This is a Capital Work Summary document for Columbia Association (CA), a Maryland-based organization managing approximately 56 facilities totaling approximately 700,000 square feet. The document lists recent capital improvements completed at CA facilities between 2009 and 2025, detailing the scope of work performed at each location. Projects encompass a wide range of facility types including neighborhood centers, bath houses, meeting rooms, golf clubs, tennis clubs, athletic facilities, and community centers. Work completed includes major renovations (full interior renovations with fixtures, finishes, and roof replacements), HVAC system upgrades, ADA accessibility improvements, sprinkler and fire alarm system installations, elevator additions, locker room renovations, and structural rebuilds. Notable major projects include the Art Center (2024) with major interior renovation and new systems, Supreme Sports Club (2019-2025) undergoing multiphase major renovation, Stonehouse (2024) with major interior renovation and system upgrades, and several facilities receiving complete rebuilds such as Dorsey Hall Bath House (2016) and Owen Brown Tennis Club (2016).

This document serves as a reference resource documenting the recent capital investment history at CA facilities and directly supports the related Long-Term Capital Plan contract opportunity, which seeks a qualified multidisciplinary consulting team to develop a comprehensive 30-Year Facilities Strategic Master Plan. The plan will evaluate existing facilities—many approximately 50 years old—and provide recommendations for renovation, replacement, relocation, new construction, and decommissioning. The consultant team will establish a 30-year facilities vision with an actionable initial 10-year capital implementation plan supported by cost modeling, evaluate ADA accessibility considerations at a planning level, and categorize approximately 56 facilities as major or minor during initial analysis, with major facilities receiving full analysis and minor facilities receiving abbreviated review. The ultimate objective is to provide CA leadership and the Board of Directors with a defensible, prioritized, and financially feasible roadmap for facility investment decisions supporting asset preservation, modernization, accessibility improvements, operational efficiency, and long-term financial sustainability.

View the file

Other files

File Type Posted
Major and Minor Facilities.xlsx XLSX spreadsheet
Minority Business Enterprise (MBE) Participation Form.docx DOCX document
27-10 Long Term Capital Plan.pdf PDF
CA Facility Square Footage.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Facility Year General Scope

Amherst House 2012; 2019 Full building interior; sprinkler replacement

Art Center 2024 Major interior renovation: fixtures and finishes, new fire alarm, new sprinkler system, elevator & lobby addition, Roof (75%)

Athletic Club 2018 Major full building renovation and addition: Roof (50%), HVAC (90%), Flooring, Locker Rooms, Spa Addition

Bryant Woods Neighborhood Center

2017 Minor interior - flooring, lighting, ceilings, Roof

Bryant Woods Bath House

2017 Minor bathhouse interior upgrades

Claret Hall 2020, 2024 HVAC, Roof

Clarys Forest Bath House

2022-2024 Minor bathhouse interior upgrades, siding, roof

Columbia Gym 2017 – 2024 HVAC, interior improvements: flooring, millwork, lighting

Community Operations Center

2018, 2021 Sprinkler, Roof

Dasher Green Bath House

2019 Full interior - fixtures, finishes, countertops, roof

Dickinson Bath House

2017 Minor bathhouse interior upgrades, roof

Dorsey Hall Bath House

2016 Complete rebuild

Dorsey Search Meeting Room

2016 Complete rebuild

Fairway Hills Golf Club

2018 Clubhouse interior renovation

Faulkner Ridge Neighborhood Center

2025 Full interior - fixtures, finishes, cabinets, countertops, roof

Faulkner Ridge Bath House

2022 Full interior - fixtures, finishes, countertops

Hawthorn Center 2018; 2020;

ADA restroom; kitchen renovation; flooring, roof

Hawthorn Bath House

2015 Full interior ADA renovation

Hobbit’s Glen Golf Club

2015 Full rebuild

Hobbit's Glen Bath House

2024 Full interior - fixtures, finishes, countertops

Hopewell Bath House

2019 Minor bathhouse interior upgrades, roof

Huntington Bath House

2023 Full interior - fixtures, finishes, countertops

Ice Rink 2018-2019 Roof (25%), HVAC, Flooring, Ice Equipment

Jeffers Hill Bath House

2022 Full interior - fixtures, finishes, countertops, roof

Kahler Hall 2019 -2020 Roof, Lobby renovation, HVAC (50%)

Kendall Ridge Bath House

2014 Full interior ADA renovation

Linden Hall 2017, 2018, HVAC, Roof, Flooring, Restroom improvements jbennett Typewritten Text Recent Capital Work at CA Facilities

Locust Park Neighborhood Center

2022 Major interior renovation; ADA bathroom addition, Roof

Locust Park Bath House

2023 Full interior - fixtures, finishes, countertops

Longfellow Neighborhood Center

2014, 2019 Full interior ADA renovation, Roof

Longfellow Bath House

2016 Full interior ADA renovation

Long Reach Tennis Club

2018 New building

Macgills Common Meeting Room

2015, 2023 Full interior - fixtures, finishes, countertops, Roof, HVAC

Oakland Manor 2024-25 Elevator addition, HVAC

Other Barn 2018, 2021, Roof, HVAC (50%), 2nd floor ADA restroom added

Owen Brown Community Center

2011, 2021 Full building renovation, Roof (90%)

Owen Brown Tennis Club

2016 Full rebuild of facility

Phelps Luck Bath House

2018 Full interior - fixtures, finishes, countertops, Roof

River Hill Meeting Room

2018-2024 Full interior - fixtures, finishes, cabinets, countertops, roof, HVAC

River Hill Bath House

2015 Full interior ADA renovation

Running Brook Neighborhood Center

2025 Full interior - fixtures, finishes, cabinets, countertops, roof

Running Brook Bath House

2022 Full interior - fixtures, finishes, countertops

Slayton House 2019 Roof, HVAC (50%)

Sports Park 2022-2023 Main floor interior - flooring, drywall repair, countertops, restroom fixtures and finishes

Stevens Forest Neighborhood Center

2025 Full interior - fixtures, finishes, countertops

Stevens Forest Bath House

2013-14 Full interior ADA renovation

Stonehouse 2024 Major interior renovation: finishes, fire alarm, sprinkler system, elevator & lobby addition, Roof (75%)

Supreme Sports Club

2019 - 2025 Multiphase major renovation: Roof (75%), HVAC, Flooring, Locker Rooms

Swansfield Neighborhood Center

2024 Full interior - fixtures, finishes, cabinets, countertops, roof

Swansfield Bath House

2009 Full interior ADA renovation

Swim Center 2017-2018 Major full building renovation and addition: Roof, HVAC, Flooring, Locker Rooms, Slide & Stair Tower

Thunder Hill Bath House

2021 Full interior - fixtures, finishes, countertops, roof

Youth & Teen Center at the Barn

2018, 2021 Roof, HVAC