Colorado Transformer-21; Secondary Bushing Repair
Solicitation number
RFQ197538
Issued by
Santa Clara County, California

About this file

This is a bid form issued by the City of Palo Alto Utilities Department for the removal and replacement of gaskets on the secondary bushings of Transformer 21 at the Colorado Substation. The project, identified as Request for Quotation (RFQ) Number 197541, requires a qualified contractor to furnish all labor, supervision, tools, equipment, materials, oil processing equipment, oil storage tanker with containment berm, testing instruments, safety equipment, transportation, hauling, disposal, and incidental services necessary to complete the secondary bushing re-gasketing work. The work scope includes pre-testing, partial draining and storage of non-PCB mineral oil, gasket replacement at bushing flanges and any disturbed manways, pressure testing, oil processing and refill, post-testing, demobilization, and delivery of test and service documentation. The objective is to stop oil leakage and restore the integrity and service readiness of Transformer 21 in coordination with the City's designated project manager. The bid form does not specify response deadlines, site visit requirements, or bidder conferences within the document provided.

The bid structure includes a Base Bid presented as a lump sum amount, Supplemental Unit Pricing for potential additional work authorized by Field Order and/or Change Order, Additive Alternate Bids, and Deductive Alternate Bids, all of which must include applicable taxes, profit, insurance, bonds, and overhead. Bidders are required to acknowledge receipt of any addenda issued during the procurement process and must provide a Subcontractor Listing. All bidders and subcontractors must be duly licensed as contractors with the State of California as required by California Business & Professions Code Section 7028. The bid form requires bidder representations and warranties regarding the accuracy of submitted information, absence of collusion, authority to enter into contract, and full knowledge of project site conditions. Actual contract quantities may vary from estimated amounts, with the resulting contract sum subject to adjustment pursuant to the General Conditions.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID FORM

City Council/City Manager Name of Company ______________________________ City of Palo Alto Palo Alto, California

In response to this Request for Quotation (RFQ), the undersigned, as Bidder, declares that the only persons or parties interested in this Bid as principals are those named herein; that this Bid is made without collusion with any other person, firm or corporation; that the Bidder has carefully examined the location of the proposed work and the plans and specifications herein referred to; and that the Bidder proposes and agrees, if this Bid is accepted, to contract with the City of Palo Alto (City), to provide all necessary materials, equipment, tools, apparatus, and other means of transport services, and to do all the Work and comply with all the specified requirements in this RFQ, in the manner herein prescribed and for the prices stated in the following Bid:

Project Title: Maybell Transformers 20 and 21 De-energized Tap Changer repair, Request for Quotation (RFQ) Number 197541

Note: All of the approximate quantities provided by City on this Bid Form are estimated amounts for bidding purposes only. Actual quantities may be greater or less than the estimated amount depending on circumstances encountered during construction of the Project, and the resulting Contract Sum will be subject to adjustment for actual quantities pursuant to Section 7.2.9 of the General Conditions.

A. Base Bid: Provide all labor, equipment material, transportation and applicable taxes, profit, insurance, bonds and other overhead to perform the Work in accordance with the Project Plans and Technical Specifications, herein:

BID ITEM
APPROX.QTY.
UNIT
DESCRIPTION, WITH UNIT PRICE IN WORDS

(EACH BID ITEM SHALL INCLUDE ALL APPLICABLE TAXES, PROFIT, INSURANCE, BONDS, AND OTHER OVERHEAD)

UNIT PRICE
TOTAL ITEM PRICE
001
1
Lump Sum
BASE BID
$
$

Base Bid Total

(Total in words: ______________________________________________________)

B. Supplemental Unit Pricing (SUP): Provide Supplemental Unit Pricing fully inclusive of all labor, equipment, material, transportation and applicable taxes, profit, insurance bonds and other overhead to perform the potential SUP work specified below, which will be a binding unit price only if the City elects to add the SUP work to the Project requirements by Field Order and/or Change Order based on conditions arising following award of the Contract as further specified in the Special Provisions, and in accordance with the Project Plans and Technical Specifications, herein:

BID ITEM
APPROX.QTY.
UNIT
DESCRIPTION, WITH UNIT PRICE IN WORDS

(EACH BID ITEM SHALL INCLUDE ALL APPLICABLE TAXES, PROFIT, INSURANCE, BONDS, AND OTHER OVERHEAD)

UNIT PRICE
TOTAL ITEM PRICE

1.

