FLOWABLE
FILL. SEE GENERAL NOTE #5.
1 2 3 4 5
A
B
C
D
SHEET ID
P a rk w a y L a n e
S u it e
P e a c h tr e e C o rn e rs
G
A
P h o n e
-7
F a x
(6
-7
S
IZ
E
A N
S I D
F
IL
E N
A M
E
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
IS
S
U E
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
F
IL
E N
U M
B E
R
D A
T E
D E
S C
R
IP
T
IO
N M
A R
K
P a rk w a y L a n e
S u it e
P e a c h tr e e C o rn e rs
G
A
P h o n e
-7
F a x
(6
-7
/8
/2
:1
:3
P M
B
IM
/1
O
H A
N G
R e p a ir
H a n g a r B ld g
/1
O H
A N
G B
L D
G
M
E P
R
.r v t
FD101B
B-3 SUBMITTAL
F
IR
S T
F L
O O
R F
IR
E
P R
O T
E C
T
IO
N D
E M
O L
IT
IO
N
P L A
N
A R
E A
B
N L Z
G R
E P
A
IR
B U
IL
D
IN
G
R
IC
K E
N B
A C
K E
R I N
T E
R N
A T
IO
N
A L
A
IR
P O
R T
A
N G
O
H
IO
S
T A
IR
R
E F
U E
L
IN
G W
IN
G
R
IC
K E
N B
A C
K E
R A
N G
B
M
IN
U T
E M
A N
W A
Y C
O L
U M
B U
S O
H
-1
J O
B N
O
N D
S
D B
B T
H
A P
R
IL
N /A
W
L
-1
-D -0
-9
M
SCALE: 1/8" = 1'-0"A1
FIRST FLOOR FIRE PROTECTION DEMOLITION PLAN - AREA B
SCALE: = 1'-0"
0 8 168
1/8" 1ST FLOOR KEY PLAN
AREA "A"
AREA "B"
AREA "C"
AREA "D"
AREA "E"
AREA "F"
E N
T R
A N
E
A
IR
S
ID
E
N
D
C
A
B
M6.8 M6.2M7.1M7.3M7.6M7.8M8.1
FD101B
FD101C
F D
C
F D
F
1ST FLOOR KEY PLAN
AREA "A"
AREA "B"
AREA "C"
AREA "D"
AREA "E"
AREA "F"
E N
T R
A N
E
A
IR
S
ID
E
SCALE: = 1'-0"
0 8 168
1/8"
F D
C
F D
F
CONTRACTOR SHALL DEMOLISH THE EXISTING FIRE SPRINKLER AND HEF SYSTEMS TO
THE FULLEST EXTENT POSSIBLE WITH THE EXCEPTION OF SPRINKLER PROTECTION IN
THE TWO EXISTING SIMULATORS AND BLOCKHOUSE #2.
CONTRACTOR TO DISPOSE OF ALL DEMOLISHED COMPONENTS AND MATERIALS OFF
SITE IN ACCORDANCE WITH ALL FEDERAL REGULATIONS.
REMOVE ANY EXISTING SMOKE OR HEAT DETECTION IN RENOVATED AREAS WITHOUT
REPLACEMENT.
REMOVE DRAFT CURTAINS THROUGHOUT THE HANGAR WITHOUT REPLACEMENT.
DEMOLITION NOTES:
1.
2.
3.
4.
KEY NOTES:
REMOVE EXISTING HEF PIPING BACK TO
EXISTING CONTROL VALVE, INCLUDING
PIPING, FITTINGS, HANGERS, GENERATORS,
ETC.
1 2 3 4 5
A
B
C
D
SHEET ID
P a rk w a y L a n e
S u it e
P e a c h tr e e C o rn e rs
G
A
P h o n e
-7
F a x
(6
-7
S
IZ
E
A N
S I D
F
IL
E N
A M
E
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
IS
S
U E
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
F
IL
E N
U M
B E
R
D A
T E
D E
S C
R
IP
T
IO
N M
A R
K
P a rk w a y L a n e
S u it e
P e a c h tr e e C o rn e rs
G
A
P h o n e
-7
F a x
(6
-7
/8
/2
:1
:3
P M
B
IM
/1
O
H A
N G
R e p a ir
H a n g a r B ld g
/1
O H
A N
G B
L D
G
M
E P
R
.r v t
FD101C
B-3 SUBMITTAL
F
IR
S T
F L
O O
R F
IR
E
P R
O T
E C
T
IO
N D
E M
O L
IT
IO
N
P L A
N
A R
E A
C
N L Z
G R
E P
A
IR
B U
IL
D
IN
G
R
IC
K E
N B
A C
K E
R I N
T E
R N
A T
IO
N
A L
A
IR
P O
R T
A
N G
O
H
IO
S
T A
IR
R
E F
U E
L
IN
G W
IN
G
R
IC
K E
N B
A C
K E
R A
N G
B
M
IN
U T
E M
A N
W A
Y C
O L
U M
B U
S O
H
-1
J O
B N
O
N D
S
D B
B T
H
A P
R
IL
N /A
W
L
-1
-D -0
-9
M
SCALE: 1/8" = 1'-0"A1
FIRST FLOOR FIRE PROTECTION DEMOLITION PLAN - AREA C
N
C P
F A
C P
5 4 3 1 1a1b2
M
L
K
J
MJ.3
MH.9
MH.5
4.7 4.5 4.4 4.2
K.7
L.2
FD101D
FD101E
F D
A
F D
D
1 1
F D
A
F D
D
EXISTING FIRE ALARM AND FIRE SPRINKLER SYSTEMS TO
REMAIN. FIRE SPRINKLER PROTECTION AT HANGAR ROOF DECK
TO BE DEMOLISHED.
LEGEND
CONTRACTOR SHALL DEMOLISH THE EXISTING FIRE SPRINKLER AND
HEF SYSTEMS TO THE FULLEST EXTENT POSSIBLE WITH THE
EXCEPTION OF SPRINKLER PROTECTION IN THE TWO EXISTING
SIMULATORS AND BLOCKHOUSE #2.
