About this file

This is a References, Resources, and Key Personnel form for the City of Palo Alto Utilities Department contract to perform secondary bushing repair and re-gasketing work on Transformer 21 at the Colorado Substation. The scope of work requires the selected contractor to furnish all labor, supervision, tools, equipment, materials, oil processing equipment, oil storage tanker with containment berm, testing instruments, safety equipment, transportation, hauling, and disposal services necessary to complete the project. The work includes pre-testing, partial draining and storage of non-PCB mineral oil, gasket replacement at bushing flanges and disturbed manways, pressure testing, oil processing and refill, post-testing, and demobilization with delivery of test and service documentation. The objective is to stop oil leakage and restore the operational integrity and service readiness of Transformer 21 in coordination with the City's designated project manager.

The form requests that bidders provide relevant references of similar projects satisfactorily completed within the last three years, including company name, address, contact information, phone number, email, completion date, and contract amount. Bidders must also provide a detailed inventory of plants, facilities, and equipment available for use on the proposed work, specifying quantity, name, type, model, capacity, condition, and location. Additionally, bidders are required to identify their management staff assigned to manage the proposed work or services, including name and field of expertise, capabilities, and experience for each personnel member identified.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

References, Resources, and Key Personnel

Provide relevant references of similar projects satisfactorily completed in the last three (3) years:

If applicable, provide a list of the plant(s), and/or facilities, and equipment owned by the Bidder which are available for use in connection with the proposed work as may be required herein.

QUANTITY NAME/TYPE/MODEL, CAPACITY, ETC. CONDITION LOCATION

(INCLUDE ADDITIONAL PAGES IF NECESSARY)

Provide a list of the Bidder’s management staff who will manage the proposed work or services.

NAME FIELD OF EXPERTISE/CAPABILITIES/EXPERIENCE

(INCLUDE ADDITIONAL PAGES IF NECESSARY)

COMPANY NAME

AND ADDRESS

CONTACT/PHONE

NUMBER/EMAIL

DATE

COMPLETED

CONTRACT

AMOUNT