Supplemental Unit Pricing Total (item 1)

C. Additive Alternate Bid: Provide all labor, equipment material, transportation and applicable taxes, profit, insurance, bonds and other overhead to perform the Work in accordance with the Project Plans and Technical Specifications, herein:

BID ITEM
APPROX.QTY.
UNIT
DESCRIPTION, WITH UNIT PRICE IN WORDS

(EACH BID ITEM SHALL INCLUDE ALL APPLICABLE TAXES, PROFIT, INSURANCE, BONDS, AND OTHER OVERHEAD)

UNIT PRICE
TOTAL ITEM PRICE

Additive Alternate Bid Total (items ______ through ______)

D. Deductive Alternate Bid Total: Provide all labor, equipment material, transportation and applicable taxes, profit, insurance, bonds and other overhead to perform the Work in accordance with the Project Plans and Technical Specifications, herein:

BID ITEM
APPROX.QTY.
UNIT
DESCRIPTION, WITH UNIT PRICE IN WORDS

(EACH BID ITEM SHALL INCLUDE ALL APPLICABLE TAXES, PROFIT, INSURANCE, BONDS, AND OTHER OVERHEAD)

UNIT PRICE
TOTAL ITEM PRICE

Deductive Alternate Bid Total (items ______ through ______)

E. Addenda:

During the Bid process there may be changes to the Contract Documents, which would require an issuance of an addendum or addenda. City disclaims any and all liability for loss, or damage to any Bidder who does not receive any addendum issued by City in connection with this IFB. Any Bidder in submitting a Bid is deemed to waive any and all claims and demands Bidder may have against City on account of the failure of delivery of any such addendum to Bidder. Any and all addenda issued by City shall be deemed included in this IFB, and the provisions and instructions therein contained shall be incorporated to any Bid submitted by Bidder.

To assure that all Bidders have received each addendum, the following acknowledgment and sign-off is required. Failure to acknowledge receipt of an addendum/addenda may be considered an irregularity in the Bid:

Addendum:Date Received:Addendum:Date Received:
#01_____________#06_____________
#02_____________#07_____________
#03_____________#08_____________
#04_____________#09_____________
#05_____________#10_____________

Or, □ _____ No Addendum/Addenda Were Received (check and initial).

F. The Bidder represents that it has not retained a person to solicit or secure a City contract (upon an agreement or understanding for a commission, percentage, brokerage, or contingent fee) except for retention of bona fide employee or bona fide established commercial selling agencies for the purpose of securing business.

G. Bidder's Representations and Warranties. The Bidder represents and warrants:

1. That any information submitted by the Bidder prior to the award of Contract, or thereafter, upon request, whether or not submitted under a continuing obligation by the terms of the Contract to do so, is true and correct at the time such information is submitted or made available to the City;

2. That the Bidder has not colluded, conspired, or agreed, directly or indirectly, with any person in regard to the terms and conditions of the Bidder's Bid, except as may be permitted by this Invitation for Bids;

3. That the Bidder has the power and authority to enter into this Contract with the City, that the individual(s) executing this Contract are duly authorized to do so by appropriate resolution (if applicable), and that this Contract shall be executed, delivered and performed pursuant to the power and authority conferred upon the person or persons authorized to bind the Bidder;

4. That the Bidder has not attempted to exert undue influence with the Purchasing Manager, Contract Administrator, Project Manager or any other person who has directly participated in the decision to award the Contract to the Bidder;

5. That the Bidder has furnished and will furnish true and accurate statements, records, reports, resolutions, certifications, and other written information as may be requested of the Bidder by the City during the term of this Contract;

6. That the Bidder and all its subcontractors performing work on this Project are duly licensed as a contractor with the State of California as required by California Business & Professions Code Section 7028, as amended;

7. That the Bidder has fully examined and inspected the Project site and has full knowledge of the physical conditions of the Project site; and,

8. That there are no claims or disputes between the Bidder and the City which would materially affect the Bidder's ability to perform under the Contract.

Bidder’s Designated Contact Person:

Name:______________________________________________________________________
Title:______________________________________________________________________
Phone:______________________________________________________________________
Fax:______________________________________________________________________
Email:______________________________________________________________________

H. Subcontractor Listing. The Bidder will complete the Subcontractor Listing form included below.

I. Bidder Acknowledgement. By submitting a Bid, the Bidder acknowledges that it has received the Instructions to Bidders and agrees to its terms and to the terms of all other Contract Documents.

Firm: ____________________________________________________________________________

Signature*: ________________________________

Name: ________________________________

* The signatory represents and warrants that he or she has the legal capacity and authority to bind the Bidder.