CONTRACTOR TO DISPOSE OF ALL DEMOLISHED COMPONENTS AND
MATERIALS OFF SITE IN ACCORDANCE WITH ALL FEDERAL
REGULATIONS.
REMOVE ANY EXISTING SMOKE OR HEAT DETECTION IN RENOVATED
AREAS WITHOUT REPLACEMENT.
REMOVE DRAFT CURTAINS THROUGHOUT THE HANGAR WITHOUT
REPLACEMENT.
DEMOLITION NOTES:
1.
2.
3.
4.
KEY NOTES:
EXISTING FIRE ALARM CONTROL PANEL TO
REMAIN.
1 2 3 4 5
A
B
C
D
SHEET ID
P a rk w a y L a n e
S u it e
P e a c h tr e e C o rn e rs
G
A
P h o n e
-7
F a x
(6
-7
S
IZ
E
A N
S I D
F
IL
E N
A M
E
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
IS
S
U E
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
F
IL
E N
U M
B E
R
D A
T E
D E
S C
R
IP
T
IO
N M
A R
K
P a rk w a y L a n e
S u it e
P e a c h tr e e C o rn e rs
G
A
P h o n e
-7
F a x
(6
-7
/8
/2
:1
:4
P M
B
IM
/1
O
H A
N G
R e p a ir
H a n g a r B ld g
/1
O H
A N
G B
L D
G
M
E P
R
.r v t
FD101D
B-3 SUBMITTAL
F
IR
S T
F L
O O
R F
IR
E
P R
O T
E C
T
IO
N D
E M
O L
IT
IO
N
P L A
N
A R
E A
D
N L Z
G R
E P
A
IR
B U
IL
D
IN
G
R
IC
K E
N B
A C
K E
R I N
T E
R N
A T
IO
N
A L
A
IR
P O
R T
A
N G
O
H
IO
S
T A
IR
R
E F
U E
L
IN
G W
IN
G
R
IC
K E
N B
A C
K E
R A
N G
B
M
IN
U T
E M
A N
W A
Y C
O L
U M
B U
S O
H
-1
J O
B N
O
N D
S
D B
B T
H
A P
R
IL
N /A
W
L
-1
-D -0
-9
M
SCALE: 1/8" = 1'-0"A1
FIRST FLOOR FIRE PROTECTION DEMOLITION PLAN - AREA D
SCALE: = 1'-0"
0 8 168
1/8" 1ST FLOOR KEY PLAN
AREA "A"
AREA "B"
AREA "C"
AREA "D"
AREA "E"
AREA "F"
E N
T R
A N
E
A
IR
S
ID
E
N
5 4 3 1 1a1b2
H
G
F
E
4.7 4.5 4.4 4.2
FD101D
FD101E
FD101E
FD101F
10"
8"8"
4"
4"
4 4
F D
B
F D
E
F D
B
F D
E
EXISTING FIRE ALARM AND FIRE SPRINKLER SYSTEMS TO REMAIN
LEGEND
DEMO FIRE ALARM SYSTEM ONLY. REPLACE WITH
COMBINATION FIRE ALARM/MASS NOTIFICATION SYSTEM.
CONTRACTOR SHALL DEMOLISH THE EXISTING FIRE SPRINKLER AND HEF SYSTEMS TO THE FULLEST
EXTENT POSSIBLE WITH THE EXCEPTION OF SPRINKLER PROTECTION IN THE TWO EXISTING
SIMULATORS AND BLOCKHOUSE #2.
CONTRACTOR TO DISPOSE OF ALL DEMOLISHED COMPONENTS AND MATERIALS OFF SITE IN
ACCORDANCE WITH ALL FEDERAL REGULATIONS.
REMOVE ANY EXISTING SMOKE OR HEAT DETECTION IN RENOVATED AREAS WITHOUT REPLACEMENT.
REMOVE DRAFT CURTAINS THROUGHOUT THE HANGAR WITHOUT REPLACEMENT.
EXISTING UNDERGROUND PIPING BENEATH THE HANGAR FLOOR TO BE ABANDONED IN PLACE. PIPING TO BE FILLED WITH FLOWABLE FILL AND CAPPED AT THE FLOOR LEVEL. PIPING SHALL BE CAPPED AND FINISHED LEVEL WITH THE EXISTING FLOOR LEVEL AND MADE SUITABLE TO BE FINISHED TO
MATCH ADJACENT SURFACES.
DEMOLITION NOTES:
1.
2.
3.
4.
5.
KEY NOTES:
EXISTING RISER ROOM.
EXISTING HIGH EXPANSION FOAM CONCENTRATE STORAGE TANK TO BE REMOVED (275 GAL.).
RESUPPORT THIS PIPE AS REQUIRED TO ALLOW FOR INSTALLATION OF NEW WALLS. THE TWO
SUPPORTS ON THE LEFT WALL (NEAR THE EYE WASH) WILL NEED TO BE REMOVED AND RE-
SUPPORTED AS THEY WOULD BE EXPOSED IN THE NEW CORRIDOR. REROUTE/RELOCATE
AUXILIARY DRAIN AS NEEDED TO ACCOMMODATE NEW WALL AND CEILING LAYOUT.
REMOVE EXISTING HEF PIPING BACK TO EXISTING CONTROL VALVE, INCLUDING PIPING,
FITTINGS, HANGERS, GENERATORS, ETC.
FILL ABANDONED UNDERGROUND PIPING WITH FLOWABLE FILL. SEE GENERAL NOTE #5.
1 2 3 4 5
A
B
C
D
SHEET ID
P a rk w a y L a n e
S u it e
P e a c h tr e e C o rn e rs
G
A
P h o n e
-7
F a x
(6
-7
S
IZ
E
A N
S I D
F
IL
E N
A M
E
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
IS
S
U E
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
F
IL
E N
U M
B E
R
D A
T E
D E
S C
R
IP
T
IO
N M
A R
K
P a rk w a y L a n e
S u it e
P e a c h tr e e C o rn e rs
G
A
P h o n e
-7
F a x
(6
-7
/8
/2
:1
:4
P M
B
IM
/1
O
H A
N G
R e p a ir
H a n g a r B ld g
/1
O H
A N
G B
L D
G
M
E P
R
.r v t
FD101E
B-3 SUBMITTAL
F
IR
S T
F L
O O
R F
IR
E
P R
O T
E C
T
IO
N D
E M
O L
IT
IO
N
P L A
N
A R
E A
E
N L Z
G R
E P
A
IR
B U
IL
D
IN
G
R
IC
K E
N B
A C
K E
R I N
T E
R N
A T
IO
N
A L
A
IR
P O
R T
A
N G
O
H
IO
S
T A
IR
R
E F
U E
L
IN
G W
IN
G
R
IC
K E
N B
A C
K E
R A
N G
B
M
IN
U T
E M
A N
W A
Y C
O L
U M
B U
S O
H
-1
J O
B N
O
N D
S
D B
B T
H
A P
R
IL
N /A
W
L
-1
-D -0
-9
M
SCALE: 1/8" = 1'-0"A1
FIRST FLOOR FIRE PROTECTION DEMOLITION PLAN - AREA E
1ST FLOOR KEY PLAN
AREA "A"
AREA "B"
AREA "C"
AREA "D"
AREA "E"
AREA "F"
E N
T R
A N
E
A
IR
S
ID
E
SCALE: = 1'-0"
0 8 168
1/8"
N
C
A
B
4.7 4.5 4.4 4.2
FD101E
FD101F
F D
C
F D
F
4"
4"4"
4"
1 1
F D
C
F D
F
CONTRACTOR SHALL DEMOLISH THE EXISTING FIRE SPRINKLER AND HEF SYSTEMS TO
THE FULLEST EXTENT POSSIBLE WITH THE EXCEPTION OF SPRINKLER PROTECTION IN
THE TWO EXISTING SIMULATORS AND BLOCKHOUSE #2.
CONTRACTOR TO DISPOSE OF ALL DEMOLISHED COMPONENTS AND MATERIALS OFF
SITE IN ACCORDANCE WITH ALL FEDERAL REGULATIONS.
REMOVE ANY EXISTING SMOKE OR HEAT DETECTION IN RENOVATED AREAS WITHOUT
REPLACEMENT.
REMOVE DRAFT CURTAINS THROUGHOUT THE HANGAR WITHOUT REPLACEMENT.
DEMOLITION NOTES:
1.
2.
3.
4.
KEY NOTES:
REMOVE EXISTING HEF PIPING BACK TO EXISTING CONTROL VALVE, INCLUDING PIPING,
FITTINGS, HANGERS, GENERATORS, ETC.
1 2 3 4 5
A
B
C
D
SHEET ID
P a rk w a y L a n e
S u it e
P e a c h tr e e C o rn e rs
G
A
P h o n e
-7
F a x
(6
-7
S
IZ
E
A N
S I D
F
IL
E N
A M
E
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
IS
S
U E
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
F
IL
E N
U M
B E
R
D A
T E
D E
S C
R
IP
T
IO
N M
A R
K
P a rk w a y L a n e
S u it e
P e a c h tr e e C o rn e rs
G
A
P h o n e
-7
F a x
(6
-7
/8
/2
:1
:5
P M
B
IM
/1
O
H A
N G
R e p a ir
H a n g a r B ld g
/1
O H
A N
G B
L D
G
M
E P
R
.r v t
FD101F
B-3 SUBMITTAL
F
IR
S T
F L
O O
R F
IR
E
P R
O T
E C
T
IO
N D
E M
O L
IT
IO
N
P L A
N
A R
E A
F
N L Z
G R
E P
A
IR
B U
IL
D
IN
G
R
IC
K E
N B
A C
K E
R I N
T E
R N
A T
IO
N
A L
A
IR
P O
R T
A
N G
O
H
IO
S
T A
IR
R
E F
U E
L
IN
G W
IN
G
R
IC
K E
N B
A C
K E
R A
N G
B
M
IN
U T
E M
A N
W A
Y C
O L
U M
B U
S O
H
-1
J O
B N
O
N D
S
D B
B T
H
A P
R
IL
N /A
W
L
-1
-D -0
-9
M
SCALE: 1/8" = 1'-0"A1
FIRST FLOOR FIRE PROTECTION DEMOLITION PLAN - AREA F
SCALE: = 1'-0"
0 8 168
1/8"
1ST FLOOR KEY PLAN
AREA "A"
AREA "B"
AREA "C"
AREA "D"
AREA "E"
AREA "F"
E N
T R
A N
E
A
IR
S
ID
E
N
3 1 1a1b2
D
C
A
B
CONTRACTOR SHALL DEMOLISH THE EXISTING FIRE SPRINKLER AND HEF SYSTEMS TO
THE FULLEST EXTENT POSSIBLE WITH THE EXCEPTION OF SPRINKLER PROTECTION IN
THE TWO EXISTING SIMULATORS AND BLOCKHOUSE #2.
CONTRACTOR TO DISPOSE OF ALL DEMOLISHED COMPONENTS AND MATERIALS OFF
SITE IN ACCORDANCE WITH ALL FEDERAL REGULATIONS.
REMOVE ANY EXISTING SMOKE OR HEAT DETECTION IN RENOVATED AREAS WITHOUT
REPLACEMENT.
REMOVE DRAFT CURTAINS THROUGHOUT THE HANGAR WITHOUT REPLACEMENT.
DEMOLITION NOTES:
1.
2.
3.
4.
1 2 3 4 5
A
B
C
D
SHEET ID
P a rk w a y L a n e
S u it e
P e a c h tr e e C o rn e rs
G
A
P h o n e
-7
F a x
(6
-7
S
IZ
E
A N
S I D
F
IL
E N
A M
E
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
IS
S
U E
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
F
IL
E N
U M
B E
R
D A
T E
D E
S C
R
IP
T
IO
N M
A R
K
P a rk w a y L a n e
S u it e
P e a c h tr e e C o rn e rs
G
A
P h o n e
-7
F a x
(6
-7
/8
/2
:1
:5
P M
B
IM
/1
O
H A
N G
R e p a ir
H a n g a r B ld g
/1
O H
A N
G B
L D
G
M
E P
R
.r v t
FD102F
B-3 SUBMITTAL
S E
C O
N D
F L
O O
R F
IR
E
P R
O T
E C
T
IO
N D
E M
O L
IT
IO
N
P L A
N
A R
E A
F
N L Z
G R
E P
A
IR
B U
IL
D
IN
G
R
IC
K E
N B
A C
K E
R I N
T E
R N
A T
IO
N
A L
A
IR
P O
R T
A
N G
O
H
IO
S
T A
IR
R
E F
U E
L
IN
G W
IN
G
R
IC
K E
N B
A C
K E
R A
N G
B
M
IN
U T
E M
A N
W A
Y C
O L
U M
B U
S O
H
-1
J O
B N
O
N D
S
D B
B T
H
A P
R
IL
N /A
W
L
-1
-D -0
-9
M
SCALE: 1/8" = 1'-0"A1
SECOND FLOOR FIRE PROTECTION DEMOLITION PLAN - AREA F
SCALE: = 1'-0"
0 8 168
1/8"
1ST FLOOR KEY PLAN
AREA "A"
AREA "B"
AREA "C"
AREA "D"
AREA "E"
AREA "F"
E N
T R
A N
E
A
IR
S
ID
E
N
1d 1c 57 4 3 1 1a10 9 8 1b2
L
H
G
F
E
D
C
A
B
K
CONTRACTOR SHALL DEMOLISH THE EXISTING FIRE SPRINKLER AND HEF SYSTEMS AT THE ROOF LEVEL TO THE FULLEST EXTENT POSSIBLE.
CONTRACTOR TO DISPOSE OF ALL DEMOLISHED COMPONENTS AND MATERIALS OFF SITE IN ACCORDANCE WITH ALL FEDERAL REGULATIONS.
REMOVE ANY EXISTING SMOKE OR HEAT DETECTION IN RENOVATED AREAS WITHOUT REPLACEMENT.
REMOVE DRAFT CURTAINS THROUGHOUT THE HANGAR WITHOUT REPLACEMENT.
DEMOLITION NOTES:
1.
2.
3.
4.
DEMO AREA
LEGEND
EXISTING DRAFT CURTAINS TO BE REMOVED
1 2 3 4 5
A
B
C
D
SHEET ID
P a rk w a y L a n e
S u it e
P e a c h tr e e C o rn e rs
G
A
P h o n e
-7
F a x
(6
-7
S
IZ
E
A N
S I D
F
IL
E N
A M
E
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
IS
S
U E
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
F
IL
E N
U M
B E
R
D A
T E
D E
S C
R
IP
T
IO
N M
A R
K
P a rk w a y L a n e
S u it e
P e a c h tr e e C o rn e rs
G
A
P h o n e
-7
F a x
(6
-7
/8
/2
:1
:0
P M
B
IM
/1
O
H A
N G
R e p a ir
H a n g a r B ld g
/1
O H
A N
G B
L D
G
M
E P
R
.r v t
FD103
B-3 SUBMITTAL
H A
N G
A R
C E
IL
IN
G L
E V
E L F
IR
E
P R
O T
E C
T
IO
N D
E M
O L
IT
IO
N
P L A
N
N L Z
G R
E P
A
IR
B U
IL
D
IN
G
R
IC
K E
N B
A C
K E
R I N
T E
R N
A T
IO
N
A L
A
IR
P O
R T
A
N G
O
H
IO
S
T A
IR
R
E F
U E
L
IN
G W
IN
G
R
IC
K E
N B
A C
K E
R A
N G
B
M
IN
U T
E M
A N
W A
Y C
O L
U M
B U
S O
H
-1
J O
B N
O
N D
S
D B
B T
H
A P
R
IL
N /A
W
L
-1
-D -0
-9
M
SCALE: 1/16" = 1'-0"A1
HANGAR CEILING LEVEL FIRE PROTECTION DEMO PLAN
SCALE: = 1'-0"
0 16 3216
1/16"
N
L
H
G
F
E
D
C
A
B
K
J
M6.8 M6.2M7.1M7.3M7.6M7.8M8.1
MJ.3
MH.9
MH.5
4.7 4.5 4.4 4.2
K.7
L.2
F-101D
F-101E
F-101E
F-101F
F-101B
F-101C
F-101A
F-101B
F -1
A
F -1
D
F -1
C
F -1
F
AREA A
AREA B
AREA C
AREA D
AREA E
AREA F
1 1
1 1
LEGEND
NO NEW FIRE SUPPRESSION PIPING OR SPRINKLERS
ADDED IN THIS AREA. EXISTING FIRE SPRINKLER
SYSTEMS TO BE RECONNECTED TO NEW SUPPLY.
KEY NOTES:
PROPOSED LOCATION OF NEW OVERHEAD FIRE SPRINKLER WATER SUPPLY MAIN. EXACT
LOCATION TO BE DETERMINED AND COORDINATED BY FIRE SPRINKLER CONTRACTOR.
INTENT OF LOCATION AND ROUTING IS TO MAINTAIN THE MAIN LOCATION ABOVE OPEN
CORRIDORS AND OPEN AREAS AND NOT ABOVE LOWER OFFICE SPACES.
1 2 3 4 5
A
B
C
D
SHEET ID
P a rk w a y L a n e
S u it e
P e a c h tr e e C o rn e rs
G
A
P h o n e
-7
F a x
(6
-7
S
IZ
E
A N
S I D
F
IL
E N
A M
E
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
IS
S
U E
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
F
IL
E N
U M
B E
R
D A
T E
D E
S C
R
IP
T
IO
N M
A R
K
P a rk w a y L a n e
S u it e
P e a c h tr e e C o rn e rs
G
A
P h o n e
-7
F a x
(6
-7
/8
/2
:0
:3
P M
B
IM
/1
O
H A
N G
R e p a ir
H a n g a r B ld g
/1
O H
A N
G B
L D
G
M
E P
R
.r v t
F-100
B-3 SUBMITTAL
F
IR
S T
F L O
O R
F
IR
E S
U P
P R
E S
S
IO
N P
L A
N
O V
E R
A L L
N L Z
G R
E P
A
IR
B U
IL
D
IN
G
R
IC
K E
N B
A C
K E
R I N
T E
R N
A T
IO
N
A L
A
IR
P O
R T
A
N G
O
H
IO
S
T A
IR
R
E F
U E
L
IN
G W
IN
G
R
IC
K E
N B
A C
K E
R A
N G
B
M
IN
U T
E M
A N
W A
Y C
O L
U M
B U
S O
H
-1
J O
B N
O
N D
S
D B
B T
H
A P
R
IL
N /A
W
L
-1
-D -0
-9
M
SCALE: 1/16" = 1'-0"A1
FIRST FLOOR FIRE SUPPRESSION PLAN - OVERALL
SCALE: = 1'-0"
0 16 3216
1/16"
N
L
K
J
M6.8 M6.2M7.1M7.3M7.6M7.8M8.1
MJ.3
MH.9
MH.5
K.7
L.2
EXISTING HRF
STORAGE AREA
EXISTING BOSS
SIMULATOR
BOSS
PHARMACIST
TRN/TEST METI /
PEDIA SIM
CONF & MEETING
MED MATERIAL
EMTs
WEST VESTIBULE
MED READINESS
PLANNER
HEALTH SERVICES
ADMIN
BIOMED EQUIP
MAINT. & STOR
CORR
SIMULATOR
TRAINING OPEN
AREA
UNASSIGNED
SPACE
UNASSIGNED
SPACE
CORR
PHARM STOR
UNASSIGNED
SPACE
F-101A
F-101B
F -1
A
F -1
D
OH
OH
OH
OH
OH
EXISTING OFFICE
EXISTING STORAGE
OH
S1 S1
NS
NS
F -1
A
F -1
D
CORR
OH
ORDINARY HAZARD
0.20 GPM/SQ.FT OVER 2500 SQ.FT
250 GPM HOSE ALLOWANCE
K-FACTOR 8.0
LEGEND
OH
NO FIRE SUPPRESSION
SCOPE
LIGHT HAZARD
0.10 GPM/SQ.FT OVER 1500 SQ.FT
250 GPM HOSE ALLOWANCE
K-FACTOR 5.6
PROTECTED FROM
ABOVE (SEE F-103)
UNDER MEZZANINE STORAGE
0.40 GPM/SQ.FT OVER 2500 SQ.FT
500 GPM HOSE ALLOWANCE
K-FACTOR 11.2
S1
SEE SHEET F-001 FOR GENERAL NOTES AND LEGEND.
FIRE SUPPRESSION SYSTEM SHALL BE DESIGNED IN ACCORDANCE WITH UFC 3-600-01 AND NFPA 13. THE
ORDER OF PREFERENCE OF CODE SHALL BE:
1. UFC 3-600-01
2. NFPA 13
CONTRACTOR SHALL COORDINATE ALL NEW SPRINKLER WORK WITH OTHER TRADES.
PLANNED SYSTEM IMPAIRMENTS SHALL BE COORDINATED AND SCHEDULED WITH THE COR AND BASE FIRE DEPT. IN ACCORDANCE WITH NFPA 13, 25, AND 241. FIRE WATCH SHALL BE IMPLIMENTED WHEN REQUIRED, AND FIRE WATCH PERSONNEL SHALL BE QUALIFIED AND APPROVED BY COR AND BASE FIRE CHIEF/MARSHAL.
EXISTING SPRINKLERS IN AREAS NOT REQUIRING SPRINKLER SYSTEM ALTERATION TO REMAIN IN OPERATION AT ALL TIMES TO THE FULLEST EXTENT POSSIBLE, UNTIL CONNECTION TO NEW SPRINKLER SYSTEM IS MADE.
CONTRACTOR SHALL PROVIDE WHITE SEMI-RECESSED PENDENT SPRINKLERS WITH WHITE ESCUTCHEONS IN AREAS WITH FINISHED CEILINGS, AND STANDARD SPRAY QUICK RESPONSE UPRIGHT SPRINKLERS IN AREAS
WITH HARD OR EXPOSED CEILINGS.
ALL SPACES ARE LIGHT HAZARD OCCUPANCIES UNLESS OTHERWISE NOTED.
GENERAL NOTES:
1.
2.
3.
4.
5.
6.
7.
FIRE PUMP TEST DATA
SUCTION
PRESSURE
DISCHARGE
PRESSURE
NET
PRESS.
TOTAL DISCHARGE
0 PSI
FLOW
CHURN
FLOW #1
FLOW #2
FLOW #3
0 PSI
0 PSI
0 PSI
174 PSI
154 PSI
149 PSI
132 PSI
174 PSI
154 PSI
149 PSI
132 PSI
0 GPM
1503 GPM
3006 GPM
4509 GPM
FIRE PUMP DETAILS: 3000 GPM @ 150 PSI
NOTE: THE FIRE PUMP TEST WAS PERFORMED JULY 5, 2016 AT 8:00AM BY SPRINKLER
SYSTEM SERVICES.
KEY NOTES:
COORDINATE PENDENT SPRINKLERS WITH FOLDING PARTITION
SO THAT THEY DO NOT INTERFERE WITH THE MOVEMENT OF THE
PARTITION AS WELL AS PROVIDE PROPER SPRINKLER
COVERAGE WHEN THE PARTITION IS OPEN OR CLOSED. IF
SPRINKLERS ARE REQUIRED TO BE INSTALLED IN THE DOOR
POCKET STORAGE PORTION, ENSURE THAT SPRINKLER(2) ARE
NOT IN CONFLICT WITH THE DOOR MOVEMENT. CONCEALED TYPE
SPRINKLERS MAY BE REQUIRED IN THIS AREA.
1 2 3 4 5
A
B
C
D
SHEET ID
P a rk w a y L a n e
S u it e
P e a c h tr e e C o rn e rs
G
A
P h o n e
-7
F a x
(6
-7
S
IZ
E
A N
S I D
F
IL
E N
A M
E
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
IS
S
U E
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
F
IL
E N
U M
B E
R
D A
T E
D E
S C
R
IP
T
IO
N M
A R
K
P a rk w a y L a n e
S u it e
P e a c h tr e e C o rn e rs
G
A
P h o n e
-7
F a x
(6
-7
/8
/2
:0
:3
P M
B
IM
/1
O
H A
N G
R e p a ir
H a n g a r B ld g
/1
O H
A N
G B
L D
G
M
E P
R
.r v t
F-101A
B-3 SUBMITTAL
F
IR
S T
F L
O O
R F
IR
E
S U
P P
R E
S S
IO
N
P L A
N
A R
E A
A
N L Z
G R
E P
A
IR
B U
IL
D
IN
G
R
IC
K E
N B
A C
K E
R I N
T E
R N
A T
IO
N
A L
A
IR
P O
R T
A
N G
O
H
IO
S
T A
IR
R
E F
U E
L
IN
G W
IN
G
R
IC
K E
N B
A C
K E
R A
N G
B
M
IN
U T
E M
A N
W A
Y C
O L
U M
B U
S O
H
-1
J O
B N
O
N D
S
D B
B T
H
A P
R
IL
N /A
W
L
-1
-D -0
-9
M
SCALE: 1/8" = 1'-0"A1
FIRST FLOOR FIRE SUPPRESSION PLAN - AREA A
SCALE: = 1'-0"
0 8 168
1/8"
1ST FLOOR KEY PLAN
AREA "A"
AREA "B"
AREA "C"
AREA "D"
AREA "E"
AREA "F"
E N
T R
A N
E
A
IR
S
ID
EN
G
F
E
M6.8 M6.2M7.1M7.3M7.6M7.8M8.1
EXISTING MECH RM
EXISTING HRF
STORAGE AREA
HLTH
SVS TECH
AUDIO TESTING
AND ADMIN
1140 BEE
OUTPATIENT
RECORDS
PUBLIC
HEALTH OFFICE
1144A
READINESS OFFICE
BEE
LABORATORY
1145A
CORR
CONF & MEETING
OPEN SPACE
SIMULATOR
TRAINING OPEN
AREA
CORR
WEST VESTIBULE
WOMEN
CORR
TELECOMM 1
IMMUNIZATION
RESP FIT TEST
1131A
TRN
& TEST
CORR
CORR
ADMIN
OFFICE
PATIENT
WAITING AREA
DENTAL
EXAM 2
DENTAL EXAM 1
STOR
CORR
MEN
WOMEN
Block 2 Male Toilet
VEST
Block 2 TOILET
VEST
Block 2 Female Toilet VEST
SPRKLR RISER 2 /
WTR HEATER
STOR
WEST STAIR
1105A
SPRINKLER RISER 1
1124A
BREAK AREA
OPEN SPACE
TLT/SHWR
OPEN SPACE
F-101B
F-101C
F-101A
F-101B
OH
OH
OH
OH
OH
OH
OH
NS
MEN
STOR
1128A
X-RAY 1
1120A
CONTROLS
CORR
1120C
X-RAY 2
1120B
ANAM TESTING
1131B
LABORATORY
TLT
TLT
OH
NS
NS
NS
NS
NS NS NS
F
- 1
B
F
- 1
E
F
- 1
B
F
- 1
E
CORR
CORR
STOR.
1105F
WEST VESTIBULE
8 8
N
ORDINARY HAZARD
0.20 GPM/SQ.FT OVER 2500 SQ.FT
250 GPM HOSE ALLOWANCE
K-FACTOR 8.0
LEGEND
OH
NO FIRE SUPPRESSION
SCOPE
LIGHT HAZARD
0.10 GPM/SQ.FT OVER 1500 SQ.FT
250 GPM HOSE ALLOWANCE
K-FACTOR 5.6
PROTECTED FROM
ABOVE (SEE F-103)
SEE SHEET F-001 FOR GENERAL NOTES AND LEGEND.
FIRE SUPPRESSION SYSTEM SHALL BE DESIGNED IN ACCORDANCE WITH UFC 3-600-01 AND NFPA 13. THE
ORDER OF PREFERENCE OF CODE SHALL BE:
1. UFC 3-600-01
2. NFPA 13
CONTRACTOR SHALL COORDINATE ALL NEW SPRINKLER WORK WITH OTHER TRADES.
PLANNED SYSTEM IMPAIRMENTS SHALL BE COORDINATED AND SCHEDULED WITH THE COR AND BASE FIRE DEPT. IN ACCORDANCE WITH NFPA 13, 25, AND 241. FIRE WATCH SHALL BE IMPLIMENTED WHEN REQUIRED, AND FIRE WATCH PERSONNEL SHALL BE QUALIFIED AND APPROVED BY COR AND BASE FIRE CHIEF/MARSHAL.
EXISTING SPRINKLERS IN AREAS NOT REQUIRING SPRINKLER SYSTEM ALTERATION TO REMAIN IN OPERATION AT ALL TIMES TO THE FULLEST EXTENT POSSIBLE, UNTIL CONNECTION TO NEW SPRINKLER SYSTEM IS MADE.
CONTRACTOR SHALL PROVIDE WHITE SEMI-RECESSED PENDENT SPRINKLERS WITH WHITE ESCUTCHEONS IN AREAS WITH FINISHED CEILINGS, AND STANDARD SPRAY QUICK RESPONSE UPRIGHT SPRINKLERS IN AREAS
WITH HARD OR EXPOSED CEILINGS.
ALL SPACES ARE LIGHT HAZARD OCCUPANCIES UNLESS OTHERWISE NOTED.
GENERAL NOTES:
1.
2.
3.
4.
5.
6.
7.
KEY NOTES:
NEW ZONE #1 DRY-PIPE SYSTEM RISER SERVING HANGAR ROOF SPRINKLERS.
NEW ZONE #2 WET-PIPE SYSTEM RISER SERVING OFFICE AREA SPRINKLERS.
NEW ZONE #3 TO RE-SUPPLY EXISTING WET-PIPE SYSTEM RISER SERVING BOSS SIMULATOR SPRINKLER SYSTEM.
EXISTING BLOCKHOUSE #2 ZONE TO REMAIN. MAINTAIN EXISTING RISER AND RECONNECT TO NEW WATER SUPPLY.
NEW UNDERGROUND WATER SUPPLY ENTRY. SEE CIVIL DRAWINGS FOR CONTINUATION. SUPPLY NEW SPRINKLER RISERS IN THIS ROOM AND CONTINUE WATER SUPPLY UP TO HANGAR ROOF LEVEL AND ACROSS TO PROVIDE WATER
SUPPLY TO RISER ROOM 245 AND ROOM 1437.
WATER SUPPLY DROP FROM HANGAR ROOF LEVEL TO RE-SUPPLY EXISTING SPRINKLER RISERS.
EXISTING SPRINKLER PROTECTION IN THIS AREA TO REMAIN AS INSTALLED. SCOPE OF WORK IN THIS ROOM IS LIMITED
TO THE WATER SUPPLY TO EXISTING SPRINKLER RISERS.
NEW OVERHEAD WATER SUPPLY PIPING TO SUPPLY TWO OTHER RISER ROOMS. SEE F-100 FOR ROUTING GUIDANCE.
NITROGEN GENERATOR FOR DRY-PIPE SYSTEM. SEE ELECTRICAL DRAWINGS FOR POWER CONNECTION INFORMATION.
1 2 3 4 5
A
B
C
D
SHEET ID
P a rk w a y L a n e
S u it e
P e a c h tr e e C o rn e rs
G
A
P h o n e
-7
F a x
(6
-7
S
IZ
E
A N
S I D
F
IL
E N
A M
E
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
IS
S
U E
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
F
IL
E N
U M
B E
R
D A
T E
D E
S C
R
IP
T
IO
N M
A R
K
P a rk w a y L a n e
S u it e
P e a c h tr e e C o rn e rs
G
A
P h o n e
-7
F a x
(6
-7
/8
/2
:0
:4
P M
B
IM
/1
O
H A
N G
R e p a ir
H a n g a r B ld g
/1
O H
A N
G B
L D
G
M
E P
R
.r v t
F-101B
B-3 SUBMITTAL
F
IR
S T
F L
O O
R F
IR
E
S U
P P
R E
S S
IO
N
P L A
N
A R
E A
B
N L Z
G R
E P
A
IR
B U
IL
D
IN
G
R
IC
K E
N B
A C
K E
R I N
T E
R N
A T
IO
N
A L
A
IR
P O
R T
A
N G
O
H
IO
S
T A
IR
R
E F
U E
L
IN
G W
IN
G
R
IC
K E
N B
A C
K E
R A
N G
B
M
IN
U T
E M
A N
W A
Y C
O L
U M
B U
S O
H
-1
J O
B N
O
N D
S
D B
B T
H
A P
R
IL
N /A
W
L
-1
-D -0
-9
M
SCALE: 1/8" = 1'-0"A1
FIRST FLOOR FIRE SUPPRESSION PLAN - AREA B
1ST FLOOR KEY PLAN
AREA "A"
AREA "B"
AREA "C"
AREA "D"
AREA "E"
AREA "F"
E N
T R
A N
E
A
IR
S
ID
E
SCALE: = 1'-0"
0 8 168
1/8"
N
C
A
B
M6.8 M6.2M7.1M7.3M7.6M7.8M8.1
EXAM 2
EXISTING MECH RM
EXAM 5
EXAM 1
EXAM 3
EXAM 4
NURSE SERVICES
BEE
PHYSICIANS
OFFICES
OPEN SPACE
ADMIN / STAFF
VESTIBULE
FITNESS AREA
COMMANDER
CONF & MEETING
HLTH SVCES
ADMIN
FIRST
SGT
COMMANDER
SUPT
AERO MED PHYS
OPT
EXAM 1
OPT EXAM
CORR
MED ADMIN
OFFICER
SUPT
SOUTH
LOBBY
1156A
OPEN SPACE
VESTIBULE
TLT/SHWR
F-101B
F-101C
F -1
C
F -1
F
OH
OH
NS
NS
OH
LABORATORY
WASTE STOR
TLT
TLT
CORR
OH
NS
NS
F -1
C
F -1
F
SEE SHEET F-001 FOR GENERAL NOTES AND LEGEND.
FIRE SUPPRESSION SYSTEM SHALL BE DESIGNED IN ACCORDANCE WITH UFC 3-600-01 AND NFPA 13. THE
ORDER OF PREFERENCE OF CODE SHALL BE:
1. UFC 3-600-01
2. NFPA 13
CONTRACTOR SHALL COORDINATE ALL NEW SPRINKLER WORK WITH OTHER TRADES.
PLANNED SYSTEM IMPAIRMENTS SHALL BE COORDINATED AND SCHEDULED WITH THE COR AND BASE FIRE DEPT. IN ACCORDANCE WITH NFPA 13, 25, AND 241. FIRE WATCH SHALL BE IMPLIMENTED WHEN REQUIRED, AND FIRE WATCH PERSONNEL SHALL BE QUALIFIED AND APPROVED BY COR AND BASE FIRE CHIEF/MARSHAL.
EXISTING SPRINKLERS IN AREAS NOT REQUIRING SPRINKLER SYSTEM ALTERATION TO REMAIN IN OPERATION AT ALL TIMES TO THE FULLEST EXTENT POSSIBLE, UNTIL CONNECTION TO NEW SPRINKLER SYSTEM IS MADE.
CONTRACTOR SHALL PROVIDE WHITE SEMI-RECESSED PENDENT SPRINKLERS WITH WHITE ESCUTCHEONS IN AREAS WITH FINISHED CEILINGS, AND STANDARD SPRAY QUICK RESPONSE UPRIGHT SPRINKLERS IN AREAS
WITH HARD OR EXPOSED CEILINGS.
ALL SPACES ARE LIGHT HAZARD OCCUPANCIES UNLESS OTHERWISE NOTED.
GENERAL NOTES:
1.
2.
3.
4.
5.
6.
7.
ORDINARY HAZARD
0.20 GPM/SQ.FT OVER 2500 SQ.FT
250 GPM HOSE ALLOWANCE
K-FACTOR 8.0
LEGEND
OH
LIGHT HAZARD
0.10 GPM/SQ.FT OVER 1500 SQ.FT
250 GPM HOSE ALLOWANCE
K-FACTOR 5.6
PROTECTED FROM
ABOVE (SEE F-103)
KEY NOTES:
COORDINATE SPRINKLER LOCATION AND OBSTRUCTION REQUIREMENTS WITH
CEILING BAFFLES. SEE ARCHITECTURAL DRAWINGS FOR BAFFLE LOCATIONS
AND DIMENSIONS.
PROVIDE CORROSION RESISTANT SPRINKLERS AND ESCUTCHEONS IN THIS
AREA.
1 2 3 4 5
A
B
C
D
SHEET ID
P a rk w a y L a n e
S u it e
P e a c h tr e e C o rn e rs
G
A
P h o n e
-7
F a x
(6
-7
S
IZ
E
A N
S I D
F
IL
E N
A M
E
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
IS
S
U E
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
F
IL
E N
U M
B E
R
D A
T E
D E
S C
R
IP
T
IO
N M
A R
K
P a rk w a y L a n e
S u it e
P e a c h tr e e C o rn e rs
G
A
P h o n e
-7
F a x
(6
-7
/8
/2
:0
:4
P M
B
IM
/1
O
H A
N G
R e p a ir
H a n g a r B ld g
/1
O H
A N
G B
L D
G
M
E P
R
.r v t
F-101C
B-3 SUBMITTAL
F
IR
S T
F L
O O
R F
IR
E
S U
P P
R E
S S
IO
N
P L A
N
A R
E A
C
N L Z
G R
E P
A
IR
B U
IL
D
IN
G
R
IC
K E
N B
A C
K E
R I N
T E
R N
A T
IO
N
A L
A
IR
P O
R T
A
N G
O
H
IO
S
T A
IR
R
E F
U E
L
IN
G W
IN
G
R
IC
K E
N B
A C
K E
R A
N G
B
M
IN
U T
E M
A N
W A
Y C
O L
U M
B U
S O
H
-1
J O
B N
O
N D
S
D B
B T
H
A P
R
IL
N /A
W
L
-1
-D -0
-9
M
SCALE: 1/8" = 1'-0"A1
FIRST FLOOR FIRE SUPPRESSION PLAN - AREA C
SCALE: = 1'-0"
0 8 168
1/8" 1ST FLOOR KEY PLAN
AREA "A"
AREA "B"
AREA "C"
AREA "D"
AREA "E"
AREA "F"
E N
T R
A N
E
A
IR
S
ID
E
N
L
K
J
MJ.3
MH.9
MH.5
4.7 4.5 4.4 4.2
K.7
L.2
EXISTING BOSS
SIMULATOR
BOSS
NCOIC/QA OFFICE
SUPT
LAUNDRY
HELMET REPAIR
AIR CREW PPE
STORAGE LOCKERS
CORR
CSEL
CLASSROOM
AFE SHOP
STORAGE
SIMULATOR
TRAINING OPEN
AREA
FUME HOOD
WST-SIMULATOR
BAY
014W
HPU ROOM
013W
MAINT / PARTS
STORAGE
012W
COMPUTER ROOM
011W
INSTRUCTORS
010W
DEBRIEF A
007W DEBRIEF B
006W
SECURE VEST.
001W
SITE MGR
004WCOMM
009W
TOILET
008W
BREAK AREA
003W
WST-CORR
002W
VESTIBULE
015W
F-101D
F-101E
F -1
A
F -1
D
OH
OH
OH
OH
OH
AFE OFFICE
NS
F -1
A
F -1
D
S1
ORDINARY HAZARD
0.20 GPM/SQ.FT OVER 2500 SQ.FT
250 GPM HOSE ALLOWANCE
K-FACTOR 8.0
LEGEND
OH
NO FIRE SUPPRESSION
SCOPE
LIGHT HAZARD
0.10 GPM/SQ.FT OVER 1500 SQ.FT
250 GPM HOSE ALLOWANCE
K-FACTOR 5.6
STORAGE
0.40 GPM/SQ.FT OVER 2000 SQ.FT
500 GPM HOSE ALLOWANCE
K-FACTOR 11.2
PROTECTED FROM
ABOVE (SEE F-103)
S1
SEE SHEET F-001 FOR GENERAL NOTES AND LEGEND.
FIRE SUPPRESSION SYSTEM SHALL BE DESIGNED IN ACCORDANCE WITH UFC 3-600-01 AND…